Loading...
HomeMy WebLinkAboutDrainage Report -, ,". u u ~1 Schneider IRWIN UNION BANK CARMEL, INDIANA DEVELOPER: TODD WILLIAMS AND ASSOCIATES 418 Third Street Columbus, IN 47201 DESIGNER: PRK THE SCHNEIDER CORPORATION 12821 E. New Market Street, Suite 301 Carmel, IN 46032 317-569-8112 317-826-6410 Fax April 18, 2007 R:\I2J 1 \034\drainage\1211,034 Drainage ReporLdoc '. ."- "~\ ...... _J. u TABLE OF CONTENTS Drainage Summary Existing Basin Map Storm Sewer Calculations Times of Concentrations Rational Method Calculations Pipe Sizing Calculations Storm Sewer Basi n Map R:\1211\034\drainage\ 121 U134 Drainage Report,doc u Appendix A Appendix B u u DRAINAGE SUMMARY DESIGN CRITERIA The drainage calculations and design for the Carmel Science and Technology Park Block 11 Development are petiormed by The Schneider Corporation. Drainage data for the overall site including retention pond and water quality design are included the Carmel Science and Technology Park Block 11 Development prepared by The Schneider Corporation dated January 17, 2007. The drainage calculations for the Irwin Union Bank Site are based on given data and design criteria as follows: Site location: Irwin Union Bank is a proposed commercial development located on approximately 1.24 acres. The site is part of the Carmel Science and Technology Park Block 11 Development in Carmel, Hamilton County, Indiana. The development is located at the south corner of the intersection of Carmel Drive and City Center Drive. Terrain and existing ground condition: The site is currently a vacant lot covered with grass. The overall site has 2' of relief, with elevations ranging from 842 M.S.L. at the northeast boundary of the site to 844 M.S.L. at the south boundary of the site. Existing runoff generally drains from southwest to northeast toward an existing retention pond approximately 300 feet east of the site. Adjoining land conditions: North: South: East: West: Commercial Commercial Commercial Commercial Soil types: Soils maps from the United States Department of Agriculture, Soil Conservation Service identify Brookston, Crosby, Shoals, and Miami soils on the subject site. Brookston (Bs) and Miami (MmB2) are a part of hydrologic group B, while Crosby (erA) and Shoals (Sh) are a part of hydrologic group C. The majority of the site is MmB2 and Brookston with only small portions of Sh and CrA. R\121 1 \034\drainagc\J 211.034 Drainage Report.doc u u Site Drainage Design: Refer to the Carmel Science and Technology Park Block 11 Drainage Report prepared by The Schneider Corporation, dated January 17, 2007 for overall site design, retention facility design and calculations, and water quality design and calculations. The Irwin Union Bank Site is part of Basin #603. A retention facility serving the site will be constructed approximately 300 feet east of the Irwin Union Bank Site. Storm sewer will convey runoff from the Irwin Union Bank Site to the existing retention pond. 3 curb inlets will be constructed to collect stormwater from the site. The inlets and pipes serving the site have been designed according to the City of Carmel Storm Sewer Design Standards to convey the 1 O-year storm. Additionally, storm pipes under pavement