Loading...
HomeMy WebLinkAboutHydrology Report u u u u u o U J ,D I U " U ! 10 :U I IU IU U U U I , 1]' , ' I I & TLF ~ TER HORST, LAMSON & FISK, INC. 8675 Purdue Road Indianapolis, IN 46268 Phone (317) 334-1500; Fax (317) 334-1552 CONSULTING ENGINEERS , .' " t:' ),. '!" ~' . i (', f ""( 11'i::'~< > , c.L JU~, '.-' :. I;' ',rinr:> ~\.Jl..") Hydrology Report LA Fitness Retail Center and Outlot Weston Park - Block A Michigan Rd. & 1 O(jth Street Carmel, IN Tl.F Project 2007-199 June 22, 2007 Prepared by: Mark N. Obergfell Reg. P.E. #890209 I i u u - D !J U u U u o ,u , I U I IU U,.'. I , I I I I . _ . J U I ,[j I I , U' I ' I ! r ' i U'. I , I , 1 :u I TER HORST, LAMSON & FISK, INC. 8675 Purdue Road Indianapolis, IN 46268 Phone (317) 334-1500; Fax (317) 334-1552 T.LF ~ CONSULHNG ENGINEERS Hydrology Report LA Fitness Retail Center and Outlot Weston Park - Block A Michigan Rd. & 106th Street Carmel, IN TLF Project 2007-199 June 22, 2007 Prepared by: Mark N. Obergfell Reg. P.E. #890209 [J u LA Fitness - Carmel Weston Park Hydrology Report u u PROJECT NARRATIVE Existing Conditions u o The 10.1 acre site is located at the southwest quadrant of the intersection of West l06th Street and US 421IMichigan Road. The site is in Section 7, Township 17 North, Range 3 East, in Clay Township, Hamilton County. See FIGURE 1 for the Vicinity Map. The existing ground caver on the site is mostly grass and weeds. The sails on the site are Brookston silty day loam (hydrologic soil group BID) and Crosby silt loam (hydrologic soil group C), as delineated on FIGURE 2, the Soils Map. The site has been filled and soil types may not reflect current conditions. The site does not lie in a special flood zone, as shown on FIGURE 3, the Flood Map. Elevations on the site range from a high of approximately 891' MSL (not including soil mounds) in the north part of the site down to about 882' MSL in the detention ba~in at the south side of the site. The entire site drains into the Park Northwestern regulated drain, located along the south and southwest sides of the site. In Basin E-1, 9.85 acres of the site drains via overland flow to the detention basin. In Basin E-2, 0.25 acres drains via overland flow to the east into the curb inlets along the private drive along the east side of the site. The storm sewer along the drive also drains to the detention basin. The ctetention basin was master planned to accommodate the on-site development per the drainage computations for Weston Park, prepared by Civil Designs, LLP (narrative attached as . Appendix A to this report). FIGURE 4 shows the Existing Conditions Drainage Map. u u { ~ u u Developed Conditions u The proposed development includes an approximately 42,000 sf footprint LA Fitness building, a 17, 600 sf retail building, a 1.0 acre outlot as well as parking lots and driveways. FIGURE 5 shows the Developed Conditions Drainage Map. The proposed construction w:ill add about 6.9 acres of impervious area. Basin D-l, which consists of 9.76 acres, will drain via proposed storm sewers into the existing detention basin. Basin D-2, consisting of 0.38 acres, will continue to drain via sheet flow into the aforementioned curb inlets along the shared access drive. Stormwater quality will be accomplished via structural BMP units on the two storm sewer trunk lines prior to discharge into the detention basin. u U I J iU U U ~U I I U Below is a summary of existing and developed runoff values. Existing Conditions: Basin E-l 4: = 45 minutes CRatinnal = 0.25 A= 9.85 ac DevelolJed Conditions: Basin D-I 4: = 13 minutes (see storm cales for 4:) CRatinnal = 0.67 A= 9.76 ac Q2 = 3.74 cfs QIO = 5.88 cfs Ql00= 8.60 efs Q2 = 21.1 cfs QlO = 32.1 cfs QIOO= 45.9 efs Ter Horst, Lamson & Fisk; Inc. Consulting Engineers TLF Project 2007-199 Page 1 u U U o LA Fitness - Carmel Weston Park Hydrology Report bxisting Conditions: Basin E-2 ~ = 5 minutes CRatioIlal = 0.25 A= 0.25 ac Develoved Conditions: Basin D-2 l:c = 5 minutes CRational = 0.55 A= 0.38 ac u U I 1 U Qz = 0.30 cfs QlO = 0.44 cfs QlOO= 0.61 cfs Q2 = 1.00 cfs QlO = 1.46 cfs Q, 00= 2..02 cfs East Water Quality Treatment Flow = 5.17 cfs (B1vIP Unit has 6.25 cfs capacity) West Water Quality Treatment Flow.= 1.79 cfs (EMP Unit has 1.80 cfs capacity) u u u [J o u u The new stonnsewers on the site were designed for the 10 year storm event using Intelisolve: Hydra/low Storm Sewers 2005 software and the Rational method. Figures'and detailed storm sewer calculations follow this narrative. u u U IU U Ter Horst, Lamson & Fisk; Inc. Consulting Engineers TLF Project 2007-199 Page 2 "I U U o D u U o J U D U U iU U U :lJ I :U IU U FIGURES {> z ~ o ro ...J w J: In M flll $: "''', ~ COlt EG weOD " co '" N ~ 0': (.) "' 0': c" Q ,-ll RET WHISPERING LN aRE P. ~~ FIGURE 1 u Soil Map-Hamilton County, Indiana (LA Fitness Carmel - Weston Park) [J o LJ u o u [J u u o 'U I U J u u iU 565000 565040 iU I iU I o 20 40 Meters 80 120 Feet :<DO 300 N A 50 100 o USDA ~ Natural Resources Conservation Service Web Soil Survey 2.0 National Cooperative Soil Survey 565120 565160 6/18/2007 Page 1 of 3 FIW;eE 2 c=: c= C=l c::== C~' c::::=: c=; ~ C..:.J L,~_, ~ ~ [ -, L' c..J CJ c::::::: : c:::::=:; c=-: APPROXIMATE SCALE 1000 0 r---i t---i t---i 1000 FEET I LARKSPU LN ZONE X If) :r: m r co o c ;!l Z m NATIONAL FLOOD INSURAt{CE PROGRAM, HAVEN <::JeT FIRM HOOD INSURANCE RATE MAP HAMILTON COUNTY, INDIANA 'AND INCORPORATED AREAS q o ~ Z =' o u PANEL 205 OF 290 (SEE MAP INDEX FOR PANELS NOT PRINTEDI CONTAlNS' NUM,ER PANEL SUFFIX l6QO:al 02.oe ...,.. ",os 18006i =5 I I Ow t!l NQIi~~ w- ~e.-r; Tht MAf' ~UMe.~ ,J1Wl1l bllQW .I1Q..;d bot. ",wI;! Whll1"\ pkI00il'lljl mop a-rdal'tl: 'lh~ COMMl1NITl' NUMElEfl ehcwn. IiIW\o'OI ,~uld b~ 1J"liId .en il1~ul~1K"V "wl~Uo;tt rOorUl~ li"wfC'Ct eommul'ltty. MAP NUMBER 18057C0205F EFFECTIVE DATE1 FEBRUARY 19, 2003 S7 106TH ~ r;~ NORTHWESTERN OR HOUNDS CROSSING TREBAH CIR "" C> WINDWARD Wi Fed~al Emergency Management Agency J w This is sn orncial copy of a portion ofthe aoove referenced flood map, It was extracted using F-MIT On-Uno, This map does not refiect changes or amendments which may have been m~de subsequent to the date 0/1 the title block. For the latest product information about Nationai Fiood Insurance Program 1100d maps che,?k the FEMA Flood Map Store at 'A^NvV.msQ,fema.gov . 50. (12550 k..- .I~ .. . ( II'f FlU) t i~l1 .. SI) rto POINT OF T/~r::F."MENT NDrfIi1Wm~ NDRTH"',j~ST 1/4, S.:C ?-l11N-FUE (sa: REFORl) N ll9""US'..f8- E - JJO.()~ ' tJ ~_._._._._._._.-t-1;.=-tif'::; .:;;....~. ~ . 1'1 CQ"1B'JO~ W - ~ -- i''\~ ..f.I" '", i ~,2S' s ocr 3D (~~ r ; r') 5~f ~ I 1 ~~~~~ ~/:.MER. a:~I~~~~~ :-~.. ~ SEC. 1:2-nm-R2-E ~S ~ CUT "I<" IN COIiCfiET'E &1-5,735.0' SQ. FT. t~ \" RSElAR ro. , ~ W/ALLfM.?/\P t 0.... ..., "AMERfC..\li CON~_.<ihG;" .