Loading...
HomeMy WebLinkAboutCorrespondence TAC Page 1 of 1 .e.~.~_.e~~._.~~....~.~~.=IQrQ.. Q~~:e.p-,li .~ .." _........... ...__.... ...._ m_._ .... ---. . Griffin, Matt L From: Brewer, Scott I Sent: Friday, July 14, 20064:59 PM To: Griffin, Matt L; 'Charlie Frankenberger' Cc: Duncan, Gary R; Holmes, Christine B; Ryg, Karyn Subject: Clay Creek Subdivision COpy Dear Charlie: In light of the Mayor's email, I spoke to both Gary Duncan and Karyn Ryg of the Engineering Department as to their agreement with the changes proposed by the developers of Clay Creek in the street profile for Meeting House Road. They have not agreed to forgo the 10 foot path on the North side of the roadway adjacent to the Village of West Clay. Therefore, the mitigation or replanting of the woodlands can not take place in that location. Another option should be proposed. Suggested options are: 1. Place a common area between the property edge and the roadway. This could take care of the bufferyard requirements and the mitigation area. 2. Reduce the amount of woodlands that are being taken. A number of lots could be added to for a conservation lot 3. Commit to woodland preservation on wooded lots by establishing tree preservation easements, and what can be down in those easements on the plat. Any suggested changes need to be confirmed in writing and by amended plan. Scott Brewer, City Forester Environmental Planner, DOCS City of Carmel, One Civic Square Carmel, IN 46032 PH: 317-571-2478 FAX: 317-571-2426 7/14/2006 City of Carmel Viaemail: Charlie@nf-Iaw.com Original by mail June 23, 2006 Charlie Frankenberger Nelson & Frankenberger, P.C. 3105 East 98th Street Suite 170 Indianapolis, Indiana 46280 copy RE: Clay Creek Primary Plat (06050020 PP; 06050021 SW; 06050022 SW; 06050023 SW) Dear Mr. Frankenberger: This letter is in response to your primary plat application and subdivision waiver applications for Clay Creek. Comments and concerns are as follows: 1. A copy of the landscape plan approvalletterle-mail from the Urban Forester is required prior to Secondary Plat approval. 2. Add Docket Number to Plat (06050020 PP). 3. Please show the proposed alternative transportation paths along Meeting House Road, and Hoover Road. 4. Please provide sample elevations for the proposed houses. 5. Please consider adding a stub street to connect to the east. Please wait to submit revised materials until after the Technical Advisory Committee (T AC) has met on this application. The resubmitted materials should include edits addressing the above comments along with any requirements that arise from the TAC meeting. Additional comments may be made after the requested revisions have been submitted. Sincerely, M7f .cj?~.~A~ Christine Barton-Holmes Planning Administrator 06050020 PP Clay Creek Page 1 ONE CIVIC SQUARE CARlvffiL, INDIAi~A 46032 317/571-2417 + Cr June 22,2006 JAMES BRAINARD, l\1AYOR Mr. Arthur L. Kaiser, L.S. Evergreen Planners, LLC 234 South Franklin Road lndianapoLis, [N 46219 RE: Clay Creek Primary Plat-Project Review #1 Dear Mr. Kaiser: Ci.sLOS002o W We have reviewed the plans submitted for review at the June 21, 2006 Teclmical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: I) Streets and Right of Way ~ City of Carmel (Hoover Road, Interior Streets) o Water - City of Carmel Utilities (previously Veolia Indianapolis Water) III Sanitary Sewers - Clay Township Regional Waste District I) Storm Sewers/Drainage - Hamilton County Surveyor's Office/City of Carmel. I) Legal Drains - Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements: I) Water Availability approval from the Board is based upon the total number of single-family residential lots. Reference item #11 below for a more detailed explanation. If a community swimming pool or bathhouse is planned, additional Water Availability approval from the Board will be required and additional Water Connection Fees will be assessed. If entryway or other community irrigation systems are planned., these will also require additional Water Availability approval from the Board and additional Water Connection Fees will be assessed based upon the size and usage of the system. D Commercial Curb Cut Approval- Ifapplicable, provide a letter to this office requesting PWS Connnercial Curb Cut approvaL. Provide an 8 ~ x 11 exhibit or exhibits detailing the requested curb cut(s) with all appropriate dimensional data including width, radii, aceVdeceVpassing blister dimensions, existing and opposing streets or drives, etc. o Temporary Construction Entrance approval if the location is at a site other than the location of the proposed pennanent entrances to the development. . Any permanent improvement to be installed within dedicated right of way or dedicated easements. This approval would require a Consent to Encroach Agreement between the Owner and the City of Carmel. . Secondary Plat approval if applicable. D Dedication of Right of Way if not platted. DEPARTMENT OF ENGINEERING ONE C1VlC SQUARE, CARMEL, IN 46o.