Loading...
HomeMy WebLinkAbout07090051 Site PlanmCrtLruRL JuC1JCUI IV ANT ?)IAIILMILNI Vh tAUIS REVEALED BY EXAMINATION OF SCHEDULE "A" AND SCHEDULE "B" OF A TITLE POLICY. HOUSE DETAIL NOT TO SCALE . (O's _rn U0 M Cn (N O O Z I ` COMB ' ` STR 52. TC - 8528Z N ? C - I \s?s, A %?t 1989' C I i ?e I I -- -20' D.E. ar PROPOSED 25' . 24.6r POOL HOUSE I I I a. I L I I AA ?. I ? C I cV N I 0 I °? I sQ? I ?s f) •44' I I ---- STR. COM9 TC - 1551.9V C.A. IT N 89'34' 561 E L=22.22' P RIVE • 41.59' i S66 SO 22'' LL' L®1 ' ? I I I ?1=1L?- 3 20' 120,802 j l I ?SQ.FT.t ° e 2.77 I I I I ,ACRES t 1m.z 120' ACCESS ESM'T 56, R ? I ' i ?I I / 0' D.E--I?---I -.I I Q I I ® Col lI I .. , I Z I e a ?I I`= I I EXISTING CONCRETE SILT FENCE I I°r.f- DRIVE , ?? IIu, ,ll-op m I I loll I03 p l I I OI I I O SEE DETAII. Ile N I II I II 1 II I I,}?-30' R.D.E. ° I N82'36'14"yyyy L S '34'56' 0 1 04_78' 89 _ _ 59.10'_ `,I I 1 S78p62 I I?__ ?I _ L82 3'14" A\, 2 j0 N83'01'45"W 93.16' S8b'31-4'16"W 1 108.84' _ E -174. 60' J ? 'L° 33.91'° 74.93' N78 te. ?x 06'20"k, ?? S?• I C.A. ffDff I 60.65' s?s2? I- C 11 isn PHATFAI IX np/i/F & D. E. 15,284 sq.ft. BOTTOM POOL IE! EV. = 834.0 & D.E. (NOT INCLUDED) NORMAL POOL ELEV. = 842.5 12,798 sq.ft. 100 YEAR FLOOD ELEV. = 844.7 (NOT INCLUDED) N 89'34' 56"E 10.43' N89'34'36"E E 83.15' ' S84 ?O6 '44'53"E 106.13' 7.7 N81_54 53 20'1 S.L. .37, 0g, I` -N 00'2`'1:4" N N 32.%8' S 89'34'56" W 416.27' , N n M gL L z S 20-x- 15? 5 I m o l I al z, I m' 1 GRAPHIC SCALE 0 25 50 100 SCALE : 1" = 50' SITE PLAN JOB NO. B31852 LEGEND ® = PERMANENT SEED / SOD IMMEDIATELY AFTER CONSTRUCTION B. L. - BUILDING LINE I. D. E. = DRAINAGE EASEMENT C. A. & D.E. = COMMON AREA & DRAINAGE EASEMENT D. & U .E. = DRAINAGE & UTILITY EASEMENT R. D.E. = REGULATED DRAINAGE EASEMENT 0 N. A.E. = NON ACCESS EASEMENT O O Co rr) DESCRIPTION LOT NUMBER 5A IN THE PROPOSED PLAT OF THE REPEAT OF LLj LOTS 5 AND 6 IN THE PLAT OF CHATUEAX DE MOULIN (THE REPLAT HAS NOT BEEN RECORDED) 'q- On (V O O PAGE: 1 OF 2 NO \,\0%%w, if ??Q?Gt.'•fE??o?t,'y .: No. S0083 STATE OF ' ._ fir` !Nn •.?P; .Q' 2. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 4. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 5. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 6. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 7. SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUM- ULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL & SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND RE- DISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON SITE. (HOMEOWNER SHALL CLEARLY MARK ANY EXISTING TREES OR STRUCTURES THEY INTEND TO KEEP) 11. SCHEDULE OF EARTHWORK ACTIVITIES: o) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY THE ENGINEER. b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. SEASONAL SOIL PROTECTION CHAR m/duundl ARACncE •Y,,. Rg «AR µq. MAY JME all.. - %PT. ACT. Nov. MC PERM?T A • // ///n // r M40iwT TFNP Rmy c 9EDGNG /// /// / W?FND G A . MEI wIX 9LEO Im m/ARID C Na RIM f ' U. lP../A Rus 2 MS 41NAW WLa/AEAL OR Am NNUAL MGRI M uli/ARS o . MNWMY RMSMUi 1A WM/ARS: R« W RD { E I= Rft/Ad[ RUS 2 TINTS S W MMH/WIL W AM NMUL RI MM W W&/ART[ c - SPWHo . a Rsh]s/A o -'« T W RK 2 BaVIIS/A02 t - AMIJM. RRLUR