-kP",. ( ~ - / I - f//7~ -Fl~GHr-CF-W.W TO BE , ~ ~ GRANTEO PER THIS P~T / w ' t~~~3 ~~~_.;- , ..... 5 /" )(t.~- j ~ :~~I~~~ ~, ~/ ~~Pi~~:' =:;()~6 LLC \1 Z1~~~~?~~~77 OJ"~'" ,,".:.'" x"'rJ J I I / ,,- / ... x.,""" ,..0"1:<- VIC'IN[TY.MAP No.r to 5[;,1\LE +' ~ . 4~~ ~ ~ -- -:- -= .~.-=- -:-~:!:'. - .-~d;"'7 . _-:---=-;:t[~--=--=-~-=~---: - ---= --- ~ -=...-- .. -.-----.--.:-a NORn'JEAST CCRIiER/ N"QRTHWEST 1/4. SEC. 7-f17N-RJE RAJlROAO SPIKE: fO. .;- ,,,,- , .' ",+,,,j": L S' GREEN3:~~ [ : 1__ ~" K.j<" ,4 " ,<7 f'''' [ ~XISTING LEGEND: j)EScRlPT[()N~ DESCRIPTION' '" smTION CORNEA " Wp.,Trn VI'.LVE 1m hlOOlIMaq rrRr: HYDRANT <i!I R:E9AA fOU~5:l/R::9AR. SET @ WATI;R, t.lElER 0 UNJ t.WL SET @ TWffiC HANDiiDLE.: (;c UGtrr POL.E <II 1"RAfAe POLE -) GUY Wl(.:E -Ii!- TR.AFFIC Fe:oml\L ~ COMl3l'NAllO"l POLE € [lETE:LSCrR' HOiJSm G fl" P{)WER POLE S1RAJN POLE ENO:5E,I:TI{'N 8 OEClDUOUS: lREE <!l> SANIT,I,Ry fJ."'.NHOLE i. C<lNIf[ROUS TREE: i ST!oND PIPE OVERHfAD ElECTPJC UNE SIGN UIIIOERCR:OUND EL.ECTRtC [ifjJ BEEHIVE IN!...ET U~DERGRDUND rEl..EPttOME 1i[l DRAl~NJ.E: M~NHOLE WJo.~.Ci: Ut-lE m TELEPHONE CROSS: BOX GAS llMt -m- TEl,Ef'i-tONE P(OESTAL OVERHEm TRAFFIC IJ I'lE UTILITIES - OA.~MEL 0<5 ~CTRrn~Mf'<lli4nOO '1Z\\'[:i1'SOtm-l~ ~flEl.J),Ii""UQ (7i)5)~i:2<<- TELEPH:)I'~ i&C~" sa.s<li ,~01'fffl ~ ....vo.t.JE IMOw\.OPous. iii. <<i:2:~{l Id'7)~~61 ~l'CI<M:S~ WT, OF ~NEmNG Qt;:ECl\1C~ CMKl. IN 4032 (30) SlI-2.U' SANITARY SEV.€~ C'Loi.'t11l11i'NSl"PREio.lOW.l.w~ 0""'''' 10701 1'1, cmu:~e: "'".E.. Sl(. ~ 'lIiCJWW'(lL.l";,"4~!Oi-$ (Jl?) at+-e.aW UTlLItYHOnINE: ~-8M-W;-~ l)lJ'[3IE: ~ h!lOO-Ue.-!.\2oo f'U'(l":"RJl'. ~ , 230 ""'EST MOOI<lS Sml"ET ltiCb\NAPCUS, 1r~~"" (.)17)2031--327(1 == "fIMt: WARNER C"s.LE 516 E_ CARMEL [JRIVE GARMf.L.,If.l46D32 pf':");T.l:...a71'l) """"'B. CAr:I.lI5,l.IJTJLITl:::-8[}EPT Ut1ECI"ICSalJARE ~~~t~~ INDlA.'1,",PQLIS 'll"ATER CO. ro.D. 80X 12'20 1~[}IM{APCllJ.S.1N4ro'la C317jtrn.15C-J I'fOTE: lliE SIlf 1<<> l..OCJr,1IOfl Cf 1JTl1.JTJf3 ME PER PI.AN:i HtD W~ POOVIIEDW'rnE:"ESf'[CTl'JE:UTllJTYe~l.Ip.ll'IES..l\l..ltJTIt..rrr~p~:ES Slw..L m: If01FIrn PRIOR ro Mff D:CA.\LIJtOM rorI: flf;I..O ~11OH r:IF ,,,,",,,, .1" , - ^~/ xtlo,"i .,,,';\,,..-' ?":I ; ~ ,/ -' , ~~~:/~~ FORMERLY; ~---rirn'5 ~NA MU LP. ~NST. 19:70913""'1 &: 2: 01-628 i'lOl1THWESTERN ORNE ZIDNSVllLE, IN'DlANA -4S077 " / /. .// / " 200' WIDE (rfIV ~OSf Ul.lrr')~ ,," PlPEo UHE WEMENT ,.,- {BCOK 280 PACE: .04-94) / (1Tl"LE rrru C7) /' /' ,,- " ,,- ,,-"- " " /" ,,- " ,,- " /. \ I \ i I \ NDW:~ Sff:lPLY $TOMei:: 2JONS'JIU_E. LL.C " , ADJDINER: ~~~R~BIT^~S D~~ ~cCMr1 AND COI.!P'ANY uc INST. #2000Co..OOi755 ~ ....ORl1-lVo'ESTERN OoRI\I'E: 2IONSYlLLE. INOI.".N.~ 45:1)1] PDf./TIDN OF" lOT 2 Sill:;:; KIT( "lIC~OAD, l!..C D>iST, , 2OO:rooo-.f-.3? I'i 9' I L.AN[] Dl'.:5CRII'lTION [FER. TI"1"LE: COM';'4TJ'MEl'ITl :Blo~k ~A. i!'l We,,:o.n Podo: SeconJ<Jr'l' Plol, tile plol ~t \1'hietl wo~ r~cordo"'d I~o~~h 12, 2[)0.4.. on Plu~ J;obi.n"ilt 3, Slide :S1'51 -lU l~lllfllf'\1/!:nt 'lOIH-OOOlIi061, ..... the CHk~ Q' U'''il P;~.c:ord.c:r et Iiam,llt'lr'l Coul"1:ty. 11ldiOr1-<:l. 9uq,v~YOR.'E> REPOR.T I, 111 -Qo;;CQrdCll\cl! with TiWe 86;, Article I, O,<:Ifil,.,r 12 "f !ht.: Inc,ono Ac'minilllr!;ll,iv. Code ("Rv;ll' 121. the rorlo"i';~ of::,'I"rvotion!< and op;:nio..", '\l'-~ 'j:~iLlc-d reqOlrciing tM ..or,.:lu!'l L1n~ertainlj!:3 ill IT-e 1.;>c:q~ioI'lS or ltl~ llnll::;; Qlld c.-orQfl'rs 8slooIJsned thr~ $ui'Va)' Cl:ll <I ~"'~L1H of unc;er1uin-tie& in rcfsrsnc./l l1'1(ltll,Jm.el'l!ation; in. (",cO<'d d..:sc:ipt,~nl ",cod pleats; ill lines or CH::cupCltion: (Ir1-d o..~ itltrodLlced tly ron.,1om ....rrors in.. ml!.o;uremAIlt C"TheoretiC::~1 UnccrtQir.n-1. Ihere ,:r!<lY bl!: ur'lwrltl!:n rlghls Q:!;!:-Clclot.e4 'l\'ith th-e3~ uM:::erlcIiM:iM. The c3;er'ot ~hoold ",:;;.s..umo!! the-rt!! ;$ (In -Qm~...nt .of wne.ettaiMy oJOt'\9 M,. I;.w: eqLJOI in r'1-'kIg<'iitude I"" tt>e Qi:s~.c:po",:y ill tr..e ,4~liol'lo 01 1:I1e Ein~ c,f PCl~=~~i6;I- lrum till!' llU-l""\l~;J IIl'1fi. ,IlJJ SlJrote)! m<::I''ltlmMt''l "I~I o~ found lhi" ~-I""\I"y ar.. fll,l!lih 'll/iLh e~i:;;tirlg gre:d:e urlle~:; ol1leJ'\'o'i!:;~ Ml~d. Thr:: <1"1",,(1':[;"'<'11 LJncerl:OLol)' (ci,,'" l.:l ..mlloom ~rrgr~ in mllO.lll.lrerner.t)-or the c:o.~nU~ of ll'l..: 1:Ubil!!ct lract C'!Itobli:l;l'led thl~ ~l.Jr.-ey " ...,thin lh-e "f"l'cifi';f,llkm5' rr;l'r !J o;';lass C SUN~ (0.5-0 fe:.l) e:s ddinl!:d 1'1 1.l\C 8i55, p..rpcse o~ Surve)': TI,e purpose Qf !;hi! S~"''''Y i~ to prepare:' 0 bO\l-n-.:tory :;:u-rv~J' (Jj the 'Ilbo>n; deso:;ribcd lanl;!. Boxis af Bl!!arjng!:~ The b-1:L~i::J o. b<'.:C'Iri"9'l; W thi..$ ,.u~ ill- per lflq. ,,",Io~, Tni:\: SI.Irv~)' is OQ~.c:d IJpM piior ....~:t.:.. r...... lll" s.,ct:tndary :PI",~ or Wesf~n Por1<l ~omplctcl1 b)' ernl ne.."lign~, LlP.03 Job Number .DJ--IS.a ono c-erlilied an I.Icrcn 2. 200+. Sold plol 15 reccrd~<J In ~h~ Orli,.c: 'Ill ,ho!! Rl!cOrller 1-i'I HomLltor. C<:l-u<1t)f, ~Il<:liana CJll- 11l~-tlUmElnL ~lOO{-16061. So,d [>lClt cross r~-fe'-~'l~19 ll' \l~.n.'ey !;It the ~il:! OIlCl'(lD :'Iu~Il,.";,,ion "hieh. Fs re~,"rdc,j ill ~id Rt:eord".':'l Office 0:'1 In$!:f1Jm<enl. ~~OO3-S0608. MditioMlly t.".c ~ur""eyg _~e corlilicd b]!' Tania M :;lruq l<lr O"iI Des''':Ifl:;: Project Numbet!i 0-1--124 one 04-1!8 lo~ lo~ 1 am!' J of tl'l'il pllit. r~etcr"',.,ce f,{Orlum",ntotion; Se-II-eHll monwnents w<,:r.c: .rec~vered inclu<!ln9 tho~;:: ::;:hown alCln~ the "'e-llt Ol'l-d !QUlh liMes "f tl't.... plot. 'l'h~g~ IoCQli~~", <;Iqree well ....ith ~hot sl1q'!'ll1 at It'lc I'lE..C-H'WO_ Ho..~,<c~, 0 r"oor ...itl1 Q yelJ.."" (lI:lp_ no IQn....,r l-eqlbl~ l'Ias fc.urld on the ~d<':nsfOrl 0.' thl!! rlorth quarhr line: lJ.ut 0.8 fc-el wMI of rbc JX'>S,tion oF tile ~c:- NWO ~,- Ul!!! plQ l, R:cCGrd De~cripli<>Il'" and Plats; ~o- o;;Io:ed ~(lJlIl- or everlaps cHid;t i.I!'llt!!:!; ...lr1"'.....''''e no~ed Lio~s of OCC\JP"JlJ.Qjl' VoriotiOI'U in [inc~ cd oX<.Jpo.ioo or<e us !'lCo'to:::.l. 2. Tho!! "'~urQCJI or eny noa:a h<nard <:101M :;ho-..,) Co,l thi~ ti\Jr'''I!I)' I,. I;u?-iect to map :s~ol~ IJnoert~'I1I)' .end to on)' Coltle,' L1olc<:rtoir1ty in loc::JtI'::Jf1 "f ~I"",otion en ~c ~erel"l!lrl~~d, RoC>d- InsLJtaJloce ROlle ~IQP. Tho': ptapcrt)' t;lO:<'l-<;:r~bC'd o-n thic SVfVey ill N;)T lo........oted ,Ii lone}, 0,.- <<,",oj lrQo;~ plQlW by ~eQ~o'.: Con Communit)' PlIlIl';l N(J. 1-80081 0:<:05 F of U.C f1Q~d In,w('Qnc:e Rotc r.top~ f~~ lh~ Clly of Cormel, HomiJtcn C(Jl,ln~. Indiono dated F.c:tll\Ul'"l }'J, 200} J. o..l1n:l'hip inl!;ll1TlOtion lnd:c(ll-ed he~eol"l! ,~ <'l:s icFe,1tifil!!d III O;v"ly Q'r Town::.t'lip ,'l!e-cf'dS Of O/'l liU", work pro~id(:cj: t.)' othe-n. 4, Evid~c<: of s~urc;e or titJ:e fO'r O',J porli-on o' th-e subjeot I(Ocl wcs pro~id"d in the fo-rm o:;Jf Ch.ico,;oQ Tme: Insuronce Cempot'l)' l:ommitr'iier1t n\J!l1t>er 3.90976, dat~d ae~o-bu eo, .:20015. ~o~t <;>1. ~,,-e Items shown ihereql1 m(Jy hav~ b-een d~p1cl-<'ld on Ill" ,.urv~)' ond ore iQ'~ntin~d by O1.c:ir re~or.c;n9 dat-a. Sh<luld <:Injo' o.:Iditiuool. it"m:r need t~ ~., o;Ioepoic:.cd .en t1'l-e .'