August 8, 2007
fer Horst, Lamson & Fisk, Inc.
&675 Purdue Rd
lndianapolis,Indiana 46268
Attn: Ben Knoop
Dear Ben,
This is formal notification thaI an address has been assigned to the future L.A.
Fitness Building located on the area of W 106th St and N Michigan Road. The address
assigned will be 10574 Workout Way. Please keep this letter as proof of the address
assigned, you will need to show it when applying for permits with the City of CanneL If
you have any questions or COne-ems feel free to c.ontact me anytime.
Sincerely,
~...~
Bill Akers
911 Operations Manager
Carmel CODllllunications Center
CARMEL CL'I.1' COMMUNICATIONS C:=r;TH
31 1 sr A V~NUE ~ W., Cf.RMEL, IN 46032
OFFICE 317571.2586. P.u3k7.571.2588
~
REVIEW FORM
FOR STREET NAMES AND
SUBDIVISION NAMES 'VITIDN HAMIL TON COUNTY
Subdivision Name:
LA. FITNESS ("VEST CARMEL)
Street Names:
WORKOUT WY
Summited by:
Bill Akers
Date: 8/7 /2007
Recommended by:
Brooke Gawjonik
Date: 8/7/2007
E-911 Address Coordinator Representative
18100 Cumberland Rd
Hamilton County Sheriff's Office
Noblesville, IN 46060
(317) 773-1872
Fax:
Bmg@co.hamilton.in.us
Recommendation By
E-911 Local Authority
X Yes No X Yes
No
Recommendation By
E-911 Local Autbority
X Yes No.x. Yes
No
Approved by:
Bill Akers
Date: 8/712007
Local Jurisdiction Representative
Carmel Communications Center
311st Avenue NW
Carmel, IN 46032
(317) 571-2586
.'ax: 571-2585
W Akers@carmel.in.gov
Page 1 of6
Mark Obergfell
From: Duffy, John M [JDuffy@carmel.in.gov]
Sent: Tuesday, August 07,20079:35 AM
To: Mark Obergfell
Cc: Hill, Dick B; Lillard, Sarah N
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Mark,
Based on the information you have provided I am using a 4,848.50 average daily consumption. This would figure to
145,455 gallons per month. One e.d.u equals 9,000 so if you divide 145,455 by 9,000 it figures to 16.16 edu's. One edu is
$1396 so the connection fee would be $22,559.36 which is payable at the time the building permit is pulled.
There is also an availability fee of $1010 per acre. I am not sure how many acres there are. There will be a $150 review
fee also.
As far as the retail is concerned, the connection fee is figured at one edu per 1,000 sq. ft. So, 17,600 sq. ft. would be 17.6
edu's or $24,56960. Retail space is tough because we really have no idea what will be going in.
Please let me know if you have any questions.
J Duffy
571-2451
-----Original Message-----
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: Tuesday, August 07, 20078:19 AM
To: Duffy, John M
Cc: Pace, Paul V; Hill, Dick B; John Turek; Chris La Mack
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
John-
Per our conversation, attached is the data you requested. We also need fee estimates for the retail building as
noted below.
Thanks,
Mark Obergfell
from: Mark Obergfell
Sent: Tuesday, July 31, 20078:53 AM
To: 'Duffy, John M'
Cc: Pace, Paul V; Hill, Dick B; 'John Turek'; 'Chris La Mack'
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
John-
See attached spreadsheet for water usage from tw-o similar LA Fitness facilities. Also, would appreciate getting an
estimate for the 17,600 s.f. retail strip building. Don't know any uses yet but am hoping you have good data from
the many other similar facilities in Carmel. '
Thanks and let me know jf you need anything else.
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
8/7 /2007
Page 20f6
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Thursday, July 26, 2007 12:05 PM
To: Mark Obergfell
Cc: Pace, Paul V; Hill, Dick B
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Mark,
We will be able to get some of the info needed to determine fees from the plans, but if LA fitness can provide
monthly water consumption data from other similar facilities it will really help in determing the connection fee.
Thanks
J Duffy
-----Original Message-----
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: Thursday, July 26, 2007 11:57 AM
To: Duffy, John M
Cc: Pace, Paul V; Hill, Dick B; John Turek; c1amack@gemini-re.com
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
John-
Good to know the ship is heading in the right direction now!! We will send you a complete set of plans. As
soon as you have a chance to look at, I would appreciate if you could give me an estimate of any tap or
other fees.
Thanks,
Mark N. Obergfell, P. E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 31 7-334-1552
From: Duffy, John M [mallto:JDuffy@carmel.in.gov]
Sent: Thursday, July 26, 2007 11:43 AM
To: Mark Obergfell
Cc: Pace, Paul V; Hill, Dick B
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Mark,
I agree that it is Carmel's to serve. I don't believe we have received a set of plans however. Can you please
have a set sent to the following:
Carmel Water Distribution
3450 W 131 st Street
Westfield, IN 46074
Thanks,
J Duffy
nmOriginal Messagem--
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: Wednesday, July 25/ 2007 11:38 AM
To: Duffy, John M
Cc: John Turek
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
8/712007
8/7/2007
Page 3 of 6
John-
We are in Hamilton County so I guess that makes it is yours. Mark Shockley left me a voicemail this
morning as a follow-up to his message below to me. He said that it is currently their main but they
are in the process of turning it over to you. He said they would make the tap for you but the rest of
the site is up to you.
Please advise if any comments on the plans we sent or if you need anything else sent to you.
Thanks,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Wednesday, July 25, 2007 9:56 AM
To: Mark Obergfell
Subject: RE: LA Fitness - Carmel Weston Park l06th & Michigan Rd.
Mark,
I believe that it is IWC's territory, but it is very close in this area. If it is in Boone County it is clearly
IWC's. If it is in Hamilton County then it is ours.
J 0 uffy
-----Original Message-----
From: Mark Obergfell [mailto: mobergfell@tlf-engineers.com]
Sent: WednesdaYI July 25, 2007 7:58 AM
To: Duffy, John M
Cc: John Turek
Subject: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Hi John-
Can you verify that this project is in your service territory and not IWC's? It is Weston Park,
Block A, the 10.1 acres in Kite's development at the SW quadrant of Michigan Rd and 1061h
Street, behind (west of) the two banks that front Michigan Road. We were told earlier that it
was IWC's territory by IWC. You received this project as a part of the TAC submittal on June
28 from my office (see 6/28 email below).
Thanks,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
From: Shockley, Mark H. [mailto:mark.shockley@veoliawaterna.com]
Sent: TuesdaYI July 24, 20074:24 PM
To: Mark Obergfell
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Mark,
I apologize. I gave you information from our GIS map and it did not show the main as Carmel
Water. The lot is in Clay Township thus they are a Carmel Water customer. IW will do the tap
on the 8" main as a pay job to Carmel Water after you submit to them for the service.
Mark
-----Original Messagen---
Page 4 of6
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: Tuesday, July 24, 2007 3:52 PM
To: Shockley, Mark H.
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Mark - This should be yours, not Carmel. See messages appended at the bottom.
Please advise.
Thanks,
Mark
From: Shockley, Mark H. [mailto:mark.shockley@veoliawaterna.com]
Sent: Tuesday, July 24, 2007 3:03 PM
To: Mark ObergfeUi Marlett, Jennifer L.
Subject: RE: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Mark,
This is Carmel Water territory.
Mark Shockley
-m-Original Messagem--
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: Tuesday, July 24, 2007 12:35 PM
To: Marlett, Jennifer L.; Shockley, Mark H.
Subject: RE; LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Do you have any comments or changes on the plan we sent you on June 28?
Thanks,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph 317-334-1500
fax 317 -334-1552
From: Ben Knoop
Sent: Thursday, June 28, 2007 10:57 AM
To: 'Conn, Angelina V'; Holmes, Christine B; Bill Akers
(Wakers@carmel.in.gov); Scott Brewer (sbrewer@carmel.in.gov); Michael
Fogarty (mfogarty@carmel.in.gov)i Chris Ellison (cellison@carmel.in.goV)i
Gary Duncan (gduncan@carmel.in.gov); Nick Redden
(nredden@carmel.in.gov); Bill Hohlt (whOhlt@carmel.in.gov); John Duffy
(jduffy@carmel.in.gov); David Littlejohn (dlittlejohn@carmel.in.gov); Terry
Krueskamp (tkrueskamp@carmel.in.gov); David Lucas
(del@co.hamilton.in.us); Jason Lemaster (jtl@co.hamilton.in,us)i Brooke
Gajownik (bmg@co.hamilton.in.us); Shirley Hunter (shirley.hunter@duke-
energy.com); Ron Farrand (rfarrand@ccs.k12.in.us)i David Malone
(david .malone@sug.com); Mark Westermeier (mwestermeier@carmel.in.gov);
Greg Hayes (grh@co,hamilton.in.us); Jason Kirkman
(jason.kirkman@mybrighthouse.com); Jennifer Marlett
(jennifer.marlett@veoliawaterna.com); Ryan Hartman
(ryan.hartman@ctrwd.org)i Ron Morris (ron.morris@aes.com); Gregory llko
(gilko@crossroadengineers.com); Dale Sparks (dale.m.sparks@usps.gov);
Amanda Foley (afoley@carmel.in.gov); Dave Klingensmith
(dklingensmith@carmel.in.gov); Chuck Shupperd (cshupperd@vectren.com)
Cc: John Turek; Mark Obergfell; Bruce Knott (bknott@carmel.in.gov)i John
Tierney
Subject: LJ\ Fitness - Carmel Weston Park 106th & Michigan Rd.
As required by the City of Carmel for TAC review, attached is a pdf of the
817/2007
Page 5 of6
following files for the subject project:
CS - Cover Sheet
C2.1 ~ Site Plan
C3.1 - Grading/Drainage Plan
C5.1 - Site Utility Plan
L 1.1 - Landscape Plan
2 - Building Elevations
Please advise if you would like copies of any of the other sheets listed on the
cover sheet (ie detail sheets) or if you would like a hard copy sent to you_ The
complete set of plans has already been sent to the City DOCS, Surveyor's
Office and the County SWCD. We will be delivering a full set of plans to the
CTRWD also.
Thanks and please call me or Mark Obergfell with any questions or concerns.
Benjamin P. Knoop, E.I.T.
Ter Horst, Lamson & Fisk, Inc.
8675 Purdue Road
Indianapolis, IN, 46268
317-334-1500 (phone)
317 -334-1552 (fax)
from: Shockley, Mark H [mailto:mark.shockley@veoliawaterna.com]
Sent: Monday, April 09, 20073:29 PM
To: Mark Obergfell
Subject: RE: Weston Park Block A - 106th & Michigan Rd
Mark,
You are correct. IW has an 8" water main in a private drive in Weston Park to serve
the parcel. There are no fees to tap the water main.
Mark Shockley
VWI
-----Original Message-----
From: Mark Obergfell [mailto:mobergfell@tlf-engineers,com]
Sent: Monday, April 09, 2007 11 :51 AM
To: Shockley, Mark H.
Subject: RE: Weston Park Block A - 106th & Michigan Rd
Mark-
I am confused by the location you mention. It appears that Mayflower Park
Drive is quite a ways west of our site. The site I am speaking of is at the SW
quadrant of US 421 and 106th Street, directly south of the Ford dealership and
directly west of the National City Bank (bank address;;:: 10570 Michigan Rd). I
just received a drawing from Kite this morning that has the water plan. It is
your job J04-021 and the line I am speaking of is an 8" PVC along a private
drive.