have been designed for a minimum 2.5 feet of cover. All of the pipes serving the Irwin Union Bank Site will meet these requirements. The 1 OO-year flood elevation of the pond is 836.00 ft. The 1 OO-year flood elevation of the existing retention pond was taken from the drainage report for Carmel Science and Technology Park Block 11 Drainage Report prepared by The Schneider Corporation, dated January 17,2007. The Irwin Union Bank Building finished floor elevation is 844.05 ft, which is well above the minimum flood protection grade of 838.00 ft. According to the Carmel Science and Technology Park Block 11 Drainage Report, an Aquaswirlâ„¢ structure will be installed in the storm sewers downstream of the Irwin Union Bank Site. The structure will treat water from the site prior to entering the retention pond. REFERENCES Design methods and data are based on the following references: 1. HERPICC County Storm Drainage Manual 2. Hamilton County Solis Survey 3. 210-VI-TR-55, Second Ed., June 1986 4. Indianapolis Stormwater Design and Specifications Manual 5. SCS National Engineering Handbook, Section 4 R:\12] ] \034\dra i nagc\] 21 I .034 Drainage ReporLdoc w u . .... :ir'~lI;Q:~;,'~':J1jW;~R:lllE$I~N.' . Appendix B R:\1211\034\drainage\ 1211.034 Drainage Reporl.doc STORl\tI SEWER DESIGN CALCULATIONS -RA TIONAL METHOD- PROJECT: fnvin Unioin Bank - Carmel STORM: 10 Year JOB #: J 2 1 1.(J34 COMPUTED BY: PRK DATE' 4/18/07 SHEET NO.: ,',... .. .. ..~.,,, ,," -< 0".".""",".'''''''_0''._' "N_" ,. i.',"S:rE,OCTURE',.:' " ., , "';,,'i -"'. m 'i. 'BAS, 'H,'" .-., .. i"~~;"":'i' ':'i' ii ."ii' m' Ai:!, ,': 'i" """".",,,,~ S06 603 606 0.82 0.'19 0.16 5 6.98 1.09 0.16 5 6.98 1.09 0.42 605 604 605 0.70 0.46 0.32 5 6.98 2.25 0.32 5 6.98 2.25 1.29 604 603 604 075 0.61 0.46 5 6,98 3.20 0.78 6 6.61 5.15 0.85 - - ----- --- - - 4/18/2007 2:11 PM c c Time of Concentration Worksheet PROJECT Irwin Unioin Bank - Carmel Based on TR-55 10B#. 1211.034 Date: 4/ J 8/07 ,.~.... .~. Typic~ll valut-s for ~rlm1Mingts 11 Overlanu Fluw Channel Flow short gras:':: IUS gra~s om f<.mn, > 200~, cUL,~r n.17 con(t'ele oms 2. yea!', 1':1, hOll.-nlLnf:JII :;;;; inches dens-c grass 0.24 rip-raIl o.ms minimum"]' c= 5.0U minutes - IJjJ\'l'I1lClll 0.0] I Ii ~ __ B ~ i,'~.i~ 604 lUO 1.00 0.01 2 60 1.00 P 2.03 0 5 605 120 100 0.01 2 90 1.00 P 2.03 1 5 606 70 1.50 0.01 1 40 1.00 P 2.03 0 5 - - ~ 4/18/2007 2:10PM c c '-OG::: 01 wq[R O~ - M,~RC, lB. 200,1 ) LOT 4 ~ I / I A -i~- I ASSlIMED NORfH ""30' P'OND HOLEY 1dOl.E'l' SA.Y8- "DON'T 0lCl ~~:ND' ~"-'" ~~- "rrs TI-lE LAW' t:a~582~s44 ~~,~~~~~~~:~,:~ ~*?~~:i-:~ ~~~1~!~: ~~ Schneider ;~~<~~r~~~r~~ ;,~~~.~~ ~;d:~~ j~~um fc>; ..Ij'J.I1:~Ii.,~~1Q ....._.O"..~~cc.l>.com g~~~~~:~t.:~rng i":l~ . ll'l; Ho}""! BII~c.~' Serw+en ""i~~tlHi91'l l.cI>d...r~"'II 1..-'H:Ill.c:~Mc.IlI:*C:i..rt r"C"l;llYlcl~~ l:~","ee-r"~ ;..'" ";~~ ,........, PP.~ llo(".~l<<lDlL\.l~'.I.G~ ~,;,"~~'l""'~,,-.. i~-Jl r--' \ ;p- I \ 07:::: )) OM e":l:j ;::O:::d ~O Z // ,...., ;;/ r-- / 0 ( I ----j N I ! ( ~~~ " I / -I ~ - / -----0----- ~ ~I r;- I r > t;l I ~. ~ AJ-'lI =--- ~ 8 - rtEl ~ 0. ~ I 'i' ~. ',J!J\ _~ le-.....~ I ~=1 ~_:' _ _ .~ .ii JH.~ ~ico. \ 'i\~!2~ ~ ~l~^~e!il~~ _. 0" -i ~ ~!.;;.~~~ . ~ ~jlU ti~