\I~~~ ple(JS~ o6vi~-e "..no;! pro\'ido!! I;h~ (JPI',,'o:;Jpr1o::Jlo!! o;l(lcumll'nts. 5_ I o{f]rlTt. und=-r the ~.':noItIM for pet jury. that I nave t"JkWl r'llason(lble car.': 1,0 ft-1M'::1 to~1'o ~io, s:celH"t:.' n-uml:,.,( ,n tr.i~ co.::um<!l1'l, unlcn. ~.c:qulre-d by law. Et~c'ldl~y P. on... Ei\ ~o ~tr"l><':tlH'al tncroOChmCIlI'll OIfere ol:serYcd, 7_ This silo!: i=- ;;r.Q'n.e~ ~-1 (ll"I4\.l5trial) per hltp:llgi~.(:\)rrn.c:l.ill.go"/n'QP/il1de:l(.cfm. The ralloll'in<; setbC'lck r~lIiremer'lti -ani p-u CARMa. CITY C()D=: Crv.~'n:1( 10: ZONINC 8: SUBDM'SIO,)IiS MTlCL'E I: ZONING C'JDE:: CARMEL ~ONING ORCIUi\NI;( CHI'IPTER :2(;,0,: 1~1!I/'lULJSTRIAL DISTRICT 20......04. !"eight crld /\reG Requirement!. CSee Chop~.- 26: A.i;lr,JIUol1ol Height. YCtd, d:: Lr,1 fvM.. R"'iul<:lllo.n:1I 'o( .6-d-dliiol1<11 r.eQlll~emr.Mts.) :2J)A._M.01 J;.axrm<J1T' ~.,Igi1t: Sixty CMlj f(l~L 20A.O<k02 loIioimurq fl'Qrll Y(lrd: A.cUln' {1 5-) jet:~. ZOA..D4-,OJ ~Inimum Side 'fOrdo I: 1(\-1l....l;lti<ll .... Du~in..!j:~ U~i: Of ~Qrnng ot1\Jttin; ~"~l'lii$Cs; !'ton:'l; 2, Reslc!entiOlI U31!! or 2o'li'11.o:JblJ\liml premlsn; five {5) feet 2Oo"',04-.D'I Mil'llmu-m Rear Yotr;i; fillo!!<erl (15) teet. 2..0A:u..Ct5 !o.Iweinil,lm Lo: CD\lcragc: NiMt)'. pereent C90~) (Jl th~ Jot. .. ~~'~~J-::~l; !~J69-0?: Z-411-:-,a:J; Z-415-tJJ: 1-.f.5J-04 ~;;: ..;~ :,'. ,: -, '--:!~,,-,' :-;;->" .1 r '~?\~~'~;~~~ai~;~~:r:~~~~e ::~mpQI1Y, :rhi~'<i~"':lo:'.c.erllt1 t~at 'lhiS:'map or. plot arKs the: ~1,Ir\''''f en i.'tricfI jl ,~ ba'5:cd 1IIc-~e made In oceo..-doncc: ;";111. '1;lI1lmum S~(lf1dor-.c:I. Delnij R~qulrem<:!'Its for ALrA/ACSI<! Lond Ti;.lc SU'l'\l~" joi"t1~ <!!:5;tubli3h~d 0:;-11<1 U<Jopt~. ~ A-LT"', ~S!ll "'ll<! .NS-PS 111 2005-, an.;! II'lCILldes It~m~ 1, 2,. J, of. ~, 70, 7b. 7c, S, a. In, 11a. ond .13 Q/' 'oble_ ~ .tn~reot. . f'ur~"nt M -tho: kcu,,"cy 'StafHIQr<lIS 0:1' o.llo.~tellb.l' AU.I-, N5~ ';lfld ACSM .in cff~ot ~n thoe <k>te of til,,,, l;:'I'r~Uiwtion. un\l~r.gigMd fltrtl'oef =,"Il",s Iho~ tn-e f'o~i1iWlal U"l:,",rM~nlie3 re-~uitil'l'il Fr~ In.c:~urvey m<!!1l3Lrl"emo:nh mod~ om ~M ~wvey do not e~~~"'d Ille o:lllow<;Ible PQSililJno1 TC.19;o1'l~~;. T~ tho: b"'~'l.t 01 my kr1Qo""''I'd~c andl be-li.ef th~ "";If',in plol: "'epr-e~enl::il g sU'rve" . moci~ ..."I'to:r my 'o,JP'Crri:Sl~dl in aeC'ordo:lnce '/'i th Till<:; EmS, ""Ide 1 ~hop,cr 12 ..t tl'lC Il'IdlOno Mrni'nliillro;tI\I'Il C<ode, the fit.:ld ...ork 'or lhi, wrv~y I','<llS compl~t~<':I in fct>i'ucJry. 2007. ,\\1\\UHI/., o.."\. \. ~ Y P I,,~I', $"'~'t-:"~~~Yik':" 0;<:--:. ~<l)"~ ~....l,':, ~ "\.. ;'1Ef~15F ) "1 ~~:-Y.iiJ~91f~:-:;~..,~ J'-I SUR \-'\\ l"t,.tiIU\\'\ ['rqt~d this 24th da)' or t.!o)'. 2(J07. (l.. fI{) /: O;tt- Br~~ PLS 1~500012' Slott!! <;Jf ~l1dic nc 8ENCHMARKS: ~ A CHISELED "";{M ON S. SlOE GOHG. UGKT P<JLE S,~E, S. SlOE' PE,&,RSOH F'ORC OEJlJ.fRSJiIP. N. SIDE ur- 106tho STREET. E. SlOt: OF OilAA"IC!:: DflM;, ~00':i: W. -OF "lICHIGAN I'!OMJ. ELDI::. 6'98.25 eMI rw<;II':""~ TB~Nl soul}! .BOHNET BOli OF A flJiE H'tDRM[f LOCATED 6+":10 SCUTt! Of Tl1€ CENTER'UNE 'OI'iTH ::il'Rf:ET &:: JUST WEST {IF' THE E,.OST Er.rrRloNCf ORlVE; f.O Pf(0~Tf FROM 1D6rn ST. EL[\,I = 894.;86- i"1V11 ()F"SI,"";NO<; TAMJI? ~Utl-l BONNET BOLT OF A ARE HYOMJr lOCATED 21' WEST OF THE CENTERWIE CJF ACCESS ROAD ,oO;NO 3,'::1: N()fm-1 Df THE SOUThWEST CORNER OF lOr :2. a.rv _ B!H.09 PREPARED fOR TER HORST, LAMSON, & FISK, INC. 867S PURDUE ROAD INDIANAPOLIS, INDIANA 46268 I " / ') ! TOPOGRAPHIC SURVEY BLOCK "A" WESTON PARK 106\h ST. & MICHIGAN ROAD CARMEL. INDIANA REVISION RECORD c:~ OAT!;, OWN. BY: CH:,m. BY: I SCALE- 05.18.2007 SES BPO I" ~ 50' Civil Designs ~'lS Ditl!ctor. It,_ ~l""~ Irodt....IOl-P'-'llli. In 462~1 317~:;>H__1953 FAX-Z-44-19G9 PROJECT NUMBER 07-162 (SHEET 1 OF 1 J F/~(/tf(f '-I EX/oS n/J 6- CUVD II7()1.)S ~~~;!f~ <'S:i:";'ijy;'n1; =LinO"Hannk.'9 I~----- I !{,:-"T .p ~")",. 1!V/<;;~nc, u.s. onl Qry ~ , ." ~" curb inl.e' tor" 89:2,-0 iny = 888. . w6t~r line 1 ~n;: N i ~T ,1 011\1 J -= DV ~o"ita mO<1l1d", tor.... e'3.3.30 inv{....)_ B78.50 if'l....($8)-a7-8,..~ ,.~~ --"-'-OOS ::;<;I'lito;,r 'nlJnho-le lor... B!il4,09 irw(s....)= Et7J.2J In...(,....)=6-60'..:51 inlJ(nw}=873.N ;n...rn'll'}..684.l;l9 inv(!i}=B7J.2,3 ;r1V<nll~=a7J.19 FIW((E ~ b~ (JJNbl7JONS ~6.e7 -fl.55 _~e..84 ,~ I .--1 U J U U U D U STORM SEWER CALCULATIONS ( , :U I I [j U !U ILJ I I I I '0 I I o I 10 I I :u D U ID I ~.~ c= c=- c:::=:: c=:: ~ c::::= c== ~ I: c= ~: c:::=-: c::::= c=J c:== c:::= C~ ~ Hydraflow Plan View -< J 0 &-ni 'S;.1': IO~ Project File: LAF-Carmel.stm ? No. Lines: 24 06-18-2007 Hydraflow Storm Sewers 2005 c=:- c=: c:= c=:J c::= c_~ ~ ~ Storm Sewer Inventory Report C::=~ c= c= C~ c= c::::::::J ~ ~ c:::= c=J C=J Page 1 Line Alignment Flow Data Physical Data Line tD No. Dnstr Line Defl June Known Drng Runoff Inlet Invert Line Invert Line Line N J-Ioss Inlet! line length angle type Q area coeff time EIDn slope EIUp size type value coeff RimEl No. (ft) (deg) (efs) (ae) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 1 End 48.0 -55.0 MH 0.00 0,00 0.00 0.0 882.70 062 883.00 30 Cir 0.013 1.00 889.80 101-100 2 1 4.0 -35.0 Comb 0,00 0.73 0.79 5.0 883.40 2,50 883,50 30 Cir 0.013 0.60 889.60 102-101 3 2 124.0 0.0 DrGrt 0.00 0.79 0.77 5.0 883.60 0.48 884.20 30 Cir 0.013 0.80 890.40 103-102 4 3 128.0 0.0 DrGrt 0.00 0.72 0,78 5.0 884.30 0.39 884.80 27 Cir 0.013 0.80 890.50 104-103 5 4 136.0 -30.0 DrGrt 0.00 0.86 0.79 5.0 884.90 0.44 885.50 27 Cir 0.013 0.80 891.30 105-104 6 5 116.0 -60.0 Comb 0.00 0.43 0,67 5.0 886,50 0.43 887.00 18 Cir 0.013 0,80 892.00 106-105 7 6 136.0 75.0 Comb 0.00 0.29 0.58 5.0 887.20 0.44 887.80 15 Cir 0,013 0.80 892.60 107-106 8 7 8.0 -70.0 Comb 0.00 0.24 0.75 5,0 887,90 2.50 888.10 12 Cir 0.013 0.80 892,60 108-107 9 8 130,0 70.0 Comb 0.00 0.22 0.55 5.0 888.20 0.77 889,20 12 Cir 0.013 1.00 893,60 109-108 10 5 136.0 30.0 DrGrt 0,00 1.02 0.81 7.0 886.00 0.74 887.00 18 Cir 0.013 1.00 893.50 115-105 11 6 30.0 -10.0 Comb 0.00 0,14 0.76 5.0 888.00 2,00 888,60 12 Cir 0.013 1.00 892.60 120-106 12 3 135.0 -90.0 None 0,00 0.25 0.90 10,0 886.00 1.00 887.35 10 Cir 0.013 1.00 893.50 roof-103 13 4 96.0 -90.0 MH 0.00 0,00 0.00 0.0 886.00 1.04 887.00 12 Cir 0.013 0.80 892.60 125-104 14 13 76,0 45.0 MH 0.00 0.03 0.90 5.0 887.50 0.92 888.20 12 Cir 0.013 080 892.90 126-125 15 14 48.0 -45.0 None 0.00 0.10 0,90 10.0 888,30 1.04 888.80 10 Cir 0.013 1.00 893.50 roof-126 16 .13 60,0 0.0 None 0.00 0.10 0.90 10.0 887.10 1.17 887.80 10 Cir 0.013 1.00 893.60 roof-125 17 End 60.0 -70,0 MH 0.00 0.00 0.00 0,0 883,00 1.67 884.00 18 Cir 0,013 1.00 891,50 201-200 18 17 4.0 -20.0 Comb 0.00 0.13 