Please confirm this location and any fees
Thanks,
Mark Oberg fell
From: Shockley, Mark H. [mailto:mark.shockley@veoliawaterna.com]
Sent: Monday, April 09, 2007 11:27 AM
To: Mark Obergfell
SUbject: RE: Weston Park Block A - 106th & Michigan Rd
8/7/2007
Page 6 of6
Mark,
IW has a 8" water main in Mayflower Park Drive to serve this parcel. The
subsequent connector fee is $8444.00 and there could be an impact fee which
is determined by meter size.
Mark Shockley
VWI
-----Original Message-----
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: MandaYI April 091 20079:29 AM
To: Shockley, Mark H.
Subject: FW: Weston Park Block A - l06th & Michigan Rd
Hi Mark-
Just following up on this request.
Thanks
Mark Oberg fell
From: Mark Obergfell
Sent: ThursdaYI April 05, 2007 1: 53 PM
To: 'Corinaldil Dorilynn'; 'Shockley, Mark H.'
Subject: Weston Park Block A - l06th & Michigan Rd
Dori or Mark-
Subject site is 10.14 acres in Kite's development at the SW quadrant
of Michigan Road/US 421 and 106th St. It appears you have a 12" line
along the south side of 1oe1h and an 8" line along the east side of the
parcel (west side of the 3 outlots that front Michigan Rd). We are
anticipating a 6" fire service and 3" domestic service for a commercial
use for our client. I would appreciate a letter or just an email back to
me that you will serve this site and what fees might be associated with
it.
Thanks for your assistance,
Mark N. Obergfell, P.E.
Associate
Ter Horst, Lamson & Fisk, Inc.
8675 Purdue Road
Indianapolis, IN 46268
Tel (317)334-1500
Fax (317) 334-1552
mobergfe II@tlf-engineers.com
817/2007
- '" - ~
/1/ r if ti ! .t. ~ I[ 1f,5, , !' d. F iI' rn
301 Pennsylvania Pkwy. Suite 155 . Indianapolis. Indiana. 46280
(pJ 317.842.8500 [I] 317.842.6677
August 7, 2007
Angelina Conn
Planning Administrator
Dept. Of Community Services - Planning and Zoning
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
[p] 317.571.2417
RE: Final Engineering Plans, LA Fitness
Weston Park, Block A
Project #07070006 DP/ADLS
Dear Ms. Conn:
We have received your July 9, 2007 review letter of the Final Engineering plans for the
proposed LA Fitness at Weston Park, Block A in Carmel, Indiana. We have revised the
drawings accordingly and bubbled all modifications. The following are our written
responses to your comments:
1.) Remember to include the DP application Finding of Facts sheet in your info packets.
Response:
The DP Findings of Fact Sheet will be included in the Carmel Plan Commission
Packet submittal, delivered on August 10.
2.) Provide the filled out and notarized affidavit of notice of public hearing page.
Response:
The notarized Affidavit of Public Notice will be sent to you by August 17, as
required.
3.) Provide the filled out and notarized Public Notice Sign Placement affidavit.
Response:
The notarized Public Notice Sign Placement Affidavit will be sent to you by
August 17, as required.
4.) Provide a copy of the Official list of Adjacent Property owners from Hamilton County
Auditor's Office. Make sure you also get the Official list of Adjacent Property owners
from the Boone County Auditor's Office.
Response:
Adjacent property owners from Hamilton County and Boone County have been
notified and green cards have been returned. The list and certified mailings
receipts will be sent to you by August 17, as required.
5.) Bring materiallcolor samples to the Plan Commission meeting.
Response:
A material/color sample board will be presented at the Carmel Plan Commission
meeting.
6.) Provide an aerial photo with site plan overlaid on it.
Response:
The aerial photo with site plan overlay will be included in the Carmel Plan
Commission Packet submittal, delivered on August 10.
7.) Show the mechanical equipment location and how it is screened from view.
Response:
All top of parapet heights will exceed the height of the tallest roof-top mechanical
unit. Rooftop mechanical equipment will not be visible from any ground level
view or sightline. This is a consistent standard for all LA Fitness corporate
prototype models.
8.) LA Fitness Signage: you propose two wall signs, each 238.54 sq ft. The Sign
Ordinance only permits a 115 sq ft sign facing 1061h Sf. and a 90 sq ft sign facing US
421. Please reduce the signage size or seek variance approval from the BZA.
Response:
The signage on the East elevation has been reduced to meet the 115 SF
allowance. The signage on the North elevation has been reduced to meet the 90
SF allowance. The drawings have been updated to reflect these revisions.
9.) Signage: please provide sign age details! cut sheets.
Response:
Actual shop drawings for the Signage details will be include in the Carmel Plan
Commission Packet submittal, delivered on August 10.
10.) Lighting: please provide fighting fixtures detailsl cut sheets.
Response:
Light fixture data sheets will be included in the Carmel Plan Commission Packet
submittal, delivered on August 1 O.
11.) Please verify measurement scale on building elevations.
Response:
An accurate scale will be shown on all drawings.
12.) Please provide bike parking, per Chapter 27.06 of the Zoning Ordinance.
Response:
Bicycle parking has been shown on Sheet C2.1 and described as Note 20.
13.) Please add 1/3 RIW to the 50-ft measurement on 10&h Street, per the 20- Yr
Thoroughfare Plan. Verify this R/W with the County Highway Department.
Response:
Right-at-way indications along 1 06tl1 Street have been clarified with the Surveyor
and will be noted on a forthcoming revision to Sheet C2.1.
14.) Please consider using pervious pavers in the parking lot.
Response:
We are not able to utilize pervious pavers in the parking lot for this project.
15.) Please consider using "green" building practices.
Response:
As a standard, we try to practice sustainable architecture where Ordinance and
budget allows. Some of the considerations for this building include daylighting,
recycled material use, and a decreased use of steel framing and gypsum drywall
beyond the LA Fitness corporate prototype model. Additionally, the Project
Architect is certified as a LEED Accredited Professional.
16.) Provide pedestrian/ bicycle connections within the site, and to the streets.
Response:
Pedestrian connections have been added at the Southwest corner of the LA
Fitness building and north trom the retail shops to 106tt1 Street, as discussed in
the TAC meeting and per David Littlejohn's request. This addition will be
reflected on the revised Sheet C2.1 .
17.) Site Plan: Showl label the bufferyard/landscape setbacks; see chapter 26.04 and
23C.10 of the Ordinance.
Response:
Per our discussion, we are required to meet the Class A bufferyard requirements
(5' -0" along 106th Street and side yard and 10'-0" rear yard). The revised Sheet
C2.1 adds the required bufferyard notations, including the 5'-0" along the outlot
and the building setback notations. Per our discussion, the 30'-0" greenbelt
requirement does not apply on the east side at the site, as we do not have
frontage on Michigan Road.
18.) Building Material: What is alumina specialty finish coating most simifar to? Stucco?
Response:
The Alumina specialty finish coating offers a more genuine stone appearance,
with the use at natural aggregates and greater surface texture. A material
sample will be provided on the material/color sample board.
19.) Architecture: variance approval from the alA may be required for faqade
projections/ recession; see chapter 23C.09.D of the zoning ordinance.
Response:
Additional projections have been added to the North and East fac;ades of the
building. These projections exceed the 8'-0" requirement.
20.) Please provide the building material percentage breakdown. Stucco, dryvit, or
equivalent cannot make up more than 20% of the overall non- window faqade area, per
chapter 23.09.K.2.e of the ordinance.
Response:
E.I.F.S. accounts for 17% of the overall non-glazing elevation area. All vertical
surface areas will be the upgraded Alumina specialty finish coating. Standard
E.I.F.S. will only be used in cornice applications. Other materials include
structural brick, cultured stone and slate tile.
21.) Future Retail Building: will the elevations, signage, lighting, landscaping be
submitted for approval at a later date under a separate docket no. ?
Response:
Our request includes site plan approval for the retail building; however, building
elevations, building lighting (if any), signage and foundation landscaping will be
submitted separately at a later date.
22.) The maximum parcel coverage (buildings and pavement) is 90%. Please provide
your lot coverage.
Response:
Parcel coverage is 73%, which is less than the allowed 90% coverage. The
percentage will be indicated on the revised Sheet C2.1.
23.) Please show/ provide building address numbers that comply with Sign Chart C in
Chapter 25.07.
Response:
Building address numbers are now shown on the East elevation of the building.
24.) Show/label the 15-ft front yard setback along 10(jh Street.
Response:
The 15'-0" front setback along 1 06lh Street has been added to Sheet C2.1.
25.) Work with Scott Brewer, City Forester, on the landscape plan approval and number
of plating required.
Response:
Per T AC comments from Scott Brewer, we have replaced the Hop Hornbeam
trees as requested. We have also shifted the parking and landscaping along the
west side of the site to clear the regulated drain, as requested by the Surveyor's
Office. Additionally, we have double checked the count of interior parking lot
trees; we have 52 trees, which does exceed the required 51 trees (for 459
parking spaces), therefore we feel we have complied with ordinance
requirements. We previously sent Mr. Brewer a copy of Sheet L 1.2, Landscaping
Details.
It is our understanding that this letter addresses the concerns of the City of Carmel. The
project team will continue to work through other T AC agency comments prior to building
permit issuance. We will provide you with copies of any T AC correspondence we
receive by August 10.
Should you have any questions or this letter does not meet with your understanding,
please advise at your very earliest convenience.
Sincerely,
Kristina L. Rexi
CC: John Turek, Project Management Consultant
Mark Obergfell, P.E.
,,'I#!f~:W%
(t.", o~ C"1i' '%
\(\\~'" 1?1'~
'2(; Ii"'~
~ '\ I!fi.. ~\ ~
I~ ~ 1i1>\ fl.~
\ ,"~_LJ., I ~
~~~~('
I cO:'III~\1
,~))I!
City of Carmel
Via email: johnrturek@aol.com
Original by mail
July 9, 2007
John Turek
LA Fitness International, LLC
13570 Marjac Way
McCordsville, IN 46055
RE: Weston Park, Block A (LA Fitness) (#07070006 DP/ADLS) - Development Plan and Architecture,
Design, Landscaping, Lighting & Signage Applications
Dear Mr. Turek:
This letter is in response to your DP/ ADLS Applications for Weston Park, Block A (LA Fitness). Members at
the T AC Meeting will make additional comments on July 18. Please complete the following items:
I. Remember to include the OP application Findings of Fact sheet in your info packets.
2. Provide the filled out and notarized affidavit of notice of public hearing page,
3. Provide the fillcd out and notarized Public Notice Sign Placement affidavit.
4. Provide a copy of the Official list of Adjaccnt Property owners from the Hamilton County Auditor's
Office. Make sure you also get the Official list of Adjacent Property owners from the Boone County
Auditor's Office.
5. Bring material/color samples to the Plan Commission meeting.
6. Provide an aerial photo with site plan overlaid on it.
7. Show the mechanical equipment location and how it is screened from view.
8. LA Fitness Signage: you propose two wall signs, each 238.54 sq ft. The Sign Ordinance only permits a
115 sq ft sign facing 106th $t. and a 90 sq ft sign facing US 421. Please reduce the signage size or seek
variance approval from the BZA.
9. Signage: please provide signage details/cut sheets.
10. Lighting: please provide lighting fixture details/cut sheets.
11. Please verify measurement scale on building elevations.
12. Please provide bike parking, per Chapter 27.06 of the Zoning Ordinance.
13. Please add Ih R/W to the 50-ft measurement OIl 106~'' Street, per the 20-Yr Thoroughfare Plan. Verify this
RJW with the County Highway Dept.