~2 OFFICE 317.571.2441 FAX 317.571.24.~9 EMAIL engineering@carmel.in.gQv I am also enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning A.ppeals (if applicable) and completion of review by the Technical Advisory Committee. A.ll written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or the Board of Zoning Appeals (if applicable). 4. T.A.C. ReviewlDrawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. The design engineer must certify all drawings submitted for fmal approval. Due to stonn drainage dual jurisdiction with the Hamilton County Surveyor's Office, a total of 8-sets of plans will be required for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and Director of Carmel Utilities. The 8-sets will then be delivered to the Hamilton County Surveyor's Office for approval. Final distribution will be 2-sets to Carmel Engineering, I-set to Carmel Utilities, 2-sets to the Surveyor's Office and I-set each to the Developer, the Developer's Engineer and the Contractor. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or dedicated easements will require a Consent to Encroach Agreement with the City of Carmel. This agreement, with the exception of irrigation systems, requires BPWS approval. The City Engineer may approve irrigation system agreements. 6. Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Paul Pace City of Carmel Water Utility 130 )SI Avenue SW Carmel, IN 46032 7. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 8. I am including copies of the following with this correspondence: . Subdivision Project Approval Procedures . Performance Release Procedure ill Subdivision Building Permits . Permit Data, Contacts, etc. . Street Signage Requirements BONDING REOUIREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performance GuaranteesIEngineer's Estimates . Streets (base, binder and surface must be bonded together) . Curb & Gutters ill Water Mains " Street Signs (See Item #12 below for additional comments regarding this item) . Sidewalks.(lnterior.builders lot right of way sidewalks and Exterior.conunon area/perimeter right of way sidewalks/asphalt paths may be bonded separately). o Right of Way Improvements may be bonded separately. This could includeaccel/decellanes, passing blister; pavement widening. thermoplastic striping, stone shoulders, curbs, etc. o Erosion control. Please contact Amanda Foley, Engineering Department Stonnwater Administrator, for details regarding engineer's estimates/performance guarantee requirements for Erosion Control. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100010 of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes and materials, etc. Upon completion and release of individual Performance Guarantees, a three-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of tile Performance amount for all other improvements. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please reference the enclosures for more detailed explanation of our procedures. Rigbt of Way Permit BDd Bonding Any work in the dedicated right of way of Hoover Road will require an approved Right of Way Permit and a License & Permit Bond. The bond amount is determined by the number of instances of work in the right of way at $2,000.00 per instance. However, if the work is included in the scope of work ofa required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of Way Permit. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way permitting and bonding. 