0.67 50 884 AD 500 884.60 18 Cir 0.013 0.80 892.10 202-201 19 18 84.0 -50.0 Comb 0,00 0.12 0.70 5.0 884.80 1.19 885,80 18 Cir 0.013 0.80 891.50 203-202 20 19 110.0 47.0 Comb 000 038 0.71 5.0 886.00 100 887.10 18 Cir 0.013 0.80 891.00 204-203 21 20 184.0 2.0 Comb 0.00 0.43 0.79 5.0 887.20 0.49 888.10 18 Cir 0.013 0.60 892.30 205-204 i Project File: LAF-Carmet .slm Number of lines: 24 Date: 06-19-2007 Hydraflow Storm Sewers 2005 C-~ c:= c:= c:=:= CJ c: c:== c=J Storm Sewer Inventory Report L-: ~ C=~ c= c=: ~ CJ ~ ~ .CJ c= Page 2 Line Alignment Flow Data Physical Data Line ID No. Onstr Lille Oefl Junc Known Drng Runoff Inlet Invert Line . Invert Line Line N J-loss Inletl line length angle type Q area coeff time EIOn slope EIUp size type value coeff RimEl No. (ft) (deg) (efs) (ae) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 22 21 192.0 0.0 Comb 0.00 0.50 0.75 5.0 888.30 0,47 889.20 15 Cir 0.013 1.00 892.80 206-205 23 19 72.0 90.0 None 0.00 0.25 0.90 10,0 887.00 2.08 888,50 10 Cir 0.013 1.00 893.50 roof-203 24 20 84,0 60.0 None 0.00 0.25 0.90 10.0 887.50 1.19 888.50 10 Cir 0.013 1.00 893.50 roof-204 Project File: LAF-Carmel: .8tm Number of lines: 24 Date: 06-19-2007 Hydraflow Storm Sewers 2005 c::J c.:::= c=:-.J 1- -; c=J c= Storm Sewer Tabulation CJ C=J c= C:=~ CJ c=: ~ ~ L. J ~ 1--: c= C=-~ Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd I Rim Elev Line 10 coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up On Up On Up Dn Line (ft) lac) (ac) (e) (min) (min) (in/hr) (cfs) (ds) (ftJs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 48.0 0.00 5.92 0.00 0.00 4.55 0.0 12.4 5.0 22.65 32.42 6.86 30 0.62 883.00 882.70 884.60 884.29 889.80 885.00 101-100 2 1 4.0 0.73 5.92 0.79 0.58 4.55 5.0 12.4 5.0 22.66 64,84 4.98 30 2.50 883.50 883.40 885.63 885,65 889.60 889,80 102-101 3 2 124.0 0.79 5.19 0.77 0.61 3.97 5.0 11.9 5.1 20.14 28.53 4.45 30 0.48 884.20 883,60 B86.21 886.01 890.40 889.60 103-102 4 3 128.0 0.72 4,15 0.78 0.56 3.14 5,0 11.4 5.2 16.22 19.35 4.25 27 0.39 884.80 884.30 886.77 886.49 890.50 890.40 104-103 5 4 136.0 0.86 3.20 0.79 0,68 2,37 5.0 7.6 6,1 14.43 20.57 3.91 27 0.44 885.50 884,90 887.32 887.11 891,30 890.50 105-104 6 5 116.0 0.43 1.32 0,67 0.29 0,86 5,0 6,9 6.3 5.46 6.89 4.01 1B 0.43 887.00 886.50 888.01 887.66 892.00 891.30 106-105 7 6 136.0 0.29 0.75 0.58 0.17 0.47 5.0 6.1 6.6 3.09 4,29 2.87 15 0.44 887.80 887.20 888.71 888.43 892,60 B92.00 107-106 8 7 8.0 024 0.46 0,75 0,18 0,30 5.0 6.1 6.6 1.98 5,63 301 12 2.50 888,10 B87.90 88879 888.84 892.60 892.60 108-107 9 8 130.0 0.22 0.22 0.55 0.12 0.12 5.0 5.0 7.0 0.85 3.12 2.06 12 0.77 889.20 888.20 889,59 889.10 893.60 892.60 109-108 10 5 136,0 1,02 1.02 0.81 0.83 0.83 7.0 7.0 6.3 5.19 9.00 3.58 18 0.74 887,00 886.00 887.99 887.68 893.50 891.30 115-105 11 6 30.0 0.14 0.14 0.76 0.11 0.11 5.0 5.0 7.0 0.74 5.04 2.34 12 2.00 888.60 888.00 888.97 888,52 892.60 892.00 120-106 12 3 135.0 0.25 0.25 0.90 0.23 0.23 10.0 10.0 5.5 1.23 2.19 3.01 10 1.00 887.35 886,00 887.84 886.77 893.50 890,40 roof-103 13 4 96.0 0.00 0,23 0.00 0.00 0.21 0.0 10.7 5,3 1,10 3.63 2.28 12 1.04 887.00 886.00 887.45 887.28 892.60 890.50 125-104 14 13 76.0 0.03 0.13 0.90 0.03 0.12 5.0 10.3 54 0.63 342 3.00 12 0.92 888.20 887,50 888.54 887.79 892.90 892.60 126-125 15 14 48.0 0.10 0.10 0.90 0.09 0.09 10.0 10.0 55 0.49 2.24 2.50 10 1.04 888.80 888.30 889.11 888.64 893,50 892.90 roof-126 16 13 60.0 0.10 0.10 0,90 0,09 0,09 10.0 10,0 5.5 0.49 2.37 1.89 10 1,17 887.80 887.10 888.11 887.72 893.60 892.60 roof-125 17 End 600 0.00 2.06 0.00 0,00 1.61 0.0 11.1 5.2 8041 13.56 6,02 18 1.67 88400 883.00 885.11 88411 891.50 884.00 201-200 18 17 4.0 0.13 2.06 0.67 0.09 1.61 5.0 11,1 5.2 8.41 2348 6.72 18 5.00 884,60 884.40 885.71 885.32 892.10 891.50 202-201 19 18 84.0 0,12 1.93 0.70 0.08 1.52 5.0 10.9 5.3 8.03 11.46 5,71 18 1.19 885.80 884.80 886.88 885.95 891.50 892,10 203-202 20 19 110,0 0.38 1.56 0.71 0.27 1.21 5.0 10.5 5.4 6.50 10.50 4.80 18 1.00 887.10 886.00 888.07 887,21 891.00 891.50 204-203 21 20 184.0 0,43 0.93 0.79 0.34 0.71 5.0 6.0 6.6 4,71 7.34 3.89 18 0.49 888.10 887.20 888.93 888.41 892.30 891.00 205-204 Project File: LAF-Carmel:.stm Number of lines: 24 Run Date: 06-19-2007 NOTES: Intensity = 5697 J (Inlet time + 9.00) ^ 0.80; Return period = 10 Yrs.~ Hydraflow Storm Sewsr> 2005 c= c: c= c=: ~~. ~ Storm Sewer Tabulation ~ CJ C~ c=: c:= c::::=: c=' r==...: C=l c=:: c:= ~~ ~ Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd I Rim Elev UnelO coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up On Up On Up Dn Line (ft) (ac) (ac) (C) (min) (min) (inlhr) (cts) (cts) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 22 21 192.0 0.50 0.50 0.75 0.38 0,38 5.0 5.0 70 2.62 4.42 3.06 15 0.47 889.20 888.30 889.88 889.41 892.80 892.30 206-205 23 19 72.0 0.25 0.25 0.90 0.23 0.23 10.0 10.0 5.5 1.23 3.16 4.54 10 2.08 888.50 887.00 888.99 887.36 893.50 891.50 roof-203 24 20 84.0 0.25 0.25 0.90 0.23 0.23 10.0 10.0 55 123 2.39 2.96 10 1.19 888.50 887.50 888.99 888.44 893.50 891.00 roof-204 , Project File: LAF-Carmel...stm Number of lirles: 24 Run Date: 06-19-2007 I NOTES: Intensity '" 56.97 / (Inlet time + 900) ^ 0.80; Return period'" 1 0 Yrs. Hydraflow Storm Sewers 2005 ~ ~ ~ c=J c=J ~~ c=; Storm Sewer Tabulation C=~. C:=-~ CJ c:=:. c:::=: c:::=:J L~ c=: c:= ~. CJ c=:! Page 1 Sta~jon Len Orng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd I Rim Elev Li ne ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up On Up On Up On Line (ft) (ac) (ac) (e) (min) (min) (in/hr) (efs) (ets) (ftls) (in) (%) (ft) (ft) (ft) (ft) (ft) (ftJ 1 End 48.0 0.00 5.92 0.00 0.00 4.55 0.0 13.2 6.9 31.42 32.42 6.66 30 0.62 883.00 882.70 885.25 885.04 889.80 885.00 101-100 2 1 4.0 0.73 5.92 0.79 0.58 4.55 5.0 13.2 6.9 31.43 64.84 6.40 30 2.50 883.50 883.40 886.05 886.03 889.S0 889.80 102-101 3 2 124.0 0,79 5.19 0.77 0.61 3.97 5.0 12.9 7.0 27.78 28.53 5.66 30 0.48 884.20 883.60 887.14 886.58 890.40 889.60 103-102 4 3 128.0 0.72 4.15 0.78 0.56 3.14 5,0 12.5 7,1 22.24 19.35 5.60 27 0.39 884.80 884.30 888.22 887.55 890.50 89040 104-103 5 4 1 36.0 0.86 3.20 0.79 0.68 2.37 5.0 7.6 8.6 20.31 20.57 5.11 27 0.44 885.50 884.90 889.27 888.69 891.30 890.50 105-104 6 5 116.0 0.43 1.32 0.67 0.29 0.86 5.0 7.1 8.7 7.55 6.89 4.28 18 043 887.00 886.50 890.32 889.72 892.00 891.30 106-105 7 6 136.0 0.29 0.75 0.58 0.17 0.47 5.0 6.5 9.0 4.23 4.29 3.45 15 0.44 887.80 887.20 891.23 890.64 892.60 892.00 107-106 8 7 8.0 0,24 0.46 0,75 0.18 0.30 5.0 6.5 9.0 2.72 5.63 3046 12 2.50 888.10 887.90 891.42 891.38 892,60 892.60 108-107 9 8 130,0 0.22 0.22 0.55 0.12 0.12 5.0 5.0 9.7 1.17 3.12 1.49 12 0.77 889.20 888.20 891.86 891.72 893.60 892.60 109-108 10 5 136,0 1.02 1.02 0.81 0.83 0.83 7.0 7.0 8.8 7.27 9.00 4.12 18 0.74 88700 886.00 890.39 889.74 893.50 891,30 115-105 11 6 30.0 0.14 0.14 0.76 0.11 0.11 