14. Please consider using pervious pavers in the parking lot.
15. Please consider using 'green' building practices.
16. Provide pedestrianlbicycle connections within the site, and to the streets.
17. Site Plan: Showllabel thc bufferyardflandscape setbacks; see chapter 26.04 and 23C.1O of the Ordinance.
18. Building Material: What is alumina specialty finish coating most similar to? Stucco?
19. Architecture: variance approval from the BZA may be required for favade projections/recession; see
chapter 23C.09.D of the zoning ordinance
20, Please provide the building material percentage breakdown. Stucco, dryvit, or equivalent cannot make up
more than 20% of the overall non-window fayade area, per chaptcr 23.09.K.2.e of the ordinance.
Page 1
ONE CIVIC SQUARE
CAfu\-fEL, INDIAN-A. 46032
317/571-2417
21. Future Retail Building: will the elevations, signage, lighting, landscaping be submitted for approval at a
later date under a separate docket no.?
22. The maximum parcel coverage (buildings an pavement) is 90%. Please provide your lot coverage.
23. Please show/provide building address numbers that comply with Sign Chart C in Chapter 25.07.
24. Showllabel the l5-ft front yard setback along 106th Street.
25. Work with Scott Brewer, City Forester, on the landscape plan approval and number of plantings required.
If you have any questions or if I may be of assistance, please feel free to call or email me at
aconn@carmelin.gov.
Sincerely,
~~
Angelina Conn
Planning Administrator
File: 07070006 DPADI~<;.WestonPark,BlkA-LAFilnessdoc
cc: File
Mark Obergfell mobergfell@tlf-engineers.colll
Page 2
ONE CIVIC SQUARE
CARi\ffiL, INDlA1'-lA 46032
317/571-2417
Mark Obergfell
From:
Sent:
To:
Subject:
Greg Hayes [grh@co.hamilton.in.us]
Friday, August 03, 2007 1 :05 PM
Mark Obergfell
RE: Weston Park - LA Fitness
Mark
Yes, we can allow you to encroach with the landscape up to 5' or so. What I will need is
an Individual Non-enforcement agreement for the encroachment of the landscaping and the
appropriate fee. This form is available on our website with the outlet and others. We
will take it to the Drainage Board and will recommended approval to the board. This would
allow the landscaping in the easement as an encroachment, that would could remove in the
future if they are in our way for maintenance of the drain. Being that we still have 25'
or so of clear flat area, I would not see that happening, but it still makes everything
official. You will need to have the owner of the property sign the N.E., whether that be
Kite or LA Fitness at this time, I don't know. If you have any questions, please let me
know.
Greg Hoyes
HCSO plan Reviewer
>>> "Mark Obergfell" <mobergfell@tlf-engineers.com> 10:47 AM Friday,
>>> August 03, 2007 >>>
Greg-
Just wondering if you had the opportunity to chat with Kent to see if we were OK with the
slight easement encroachment at the south edge of the parking lot? We are hugging the
landscaping close to the parking lot and they are only a few feet into the easement, with
a good deal of flat area before the detention area.
We have fixed the west side as discussed, including piping the portion of the drain you
are requiring plus moving the parking east so the plant material is out of the easement.
Thanks,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
-----Original Message-----
From: Greg Hayes [mailto:grh@co.hamilton.in.us]
Sent: Thursday, July 19, 2007 10:23 AM
To: Mark Ohergfell
Cc: Christine Holmesi Scott Brewer
Subject: Weston Park - LA Witness
Mark
I reviewed one additional items on the LA Fitness plans when I got back to the office from
TAC and have one additional comment that I missed on my review letter.
No landscape planting will be permitted or allowed within the existing regulated drainage
easements per Indiana Code 36-9-27-33 (d). The landscape plans show several trees within
the existing platted easement for the Park Northwestern Drain. This platted easement is
our only maintenance access to the drain, as the other side pretty much has buildings up
to the top of bank of this drain/detention area. If the trees are planted as they are
shown of the L.S. plan, they will grow to a point where they completely block off the
"flat" maintenance area to the point you will not be able to even drive a pick up along
the drain, let along take heavy equipment down the easement when maintenance is required.
One the section along the west property line, it appears the parking lots is extending
right to the top of bank and the trees will need to be planted on the slope of the ditch,
which will hinder maintenance access even more.
1
please review the landscape plans and make the necessary changes that will allow for us to
maintain our existing drain without being hinder by newly planted buffer area trees.
If you have any questions, please let me know.
Greg Hayes
HCSO plan Reviewer
2
07/10/2007 17:05
317775'3528
HAMILTON CO SURVEYOR
PAGE 211/03
HAMILTON COUNTY
SURVEYOR'S OFFICE
~
FACSIMILE TRANSMITT AL SHEET
'To: 1\1ark Obergfell
FROM: Greg Hoyes
COJ\1PANY: TLF, Inc.
DATE; JULY 10, 2007
FAX NUMBER 334-1552
NO. OF PAGES INCLUDING COVER: 3
PHONE NUMBER: 334-1500
REFEREN CE NUMBER:
RE: L A Fitness
YOUR PROJECT NUMBER: 2007 -199
o URGENT 0 FOR REVIEW 0 l'L,,~^SE COMMHNT 0 T'1.Ei\Sl': REPLY
61 PLEASF RECYCLE
_"i~~~;t~ Th~ inform~tion confAioed in thi~ f:l.Csimilc mC$~$\ge is intende:d only for the: use ofthc
Individual or entity 1'Iamc:d above. If rile l:c::u:kr is oot me intcnded recipient or ~n employee, at a~t of the intended
recipient who is respomible for delivering it to the intend.ed rt":cipi.enl, you ,ue hel:cby ootified th:l.t >lny cfusf'mirution,
distribution or copying of this communication is strictly prohibited. If you ha.ve rcceivcd thi~ FAX in en(!(. ple:l~e notify
~IS imm"diatcly by relcpho!"l~ :It (317) 776.8495, and rclum the ong\n:tl to tbe "ddrcs& below by U .5. M~il.
ONE IlAMILTON COLJNTY SQU ^ RF., suITt'. 1 ~B
N OIl T.ESV Il L ~:. J N 4(, nf,cI.22~ 0
P 11 () N c':: (3 1 7) 77 ~ . ~ 4 ~ 5 r ^)(; P I 7) 77 (. - 9 t, a
TI II AI ~ ..-,~,-,~ .. ...., . ~~
07(10/2007 17:05
317776%28
HAMILTON CO SURVEYOR
PAGE 02/03
:Xeni'On c. 'U/ard) C'F:..M
SJ/rL'cn;or Of Jlnrllilf.on Coul1ly
i"P(,,1I1C Cj r 7) 776-84:JS
'I-'ax (JII) 7(6-.9618
Suire rS$
OJl~ .'}{crmil/~M COUilt)' Sqrmrc
_iViJhbl'iIlc, fndwMlI 1-"'.16,1-125('
July to, 2007
TLF Consulting Engineers
ATTN: Mark Obcrgfell
8675 Purdue Road
Indianapolis, IN 46268
VIA FACSIMILE: 334-1552
RE: Weston Park - L A Fitness
Dear Mr. Obergfell:
We have reviewed the construction plans submitted to the Bamiltou County Surveyor's
Office on June 22, 2007 for this project and have the following comments:
1, The project in located in tlJe unincorporated area and MS4 jurisdiction of
Hamilton County.
2. The projoct faUs in the Park Northwestern Regulated Drain Watershed.
). The proposed site DOES NOT fall in a Caunel Wellhead protection Area.
4. The detention for this site was master plann.ed with the design of Weston Park.
5. Please s.ubmit an outlet permit (2 outlets) for the direct discharge to the Park
Northwestern Regulated Drain. The application is available on our website at
htLP:/lwww.co.hamilton.in.l1s. go to Departments. Surveyor, and Forms.
6. While the detention is provided, the drainage calculations seem to use a Rational
<<C" value that seems to low for this site use. TI)e Hamilton County Stormwater
Technical Standards Manual suggests a 0,85 Runoff Coeffici ent for Business,
Commercial, and Industrial uses (Tab Ie 201-1 on page 200-7). This would seem
to be a wore appropriate number then the 0.67 used in the drainage calculations
provided for this proj ect.
B7/18/2887 17:85
317775%28
HAMILTON CD SURVEYOR
PAGE 03/83
7. The open ditch along the west side of this parcel-ls part of the Park Northwestern
Regulated Drain. W'hen Weston Park was platted, the intent was the open ditch
would be piped from l06111 Street south to where the detention area begins, which
is what the easer,nent wi.dth was based on. Since the open ditch is remaining, the
easement is not sufficic::nt to cover the open ditch, let alone provide maintenance
access along the drain. If the open ditch is to remain, HCSO will require 25'
Regulated Drain Easement grant beyond the existing easement. HCSO would
l1ave no problems with parking area remaining jn the easement, but the trash
enclosures would be an obstacle to the maintenance access. This can be discussed
in more detail in the near future.
8. Please provide about 3 cross-section views of the open ditch along the west side
of the project, including the parking lot to the top of bank.
9. Wbat pipe material is being used on this site? HCSO will require the pipe located
within the Park Northwestern Easement to be RCP so we oan still maneuver
heavy ma.chine in the easement at the time maintenance is required.
10. HCSO would prefer the Aqua-Shield BMP Structures not be placed within the
Park Northwestern RDE. The property owner will be responsible for the
maintenance of the BMP, but location within the easement could hinder
maintenance access.
ll. How are the existing curb inlets being addressed that end up in the drive isles?
These structw:es are also part of the Park Northwestern Drain a.."1d any changes
will need to be approved by us and as-built changes submitted back to HCSO.
12. Please address all comment from the SWPPP review by Bob Thompson of
HCSO.
13. Please note the additional comments may be warranted at a later date.
Should you have any questions, I can be reached at 317 -776-8495.
Sincerely,
~~
Plan Reviewer
CC: Matt Griffin - Carmel DOCD
Joel Thunnan- HCRD
Dick Hill - Carmel Engineering
Greg Ilko - Crossroads Engineering
Robert Thompson - HCSO
TI II -1 .~_?GlC1':' 1')' D,O:;
"71 "'I"""';:-""COC-..O
C101'_~
<=> "'""
Page 1 of 4
Mark Obergfell
From: Mark Obergfell
Sent: Tuesday, July 17, 2007 3:42 PM
To: 'Robert Thompson'
Cc: John Turek; Angelina V Conn; Greg Hoyes
Subject: RE: SWPPP LA Fitness
Robert-
I guess I am confused on your expectations. The text we added at the top of the third column, item e6, specifically
addresses and explains what post-construction BMP's are being proposed for this project, in addition to the structural
storm treatment units, and how each of these measures helps improve water quality. I don't think I am confused on
construction BMP's with post-construction water quality as we have thoroughly addressed both construction and post-
construction.