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. When construction plans are submitted for review for this development, please provide a set of drawings and drainage calculations directly to Crossroad. AVAILABILITY AND CONNECTION FEES 11. Availability (acreage) Fees must,be paid after all other Engineering Department requirements have been satisfied and prio.r to. approval and start of construction activities. Availability Fees are based upon to.tal platted acreage or legal description acreage for the development at the current rate af$I,01O.00 per acre for Water Availability. Based upan the indicated acreage on the primary plat, the foIlo.wing Availability Fees would apply: Water-30.74'" Acres @$l,OIO.OO/Acre = $31,047.00 "The total acreage from the legal description is 22.12 + 8.62 = 30.74 acres while the Develapment Summary indicates a Total Site Area af29.971. What is the difference? Connection Fees-Based on the drawings submitted, there appear to. be 30 residential lots or 30.0 E.D.U.s. The current Water Connection Fee is $1,310.00 per EDU. Cannection Fees are paid when the infrastructure has been campleted, satisfactary test results obtained and the development has been released far building permits. Connectio.nFees are paid on an individual~lo.t basis. The Availability and Connectio.ns Fees are current as of this date but are subject to. future revisions. If an Irrigation system. swimming pool or clubhouse is plannedjor this development, additional Water Connection Fees wUI be assessed based upon the recommendations ojthe Director of Carmel UtUitles. PROJECT COMMENTS 12. The proposed cross-section fo.r Meeting Ho.use Road do.es nat meet the road cro.ss-section anticipated by the City. Please provide a cross-section for Meeting House Road as detailed in the enclased TYPICAL CROSS-SECTION. 13. There appear to. be same discrepancies within the legal descriptio.n. The acreage in the prose legal description do.es not match the acreage listed under the DEVELOPMENT SUMMARY. 14. On the lacal street andcallector street cross-sectio.ns, please revise such that the outside edges af the subsurface drain trenches align with the backs of the curbs per the City afCarmel standard. 15. Under the PROJECT NARRATIVE, please change VEOLIA WATER, CITY OF INDIANAPOLIS DEPARTMENT OF WATER WORKS to. CITY OF CARMEL UTILITIES. 16. Street Name Signs~By virtue of City of Carmel Ordinance No.. D-1457-00, we require the type of green reflective type street name signage, pasts and brackets as indicated in the Subdivision Signage Requirements document included with these co.mments. If the development adheres to these requirements, the develo.per may order and pay for the signs and have them shipped directly to. our Street Department, along with a copy of the recorded secondary plat afthe development, and the Street Department will install the signs. Once installed, the Developer's Performance Guarantee may be released by our Board of Public Works and Safety. After release, the Developer is required to post a 3-year Maintenance Guarantee in the amount of 10% of the Performance Guarantee or $100.00, whichever is greater. At the end of the 3-year maintenance period, it becomes the City's responsibility for the maintenance and replacement of street signs. If it is the Developer's intention not to adhere to the above requirements and to install decorative style street name signs, these signs must conform to the City of Carmel Decorative Street Signage Detail included with these conunents. However, it will be the Developer's responsibility to install decorative posts, brackets and street name blades. Once installed, the Performance Guarantee may be requested to be released. Once released, 3-year maintenance guarantees will not be required and maintenance and/or replacement of decorative street name signage will be the responsibility of the Developer and/or the Homeowners Association. Regulatory Signs-All regulatory signs require City of Cannel Ordinances. Therefore, we ask that the Developer not to bond or install standard or decorative regulatory signage in subdivisions. Installation of street name signs and regulatory signs are included as one of the requirements for building permit approvaL 17. Please contact Crossroad Engineers to obtain drainage review checklist for consideration in developing secondary plat and that design effort. The City's drainage standards shall apply to this project. The Department would expect the secondary plat and construction drawings submitted to conform to the requirements of the checklist. 18. Please provide detention volume for the fully developed site and for the fully developed thoroughfare plan rights-of-way for the Hoover Road and meeting House Road frontages. This requirement shall apply regardless of watershed limits. Please provide adequately sized pipes to carry water from the street to the proposed ponds. 