5.0 5.0 9.7 1.03 5.04 1.31 12 2.00 888.60 888.00 890.83 890.80 892.60 892.00 120-106 12 3 135.0 0.25 025 0.90 0.23 0,2;,) 10.0 10.0 7.8 175 2.19 3.20 10 1.00 887.35 886.00 888.74 887.88 893.50 890.40 roof-103 13 4 9S.0 0.00 0.23 0.00 0.00 0.21 0,0 11.7 7,3 1.51 3.63 1.92 12 1.04 887.00 886.00 889.21 889.03 892.60 890.50 125-104 14 13 75.0 0.03 0.13 0.90 0.03 0.12 5.0 10.5 7.6 0.89 3.42 1.13 12 0.92 888.20 887.50 889.34 889.29 892,90 892.50 126-125 15 14 48.0 0.10 0.10 0.90 009 009 100 10.0 78 0.70 2.24 148 10 1.04 888.80 888.30 889.39 889.35 893.50 892.9D roof-126 16 13 60.0 0.10 0.10 0.90 0.09 0.09 10.0 10.0 7.8 0.70 2.37 1.28 10 1.17 887.80 887.10 889.35 889.28 893.60 892.60 roof-125 17 End 60,0 0.00 2.06 0.00 0.00 1,61 0.0 11,0 7.5 12.00 13.56 6.79 18 1.67 884,00 883.00 885.82 885.04 891.50 884,00 201-200 18 17 4.0 0.13 2.06 0,67 0,09 1.61 5.0 11.0 7.5 12.00 23.48 6.79 18 5.00 884.60 884.40 885.59 886.54 892.10 891.50 202-201 19 18 84.D 0,12 1.93 0.70 0.08 1.52 5.0 10.8 7.5 11.44 11,46 6.48 18 1.19 885,80 884.80 888.23 887.23 891.50 892.10 203-202 20 19 110.0 0.38 1.56 0.71 0.27 1.21 5.0 10.4 7.6 9.24 10.50 5.23 18 1.00 887.10 886,00 889.83 888,98 891.00 891.50 204-203 21 20 184.0 0.43 0.93 0.79 0.34 0.71 5,0 6.1 9.2 6.57 7.34 3.72 18 0.49 888.10 887.20 891.10 890,38 892,30 891.00 205-204 Project File: LAF-Carmel:',stm Number of lines: 24 Run Date: 06-19-2007 NOTES: Intensity '" 92,721 (Inlet time + 11.00) ^ 0.81; Return period" 100 Yrs. c.Jv c..t:. k ("ou/";//r C, II Jf& L.. ~/rMJ n~ t'~I.I. :.0 K. Hydraflow Storm Sewers 2005 LJ C-= c::==: c= CJ c=: Storm Sewer Tabulation CJ CJ ~- c= CJ C=~ c::= c=:! LJ c= c:=: c= c= Page 2 Station Len Orng Area Rrioff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd I Rim Elev Line 10 coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up On Up On Line (ft) (ac) (ac) {C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 22 21 192.0 0,50 0.50 0.75 0.38 0.38 5.0 5.0 9.7 3.63 4.42 2.96 15 0.47 889.20 888.30 891,92 891.31 892.80 892.30 206-205 23 19 72.0 0.25 0.25 0.90 0.23 0.23 10.0 10.0 7.8 1,75 3.16 3.20 10 2.08 888.50 887.00 889.70 889.24 893.50 891.50 roof-203 24 20 84.0 0.25 0,25 0.90 0.23 0.23 10.0 10.0 7,8 1.75 2.39 3.20 10 1.19 888.50 887.50 890.97 890.44 893.50 891.00 roof-204 Project File: LAF-CarmeL,stm Number of lines: 24 Run Date: 06-19-2007 NOTES: Intensity" 92.72 I (Inlet time + 11.00) ^ 0.81; Return period" 1 00 Yrs. Hydraflow Storm Sewers 2005 CJ ~ L---.J c= Inlet Report L..J C-j c: CJ ~ c:= .c=J c=: c= c:= r--- -1 L-~ c=: c:::=.: C' c:=J C1 II Ok.. Page 1 Line Inlet 10 Q= Q Q Q June Curb Inlet Grate Inlet G utte r ~ Inlet Byp No CIA carry capt byp type line Ht L area L W So W Sw Sx n Depth Spread Depth Spread Depr No (efs) {efs} (efs) (ets) (in) (ft) (sqft) {ft} (ft) (ftIft ) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) MH~<O .. 1 101 R-1772 0.00 0,00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 000 0.00 Off 2 102 R-3287-15 4.03 0.00 4.03 0.00.., y~~i J.3 3.60 3,60 3.60 1.80 Sag 1.80 0,040 0.012 0.000 0.33 23,30 0.33 23.30 0.00 Off 3 103 R-2251 4.25 0,00 4.25 0.00 DrG rt 0.0 0.00 2.90 2,35 2,35 Sag 2.35 0.012 0.012 0.000 0.34 59.49 0.34 59.49 0.00 Off 5'/'1);1- 4 104 R-2251 3.92 0.00 3.92 0.00 DrGrt 0.0 0.00 2.90 2,35 2.35 Sag 2.35 0.012 0,012 0.000 0.33 56.52 0.33 56.52 0.00 Off ~r(t1!f 5 105 R-2251 4.75 0.00 4.75 0,00 rGrt 0,0 0.00 2.90 2.35 2.35 Sag 2.35 0.012 0.012 0.000 0.37 63.86 0.37 63.86 0.00 Off 5';r1t1 6 106 R-3286-8V 2.01 0.00 2.01 0,00 CO~~ 0.3 1.75 0.70 1.75 1.30 Sag 1.50 0.040 0.020 0.000 0.29 13.00 0.29 13.00 0.00 Off 'II rn 7 107 R-3286-8V 1.17 0.00 1,17 0.00 Comb 0.3 1,75 0.70 1.75 1.30 Sag 1,50 0.040 0.020 0.000 0.21 g,OO 0.21 9.00 0.00 Off 7"YPc I}- 8 108 R-3286-8V 1.26 0.00 1,26 0.00 Comb 0.3 1.75 0.70 1.75 1.30 Sag 1.50 0.040 0.020 0.000 0.22 9.50 0,22 9,50 0.00 Off 1J;C fl 9 109 R-3286-8V 0,85 000 085 0.00 om~ 0.3 175 0.70 1.75 1.30 Sag 1.50 0,040 0.020 0.000 0.17 7.00 0.17 7,00 0.00 Off 10 115 R-2535 5.19 . 0,00 5.19 0.00 ~rt 0.0 0.00 1,10 1.45 1.45 Sag 1.45 0,010 0010 0.000 077':11 155,62 0.77 155.62 0.00 Off If 'yflt/ 11 120 R-3286-8V 0,74 0.00 0.74 0.00 com~ 0.3 1.75 0.70 175 1.30 Sag 1.50 0.040 0.020 0,000 0.15 6.00 0.15 6.00 0.00 Off Ty~ 12 roof 1.23 0.00 0.00 1.23 None 0.0 0.00 0.00 0,00 0.00 Sag 0.00 0.000 0.000 0,000 000 0.00 000 0.00 0.00 Off 13 125 R-1772 0.00 0.00 0.00 0,00 MH 0.0 0.00 0.00 O.OQ 0,00 Sag 000 0.000 0.000 0.000 0,00 0.00 0.00 0.00 0,00 Off 14 126 R-1772 0.19 0.00 0.00 0.19 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 000 0.00 0.00 0.00 Off 15 roof 0.49 0.00 0.00 0.49 None 0.0 0,00 0.00 0.00 0.00 Sag 0,00 0.000 0.000 0.000 0.00 0.00 0,00 0.00 0.00 Off 16 roof 0.49 0.00 0.00 0049 None 00 000 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 Off 17 201 R-1772 0.00 0.00 0.00 0.00 MH-5 0.0 0.00 0,00 0.00 0.00 Sag 000 0000 0.000 0.000 000 0.00 0.00 0.00 0.00 Off 18 202 R-3286-8V 0.61 0.00 0.61 0.00 Com~ 0.3 1.75 0.70 1.75 1.30 Sag 1.50 0004 0.020 0000 0.13 7.70 0.13 7.70 0.00 Off 'f ' If) 19 203 R-3266-8V 0,59 0.00 0.59 0.00 Comb 0.3 1.75 0.70 1,75 1.30 Sag 1.50 0.040 0.020 0000 0.13 5.00 0.13 5.00 0.00 Off '1 {/Iltf 20 204 R-3266-8V 1.88 0,00 1.68 0.00 Comb 0.3 1.75 0.70 1.75 1,30 Sag 1.50 0.040 0.020 0.000 0.28 12.50 0.28 12.50 0.00 Off 'i' "'if 21 205 R-3286-8V 2,37 0,00 2.37 0.00 con:~ 0.3 1.75 0.70 1,75 1.30 Sag 1.50 0.040 0.020 0.000 0.36 16.50 0.36 16.50 0.00 Off floe 22 206 R-3287-10V 2.62 0.00 2.62 0.00 ~~~ 0.3 2.80 2.10 2.60 1.30 Sag 1.50 0.040 0.020 0.000 0.30 13.50 0.30 13.50 0.00 Off Project File: LAF-CarmeI2.stm I Number of lines: 24 I Run Date: 06-19-2007 NOTES: Inlet N-Values;; 0.016; Intensity:;; 56.97 I (Inlet time + 9.00) ^ 0.80; Return period;; 10 Yrs.; * Indicates Known Q added 'j! 9rc:.-t oK.. ~r !(fW't1 tll'fC<.- qt our{o-r 1,.vh.J,., ~r t7ewlu;2'J1 will h..t ,o/~) -Iv P'c.-,?Jw!e.- Hydraflow Storm Sewers 2005 c= ~ ~ c= Inlet Report ~l ~ ~ c:::::= ; CJ ,,---J 'c.:.: ~ c:::J c:==: ~~ C=:J c:=:J r -1 ~ Page 2 Line Inlet ID Q= Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt byp type line Ht L area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cts) (ets) (cfs) (cfs) (in) (ft) ( sqft) (ft) (ft) (ft/ft) (ft) (ftJft) (ftJft) (ft) (ft) (ft) (ft) (in) 23 roof 1.23 0.00 0,00 1.23 None 0.0 0.00 0,00 0.00 0.00 Sag 0,00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 Off 24 roof 1.23 0.00 0.00 1.23 None 0.0 0,00 0.00 000 0.00 Sag 0.00 0000 0.000 0.000 0.00 0.00 0,00 0.00 0.00 Off Project File: LAF-Carmel'stm I Number of lines: 24 I Run Date: 06-19-2007 NOTES: Inlet N-Values '" 0,016, Intensity'" 56.97 f (Inlet time + 9.00) ^ 0.80; Return period '" 10 Yrs. ; * Indicates Known Q added Hydraflow Storm Sewers 2005 u u [J u u u u U ! !J I . I IU 1 U I I IU IU D I 10 U :U i I STORMWATER QUALITY DESIGN CALCULATIONS u u TER HORST, LAMSON & FISK, INC. CALCULATIONS FOR WOI.ter QvtA': ~ T~6'tfllent Flow - BmP" for A I, PROJECT NAME: I"A f"""V1e.s:; -[q;rref PROJECT NO.: 2Q]}'- \t\g OF 2.. PAGE L BPK '/1'1/07 BY: DATE: U Hydrograph Report U Hydraflow Hydrographs by Intelisolve U Hyd. No. 1 WQ Treatment Flow - BMP 101A U Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 5.92 ac U Basin Slope = 0.0 % T c method = USER Total precip. = 1.00 in D Storm duration = 24 hrs " Hydrograph Discharge Table Time -- Outflow U__" (hrs cfs) 11.60 0.62 11 . 