Mark N. Obergfe II , P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: TuesdaYt July 17, 20073:26 PM
To: Mark Obergfell
ec: John Turek; Angelina V Conn; Greg Hayes
Subject: RE: SWPPP LA Fitness
I noticed your section C still fails to address and explain what post-construction BMP s are being used and hO\v
they will address water quality--do not confuse construction BMPs with Post-Construction Water Quality
BMP's. These comments are also project specific
CJ{o6ert 7Ftompson, (j(Lfl) CLjlCJ{cJ3
Program Manager
Hamilton County Surveyor's Office
1 Hamilton Co. Square, Suite 188
Noblesville, IN 46060
Q) 317-776-8495, fax: 317-776-9628
aD rct@CO.hamilton.in.us
'Watch O'Ver your watershed-you drinlt what runs off
>>> On 7/17/2007 at 3:13 PM, in message
<B83C662E646298438AA9D6EA8A8C6550 196183@tlfmail.tlflocal>, "Mark Obergfell" <mobergfell@tlf-
engineers.com> 'VIote:
Robert-
I wanted to take care of your comments while they were still fresh. We received Greg Hayes' comment letter from
your office last week but I am waiting to address his comments until we go thru the T AC meeting tomorrow to see if
the city or anyone else has any changes that might affect the drainage. The following is a response to your various
emails from 7/13:
7/17/2007
Page 2 of 4
1. As requested, we added the pre-con and NOllanguage to the Pre-construction activities as item #1 on
attached Sheet C4.3
2. We addressed your seeding fertilizer comment in our previous submittal to you on July gIll. See our response
letter item #9 and revised Sheet C6.5 (change bubbled with revision triangle A).
3. It is impractical to change the term "Erosion Control Plan" to "SWPPP" as we have a Sheet C4.1 titled
Erosion Control Plan, a Sheet C4.2 titled Erosion Control Details and Sheet C4.3, which is the SWPPPIStorm
Water Pollution Prevention Plan. All three of these sheets make up the package to address the Rule 5
requirements.
4. The requested language has been added to item C5 on Sheet C4.3 to address providing copies of the
inspection and maintenance reports to your office. This was covered in our previous response to you on July
9 but had gotten eliminated when we reformatted the sheet to meet your requirements on July 12.
5. See Sheet C4.3 for revised language in the Dewatering and Pumping Operations section to address your
requirement for dewatering bags.
6. Your office has been added to item H on Sheet C4.3 under the spill alert procedures.
7. As addressed in our previous submittals, post-construction water quality is accomplished through the use of
two BMP units as shown and detailed on the plans. All of the developed areas of the site are routed through
the BMP units. We have added additional language to Sheet C4.3 (item C6) to address trash removal, lawn
and landscape maintenance, noted the existing detention device and proposed outfall protection, etc.
8. We will send you a full-set of plans after we get through the TAC meeting and assuming the above meets
with your approval. Greg has a full-set of plans in case you need to look at them in the meantime (the only
sheets that have changed from the full-set are the ones that you have been sent addressing your comments).
I trust this addresses all of your concerns.
Sincerely,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Friday, July 13, 2007 9:38 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
make the changes and address Greg's conunents then resubmit plans to us
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Friday, July 13, 2007 8: 11 AM
To: Mark Oberg fell
Subject: RE: SWPPP LA Fitness
add: under sequence #1. Schedule pre-con with l-ICSO prior to any earth disturbing activity owner shall
provide copy of NO I at that time
in seed bed specs and landscape specs add: Do not use phosphorous containing fertilizer unless soil test
indicate a phosphorous deficiency, use phosphorous free feliilizer 12-0-12.
Change the term 'Erosion Control Planes) to SWPPP
7/17/2007
Page 3 of 4
add to Section C post-construction BMP #5 Owner shall provide copies of all inspection and maintenance
reports to tbe HCSO at least annually
use dewatering bag for all dewatering activities
1?Jl6ert rniompson) CR..,LJi, CL)1Jl(CB
Program Manager
Hamilton COlUIty Surveyor's Office
I Hamilton Co. Square, Suite 188
Nob1esvil1e, IN 46060
Q) 317-776-8495, fax: 317-776-9628
8D rct@co.hamilton.in.us
Watc/i overyourwatersfied' - you d'rinft w/iat runs off
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Friday, July 13, 2007 7:53 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
include the HCSO in spill notification
1?Jl6ert 1Jiompson} tJ(Ljl, CLJl1{.CB
Program Manager
Hamilton County Surveyor's Office
1 Hamilton Co. Square, Suite 188
Noblesville, IN 46060
Q) 317-776-8495, fax: 317-776-9628
tD rct@co.hamilton.in.us
Watch m)eryour watershed - you arinft wliat runs off
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Friday, July 13, 20077:51 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
Your Section C Post-construction BMP is not for erosion control and construction activity--only for Post-
Construction BMP's. This needs revised to reflect how you will address water quality once construction is
finished
'Rp6ert '7liompson} 1{.Ljl} CLjl~
Program Manager
Hamilton County Smveyor's Office
1 Hamilton Co. Square, Suite 188
Noblesvi1le, IN 46060
Q) 317-776-8495, fax: 317-776-9628
tl!'J rct@co.hamilton.in.us
(Watch over your waterslied - you d'rin(wliat rnns off
7/17/2007
Page 4 of 4
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Friday, July 13, 20077:33 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
Need a full set of plans
rR.p6ert rrriompson) (j{L)l, CLjIW/3
Program Manager
Hamilton COWlty Surveyor's Office
1 Hamilton Co. Square, Suite 188
Noblesville, IN 46060
(j) 317-776-8495, fax: 317-776-9628
80 rct@co.hamilton.in.us
'fIVatcfi over your 'watersfiea - you an'nlt wfzat runs off
>>> On 7/12/2007 at 3:32 PM, in message
<B 83C662E64629843 8AA9D6EA8A8C6550 195E76@tlfmail.tlf.1ocal>, "Mark Obergfell"
<mobergfell@tlf-engineers.com> wrote:
Robert-
Attached is an updated SWPPP hopefully conforming to your standard format. Please let me know if you need a
hard copy mailed to you or if any other concerns or issues.
Thanks,
Mark Obergfell
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Monday, July 09, 2007 11:07 AM
To: Mark Obergfell
Subject: SWPPP LA Fitness
Mark
I received plans that do not follow our standard format. I made the comment on the previous review. It
may seem like a minor point but that is what we require for all SWPP plans.
qw6ert rrJiompson, (j{LjI) CLjICJ?5B
Program Manager
Hamilton County Surveyor's Office
1 Hamilton Co. Square, Suite 188
Noblesville, IN 46060
Q) 317-776-8495, fax: 317-776-9628
~ rct@co.hamilton.in.us
Watcfi OTJcr your watersned - you an'nlt wl1at nms off
7/17/2007
TER HORST, LAMSON & FISK, INC.
TLF
CONSULTING ENGINEERS
July 9,2007
:Mr. Robert Thompson, RLA
Hamilton County Surveyor's Office
One Hamilton County Square, Suite 188
Noblesville, IN 46060
Re: LA Fitness - Carmel Weston Park
TLF Project No. 2007-199
Dear Mr. Thompson:
In accordance with your review, we have completed amendments to the SWPPP, ESCP and
Specifications tor this project. The following is a summary of the revisions corresponding to your
comment form dated 6/26/07:
Section A
1. The legal description for the site has been added to Section A.3 on Sheet C4.3.
2. The identification of all receiving waters has been added to Sheet C4.1.
Sections B & C
1. The project SWPPP on Sheet C4.3 addresses the items covered per the standard example sheet
format. The provided \vntten plan addresses the information required by Rule 5 and the Hamilton
County Surveyor's Office.
2. A copy of the O&M manual for the proposed BMP is enclosed.
3. Item number 4 was added to Self Monitoring Section (C) ofthe SWPPP to address the requested
annual maintenance and inspection reporting for the BMP.
4. The requirement of scheduling a pre-constmction meeting and supplying the NOr prior to earth
disturbance was added to the Construction Sequencing Section (D.2) as the initial activity of
construction.
5. The ovvner's representative has been listed as the responsible individual at this point in the review
process as bids have not been taken yet and thus the site contractor has not been determined. The
selected contractor win be required to have a qualified indi"idual responsible for the SWPPP
implementation.
6. The additional contact infonnation has been added to the Spill Prevention and Control Section (F)
ofthe written plan.
7.The required information concerning post constmction pollution sources and water quality is
included in the section titled "Materials and Wastes" which is Section E of the SWPPP plan.
Additional information addressing the adequate treatment of pollutants to the maximum extent
possible for the specified BMP was added to Section EA.
8675 Purdue Road Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334-1552
July 9, 2007
LA Fitness - Carmel, IN
Page 2
8. A recommended location for the NOI, staging area and sanitary facilities was added to the erosion
and sediment control plan. See notes and revisions on Sheet C4.1 for the detailed information.
9. The requested note regarding phosphorus use was added to the Specifications Section 2, part 2,
"Products" on Sheet C6.5.
Please call me if you have any questions or need additional information.
Sincerely,
Ter Horst, J-,amson & Fisk, Inc.
niWt. l7 ~
Mark N. Obergfelt P.E.
Associate/Site Deparhnent Manager
Enclosures:
Revised Sheets C4.1, C4.3, C6.5
Stormwater Quality B.rvlP Unit O&M Manual
Copy of your comment form
Copy to:
Mr. John Turek- LA Fitness
Ms. Angelina Conn - City of Cannel
P ;\2007\ 1 00\2007 -1 99\Admin \Correspondcnce\HCSO response 07-09-2007 .wac.doc
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: ILA Fitness I County: IHamilton
Plan Submittal Date: I 06/22/07 I I Hydrologic Unit Code: I 5120201120080
Project Location Description: IWeston Park Block 'A' 106th & Michigan Rd
Latitude & Longitude of point of discharge: IProvide
d Civil Township: IClay I Quarter: I NW I Section: I 7 I Township:1 17N I Range:! 3E
.8
""' Project Owner Name: ILA Fitness
c:
a Contact: 1101m Turek
...
.z Address: I WGth ana Ivfichigan R:d-- /3570 /"'Ie<r jCi C y.t;ty
d
..... lnr.li~nuJ381i3 Ml (cJrd~v.-Ile- [State: IrN' I Zip: I ~",osr
""' City:
u
<l) Phone: I 416-8322 I FAX: I 53(,,- 31'32- I E-Mail: I
.....,
0
...
.0.. Plan Preparer Name: I Mark Obergfell
Affiliation: ITer Horst Lamson & Fisk
Address: 18675 Purdue Rd
City: IIndianapolis IState: IIN I Zip: 146268
Phone: I 334-1500 I FAX: I 334-15~ '2-1 E-Mail: I moberqfell@t1f-enQineers.com
Review Date:I06/26/07
~ Principal Plan Reviewer: IRobert Thompson, RLA
.~ Agency: IHamilton County Surveyor's Office
E)
p:; Address: 11 Hamilton County Sq. #188
= City: INoblesville IState:TIN 1 Zip: 146060
c:
~ Phone: I 770-8833 I FAX: I 776-9628 I E-Mail: Irct@co,hamiltOIlin.us
Assjste~l By: T
PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum rcq uirements and intent of 327 lAC 15-5.
o Please refer to additiollaliJlformatiol!ind,!!l~d-~~-~h~fiil~Q,ving ~age(s).
o Submit N oticc of Intent (NOI);, cAitaCh'i;;- c!}plo/thi~ cove'f.p~g~'wb~li submitting the NOI to the Indiana
Department of Environment(ll M~l1d'geme;{; "'-Cons'"iructton activiJiel "!pYbegin 48 hours following the submittal of
the NOT. A copy ofthelvpjl1f../ist f1tsobe sent to the HCSO. "n
o A preliminary plan rev~';~)~"~s~eencompleted; a cOJl1.Plje]WI.lsive rcview wHtn9l~.e'completed within the 28-day
review period. The r~{iewihg,iuthority reserves t~~~!H~~.~::ta'i!~t~rform a compr~h~n~iv~ review at a later date and
revisions to the plan ,imiy.l)e iequired at that till1e~9~:~dd.~~s'~~(lfficiencies.\".'~":-:,'
/ "~"~~~:_'-,..' - /',. _~:'-~'_,~-" _ ,"'I'<~:-'~_'_~-::'~:'I :':irrl~~;:;:~~~~'f:'.,~' ,
o Please refer to 3;dditional infRr:~a:t\~~lincluded'i>n~:.,.c;"'~~viIlg page(s). '"
o Submit N otiec 6f Intent (N6I5;~;Att~c'h>qcopy of th?,. .......... page when submittirlg the NCJJ to the Indiana
Department of E,nvironni,ental Mana~~-ine'J(~\. C9nsf/:~~'fi~1f.1'~cfivities.may begin 48 hours following the submittal of
','. "::;_, ~':>;~-,_:_~': ':"~::'~?'~;"':-_ (_: ',_";.'_'_T,"'-"-'~" :"';"-': ;,--_~'>_c".__" :"":-.e-c:":"_)-' ;,:,,,,:-:',1 .
the NOl. A copy "'ojX~i?c NOr must also bes-e'/if/ql~,~lj;g}fi\'.'\j\ ...., ,.. .