m 1?S/ARfl ( I WINWO R FT.) F_mD D _ S W YLIW 2 1RR/A •A/` - BRQWm N)1FD WRING .NE OLY. wpbs AW/m TEPTEMBFn - _ IROGAMYI I®m Fan 2 ro a ?c RFTm Wrxnxc sm ®eE0 R?AMIKN me PmMA1F21r $RnRp 1.TBr TOE m TEmmc AW Il1Tifl«T IDETA (co«nc1 cRATr AWm ? CCOFnAT1N[ n10m1 ORKE FOR ARRTAx¢ AAY pW3 YRRIWTIGIL lrunslc AYALATU 1ESTIxG fdWLS) S. w pl ==m M 9TE ro w SBDB. IPFLY LNe AR.aCWIo a 1o7oVII AS KmlEOUm m n1E 9 TCT. F 1R1YG aAS xof DoT. mNRCU MRRIC q}oD b/Aaa: a 1•I 1I 12 ANAL. 5 W EV.RY40R. FERRIID,. A RL RP Sol. m wy. , W W WI SEIOYfA WlYID OC IRIRIIIR NO u1E T.'ND M Fl Y-A NRO OLD WN A DIX W A RIIR d(IUIED Mf6'S M flWL RIAE R Km AIM R4R1® AREAS IYRY m ME NEn FOR 15 DAYS SNAIL NAW WARAUE EfAAII/,tlRl NPIEA YET, ta1,R11 Ctl[iMY6 MEW(f RIIV mOMARNI V WA63. THd xr/.c rAw .u eE u? ro EE?a ap.o nrmuAnpl 1WalemolR «W Fn. NW qA! ROnxT2c FAWRe re YOm M1RA (ABIIIL «L\y POSr WfR PNl ,N:C A W WY IFMGIM 6 s nIYEA wa u DRAM. Rosr FLOW SNAU Y: Y]IYI, s1R1, OR 1YNIIEOG Mn NII11 m Imsr ou,u.L u R' "o wvm m AND IYSrALUnax W m pIF1YYI ARRRD IRAOs fABllc 9U11 ME A «n.Tn ®n]lRt FAMOC NI561N0 6 7; aN,dlq ROT MVPvMT '.'.? YAIEH.«S M?INR TO U1FA: mA TIM i uR.«pn AW BAr Tm(MURL ' I I SILT FENCE CONSTRUCTION N75 YANTENANCC ASPECT TIE AT Fi]xCE PENCdCALLY AND AfTEA FAW STDmx L1Elxi. IF FENCE FABRIC TEARS STARTS TO DECOMPOSE, OR N ANY WAY BECOMES NEFFECTIYE. REPIACE THE AFFECTED PORTION! OYEDIATELY. IEIFDYE DvP0 SEDIMENT YEAR IT REACHES NNS ME HEIGHT OF THE FENCE AT ITS LOWEST PCNT OR M CAUINC THE FABRC TO WU TAKE CARE TO AVOID ONDERMINING WE FENCE OUNNO CLFANOJT. AFTER THE CONTRHOTNG IRANALE AREA HAS BEEN STABDJLD REMOTE TIE FENCE AND SEDIMENT DEPOSITS ERRIC TIE DISTURBED AREA TO GRADE, AND STADIUM SECTION 102.07 NOTES 1) BUILDER TO INSTALL TEMPORARY CONSTRUCTION ENTRANCE PRIOR TO ANY EARTH DISTURBING ACTIVITY. II) BUILDER TO INSTALL SILT FENCE OR APPROVED EQUAL. BUILDER TO INSTALL AND/OR MAINTAIN INLET SEDIMENT PROTECTION. III) BUILDER TO CLEAN MUD FROM STREETS AND ALLEYS DAILY. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED ON IN A MANNER COMPLIANT WITH ALL STATUTES AND REGULATIONS. IV) BUILDER MUST COMPLY WITH ALL ORDINANCES GOVERNING SITE EROSION AND SEDIMENT CONTROL AND THE APPROVED EROSION CONTROL PLAN FOR THE DEVELOPMENT. V) BUILDER SHALL NOT ALTER ELEVATIONS OF ADJOINERS LOT. BUILDER TO ENSURE SEDIMENT / EROSION DOES NOT LEAVE THE LOT. VI)THE OVERALL SELF MONITORING PLAN AND PROCEDURES AS APPROVED FOR THE DEVELOPMENT SHALL BE USED IN CONJUNCTION WITH THIS PROPOSED SITE PLAN. VII) BUILDER TO OBTAIN A REFERRAL FROM THE DEVELOPER FOR THE "QUALIFIED INDIVIDUAL" IN CHARGE OF THE MANDATORY STORM WATER POLLUTION PREVENTION SELF MONITORING PROGRAM FOR THIS PROJECT SITE. BUILDER TO ENSURE THE NECESSARY DOCUMENTS PLANS AND PROCEDURES ARE IN PLACE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. VIII) BUILDER IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SITE IS STABILIZED. SITE PLAN PAGE: 2 OF 2 JOB NO. 831852 `AY`AL,oan u n nF,,,,,,Y <t : P? 50083 STATE OF ?:?-9?'?NnIAN ?pQ ?myIIIl,?rnln? I HEREBY CERTIFY THAT THE DRAINAGE WAYS, PAD ELEVATIONS, AND EROSION AND SEDIMENT CONTROL MEASURES ARE CONSISTENT WITH THE OVERALL DEVELOPMENT PLANS 1145n rHATFAI IX np/i/F / . (Z? - . , „ ^R?,