70 1 . 11 11.80 2.05 .11.90 3.71 12.00 5.17<< 12.10 462 12.20 2.88 12.30 1.46 12.40 0.81 12.50 0.69 12.60 0.58 u U lU I ,0 I iU , ~U I I ~ . - , 'U U , I' ',1 I i i U i iU \ J I , U Tuesday, Jun 192007, 1 :26 PM Peak discharge = 5.17 cfs Time interval = 6 min Curve number = 98.3 Hydraulic length = 0 ft Time of cone. (Tc) = 12 min Distribution = Type II Shape factor = 484 Hydrograph Volume'" 16,495 cuft ( Printed values >~ 10% of Op.} ...End u u o u u o u u 'I J i iU I iU I ,U I 'U I u iU I iJ I U :U I U Culvert Report Hydraflow Express by Inlelisolve Tuesday. Jun 19 2007 BMP Diversion - ~T~ IotA Invert Elev On (ft) = 883.20 Pipe Length (ft) :::: 5.00 Slope (%) = 2.00 Invert Elev Up (ft) = 883.30 Rise (in) = 15.0 Shape = Cir Span (in) = 15.0 No. Barrels = 1 n-Value = 0.012 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Calculations Qmin (cfs) :::: 5.00 Qmax (cfs) = 6.50 Tailwater Elev (ft) = (dc+O)/2 Highlighted Qtotal (cfs) = 6.25 Qpipe (ds) = 6.25E- Q~p.e ~ Qovertop (cfs) = 0,00 C( Veloc Dn (ftls) = 5.35 Veloc Up (ftIs) = 5.86 HGL On (ft) = 884.33 HGL Up (ft) = 884.32 Hw Elev (ft) = 885.16~ V'AYl9t'v'" Hw/D (ft) = 1.49 Flow Regime = Inlet Control Embankment Top Elevation (ft) = Top Width (ft) Crest Width (ft) 889.50 = 2.00 = 10.00 Elevlftl 890.Gn BMP Diversion HwOeplnlllJ 0.70 889.00 5.70 883.00 4.70 687.00 3.70 88B.00 2.70 885.00 1.70 884.00 070 0.30 883 00 _ _ _. ______~_ __ _ ___~______ _.____..~__ ~~ __~___ m_ _m_.~~' _,,~______. cw.c______ - ----- ---,--~-- -..--------.. ~.,.,.,.,.,,~-~.-- .,~__ .,..~.__,~..,___ __ - _______ .__~___..____~_"". ~_~.__ _______ ~_.._ ~_~ _._o~~_ ~_~___.__ _____ ___"_.__ -.-.0 "...._""-~._,-~ ~--~~ .______w____ "~~, ..._".~ ~.__n'________ ~~~______ _~~~ ____< ~__'n__ __ ~___~~ _~,,_-~ "u~_.___,_" ~-_ - -- - _____."__.LL .1.30 882.00 10 11 12 13 14 7 9 o 1 2 3 4 -ClrCulvert -HGL Reach (ft) - Embank .-.. ..n<<_n~ .~.""" ~ .,~c'__."_.'.'m_"~'" _.'~ "''''~''''-''""".= ''''.-=..-_-,_-_-,w~ ~<.......C".. ~,--" ^ ~m'" ~~,--" ~""-".~'~~' _~..".".".,,^-,..m ~ ~....,~~..n ~'"~~. _.~..._.,''''_v'~m.''.wAv.~'.'= -..'_~_'~ T E R H 0 R S T, L A M S 0 N & JF I S K , I N C . PAGE :z OF 2- CALCULATIONS FOR Weder 6hJal:-ry TilA~ AoW-BmP'JOf4" BY: ~Pl( '/lq, /0 7 PROJECT NAME: l..A- F'i'kTPSIS - ~ r PROJECT NO.: 2.00 7- r q'l DATE: I , , I i , ! 1 , \ . , .F.:r~! T"r..:....T":J .. .! l ,;{ ; i . 1 l r.ot: : .._.i ") . , I -i'll : . \ 'f".l"j U I L 0111 r j l ' C'....T~~.r.~."..c..~~..\.. .~., , . I , , Url'T' ,)~" 'r..' ,...J. , I . I U' i ;~: . , .. . J"',' · ~'^ -;"'~ ;.M"~~'~"'"" u u U u iU : !J , , I '0 I U r ' U U U U u , I ,I IU I u LJ I I LJ ,u :U I Hydrograph Report Hydraflow Hydrographs by Intelisolve Tuesday, Jun 19 2007, 1 :38 PM Hyd. No. 2 WQ Treatment Flow - BMP 201A Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 2.06 ac Basin Slope = 0.0% T c method = USER Total precip. = 1.00 in Storm duration = 24 hrs Peak discharge = 1.79 cfs Time interval = 6 min Curve number = 98.2 Hydraulic length = Oft Time of cone. (Te) = 11 min Distribution = Type II Shape factor = 484 Hydrograph Volume'" 5,674 cuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) ( Prinled values >~ 10% of Qp ) 11.60 0.21 11.70 0.38 11.80 0.71 11.90 1.28 12.00 1.79<< 12.10 1.60 12.20. 0.99 12.30 0.50 12.40 0.28 12.50 0.24 12.60 0.20 ...End u u ,0 D :u ! ,U , i o '[J I iU 1 U IU '; U Ie 'U IU I U I IU , , I[J J Culvert Report Tuesday, Jun 19 2007 Hydraflow Express by Intelisolve BMP Diversion- S7R zetA Embankment Top Elevation (ft) = Top Width (ft) Crest Width (ft) 891.50 = 2.00 = 10.00 Calculations Qmin (cfs) = 0.10 Qmax (cfs) = 2.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 1.80 Qpipe (cfs) = 1 . 80e- G?cdlllp.tet.... Qovertop (cfs) = 0.00 , Veloc Dn (fUs) = 3.60 Veloc Up (ftls) = 4.24 HGL On (ft) = 884.92 HGL Up (ft) = 884.91 Hw Elev (ft) = 885.2~ TIPiIIe.r Hw/O (ft) = 1.19 Flow Regime = Inlet Control Invert Elev On (ft) = 884.20 Pipe Length (ft) = 5.00 Slope (%) = 2.00 Invert Elev Up (ft) = 884.30 Rise (in) = 10.0 Shap~ = Cir Span (in) = 10.0 No. Barrels = 1 n-Value = 0.012 I nlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398,0.67, 0.5 Elev lfl] BMP Diversion Hw Depth If!] 892.00 7.70 891.00 6.70 890.00 5.70 889.00 4.70 88800 ,3.70 ---' ____n_ ._~__.~~ . _.__ ...,._..~... ~.,,_ ._~,---,-.--_~_~ 887 DO 2.70 881;.00 170 B85,00 0.70 884.00 .0.30 .130 883.00 3 4 -HGL - Embank 12 13 14 10 11 o -Ci,Cul""l Reach (HJ U IJ U I D I I U J I ,U I :U IU I I :0 I IU ; i U U U U D U J IU TR55 Tc Worksheet Hydraflow Hydrographs by Inlelisolv8 Basin E-1 Description A B C Totals Sheet Flow Manning's n-value :::: 0.240 0.011 0.011 Flow length (ft) 300.0 0.0 0.0 Two-year 24-hr precip. (in)" :::: 2.64 0.00 0.00 Land slope (%) :::: 1.67 0.00 0.00 Travel Time (min) = 40.67 + 0.00 + 0.00 = 40.67 Shallow Concentrated Flow Flow length (ft) ::::: 650.00 0.00 0.00 Watercourse slope (%) ::::: 1.38 0.00 0.00 Surface description ::::: Unpaved Paved Paved Average velocity (ftIs) = 1.90 0.00 0.00 Travel Time (min) = 5.72 + 0.00 + 0.00 = 5.72 Channel Flow X sectional flow area (sqft) :::: 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (tUs) :::: 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 T ota I Travel Time, T c . ..~........ ....................... ........... ................................ 46.38 min ~ 1I5~ Lf.) WI ,'t} u [J u u I I r' IU u 'U I I U :U I , iL :u I I U \ I D o [j U !U I , iu I : i 1 , U I I APPENDIX A WESTON PARK DRAINAGE REPORT NARRATIVE (by Civil Designs, LLP) U i '1-- y ----, U U u ~-~ U 'U " ~ I 'U I " U ! ~ , cJ. I I . I ' U ! ' I IU 'J U I 'u IU I iU I :u I LJ I ! Surveying It Site Design. Civil Engineering., Urban Planning . Water Quality CIVIL DESIGNS, LLP 241 5 DIRECTORS Row, SUITE E ,INDIANAPOLIS, INDIANA 46241 PHONE: 3 '-7 244 1 968 DRAINAGE COMPUTATIONS FOR WESTON PARK CARMEL, INDIANA KITE COMPANIES, INC. 30 S. MERlDIAN STREET, SUITE 1100 INDIANAPOLIS, IN 46204 DECEMBER 1 2003 REVISED: JANUARy 28, 2004 ~~\4C~d~ ,\\UII''1-#1 ..."......' ~o R. 1-1;"''''- ~x-~ ........ 0 ~ ~ C> ..~G\STf"Ii'~. f- ~ - ~ '- .D<;!- '().. (\\:. .... Q:- . . --rt.. _. . NQ ~ ~ - :: :Jf-: PEBB0303 :..:: = ~ STATE OF : = -= ~ ~. : lC- ~ ':- ~o .. /"'f'IA"\~... /fli ~ ., .'X' -..1...1 ,....... ~-v " ~ ~ ..... 0~- ~ "'-" 8,s/ONA\.. 'C.