[2] PLAN IS DEFICIEN-'r.:'-'Sig'nificant gefi~il1!'cies'~fl.;id~'~ffhii~ quring.the plal./review.
D Please refer to a~d;ti~~al i~fon~~,i!~~4}i*~i~~~~~~{i1~'~!fK1Yg~~i~;i!;~~~t(~).P~g~'4'" .
\, -".~"'-'-'_-,.,,:!1 --'- /-'--- -- - :- ~ ~- '---
D DO NOT file a Notj'ce ghflte~t for tlii~'pT~aec-r: ~-". .., .-'
[2] DO NOT commence l~nidis!~{bhig activities until~all-defic,iencieS~~f ~d~ql.la';eIY addressed, the plan re-
submitted, and notification ~as;bee~p:tcdvedthatthe-minimUlpr,eqiJ.irements have been satisfied. .
[2] Plan Revisions 0 Deficient Items'shQ.~;_~dbe 1).i~1Ied Of:(le]jv~r.ed totllc Principal Plan Reviewer identified
in thc'-Plan Reyiew Section above.
Hamilton County Surwyor
6/26/2007
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: LA Fitness
Date Reviewed: 06/26/07
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution
Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All
measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a qualified individual with stmctuml measures designed by a qualified engineer. The Plan has not been reviewed
or other local, state, or federal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to further evaluate the Plan.
All proposed stormwater pollution prevention measures and those rpferenced in this review must meet the design criteria
and standards set forth in the "Indiana Stormwater Quality Mamial"from the Indiana Department of Natural
Resources, Division of Soil Conservation as well as the Hamilton County Stormwater Design Manual.
Please direct questions andlor comments regarding this plan review to:
Robert Thompson, RLA
Please refer to the address and contact inform:ltion identified in the Plan Review Section un page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to l~omplcte a plan review:
o Yes 0 No
The items checked below are deficient and require submittal to meet the requirements oHhe rule.
A
A
o 2 11 by 17 inch plat showing building lot
numbers/boundaries and road layout/names
o 1 Index showing locations of required Plan Elements
o 5
Location of all lots and proposed site
6
im provem ents (roads, utilities, structures, etc.)
f ,NotatiQ!l of any State or Federal water quality
.8 .+.. '.,
'., p,,"prtIts ....
Loc~~ici~.and ..iiame of all wetlands, lakes and
10 water'collrs,e~J'.)[l alld adjacent to the site
QJ2 IdentificatioJl' o;,p~tel~.tial discharges to ground
" ", ,:qj~\i water (abandO:n~d wcll.s;'~mkholes, etc,)
D....'..'!~ PrNoIl.structioi\ and~po~~.constmction estimate of
';:;"fil.t:j: Peak Discharge 00 Year storm event)
" ,,,",.. c'. .... ::;lt~IQ!:[.'..' 6 Locations and app...roXimat~.. boundaries of all
o 15 Adjacent landuse, inc1ud~ng Upstrdal'n, -Wiltershed 1
! 'C!,. .t\ ,! disturbed areas (C~nstructi9Jl Limits)
O . . .. ,"", f'".<;If 'i,.\Z'''' S6ir~?illj'p'inclllding soil descriptions and
17 ldentJficatlOn of eXlstmg vegetatIVe cover:':0L';,> .'c,,~';11 '\1~~ limitations ,/ S);) ,
o 19 Locations, siz~ ati? ~i'~.fns;ons of5~R.~;~;?j1~~;g~;~~:~~~~ OF::\~ ~;~~~~J~~,;~any off-~ite r~~struction actlVit.ie~
systems (e.g. pIpes, swales l!fldchannels)",:'"'k.6;':::;;;i:fa:':i;t;sz::~ :r;:~"I~~O, i'.s~9gatel:hvltli thiS project (sewer/water tle-ms)
o 21 Locations ofpropose~ 'Ei'di!'stockpiles'imc1!pr c~"'_:/ 0.22 ~~~S~g site'top'o~a~hy at an interval appropriate
borrow/dIsposal areas;!',' .." . to mdH,:ate 9I~.lI1age..patterns
o Proposed final topography'at a~)l}terval appropriate to .......,
23 indicate drainage patterns .< ii.e, ...--.-,.-.-- ,-"""-,,,.,
" ,(>~,<;
Narrative describing the nature and purpose of the
project
Legal Description of the Project Site D
(Include Latitude and Longitude, NO] Requirement)._ .,..""c,..' "
T",T 0
o 4 Vicinity map showing project location
o 3
o 7 Hydrologic unit code (14 Digit)
,...':<'),:
o Specific points where stonnwate1')lischarge will leave 0
9 the sitec",t"p .'.'. .." .
o 11 Identification of all ~~cei\iD~>waters
'..1>'
o 13 100 year floodpl'Ybs~,~ij}'l~f~vays,~p1:~oodWay ;I!
Ilamilton County Surveyor
6/26/2007
2
Construction/Stormwater Pollution }>revention Plan - Technical Review and Comment (Form 1)
Project Name: LA Fitness
Date Reviewed: 06/26/07
~
;Q
<ll
Q,) "'"" .~
~ Cl "a
:: .~ 0-
g' ~ ~
"0 <l) b
~~Z
00
00
00
000
000
0DD
000
000
ODD
00
00
00
00
00
000
~ =
~ .~
C" I:J
<:.l ~
"0 '""
~>=l
00
00
00
00
00
Assessment of Stonnwater PoUution Prevention Plan (Sections B & C)
Stormwater Pollution Prevention Plan - Construction Component (Section B)
The construction component of the Stormwater Po{[ution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation afthe plan and inspections of the construction site are
necessmy to minimize the discharge of pollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the peifomwllce of a practice or the
effectiveness of the plan. The plan must be ajlexible document, with provisions to modify or substitute
B Ipractices as necessary.
1 Description of potential pollutant sources associated with construction activities
Sequence describing stormwatcr quality measure implementation relative to land disturbing
2
activitics
3 Stable construction entrance locations and specifications (at all points of ingress and egress)
4 Sediment control measures for sheet flow areas
5 Sediment control measures for concentrated flow areas
6 Storm sewer inlet protection measure locations and specifications
7 R!1noff control measures (e.g. diversions, rock. check dams, slope drains, ete .)
8 Storm water outlet protection specifications
9 Grade stabilization structurc locations and specifications
10 Location, dimensions, specifications, and construction details of each stormwatcr quality measure
11 Temporary surface stabilization methods appropriate for each seaSoon (include sequeNcing)
12 Permanent surface stabilization specifications (include sequencing)
_____~,"-",..'c;"....1i.:c.<_
13 Material handling and spill pxeVclitFul pl~n:'.,
._' ~J ,_~..:~~ .i! :.t ,t. "(,~) ',it '''', '
14 Monitoring and mainten.a~,ce gi~ide'IiJ~~,.,s.f!!I.:~tl!~ proPQ;~e.~ st?rnl~vater quality meaSllre
15 Erosion & sedimcnf:~o~tr~'i"~;ecfri~~~ions for in~i~idualhuifdi;;g iots
-' ..1-::. '. ~ . .~'~',
/" ..,.,.;~"t,'....", ,/ ~../- . '.
Stormwater Pollution Prevention Plan - Post Construction Component (Sectioll C)
Z The post C9h~_{r,J~,c~i?h' component of the ~t~lti~~{~~j.*~Nution preventiqn {:;Iq!! i1~cludes the
.~ implemen{atioh,b/Stormw,~[IfG,quality me&f,ii,1~~~i;tRi~~cJtess pollutants tha{ will be'Cfssociated with the
c.. lfinallanduse. Poh cOlJsti:iictifjil..stormwater'qi{dl!fjtlrieasures should befimctional upon completion of
~ I _,' .,.~t-:.""o"."i.:.... ._.:""-'- T.l:.... ir,:.,01_:'-"'_'7_~-'r,~' -L I
~ the project. Long termfu,1.'alond'lity of the meqti1~'e'Lare critical to their performance and should be
...- j' .~."":?-:- c- '!- -~? _~:'~-{~,,:__~~~_~i!; n,,1
o C monitored and m'aintained. S~'f:th;;1-Iamaton :dfoiii/t'..,Stormwater:Design Manual./or guidance.
Z 1: r _::<<'~ \ , '~')i.:*Jl,&~-~}::~~~;k,~~1)~~~?r:~~~i'tG1i:\'~-."~"~:'"';';!~:<\~i~'~:'G;1:. l ;~-" ""i 'I:
1 Description ''Of pollutants and tll~ir"sources.i~ssbciaied with the proposed'land use
~': __' \ -. ~:~h'1,,;~ -"'\~::;/-'nrt}~~S~'~~1", ,_ . ' ;'
2 Sequcnce.d~sc'l;!bing stofnn':!fJft, .-...c~;~l!:~.'fi~:H!1pJ~mlOi.i.tlltion ,i ,c' ;
1, '''-~ ,-. ;~;,:--~"",~":'-i:~_~~;-'~~ ~,~r,*jp\~-f,"~{{,~~T'::\.f;~:':;_:::":+~:''':'!~}_~~_;~jS\'~~l:~~~'" :"' \, " '
Description of ]JJ:"ppo.sed po~rco-n' "n:sform:W~~i:er.ij'iialifY.,ilie!lsureiV .
3 (Include a w}(tt~;dles~riptioft~6J /.Jpw:t!lese mepsIJIexw~!lrediic'ediSC!1atge.,.ofe~pected pollutants)
4 Location, dirrie~~illiis, s~~ci.!i~atiO~ns, ~~'d-c-;;~~tru-"Cti~l; 'dcta.!ls..ofe~~h st.ormlVatcr quality measure
5 Description of Illainten~nce ~u'jdeliQe~_ for post constructlonsf?rIll\\'ater quality measures
'\)
Hamilton County Surveyor
6/26/2007
3
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment
Project Name; LA Fitness
Date Reviewed: 06/26/07
1. Layout of Sheet C4.3 does not meet our standard sheet format. See ,\'ww.co.hamilton.in.us/cleanwaterand see
examples of SWPPP sheet layout for technical review (Part A, B and C). Revise and re-submit
2. Provide HCSO a copy ofthe O&M Manual for Post-construction BMP's.
3. Add to Part C, Post-ConStruction BMP :"Owner shall provide copies of all inspection reports and maintenance
activities at least annually."