19. If off-site easements will be necessary to install the utilities, these easements must be secured prior to the Department of Engineering approving the drawings. 20. Please provide ADA ramps where the Meeting House Road entrances cross the asphalt path and at all interior street intersections. Also provide an asphalt path along the Hoover Road frontage with ADA ramps at the Hoover RoadlMeeting House Road intersection. 21. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 22. The City has adopted a new paving policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. 23. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to accommodate this policy. The language ofthis policy must be added to a specification sheet on the plans. 25. The frontage loop at the southeast comer of Hoover Road and Meeting House Road, which provides access to lots 1,2, and 3, does not meet City standards. Both of the intersections created by the frontage loop are within the functional area of the Hoover Road/Meeting House Road intersection. Please revise to provide access to lots 1,2, and 3 from internal streets. 26. Please provide monuments at aU external comers. 27. The City does not allow direct access to perimeter roads. Please establish non-access easements along the Hoover Road and Meeting House Road frontages. 28. The City does not allow common areas within the right-of-way. Please revise so that all areas within the limits of the right-of-way are right-of-way. 29. Please label and dimension the right-of-way of all exterior roads and interior streets. 30. Asphalt paths will be required along both the Hoover Road and Meeting House Road frontages. Please label the 10-foot asphalt path for Hoover Road and the 8.foot path for Meeting House Road. 31. Place "PRIVATE" label on all alleys and private streets. 32. The minimum horizontal curve radius for each interior public street shall be 150 feet. The horizontal curve radius on Nakoma Court is shown as 100 feet. Please revise. '. 33. The curb return radii at each oCthe Meeting House Road entrances shall be a minimum of 40 feet. The curb return radii at the Hoover RoadlMeeting House Road intersection shall be a minimum of 40 feet. 34. Please provide the City standard street width of 30 feet back of curb to back of curb and standard right-of-way width of 50 feet for all interior public streets. Cul-de-sacs can be 26 feet. 35. Please indicate subsurface drains beneath the curb on both sides of all the streets. 36. Please indicate sidewalks on both sides of all interior streets. 37. The intersection angle between two interior streets may be no less than 75 degrees. 38. The intersection angle between River Road and an entrance must be 90 degrees. 39. All lots adjacent to side yard easements must be wide enough to acconunodate the anticipated house model and any planned driveways such that there is no encroachment in the easements. 40. Any entrance from perimeter roads will require auxiliary lanes (acceleration lane, deceleration lane, and passing blister) conforming to City standard dimensions. Auxiliary lanes for Meeting House Road at Hoover Road are shown on the proposed plat. Auxiliary lanes are also required at the intersection of Meeting House Road and Nakoma Court and at the intersection of Meeting House Road and Blackhawk Court. 41. Entrances with medians may be a maximum width of 46 feet. Each travel lane (on either side of the median) shall be a maximum of 18 feet wide and the median shall be a maximum of 10 feet wide. 42. Please indicate widening across the property frontage or to the extents of the auxiliary lanes, whichever is greater for IS-foot travel lanes on the property sides of Hoover Road. Auxiliary lanes shall be measured from the edge ofthe 15-foot travel lane. Please add a note to the site plan that all existing pavement shall be sawcut to a clean edge where new pavement (for widening or for auxiliary lanes) is to be installed adjacent to existing pavement. Any new pavement placed in the Hoover Road right-of-way for widening, for auxiliary lanes and for each entrance up to the mainline right-of-way limit shall meet the following section: 1.5 inches HMA #11 surface on 2 inches HMA #8 binder on 3 inches HMA #50 base on 7 inches #53 stone on 4 inches #2 stone or match existing, whichever is greater. Please delineate this section with hatching on the plans and appropriate reference in the legend. Please indicate widening on the road cross-section. 