~ ,,,'" I, ,'\ 1-#'"11\1\' Richard R. Hoover, PE Easement Preparation . Construction Staking . Permitting. Construction Services U :;;OJ rJ l~ U Q u !!; I lJ U '-' o I i I :U I, i U' I i ,U I I :u I i U-- I I :U I 'U I U' I I I . , U. DRAINAGE REPORT for WESTON PARK TABLE OF CONTENTS 1 ,0 I ntrod u ction .., 00' . . ..... . . .. .. . . .. . . . . . 0 ......... . . ...... ....,. ..... .... . . .0.... o. .. .. 0 , , .. . ...0.. 2 1.1 Project Description......................... 0..... ....... ..................................... ................. 2 " 2.0 Hydrologic Method................................. 0.... 0................................... 0 2 2.1, Rainfall Distribution.... 0.......... ..... ............ .................. ................ ............. ............ 3 2.2 Software ....... ............. ........ ........................... ..... ..... ........... ................... ............ 3 3.0 Pre-Developed Drainage Analysis ....... ...m.... ............. ...... ............... 3 3.1 On-site .............................................................. ....................... ............ ... .......... 3 3.2 Off -8 ite .. ..... .. ...... .. . .. . .. . .. . ~ .. . .. . .. . .. .. .. , .. __ . . . . . .. .. ... '.. .. . ....... .. .. .. .. ... .. .. . .. 0.. . . . . ...... ... .... 3 3.3 Existing Conditions Model............... .................................................................. 4 3.4 Allowable Peak Discharge .....,......................... ..........,... .... ..:.... ........................ 5 4.0 Post-Developed Drainage Analysis..... 0.. ..... 0...................0......... 00..... 5 4.1 On-site ..... ..................... .............. ............ ..................................................... ..... 5 4.2 Off-site .......... .................. .......... ........ ....... ....... ...... .............. ......................... ..... 6 4.3 Propp sed Conditions Model............ ............................ ........................ .............. 6 5.0 Conclusion.... ....................................;.. ....................... ........-..0..... ..... 7_ 5.1 Summary of Discharges.... .......... ............................... ......... ....................... ....... 7 5.2 Report Summary.. ...................................... ................... ..:... .................. ............ 7 Appendix A - Location Maps -Appendix B - Pre-Developed Drainage Analysis Appendix C - Post-Developed Drainage Analysis U !U 1 o ru.~.:.'i 1 o 1.0 Introduction lJ This report outlines the design of thE;! storm water management system to serve Weston Park located on the southwest comer of 106th Street & US 421 in the city of Carmel. The scope of the report i,dentifies the design parameters for the storm sewers and storm water detention system required far the proposed development. ,0 I U 1.1 Project Description u , iU ' I I , U ,0 I ;U I I D The proposed Weston Park development includes 15..9:t acres that is divided into three separate lots and Block 'A', and the primary use is commercial/office. These lots and Block 'A' will drain to an existing detention facility located along the south property line which is in place .for the deVeloped areas east and south of the proposed development. This detention facility is also a legal drain regulated by th~ Hamilton County Surveyor's Department and wilr be enlarged to accept the additional runoff created by this development without producing increased discharges downstream. For the purpose of this report, this detention facility will be called the "Park Northwestern Drain". The outlet structure for the Park Northwestern Drain detention facility consists of twin 27" pipes that are located west of the Weston Park west property line. The site discharges are computed at the 27" outlet pipes. The primary uses adjacent to this propertyare: North Commercial East Commercial/Retail South Industrial West Commercial/Undeveloped 2.0 Hydrologic Method u . I .u . I . :u o IU 10 I . iU. I I :0 I . The method used to generate runoff from the existing and proposed watersheds is the SCS unit hydrograph method of determining lhe peak flows that regulate the volume of retention pond needed. Factors involv.ed in the use of this method are the area of the watershed or basin, the runoff coefficient (eN), and the time of concentration (Tc). The basin area is measured off the plans and survey. The runoff coefficient is estimated based on the proposed land use conditions and the types of soils.. The time of concentration is determined from surface conditions and the slope of terrain. 2 u u o u u, u o u 2.1 Rainfall Distribution The Huff-Second Quartile Rainfall Distribution is used to calculate pre-deve!oped peak flows, post-developed peak flows, and to design the detention basin. The 30-minute, 1-hour, 2-hour, 6-hour, 12-hour and 24-hour storm events have been calculated for all conditions (Note: This is consistent with the model prepared by American Consulting for the West Carmel Center). Manning's formula has been used to calculate storm 'sewer pipe sizes. 2.2 Software After the input data and rainfall have been estimated, TR 20, a ,hydraulic modeling program, is used to determine the peak flows and volumes using the SCS TR-55 unit hydrograph method. TR20 generates an individual hydrograph for each basin and 'then the hydrographs can be added to generate runoff flows for ponds or to points of interest. The time-of-concentration was calculated for each basin using a minimum Tc of 5 minutes. J I I 'U I 'U I IU U I 3.0 Pre-Developed Drainage Analysis 3.1 On-Site The existing site is a cultivated field that has been used for row crops. The ground slopes toward the southwest, where runoff enters the existing Park ,Northwestern Drain that borders the south property -line. There is also an existing swale located on the west side of the property that accepts stormwater from 106th Street and directs runoff to the Park Northwestern Drain. This ~wale provides some detention volume, and is included in the existing site detention calculations. 