4. Add: under construction sequencing #1 shall read: "Schedule a pre-con witb the HCSO prior to any earth disturbing
activity and furnish a copy of the NOI"
5. Provide HCSO proof that the trained individual (Turek) is trained in sediment and erosion control activities.
6. To spill prevention add contact info for IDEM and HCSO in case of spills.
7. Missing Section C which addresses post-construction water quality-follow standard sheet format
8. Show location of NO I posting, staging area and port-a-Iet location on plans.
9. To seedbed and landscape specifications add" Do not llSC phoshorous (12-12-12) containing fertilizer unless soil test
show a phosphorous deficiency Use phosphorous free fertilizer (12-0-12)
These comments reflect only the SWPPP and do not address other plan review agencies.
;.
Hamilton County Surveyor
6/26/2007
4
.'
..
Page 1 of 1
Mark Obergfell
From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent: Monday, July 30, 20078:21 AM
To: Mark Obergfell
Subject: RE: Weston Park - LA Fitness Sanitary Review
Mark,
That sounds acceptable. Please make changes and proceed with the corrections. Thanks.
Ryan C. Hartman
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
ryan.hartman@ctrwd.orq
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: Tuesday, July 24, 2007 11:53 AM
To: Ryan Hartman
Cc: Angelina V Conn; John Turek
Subject: RE: Weston Park - LA Fitness Sanitary Review
Ryan-
I think we can change the angle of the sanitary sewer counterclockwise to make a straight shot eastwardly out of the building
(rather than angled) and then we can locate c1eanouts in each of the three islands to address your comments #1 and #2. OK?
Regarding #3, we will add the type 1 c1eanout detail for the one at the building, but am thinking we will not need the Type 2
cleanout detail any longer since we can move the c1eanouts of the paved areas - agree?
Otherwise, comments #4 thru #13 are straightforward and we will proceed accordingly.
Thanks,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
From: Ryan Hartman [mailto:Ryan.Hartman@CTRWD.ORG]
Sent: Friday, July 20, 20079:55 AM
To: Mark Obergfell
Subject: Weston Park - LA Fitness Sanitary Review
Mr. Obergfell,
Please see attached comment letter. Thanks!
Ryan C. Harhnan
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
ryan.hartman@ctrwd.orq
7/'J. 1 nn()7
, ,',', :::CI,~y' Townshi'p ,R~giq,n,'cii',Waste. District "
0" '.. .' . '.. ,\,'. -' '., . . .
',~.ctr;vd:brg': (3.l7}'8~4~926:O~, fi ',Fq~ (3'l:7)"$44~92D3 ;~..., ' '
"
,,' 'July,20';:,2007' '." "
. .~ '
Te(I-1cj;st,\atnso'n '&"Fis'k,~~rn8., ", "
, , ': 8615Putdue:Ro~d.., "
" Indianapolis" ~~: 4?268, ", '
,Tel (317) 334':1500, ' ,
, ,Fax(317)<~34:-1552'" , '
,Attn:, Mr. ',Mark ObergfelF,.': ' "
, :moberQfell@ilf-e'noine'ers:cifrr:
"-!. '-'I"~ .
'. .~'. - .
. _.' . '. ,~.:,' ~ - ; ',; :: ,.~.s;;:-:;'-::'-.:"; :;:..' :' ~-. . ..' - . ,
Subj~ct;,;yiJestdn'i:':~rk BI6ck'A."LA Fifnes's, ..
, :.. . . . . '(:.:' '.:~':.' - .'~~~>{::--.:.... . - . ':. -' . . -, . ' . .
:, Dea\,~s;.. Ol?e~~f~"f , , '" , " ' '"
, ' ':, f',1l(e':D:ist~i'qth~~,,~~,~je0~d':' th;e:":si1bmitt~d:: PI~'ns',and~'~~~s:thefonOWing',
... ...GOi$~t~"~..;~~~i6~J~~~~~~~hfj;~i'\~~icigJOd~,::~~~: .. ...
::~,~,'.,~ ',,: ,(6JfrecJidns, a~~ordi~bIY ari~ ,ind4de',CO callQut type "at C,O
.Co. "locatidB., ,:", ..~~:.,'>, ':';j::"."" ,:,::,', . , " ,:,' , ,
";lr'2. ),: ",The 'DJ~tdq )j!Jgge~:!~; thar,:,90:s:;b~ lqc<.1t~:W ~fP?ssib!e withlri' '
'-i' ' :ar~as,~o.bg'seededpr$odd6d":':'<::,,,e.<::<,:':,,>:' ,:",,:. '
3.),;Y";c,"Pleas~add'the, service ,Jaf~rc:lldetail,,,;~saddie' detaH"and',CO,
"":,,.), ','Type EL 'det~i1 'on---",sheet(C6.2', wl)iSh<'~..'can,'be .found at ,',
",:', '~j)~~(Lorg..,"".." ~;;:',,' .",~",..., : ,'" ,', ":..'
4.).' " J~lease' 'al59 ::rnake', note,,'pr1 "l)tilityo"$.heet that "the proposed' ,
~ )'1 ~ '._. _' ..' .J (. ~ . ' .' ',." . . .' ..
, , ,';j;orifn'ection',be' tria'de throblgh u,se"of'a' rigid saddle., ,
,,5: )'; "Ple~s~:r~/~~~~' s~nit~fy' ,~~WeF'09~ed:, 9~ 'sheetC6:4. an(i" add~ '
" ," the Olstrrctl$:.cur(enti~,p-,ectflcatlons,mcludlng sumJ11anl of,lB,teral
, lnstallatlonrkites. ;"~':':'" ' '" '" " " ,., ',",;':,,:',
6.) : " 'Ple:a~eiin(;lude ariexecutep:,sew~'r-i:lpplicatiori with'nexf'plan
slibmittal ,: ,:d ", , . ." , , ., ' ,
.-.'
, . I'
, o', ,: Please contact'me at311':844~9200;,i(.you"ha'Veany questiC?n~orneed
,add.itio~alinform,at1ori... .
",SinCe~IY~'~, " :"'.<'"
, it:S.:. )'o" '
, 'Hy.' " rtman" :," ,
0' tri,ct Eriginee'r ..
, rya '. , rtmcm@c~rwd,org'
'.". '..
..
, '-.'
. .....
"., ".:-:" ,"-
',.
. ' .
" T07.6.l:'~, Cqlle~eAv'~:,:SUit~ A' . ,Iridi~'~(l'~qris.. fridian~46280~ 1098.,
". ",
,',
o .'
Page 1 of2
Mark Obergfell
From: Mark Obergfell
Sent: Tuesday, July 31, 2007 8:19 AM
To: 'Ryan Hartman'
Cc: 'Jon Zaich'; 'John Turek'
Subject: RE: Weston Park - LA Fitness Sanitary Fees/Application
Attachments: LA Fitness Water Useage Report - 2006 - Norwalk, CTxls
Ryan-
Thanks for your reply. Our client does not think 35 gpd is a reasonable number. Attached is a spreadsheet for two other
similar sized facilities showing actual water meter readings. These average out between 20 and 25 gpd/person. There is
a juice bar with a couple of sinks and an ice machine, but no food prep.
Sincerely,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
From: Ryan Hartman [mailto:Ryan.Hartman@CfRWD,ORGJ
Sent: Monday, July 30, 2007 2:45 PM
To: Mark Obergfell
Subject: RE: Weston Park - LA Fitness Sanitary Review
Mark,
As far as the application goes we do use the 327 lAC 3-6-11 as a general rule of th umb the calculation of 210 people is
acceptable but because this facility has showers we will need to use 35 gpd per person as a calculation. Will you have
any food preparation areas within the facility?
As for the plan review and application fee this can be delivered at the time you receive a permit. I will send you and
jonz@lafitness a invoice showing your fees prior to permitting. Thanks.
Ryan C. Hartman
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 3:17-844-9200
Fax: 317-844-9203
ryan.hartman@ctrwd.orq
From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com]
Sent: Thursday, July 26} 2007 12:03 PM
To: Ryan Hartman
Cc: John Turek
Subject: RE: Weston Park - LA Fitness Sanitary Review
Ryan-
Attached is a pdf of the signed application you requested. I wanted to get it to you so you could review and see if we did
everything correctly. Let me know and about my questions below. Also advise if you need the plan review and inspection
fee now or later.
Thanks,
Mark Obergfell
From: Mark Obergfell
8/3/2007
Page 2of2
Sent: Tuesday, July 24, 2007 11:53 AM
To: 'ryan,hartman@ctlWd.org'
Cc: Angelina V Conn; 'John Turek'
Subject: RE: Weston Park - LA Fitness Sanitary Review
Ryan-
I think we can change the angle of the sanitary sewer counterclockwise to make a straight shot eastwardly out of the
building (rather than angled) and then we can locate cleanouts in each of the three islands to address your comments #1
and #2. OK?
Regarding #3, we will add the type 1 cleanout detail for the one at the building, but am thinking we will not need the Type
2 c1eanout detail any longer since we can move the cleanouts of the paved areas - agree?
otherwise, comments #4 thru #6 are straightforward and we will proceed accordingly.
Thanks,
. Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc,
ph. 317-334-1500
fax 31 7 -334-1552
From: Ryan Hartman [mailto:Ryan.Hartman@CTRWD.ORG]
Sent: Friday, July 20, 2007 9:55 AM
To: Mark Obergfell
Subject: Weston Park - LA Fitness Sanitary Revlew
Mr. Obergfell,
Please see attached comment letter. Thanks!
Ryan C. Hartman
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
ryan.harcman@ctrwd.orq
8/3/2007
;,1 '
;ii\L ~-\C\M~3 (_'~,\-6 \
~- --~, - "'I.'" I -" - -- ---. - -~ ----
_ __ _ L'0lW--- - ~ ~ $~L$-,^-cL~'
_-0- o--f1-~~ ~-J _~:_-k~o~
----,- i=i,--'9~'~~--'
..-'hi ct t \ YS .-
,,..~~_#). - -.\- --
I '
I ,'- .m- - - - -' _bJ2"- - <;.eft.(~ on :_-
· :fi ~ 1,. :?'~ - ~Ld-- ~o'
~L \tct1t~-L-
..;..J ~ .
, - - - -- - l',- -.-~ -- - - -l_fl-_ J_,1-1_ "61--1_ _ '-- - A_' ~
7""\:42-5 ~ _ n ~._ _ _ _ _ __ ~1IA!{ V
I'
'~~~ .
__ __ - u. _' _ \ - --
_uk-_ '- <3 f4- I
I
I >
. 1m 0L,
._ J1L ~ .
~
.. ,
_ _ ~ _1.1<"
:1';
I'!
I,,+-
1~ ~--: -
__ -'I:i,\
1'1
,I: ,
il"',t
, I
1,1 !
.fii-
I
I, '
- - - 't;t.'t
I" I
i
'Ill -
,I
I'
Page 1 of 1
Conn, Angelina V
From: Conn, Angelina V
Sent: Friday, July 27,2007 11 :42 AM
To: 'Kristy Rexing'
Cc: 'mnuckols@architectsforumllc.com'; Holmes, Christine B
Subject: LA Fitness building facade projections/recessions
Attachments: BZA Calendar 2007.pdf; Development Standards Variance originaI2007.pdf; DSV Instructions.pdf;
BZA Public Notice Sign Procedure.pdf
Kristy:
In speaking with the Director and looking at the zoning ordinance, the fa<;ade projections/recessions depths shown on the
LA Fi1ness building will require a variance request approval form the BZA, due to them not being 8-ft deep.
The Department will most likely be in support of your variance request, and so, one option is to appear before a Hearing
Officer of the BZA. It is one member of the 5-member Board, the fee is less, and the public notice deadline is 10 days
prior to the BZA meeting, rather than 25 days.