43. The City typically requires I" milling with 1.5" H.A.C. #11 resurfacing for the entire width of the existing roadway across the property frontage or to the limits of the auxiliary lanes, whichever is greater. The roadway would then also need to be restriped with thermoplastic striping. Please develop a plan for the restriping and for striping of the auxiliary lanes. Please add a note to this plan that all striping shall be thermoplastic. Please delineate the milling and resurfacing areas with hatching on the plans and appropriate reference in the legend. 44. Please edit or provide a detail which requires the following pavement section for the paving of the proposed interior public streets: 1.5 inches HMA # II surface on 2 inches HMA #8 binder on 3 inches HMA #5D base on 7 inches #53 stone. Please add a note that all paving must be completed in one paving season. 45. Please add an Asphalt Path Detail that requires I inch HMA #1] surface on 2 inches HMA #8 binder on 5 inches #53 stone if the proposed multi-use paths will not be concrete. 46. Please add the Department Standard Sub-Surface Drain detail. 47. A three-foot wide #73 stone shoulder at a minimum depth of six inches is required across the property frontage or to the limits of the auxiliary lanes, whichever is greater. Subsurface drain is required beneath the stone shoulder. 48. All paving within the existing and proposed City right-of-way shall conform to the requirements of the Department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre-construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right-of-way. 49. Please provide amaintenance of traffic plan. 50. Please include the note "THERE SHALL BE NO WATER VALVES OR MANHOLES WITHIN THE PAVEMENT, CURBS, SIDEWALKS, OR ASPHALT PATHS" on all appropriate sheets. 51. Please do not include a landscape plan in sets of plans submitted for approval by the Department of Engineering. The Department of Engineering does not approve the landscape plan. ". 52. If it will be necessary to relocate existing utility poles, they must be relocated to within one foot of the proposed right-of-way. Costs for such relocations are to be borne by the developer. 53. All Hoover Road and Meeting House Road drainage structures (bridges and culverts) must be indicated on the plans and constructed, replaced, or improved by the developer to acconunodate the widening, auxiliary lanes, multi-use path, and any other required improvements. 54. This project is subject to the Carmel Stormwater Management Ordinance, which was adopted February 6, 2006. 55. Please provide a stub street from Nakoma Court to facilitate development to the south and a stub street from Blackhawk Court to facilitate development to the east. 56. Please indicate a comer cut that will accommodate a 120.foot radius roundabout centered at the intersection of Hoover Road and Meeting House Road. The Department requires that the Developer dedicate this right-of-way. The Department understands that this dedication will go through the Board of Public Works in the future but needs the right-of-way to be shown on the plans to ensure that the site plan is able to accommodate the future construction. 57. How is sanitary proposed to be provided to Nakoma Court? 58. Please provide the Department of Engineering a flood study to establish the flood hazard areas (flood way, flood fringe) and the base flood elevations. 59. Fill in the flood plain will not be permitted. 60. Please provide left turn lane in the median on Meeting House Road for vehicles turning left onto Blackhawk Court and Nakoma Court. 61. Overbank detention is a feasible option, provided that the storage volume provided is realized by allowing water from the creek to fill pond and discharge slowly out. The proposed direct discharges do not conform to City standards for sotrm water quality. 