HomeMy WebLinkAbout07090051 Site PlanmCrtLruRL JuC1JCUI IV ANT ?)IAIILMILNI Vh tAUIS
REVEALED BY EXAMINATION OF SCHEDULE "A" AND
SCHEDULE "B" OF A TITLE POLICY.
HOUSE DETAIL
NOT TO SCALE
.
(O's
_rn
U0
M
Cn
(N
O
O
Z
I ` COMB
' ` STR 52.
TC - 8528Z
N ? C -
I \s?s, A %?t 1989'
C
I i ?e
I I
-- -20' D.E. ar
PROPOSED
25' . 24.6r
POOL HOUSE
I I I a.
I
L
I
I
AA ?.
I ? C
I
cV N
I
0
I °?
I sQ?
I ?s
f)
•44'
I I
----
STR. COM9
TC - 1551.9V
C.A. IT
N 89'34' 561 E
L=22.22' P RIVE • 41.59' i
S66 SO
22''
LL' L®1 ' ? I I I ?1=1L?- 3 20'
120,802 j l I ?SQ.FT.t ° e
2.77 I I I I ,ACRES t
1m.z
120' ACCESS ESM'T
56, R
? I
' i ?I I
/ 0' D.E--I?---I
-.I I
Q I I ® Col lI I .. , I
Z
I e a ?I I`= I I EXISTING
CONCRETE
SILT FENCE I I°r.f- DRIVE ,
?? IIu, ,ll-op
m I I loll I03
p l I I OI I I O SEE DETAII. Ile
N I II I II 1 II
I
I,}?-30' R.D.E.
° I N82'36'14"yyyy
L S '34'56' 0 1 04_78'
89 _ _ 59.10'_ `,I I 1
S78p62 I I?__ ?I
_ L82 3'14"
A\, 2 j0 N83'01'45"W 93.16' S8b'31-4'16"W 1 108.84' _ E -174. 60' J
? 'L° 33.91'° 74.93' N78 te.
?x 06'20"k, ?? S?•
I C.A. ffDff I 60.65' s?s2? I-
C
11 isn PHATFAI IX np/i/F
& D. E.
15,284 sq.ft. BOTTOM POOL IE! EV. = 834.0 & D.E.
(NOT INCLUDED) NORMAL POOL ELEV. = 842.5 12,798 sq.ft.
100 YEAR FLOOD ELEV. = 844.7 (NOT INCLUDED)
N 89'34' 56"E
10.43'
N89'34'36"E E 83.15' ' S84
?O6 '44'53"E 106.13'
7.7 N81_54 53 20'1 S.L.
.37, 0g, I` -N 00'2`'1:4" N N
32.%8'
S 89'34'56" W 416.27'
, N n
M
gL L z
S 20-x-
15? 5
I
m
o l
I
al
z,
I
m' 1
GRAPHIC SCALE
0 25 50 100
SCALE : 1" = 50'
SITE PLAN
JOB NO. B31852
LEGEND
® = PERMANENT SEED / SOD IMMEDIATELY
AFTER CONSTRUCTION
B. L. - BUILDING LINE I.
D. E. = DRAINAGE EASEMENT
C. A. & D.E. = COMMON AREA & DRAINAGE EASEMENT
D. & U .E. = DRAINAGE & UTILITY EASEMENT
R. D.E. = REGULATED DRAINAGE EASEMENT
0 N. A.E. = NON ACCESS EASEMENT
O
O
Co
rr)
DESCRIPTION
LOT NUMBER 5A IN THE PROPOSED PLAT OF THE REPEAT OF
LLj LOTS 5 AND 6 IN THE PLAT OF CHATUEAX DE MOULIN
(THE REPLAT HAS NOT BEEN RECORDED)
'q-
On
(V
O
O
PAGE: 1 OF 2
NO \,\0%%w, if
??Q?Gt.'•fE??o?t,'y
.: No.
S0083
STATE OF '
._ fir` !Nn •.?P; .Q'
2. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL
ORDINANCES THAT APPLY.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE
AS THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING
THE SITE.
4. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE
INSPECTION.
5. SEDIMENT LADEN WATER SHALL BE DETAINED BY
EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE
SEDIMENTATION IN THE RECEIVING STREAM. NO STORM
WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER
THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
6. WASTES AND UNUSED BUILDING MATERIALS SHALL
NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY
STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES
AND UNUSED BUILDING MATERIALS IS REQUIRED.
7. SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE
ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUM-
ULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH
WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE
SITE FOR DISPOSAL
& SOIL WHICH HAS ACCUMULATED NEXT TO EROSION
CONTROL DEVICES SHALL BE COLLECTED AND RE-
DISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND
AT LEAST ONCE A WEEK.
9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE
INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS
SHALL BE COVERED WITH FILTER FABRIC.
10. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC.,
WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND
DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON
SITE. (HOMEOWNER SHALL CLEARLY MARK ANY EXISTING
TREES OR STRUCTURES THEY INTEND TO KEEP)
11. SCHEDULE OF EARTHWORK ACTIVITIES:
o) THE DURATION OF TIME WHICH AN AREA REMAINS
EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE
AREA SHALL BE STABILIZED AS SOON AS POSSIBLE.
TEMPORARY VEGETATION OR MULCHING SHALL BE USED
TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY
CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY
THE ENGINEER.
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM
MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL
OTHER TIMES OF THE YEAR. PERMANENT AND FINAL
VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES
SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
SEASONAL SOIL PROTECTION CHAR
m/duundl
ARACncE •Y,,. Rg «AR µq. MAY JME all.. - %PT. ACT. Nov. MC
PERM?T A • // ///n // r
M40iwT
TFNP Rmy c
9EDGNG /// /// /
W?FND G
A . MEI wIX 9LEO Im m/ARID C Na RIM f ' U. lP../A
Rus 2 MS 41NAW WLa/AEAL OR Am NNUAL MGRI M uli/ARS
o . MNWMY RMSMUi 1A WM/ARS: R« W RD { E I= Rft/Ad[
RUS 2 TINTS S W MMH/WIL W AM NMUL RI MM W W&/ART[
c - SPWHo . a Rsh]s/A
o -'« T W RK 2 BaVIIS/A02
t - AMIJM. RRLUR m 1?S/ARfl ( I WINWO R FT.)
F_mD
D _ S W YLIW 2 1RR/A
•A/` - BRQWm N)1FD WRING .NE OLY. wpbs AW/m TEPTEMBFn
- _ IROGAMYI I®m Fan 2 ro a ?c RFTm Wrxnxc sm
®eE0 R?AMIKN me PmMA1F21r $RnRp
1.TBr TOE m TEmmc AW Il1Tifl«T IDETA
(co«nc1 cRATr AWm ? CCOFnAT1N[ n10m1 ORKE FOR ARRTAx¢ AAY
pW3 YRRIWTIGIL lrunslc AYALATU 1ESTIxG fdWLS)
S. w pl ==m M 9TE ro w SBDB. IPFLY LNe AR.aCWIo
a 1o7oVII AS KmlEOUm m n1E 9 TCT. F 1R1YG aAS xof DoT. mNRCU
MRRIC q}oD b/Aaa: a 1•I 1I 12 ANAL. 5 W EV.RY40R. FERRIID,.
A RL RP Sol. m wy. , W W WI SEIOYfA WlYID OC IRIRIIIR NO u1E T.'ND
M Fl Y-A NRO OLD WN A DIX W A RIIR d(IUIED Mf6'S M flWL
RIAE R Km AIM R4R1® AREAS IYRY m ME NEn FOR 15 DAYS SNAIL NAW WARAUE
EfAAII/,tlRl NPIEA YET, ta1,R11 Ctl[iMY6 MEW(f RIIV mOMARNI V WA63.
THd xr/.c rAw .u eE u? ro EE?a ap.o nrmuAnpl 1WalemolR «W Fn.
NW qA!