Please work with Christine Barton-Holmes, should you choose to seek a variance. She is the liaison to the BZA and can
help you through the variance approval process. Attached are the variance application, instruction sheet, public hearing
sign placement requirements, and BZA calendar.
Thanks,
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
p.317-571-2417 f. 317-571-2426
aconn@carmel.in.gov
7/2712007
Page 1 of 4
j
Conn, Angelina V
From: Mark Obergfell [mobergfell@tlf-engineers.com]
Sent: Tuesday, July 17, 2007 3:14 PM
To: Robert Thompson
Cc: Greg Hoyes; John Turek; Conn, Angelina V
Subject: RE: SWPPP LA Fitness
Attachments: LAFitnessC43.pdf
Robert-
I wanted to take care of your comments while they were still fresh. We received Greg Hayes' comment letter trom your
office last week but I am waiting to address his comments until we go thru the TAC meeting tomorrow to see il the city or
anyone else has any changes that might affect the drainage. The following is a response to your various emails from
7/13:
1. As requested. we added the pre-con and NOI language to the Pre-construction activities as item #1 on attached
Sheet C4.3.
2. We addressed your seeding fertilizer comment in our previous submittal to you on July 9th. See our response
letter item #9 and revised Sheet C6.5 (change bubbled with revision triangle A).
3. It is impractical to change the term "Erosion Control Plan" to "SWPPP" as we have a Sheet C4.1 titled Erosion
Control Plan. a Sheet C4.2 titled Erosion Control Details and Sheet C4.3, which is the SWPPP/Storm Water
Pollution Prevention Plan. All three of these sheets make up the package to address the Rule 5 requirements.
4. The requested language has been added to item C5 on Sheet C43 to address providing copies of the inspection
and maintenance reports 10 your office. This was covered in our previous response to you on July 9 but had
gotten eliminated when we reformatted the sheet to meet your requirements on July 12.
5. See Sheet C4.3 for revised language in the Dewatering and Pumping Operations section to address your
requirement tor dewatering bags.
6. Your office has been added to item H on Sheet C4.3 under the spill alert procedures.
7. As addressed in our previous submittals, post~construction water quality is accomplished through the use of two
BMP units as shown and detailed on the plans- AI! of the developed areas of the site are routed through the
BIV1P units. We have added additional language to Sheet C4.3 (item C6) to address trash removal, lawn and
landscape maintenance, noted the existing detention device and proposed outfall protection. etc.
8. We will send you a full~set oi plans after we get through the TAC meeting and assuming the above meets with
your approval. Greg has a full-set of plans in case you need to look at them in the meantime (the only sheets
that have changed irom the full-set are the ones that you have been sent addressing your comments).
I trust this addresses all of your concerns.
Sincerely,
Mark N. Obergfell, P.E.
Ter Horst, Lamson & Fisk, Inc.
ph. 317-334-1500
fax 317-334-1552
7/17/2007
Page 2 of 4
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Friday, July 13, 2007 9:38 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
make the changes and address Greg's comments then resubmit plans to us
From: Robert Thompson [mailto:rct@co.hamilton.ln.us]
Sent: Friday, July 13, 2007 8: 11 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
add: under sequence #1. Schedule pre-con with HCSO prior to any earth disturbing activity owner shall
provide copy of NOI at that time
in seed bed specs and landscape specs add: Do not use phosphorous containing fertilizer unless soil test
indicate a phosphorous deficiency, use phosphorou~ free fertilizer 12-0-12.
Change the term 'Erosion Control Plan(s) to SWPPP
add to Section C post-construction BMP #5 Owner shall pro.vide copies of all inspection and maintenance
reports to the HCSO at least annually
use dewatering bag for all dewatering activities
1?p6ert %omp,'Wn, 2(LJl, CLJl.2('13
Program Manager
Hamilton County Surveyor's Office
1 Hamilton Co. Square, Suite 188
Noblesville, IN 46060
Q) 317-776-8495, fax: 317-776-9628
l'1J rct@co.hamilton.in.us
Watdi over your watershed - you drinl( wfwt runs off
From: Robert Thompson [mailt~pct@co.hamilton.in.us]
Sent: Friday, July 13, 2007 7:53 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
include the HCSO in spill notification
2?96ert'lliompson, 2(LJl, CLJl2('13
Program Manager
Hamilton County Surveyor's Office
I Hamilton Cu. Square, Suite 188
Noblesville, LN 46060
ClJ 317-776-8495, fax: 317-776-9628
ttJ rcl@co.hamilton.in.us
7/1712007
Page 3 of 4
I
Watcfi over !Jour watershecf - !fou dn'nl( what runs ojl
From: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: FridaYI July 131 2007 7:51 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
Your Section C Post-construction BMP is not for erosion control and construction activity--only for Post-
Construction BMP's. This needs revised to reflect how you will address water quality once construction is
finished
tJ\p&ert (Ifwmpsotl, 1(1..5l, C.LJi'/.2($
Program Manager
Hamilton County Surveyor's Offic.~
I Hamilton Co. Square, Suite I R8
Nob1esville. [N 46060
CD 317-776-8495, fax: 317-776-9628
r:tJ rct@co.hamilton.in.us
IWatdi over !four watersliecf - you ann/( what runs oil
From: Robert Thompson (mailto:rct@co.hamilton.in.us]
Sent: Friday, July 13, 20077:33 AM
To: Mark Obergfell
Subject: RE: SWPPP LA Fitness
Need a full set of plans
1(p&ert crfwmpsotl, 1(1..;4, CLJl2($
Program Manager
Hamilton County Surveyor's Office
I. Hamilton Co. Square, Suite 188
Noblesville, IN 46060
CD 317-776-8495, fax: 317-776-9628
SI'J I9t@co.hamilton.in.us
Watcli over your 'watersfud - you dnnl( what runs off
>>> On 7/12/2007 at 3:32 PM, in message
<B83C662E646298438AA9D6EA8A8C6550 195E76@tlfmajLtlf.local>, "Mark Obergfell" <mobergfell@llf-
engineers.com> wrote:
Robert-
Attached is an updated SWPPP hopefully conforming to your standard format. Please let me know If you need a hard
copy mailed to you or i1 any other concerns or issues.
Thanks,
Mark Oberg1ell
from: Robert Thompson [mailto:rct@co.hamilton.in.us]
Sent: Monday, July 091 2007 11 :07 AM
7/17/2007
Page 4 of 4
"
To: Mark Obergfell
Subject: SWPPP LA Fitness
Mark
T received plans that do not follow our standard format. I made the C0llU11ent on the previous review. It may
seem like a minor point but that is what we require for ali SWPP plans.
2\9&ert 'TfiompsonJ ~LJt CL:A.2\.13
Program Manager
Hamilton County Surveyor's Office
I Hamiltoll Co. Square, Suite 188
Noblesville, IN 46060
CD 317-776"8495, fax: 317-776~9628
tlr:J rct@cohamilton.in.us
Watch over Ilour watershed - lfOU dn/!( wliat runs ofl
7/17/2007
2
~
'"
t,;
W
::;:
is
w
U)
.
~~
r3
~~
i8
~~
a
~ffi ~
W i
i~i :E !
J ~ ~ ~ ;."
~w~ ~ ~
~:; ~,'
m ~ i
pc~ ~ ~
,~~, ~ ~
~~.. 1. ~,~
~ ~ ~ ,11 ~ ~ ~
,~m I: i ~~' ~,~ 8,',
~H ~ ~~ ~ ~
u :~~ i ~~ ~
.
~ r
~1 !
u~
~d
~~3
r~~
e~~
~~1
~~.,
~~~
s~~
~~i
~~]
I~~
1"
en.
I. ". f~~
> 'I'"
~ j~~~
; i~'i~
' t~~~
~~~~
~M
f.~ ~ t~ ~ ! ~
O~~5~~o'~
~~~~w~~~mL'~
~~""'o~fc "8"""
~~nj~~~~9~~~~~~
!t~~~;~~.-uj~~"~~';
~~~~Hl~:!~il!~i.~
H~~.~~h~~W~t
~j::::':!tE~lI' Ii r:;1 :oJ',
~2g;-o~~" ~:\i."
,e,.~M~~~.~p~
.!t~q l^h~"2,
l'b "~~"~~~~"~,
:,~~ls~~~~~~~~~!
~1 ;U~~~~!~H~
~H!H'~~r,~lci'
ta'\"'l"~'~" '~',
~~~;l:~t~e,~'il~a~
):'~:~'~1);- :i1",!P~q~
~~S~..::~i;i;ji:~1
~~~ ~~~;:~~~ i;B ~
'5;XHB~lE'i!~
~fjj'i:i'~~~~;~~~i~
.."1'. ,.h.H, ~ "I;
"n.,_., ,""'"\ E!
~~'~h"~~~~!!Jr.
Hli~~l~~!~j.~.~
fP'J~~~~~l-:~~~~di~
~
~
o
;;:
I
'.
B
~.
~ '5
H
H
~~
"
~J
!l
I!
'I
Ii
,!
H
In
, ~~
~ H
, }~
r~
.
~
0-
Z
o
i=
z
~
w
((
CL
'"
o
i=
::0
~
((
w
,~
s-
:2
((
o
f-
'"
~~
~~
U~~
li.~
'l'~
j:~p'
~~~~
~~$s
""~. P- '"
P~f
~i~~
~t~~
1~~3~
'~r~~
~h~i
~ ~!~,!~
~*~
Pm
~ "'j'
,m~
I
:/" d
~ .E
z ~ ~~HJ
_ w: ~I~
.':: lid ~~~~
e Dc t I
~ ~ ,Co"
."l ~r'"
li~&!.
:f! ill~
~
..
.....
.
G
,
<
"
~
f,
~
~
"
~
~
~
~ ~
8 ~
i i f-
I -~ m
H" ~ ;;<
!~* ~ @
~~~ ~ in
, ~
; i ~~
~ q ~ ~~
i ~ ~ ~!
~ I ~ ~ ~~
~! ~ ~ ~~
~ ~ ~~ ~ ~~i
?, ?/' ~ ~gl)
; I oB ~ ,I'
r. g ~~ w ~~~
~ h i~ ~ h~
~ ~~ ~~ ~~~i~
~ ig ~~ ~~H.
~ i~ ~~ L~~~,
~ ~~ ~~i'~~~~~ 2
~a~~'~~ 'mID~'~ 0
~fo"~ eF. l-
I) ~ ~o.~ ~..~'~ ~
..., ~ r-~!l~;L~~!'!..;~ .-
, I Ili~i~~.~11 ffi
. ! li~.I;.~~~~ ~
~ I ' ~., ~..F ~
.
"
~ ~ ~
~r. ~~~
m; ~~~
~ ~ 4""~
is ~~~
H H~
~~ !"
~.J ~!!
.,- ~ ,~" IIJ
101 i~ ~
1i'; ~~ i
~~ ~~~
~~ !~~
i~~l~!
~~.1"1
."mg
'i.pp"
,~2~'~tr
!' I,," ~
mm
f/l
: II)
I' w
'i,~? z
" l-
LL
ex
....
"b
y
7".>.~
't:O~
....tl'
-;.~ %
a;, 0
i))<;/-~
t'"
"'.....0
'f,-
,
~ ~
~ t, r1
>~ ~ ~
~ ~ ~ ~
!a co ~
", ~
:'. 1
}; l ~
"~ ~
a . , . ~
~~ i ~ ~ ~
M :.' L H
~~~, 0 ~ 0 ~
~"'~ ~ ~." ~ ~
~i! i .! ~ l
~~i ~ ~ ~ ~ ~!'