62. Please review storm water quality requirements for this project with Amanda Foley at (317) 57]- 2441. These connnents represent the Department of Engineering's initial review of the primary plat for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. We reserve the right to provide additional review and conunents when detailed construction plans are submitted for this project. It is critical that this office be made aware of all modifications made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notifY us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. The Department reserves the right to provide additional comments based upon subsequent reviews and on the grading and drainage system upon receipt of drainage calculations and more detailed construction drawings that provide grading elevations, pipe sizing and invert elevations. These comments may affect the drainage system layout presented on the primary plat. If you have questions, please call me at 57]-2441. ~., Assistant City Engineer Deparbnent of Engineering Enclosures Cc: Matt Griffm, Department of Community Services John Duffy, Director Carmel Utilities Paul Pace, Carmel Utilities Distribution Greg Ilko, Crossroad Engineers Greg Hoyes, Hamilton County Surveyor's Office Engineering File Copy Engineering Department Review S:\PROJREY06\CLA YCREEKPRrMPLA T 05/12/2006 17:07 3177759528 HAMILTON CO SURVEYOR PAGE 01/03 ;> XCI/lon C 'Word, Srm1ryor (l'lilwl' (51,.) 'i'((~-"4':'l5 (/n.1' (iX?) 77('-,:)(:';:.$ Sllire 1 gg (Jill' .'Hrlmiltl_n (orm~' SI/'IO"( ."l1:ob/c.,I'i{!c, fllr/il/llft 1/6l?Li(~':!.2JO June 12, 2006 Evergreen Planners, LLC AITN: Art Kaser 234 South Franklin Road Indianapolis, IN 46219 VIA FACSIMILE: 353-0684 " I' . ' ,,''''-ern :j-.':'.I rtt. t.l' L.' JU~ 1 :~ .,"', DOCS RE: Clay Creek Primary Plat Dear Mr. Kaser: We have reviewed the primary plat submitted to the Hamilton County S\lrveyorls Offi.ce on May 25, 2006, for this project and have the folJowing comments: . I. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of Cannel 2. The proposed project DOES NOT fall in a Cannel Wellhead Protection Zone. 3. The proposed project islocatcdin the Clay Creek Watershed and has Clay Creek running through the proposed project. Clay Creek RegUlated Drain is located upstream. of this proposed project. 4. The Hamilton County Stormwater TechniCal Standards Manual requires an allowable release rate of OJ 0 cfs per acre up to the 10 year event and 0.30 efa per acre for the 100 year event. This site will be allowed to release 3.00 cfs up to the J 0 year event and 8.99 up to the 100 year event, including direct run-off areas. 5. This proposed .development will be a Hamilton County Regulated Drain Subdi\'ision. Please not that all regulated drain easement need to be a minimum of IS' per half of storm sewers and 25' from the top of bank on open. drains. 06/12/2006 17:07 3177759528 HAMILTON CD SURVEYOR PAGE 02/03 .' 6. Please note this site will be required to comply with parts (release rates) of the new Hamilton. County Stormwater Management Technical Standanb Manual, and any additional requiremmts of the City of Carmel Stormwater Management Manual. 7. Wi.th construction plans, please submit the following procedural items to this office, petition for regulated subdivisjon. subdivision non-enforcement agreement, engineer's estimate, and all associated bonds for 120% of construction cost. The applications are available on our website at httl.:llwww.co.hamjlton.in.us1go to Departments. Surveyor, and Forms. 8. Hammon County Ordinance 4-26-99-C(3) will require improvements to the natUJ;'al watercourse across the site and possibly downstream. These improvements will included, but not limited to. debris and flowline obstruction removal, tree clearing from. top ofba.nk to top of bank. and stream bank erosion repair and stabilization. 9. The natural Watercourse across this site will become a Hamilton COWlty Regulated Drain, along with all the stonn pipes within the development. The easement associated with the open regulated drain will need to be 25 feet from the top of ban1\: on each size ofthe stream, as required by Ie 36-9-27~33. 10. Hamilton County Ordinance 4-26-99-C(6) requires any natural wateroourse that - does not nave an established 100 year water surface elevation to have a site specific engineerin,s analysis performed by the engineer for the proposed project. 11. Allfll,)odplain areas determined by the study will be required to be place in a Drainage Easement, to prevent filling and encroachm.ents in the future. 12. Hamilton County Ordinance 4-26-99-C(7)e requires all minimum fmished floor elevations to be it minimum of 2 feet about the 100 year water surface elevation of this natural watercourse. These minimum finished floor elevations must be denoted on the construction plans. 