3.2 Off-Site u U iU iU U I iU The areas surrounding the proposed development that contribute to the flow into the Park Northwestern Drain are: N-NE INDOT drainage from US 421 E West Carmel Center S Pa rk Northwestern The information used to compute the off-site existing. drainage conditions came from: The Drainage Computations Summary for West Cannel Center Blocks A, B & C (prepared by American Consulting, Inc., dated October 19, 1999); INDOT 3 u u u u [J u u U I [J I u IU I , Il 'LJ I : u- - . I IU ! ~D .U D__un u w plans for US 421 construction (Des# 9015600, dated 7/03); IDS information obtained from the Hamilton County Surveyor's Department. The West Carmel Center property located on the southeast comer of 1 o 6th Street & US 421 contains two drainage basins that drain to the Park Northwestern Drain. One basin flows to a detention facility on the West Carmel Center site before it enters the Park Northwestern Drain. This detention facility was originally designed using a 15" outfall pipe with a 6" orifice; however, the 6" orifice was never constructed. This basin was modeled both with and without the 6" orifice to compare the difference in flows. The other drainage basin is directly discharged (without detention) into the Park Northwestern Drain. The outlet control structure for the Park Northwestern Drain is located south and west of the Weston Park west property line and consists of twin 27" pipes with a berm above them that serves as a weir. The weir (located at elevation 886.12) is overtopped in the present condition at the 1 DO-year event. See Tables 1 & 2 for the detention facility water surface elevation for the 2-, 10- and 1 DO-year events. See Appendix B for the pre-developed drainage analysis input and output information and nodal diagram. 3,3 Existing Conditions Model The existing on~ and off-site areas were combined into one model to determine the discharge at the 27" pipes. Two existing models were prepared to determine the existing discharge since the 6" orifice originally designed for the West Carmel Center detention outlet was not constructed as designed. The existing discharges are: TABLE 1 - Existing Conditions Model Option A (with 6" orifice) File: 0318aE.t20 Retu rn Period Discharge (cfs) Water Surface Elevation 2-year 56.5 883.30 10-year 89.1 885.41 1aO-year 167.9 887.1 0 TABLE 2 - Existing Conditions Model Option B (without 6" orifice) File: 03188Eb.t20 Return Period Discharge (cfs) Water Surface Elevation 2-year 56.6 883.31 10-year 89.2 885.43 1 aD-year 170.9 887.12 4 :J U u J o U u u [J u u o u~----_u- u' ,0 I , iU I, [J'i ' : ' .........i:..::,..~,...~,_. . ,....__ . , i : U-"-p: ,,________m_ I-u ' iO:" I, I (, 3.4 Allowable Peak Discharge Since the existing site drains to the Park Northwestern Drain detention facility, the Weston Park development will require additional detention only to the extent that the existing basin discharge is not exceeded, 4.0 Post..Developed Drainage Analysis 4.1 On-Site The proposed site consists of Block 'A' and Lots 1, 2 and 3. The Park Northwestern detention facility will be designed for the entire site in its fully developed state, however, the storm sewer calculations are for lots 1, 2 and 3 only. Block A will provide a separate storm sewer system when it develops. The Park Northwestern Drain detention volume will be expanded to provide additional detention volume for the proposed Weston Park site. The detention volume does not include the existing swale that is located on the west property line. This swale was removed from the detention volume to allow flexibility in site layout. Because of this, Kite has the option to pipe this swale as Block 'A' develops. The additional detention is located along the entire south prQperty line and consists of two areas. The first area, located at the southeast 'corner of the site, " will be cut from the south overbank of the existing Park Northwestern Drain. It 'will be contained within a portion of lot 2'of the Park Northwestern property. The second area is located along the nortn bank of the Park Northwestern Regulated Drain and extends to the southwest corner of the property. This detention area was required to maximize the detention volume at low flow conditions. While the detention volume was increased, the discharge was exceeded for the 2-year storm event. In order to meet the detention requirement for the 2-year event the detention area would have to be further increased, or the outfall structures would have to be modified. Since the discharge increase is relatively minor for the 2- year event, the disturbance that would be required to meet the existing value is not recommended. Also, any restrictions imposed to meet the 2-year requirement would result in an increase in water surface elevation. Since the finished floor elevation of the existing buildings located on the south bank of the detention facility is very near the existing 1 OO:..year flood elevation, any increase in flow elevation would not be desirable. See Appendix C for the proposed basin characteristics and detention basin volume. 5 u u 4.2 Off'-Site iJ u u The off"-site conditions do not change in the proposed model. Two proposed models were prepared to determine the discharge for both off-site scenarios (with and without the 6" orifice in the West Carmel Center detention facility). Also, in the proposed condition, the weir over the 27" outlet pipes will overtop in the 1 00- year event (as it does in its present condition). However, the 1 OO~year elevation is less than that for the existing conditions. .--, U U D 4.3 Proposed Conditions Model The proposed discharges are: TABLE 3 - Proposed Conditions with Existing Option A (with 6" orifice) File: 03188P.t20 'U I i :U I Return Period Discharge (cfs) Water Surface Elevation 2'-year 57.4 883.33 1 a-year 85.7 885.03 100-year 1.30.2 886.83 TABLE 4 - Proposed Conditions with Existing Option B (w/out 6" orifice) File: 03188Pb.t20 o I I U Return Period Discharge (cfs) Water Surface Elevation 2-year 57.4 883.34 1 a-year 85.8 885.04 100-year 131.9 886.85 ~ . i U-_. I U U U I . I I I iU I , U I I r I U . I I I I 6 U D u 5.0 Conclusion o u u o o u 5.1 Summary of Discharges Tables 5 and 6 show the comparison of the proposed discharges to the existing discharges. The proposed discharges are less than existing for the 10- and 100- year events. Forthe 2-year event, the proposed discharges are 0.9 cfs and 0.8 cfs more than that of the existing condition models. This increase results in an elevation increase of less than 0.05' in the detention facility for the 2-year event for both proposed models. For the 10 and 100-year events, the elevation in the detention basin is decreased by 0.27' for both proposed models. TABLE 5 - Comparison of Proposed and Existing Option A (with 6" orifice) (Condition of original off-site design) :U I I IU I :u I U Return Period Existing (cfs) Proposed (cfs) Proposed - Existing (Table 1) (Table 3) 2-year 56.5 57.4 0.9 10-year 89.1 85.7 -3.4 tOO-year 167.9 130.2 -37.7 TABLE 6- Comparison of Proposed and Existing Option B (without 6" orifice) (Actual existing condition) r ' U U Return Period . Existing (cfs) Proposed (cfs) Proposed ~ Existing .. (Table 2) (Table 4) 2-~ear 56.6 57.4 0.8 i0-year 89.2 85.8 -3.4 i 100-year 170.9 131,9 -39.0 5.2 Report Summary Although the 2-year release rate is increased by 0.8 cfs over the existing condition, 100-year event is 19% less than the existing discharge for the same event. Because these values closely match the existing values, there are no adverse effects anticipated. 7