ROnxT2c
FAWRe
re
YOm
M1RA (ABIIIL «L\y POSr WfR PNl ,N:C A W WY IFMGIM 6
s nIYEA wa u DRAM. Rosr FLOW SNAU Y: Y]IYI, s1R1, OR 1YNIIEOG Mn NII11
m Imsr ou,u.L
u R'
"o wvm m AND
IYSrALUnax W m pIF1YYI ARRRD
IRAOs
fABllc 9U11 ME A «n.Tn ®n]lRt FAMOC
NI561N0 6 7; aN,dlq ROT MVPvMT
'.'.? YAIEH.«S M?INR TO U1FA: mA TIM
i uR.«pn AW BAr Tm(MURL
' I I
SILT FENCE CONSTRUCTION
N75
YANTENANCC
ASPECT TIE AT Fi]xCE PENCdCALLY AND AfTEA FAW STDmx L1Elxi. IF
FENCE FABRIC TEARS STARTS TO DECOMPOSE, OR N ANY WAY BECOMES
NEFFECTIYE. REPIACE THE AFFECTED PORTION! OYEDIATELY. IEIFDYE DvP0
SEDIMENT YEAR IT REACHES NNS ME HEIGHT OF THE FENCE AT ITS LOWEST
PCNT OR M CAUINC THE FABRC TO WU TAKE CARE TO AVOID
ONDERMINING WE FENCE OUNNO CLFANOJT. AFTER THE CONTRHOTNG
IRANALE AREA HAS BEEN STABDJLD REMOTE TIE FENCE AND SEDIMENT
DEPOSITS ERRIC TIE DISTURBED AREA TO GRADE, AND STADIUM
SECTION 102.07 NOTES
1) BUILDER TO INSTALL TEMPORARY CONSTRUCTION ENTRANCE
PRIOR TO ANY EARTH DISTURBING ACTIVITY.
II) BUILDER TO INSTALL SILT FENCE OR APPROVED EQUAL.
BUILDER TO INSTALL AND/OR MAINTAIN INLET SEDIMENT
PROTECTION.
III) BUILDER TO CLEAN MUD FROM STREETS AND ALLEYS DAILY.
CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED
ON IN A MANNER COMPLIANT WITH ALL STATUTES AND
REGULATIONS.
IV) BUILDER MUST COMPLY WITH ALL ORDINANCES GOVERNING
SITE EROSION AND SEDIMENT CONTROL AND THE APPROVED
EROSION CONTROL PLAN FOR THE DEVELOPMENT.
V) BUILDER SHALL NOT ALTER ELEVATIONS OF ADJOINERS LOT.
BUILDER TO ENSURE SEDIMENT / EROSION DOES NOT LEAVE
THE LOT.
VI)THE OVERALL SELF MONITORING PLAN AND PROCEDURES AS
APPROVED FOR THE DEVELOPMENT SHALL BE USED IN
CONJUNCTION WITH THIS PROPOSED SITE PLAN.
VII) BUILDER TO OBTAIN A REFERRAL FROM THE DEVELOPER FOR
THE "QUALIFIED INDIVIDUAL" IN CHARGE OF THE
MANDATORY STORM WATER POLLUTION PREVENTION SELF
MONITORING PROGRAM FOR THIS PROJECT SITE. BUILDER
TO ENSURE THE NECESSARY DOCUMENTS PLANS AND
PROCEDURES ARE IN PLACE PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION.
VIII) BUILDER IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL
MEASURES UNTIL SITE IS STABILIZED. SITE PLAN
PAGE: 2 OF 2
JOB NO. 831852
`AY`AL,oan u n nF,,,,,,Y
<t : P?
50083
STATE OF
?:?-9?'?NnIAN ?pQ
?myIIIl,?rnln?
I HEREBY CERTIFY THAT THE DRAINAGE WAYS, PAD ELEVATIONS,
AND EROSION AND SEDIMENT CONTROL MEASURES ARE CONSISTENT
WITH THE OVERALL DEVELOPMENT PLANS
1145n rHATFAI IX np/i/F / . (Z? - . , „ ^R?,