13. Please note that R.D.E. arid L.M.A.E. (landscape buffers) ace not allowed to overlap. This is per agreement of our office, Carmel DOCS, and the Carmel Urban ForesteJ:') to avoid future conflicts. 1.4. Although the-Hamilton County Survey"r1~ Office has reviewed this primary plat and issued a comment letter, this office will not be limited by the primary plat in regards to the pond sizes or location, drain.age e~ement widths, stonn sewer locations~ lot layout. landscape layout, or any other drainage related issues. Insufficient infonnation is presented to conduct a complete drainage review and changes may be required during the construction planning stage. 06/12/2006 17:07 317775%28 HAMILTON CO SURVEYOR " 15. Please submit complete construction plans, the secondary plat, and drainage calculations to tIlls office when they become available. 16. Please note that further comm.ents may be necl;:ssaty at a later date. Should you have any ques.tions, I can be reached. at 317-776-8495. Sincerely, ~~ Greg Hoyes, AC Plan Reviewer CC; Matt Griffin - Carmel DOCD Amanda Foley - Carmel Engineerin,g Dick Hill - Cannel Engineering Mike McBride - HeRD Greg Ilko - Crossroad Engineers ME Development Company - 264-9831 PAGE 03/03 C BLJr']]J(]l IE li Ola b S 002JJ pr ~ / "- \-:: j/ .('\ ~ _ :"i." ~~.~ ~ ,. ~ c~....,. . ,. r\.:~~.. . . May 30,2006 Mr. Arthur L. Kaser, L.S. Evergreen Planners, LLC 234 S. Franklin Road Indianapolis, IN 46219 RE: Plate of Clay Creek Carmel, IN Dear Mr. Kaser: I have received and reviewed the information for the above-referenced project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. A'~ Ti::i (!~~een Acting Chief of Police T JG:vb cc: Dept. of Community Services A Nationally Accreditj!j,1r;ii;;:;;';'{'il!'forcement Agency "llli"="'''''b.''l.l2i.'i' C517IG711-2GOO Fax CH?1 571L-2&1l2 If Clay Township Regional Waste District WW'N.ctrvvd.org · (317) 844-9200 . Fax (317) 844-9203 1\ April 17, 2006 r:. :. '/". .... "'v' "'-. 1.0;...... '=-> ! . . (. .' , - ~'--' . '- L:~/ .-. Fax 353-0684 :""'~ ~ I :.' ..' .J Mr. Arthur Kaser Evergreen Planner Inc 234 S Franklin Road Indianapolis, IN 46219 Subject: Sanitary Sewer Service along 116th Street from Hoover Road to Springmill Road Dear Mr. Kaser: Clay Township Regional Waste District is in the process of hiring a consultant to design the sanitary sewer along 116lh Street from Hoover Road to Springmill Road. Lift Station 20 was installed in High Grove subdivision as a temporary lift station. High Grove and developments to the south are intended to drain to the proposed sewer along 116th Street. It is anticipated that the design will be completed this year with construction scheduled in 2007. Sincerely, ~~ Andrew Williams Utility Director 10701 N. College Ave., Suite A · Indianapolis, Indiana 46280-1098 ( . ':" EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD., .INDIANAPOLlS, INDIANA 46219 (317) 353-6161 FAX 13171353-0684 May 18, 2006 1\ ."" : ~ECt1VEJJ L!:;~'.' 1 ~~ ~:~€ Police Chief Carmel Police Department 3 Civic Square Carmel, Indiana 46032 DOGS Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions. or need additional information please contact me at your earliest convenience. Sincerely, j~ Arthur L. Kaser, L.S. ... EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD.. INDIANAPOLIS. INDIANA 46219 (31 71 353-6161 FAX l31 71 353-0684 May 18, 2006 Fire Chief Carmel Police Department 2 Civic Square Carmel, Indiana 46032 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. . Sincerely, jvL~ Arthur L. Kaser, L.S. . .~ EVERGREEN PLAN.NERS, LLC 234 SOUTH FRANKLIN RD.. INDIANAPOLIS. INDIANA 4621 9 131 7) :3 53-6161 FAX (31 7) 353-0684 May ] 8, 2006 Police Chief Carmel Police Department 3 Civic Square Carmel, Indiana 460~ 2 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, )JLL- Arthur L. Kaser, L. S. ." , EVERGREEN P.LANNERS, LLC 234 SOUTH FRANKLIN RD., INDIANAPOLIS. INDIANA 46219 (317) 353-5151 FAX (317) 353-0684 May 18, 2006 Carmel Clay Schools 5201 E. 13151 ~~reet Carmel, Indiana 46033 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, JJL/- Arthur L Kaser, L.S. ~ "''\ EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD.. INDIANAPOLIS, INDIANA 46219 (317) 353-6161 FAX (317) 353-0684 May 18, 2006 Board of Public Works One Civic Square Carmel, Indiana 46032 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the P~imary Plat for the above referen~e subdivision. This plat is for your review and comment. If you have any questions or need additional inform'ation please contact me at your earliest convenience, Sincerely, j -v-Lff- Arthur L Kaser, L.S. EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD., INDIANAPOLIS, INDIANA 4621 9 (317) 353-6161 FAX (317) 353-0684 May ] 8, 2006 Department of Engineering One Civic Square Carmel, Indiana 46032 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy ofthe Primary Plat for the above . reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, )~UL- Arthur L. Kaser, L.S. -ill" . . '. EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD., INDIANAPOLIS, INDIANA 46219 (3171353-6161 FAX (3171353-0684 May 18, 2006 Carmel Street Department 3400W. 13 1st Street Westfield, Indiana 46074 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy ofthe Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, j~C Arthur L. Kaser, L. S. EVERGREE:N PLANNERS, LLC 234 SOUTH FRANKLIN RD., INDIANAPOLIS. INDIANA 46219 (31 7) 353-6161 FAX (31 7) 353-0684 May 18, 2006 Director Department of Community Development One Civic Square Carmel, Indiana 46032 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, Arthur L. Kaser, L.S. EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD., INDIANAPO!-IS, INDIANA 46219 (3171353-6161 FAX (317) 353-0684 May 18, 2006 Hamilton County Surveyor's Office One Hamilton Square Suite 146 Noblesville, Indiana 46060 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at . your earliest convenience. Sincerely, )~U- Arthur L. Kaser, L.S. EVERG REEN PLANN ERS, LLC 234 SOUTH FRANKLIN RD.. INDIANAPOLIS, INDIANA 4621 9 (31 7) 353-6161 FAX (317) 353-D684 May 18, 2006 Duane Whiting Veolia Water 1220 Waterway Boulevard P.O. Box 1220 Indianapolis, Indill;na 46206 Re: Plat of Clay Creek Dear:Mr. Whiting; Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, j~UL Arthur L. Kaser, L.S. EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD.. INDIANAPOLIS, INDIANA 46219 (31 7) 353-61 61 FAX (31 71 353-0684 May 18,2006 Mr. Andrew Williams Utility Director Clay Township Regional Waste District 10701 N. College Ave. Suite A Indianapolis,. In. 46280 Re: Plat of Clay Creek Dear Mr. Williams; Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, )~LL Arthur L. Kaser, L.S. EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD.. INDIANAPOLIS. INDIANA 4621 9 (317) 353-6161 FAX (317) 353-0684 May 18, 2006 Director Hamilton County Health Department One Hamilton County Square Suite 30 Noblesville, Indiana 46060 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, j~ Arthur L. Kaser, L.S. EVERGRE.EN PLANNERS, .LLC 234 SOUTH FRANKLIN RD., INDIANAPOLIS. INDIANA 46219 (3171353-6161 FAX (317) 353-0684 May 18, 2006 AT&T Indiana Attention: Ms. Mary Broadus 240 N. Meridian Street, 225 Indianapolis, Indiana 46204 Re: Plat of Clay Creek Re: Plat of Clay Creek Dear Ms. Broadus, Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. IfYOll have any questions or need additional information please contact me at your earliest convenience. Sincerely, jJ Uc- Arthur L Kaser, L.S. '-, .~ EVERGREEN PLANNERS, LLC .234 SOUTH FRANKLIN RD.. INDIANAPOLIS. INDIANA 46219 (31 71 353-6161 FAX (31 7) 353-0684 May 18, 2006 Cinergy 100 South Mill Creek Road Noblesville, In. 46060 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. . Sincerely, j~U- Arthur L. Kaser, L.S. EVERGREEN PLANNERS, LLC 234 SOUTH FRANKLIN RD.. INDIANAPOLIS, INDIANA 46219 (317) 353-6161 FAX (317] 353-0684 May 18, 2006 Vectren Energy . 15900 AJlisonville Road Noblesville, In. 46060 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This ptat is for your review and comment. If you have. any questions or need additional information please contact me at your earliest cOnvenience. Sincerely, Arthur L. Kaser, L.S. EVERGREEN PLANNERS, L'Ll:: 234 SOUTH FRANKLIN RD., INDIANAPOLIS, INDIANA 46219 (317) 353-6161 FAX l31 71 353-0684 May 18, 2006 Indiana Department of Natural Resources 402 W. Washington Street, Room W-273 Indianapolis, Indiana 46204 Re: Plat of Clay Creek Dear Sir or Madam: Please find enclosed with this letter a copy of the Primary Plat for the above reference subdivision. This plat is for your review and comment. If you have any questions or need additional information please contact me at your earliest convenience. Sincerely, Arthur L. Kaser, L.S.