~!~ ~ b ~ ~
~"e ~ " ~ ,;
~ 6 t::I ~ i'
l~~ ! H ~ ~
lh I~ ~ q d
~~;'~~ca~~
~~~ l~ ~ ~ ~ ~ ~
I'i~~ II lit I'~ ;
.~. C, f . ~ ~ i
! ~ ~ I~h B ~ y 'i ~
z
o
;::
z
w
>
w
oc
"-
z
o
S
:1 ::3
~ ~
" ~
~ ~
:i: 1;;
fL ~i
o ~
f- ~
<II c;
;z U) ~
8~ ~
~~ d
clJ..i ffi
<: ~ ;;.
p.
~
:;
~ ~~
I ~ H
~ ~~ ~~
1 >"~"
~ ~~~ U
! .~~ L~
~ j~~ ~ ~
i n~~ ~~,'
~ p~t~ h
, ~h~ Ii
~ ~'~~ 1~
~ ~~~! ~'U
!~ ~~~: j,
.W ~.
1~~ 0
~ tr ~
,
~~~
,~p
IH~
..,..l~' 'i
~':.
o~' ~
~ If"
..i!~
~9~~
"a~
~1!~
ri~J~
~'~ ~ t
1 ~~ ~
~ ~ ~ i
~,j~ i
E:i
.,c.
I'. ~.'.; 1 :,'
IW!
I: >.:rr~}l
~ ~: ~ ~
1 ~n~
~ Hi~
" ~ 3 ;r ;;:
~
~
~
f
!
~
~ ~
I. ~
~ ~
i t
! ~
~ ~
.
i ~
~ ~
~ ~ ~
. ~ ~
~ ~ ~
~ ~ ~
~ ~ '"
~ ~ ~~
~
~
.
}
.
~~
'-:1
~ ,," I
" ""
, < i
~ ::1 l
~ ~t Co
~ 'H
~ ~; ~
~ r !
~ 5~ ~
A ".&: .
~ ~~ ~
pi
.! -'
.' ;
~~ i
~o -I
n ~i
f~: ~ ~
'[I,L";
~
/{l'-<:!."]
~
! ~
; a
Ii
i ~ ~ ~
~ ~ i i
~ " 'i
~ < l i
~ '~ i ~
! . . ~
I ~ ,~
~ ~ ~ l
~ ~ q
;.~ ~ ~ ~:::
.f J ~i t. ~
a~ ~ ~ I ~
~~: ~.','! ~ ~
ia i~! i
H~; ~,<!" {Ii
~~ ~ ilJ..~ ~
g~ *f !3 ~~ ~ ~
"\ ~, ~~" "~.':
~~. : ~ ;,' ~ ~ ,j ~., ,
,~~ ~~ ~i ~! ~i ~~
,~~ ~I; III :~ :~ H
cr;
l:!
-'
IT:
~
co
I::
~
((
~
~~ ~
~~ ~
~5 .
~~ ~
ie ~
~~ ~
.<
~~ ~
~~
~~ ~
.".~ ..,
~Ii ~
! Ii ~
! '!
: ~i 5
~ l;~ .
~ ~~ j
y H 8
~ ,S ~
~ffi ~;_~ ~
~~ -'.~ '"
j
So ~.
3~~ ~~
~~. ~~
,.! "i
W ~~
~~! ;~
i~ ~ ..
" ~~
~h ~~
"'l a.
H. ~~
ll~ i~
U~ ~~
m t~
i~~ ~i,
mw
~ H,HH
, ~'~~ !;~J
, ~'" 1;~
f !~~ i{~
~
,i ~
j ..~<.
Ij ..w \' ;1
I ~ ~~ ~~ ·
" ~ ~~ii~g!
, ,E .~.\~o;s
~"i .'~ '~l~"~~
~I! ~~J~i !~~~~~"!
, ~l"<."~~' ~~~~~iIW~
~ ~~~~~~~~~~~~~~~!
E.i!"...~e~..!."g, .~
"1,~~~~~lf;"1~~~~~~3~
",~!~~~.~~;~j,!.t.~~~
I!I!!I' J'~II~~I!~.~
!!!!~B~~~I~I'IIIII;~~
~;'?,~ '~~~.o:'~~~
md.~
;;;j~
f1i ~ iI: ri
C ,. E ~ ~ ~; 1\1
:; ~, I'l~~' ~~ is i~ ~
~ ~~ ~ W ~~i ,~~ ""11th d
0.' ~E; ~ ~i~ l~ ~~~~~~~,g;i~ i~
2,1 ~~ ij ~~~ tmn~.~~~~~"ffi c~
Qi 'i ~ ~~" "~~.~;g"2'~"'"~ H
~I ID!,J ~~~ h~mHj~~~~~ ~~
w ~g~~ ~h ~'~~~~6~8:5~:~~~b~~
Q '. 6- ~~! ;,!;,~'~~a..-~,:~~.g
n. ~!,1,'~<' ~ h'l"'" " .~" 0
5 gU~ ~~H~~i~~i~!m~ ~~h
;:: ~'-_~0 "s~f\t.~clll1~I,"~h~',~~"~~
::J ". s"e. !l~ ~..""~~~,,,
~ ~~f~ '~I.~.~I:'!I~i..-,~!1
is ~il~~ ~~UW~~, ~!l~W~n~
~ ~i~~~ ~~ii~i~~~~~I~-~:':~~~~~t
IJJ ~;10i\ ;J~~~'~~~~~i~'i~~;U~
~ ~~~G~ ~"i~.o~~h",L~s.d~
?: ~~f.~~ ~~~i~~~S~~~~~~~,~~~i~i
~ -!:_~,'<~ ~~:t-=l:~ ,~" .....Fl': L ~;;':5u
~ I ~ "-'" il;~U,ap~,~,~
~ ~f~.~ ~~~~iK~~~r;f~~~~~~';~
U) 'i1"""'I~ ~ :111" ~I ~,I ':1 ,I
i
i .~~ I
~ ~'Y ~ rr h,!~ 0- a
t E '!:l~ ~ ~~~. "In!~!,i~
;B' '~ ',~- "~m"'~ ~'~I""'I!
~,~ ~" l, \\L '0I,;;!;8~ ~ '"~~l'
;~& ~tJ ~~ ~~t ~~~:;:;~~ ~.~r:E:s'!~~
~"~ ~h~i i~~ ~~:~:;~~J l~*~i!!
~~I'; i~~h ~r:;e~~~~~;S ~~~~!h~g~
~~ ~l!~~ ~it'~m~~~ ~'~!"t:;",
u.. il[ i~ ~,~",~~v~~:i1;:!:!!!flr"':il"~~ii~~
~!~ 3g~ ;..;;~~~". ~S 'I' ~~~ m~;: 1 ~~~l
':1' .m<;!~m~. ~~~~rinl~~~~~ic
~ff. 3ei~~l>~~IOI't:a~ ~~~~ti~f.:-,_Ili'P:~,~
I~~ ~~~~~~~~~~~;~~~~~~~~~i~g~~~
~.~ f<"l~I~~~~~I.f.'~'~~~.!.'!I~1
m ~~~~"~'~"o.j~'l~ijS~~~~~i. ,~,~~
~fi~ S~".,.~~~~;~~"g~!~~~E',~,,~
~,u~~nm~~!~ l~g~g~~ ~I' ~ 1 ~~~~
=~5Miif~II~!I~II,'i!i~l~ 'if;t~t
~~~~ ~~lJ n~~~~~~l;~~ ~~"~~~: ! ~~~~~
:\lo~.r;rc7U '5l"1:l~O:~i :r:~;;:,""", ~ '='~ 0: '.:I >
~"'1i'~!"{~~~~""', :.i,>' ',"!H"'~
~'~'r""l t '~.'''''~''~il''g'.!~~'~~
~~~~~H ~h~'lfm i~!~~!M",l~~~
>, ,.,~<. ,,";r~'^!"~."'" ~,,~l._".o
ll"~,..i)ltc;~ ~11) J3~"'~.~~- J'if. ~t.,,-d~.~t;::!l(
,I~I ,I !1 ~ ~." ~ ~.I ~
!.
!i~
I;
.'
~ '
It
~ ~~
" t
~'
~~
,~
~i
5~
I ~~
,~
H
, !~
"
~~"2~
I~~~~~
~~~~~
.. ~~ t:J
~ ;r'l:;> :'1'
:! tIri~
~~l~~""
;1-' -"'"i
"j~,
o!-..'
~':Ror"
~~~H
!o~"~c
~~~~il
~~~~~,
~!~~~~
~i~~~~
~~~~~~
~!~ !~"
:hpl
"0" I >
;1 q.,,~,
i.l ';If (g~
~ ~i~\,~
~ ,I,..lj ~""
f'['J~.1
:JIl\]
<
"
iI
~
~
g
~ j
~ ~, '
" ~ l
~ 5 ~
;:J ~ ;
~H
i ; ~
e l !~
I j H
~ t.'
~ "
, ;
, ~
ij 2
~ ~
~ ~
~ I
: i
: i
~ ~
i ;;.
!:) ~
?B Ii
~j ~~
I! ~~
H ~~,
~~ .
~~ U
e~~ ~~: ..
." ~"f :l:
~~~ ~~~< ~~
~!,~ ."
~~.~ ~!~ ~~
. ~"i~~
~~? ! P
"- Ii .~
~~~ ,!,~~~;
~~~. ~..
~.: ~:l~"
t~~ uq~1
~~j ~~~~i
~<.l;i ~d $~~
~i~ ~ti=f,
s' ~ .: ,.~"
~!! Wi~
~~, i~t~~
< l~{ i;h~
~ .~ l} ~~iEl
~ ~l~"~~;J.
"".'~-"
,~I I,Wa;.iij~
"^'J ~Iii~mn~
I~~_oi":=&~~
:idmW
;lr
il:l',::;'i"I,'IO::'M3.l)\".j:-J.iJ~;:jH
P:Ii,,>>O:l J~i:"lIJS OJl~lr,7Jtt nS::J~
f;lN~Vl(l:1.,^,~v.-:I~ n~:l\ml
Nalldl~:J,]a
SNOISI^3l/
~ ~! .
S m I ~
~ ~~~H 1,:,'
~ "i ~ ~ ;; ~
~~ ;:;~~ t; ~
,~ ~~@~ !: ~
~~ ~~~~ ~ f.
gl ~~ ~"B~ ~ '
g ~< 2~ ~~i~ 5 ~
"~ ,~,1 ~ .
~ ii ~i ~~~~ i ~ ~
i ~~ ~~ 'f~~.~ ~ ~~ ~
? ;~ ~~ ~'\~ ~ ~~ ~
~ i; ~~ !i!~ i I~ ~~";~
~ ~; ~; ~!;~ ~ ~1:
~ ,J ~; i~~~ ~ !~
1.~: ~ ~ij ~ ~o
~ ~~ j~ [~~~ ~ ~~~!
~,
~ ,~
~i~ ~ ~~
tl2 ~ ~~
"~ .',
Er. ~ ~~
S~ ~ 0."
~~ ~ ~~
~l"J ; ~~
;jm~ " 'r
o B~8 ~ ~~
V ~~. < ",
; ~_. ~ ~.
.f. ~'- ~ "l
~ 3i Ii ~~
!: ""1= t ,,:I
~~l ~ ;1
~Z~ ~ B
~.. . p
~H ~ di
~i~ ~ ~~j
1,~ , 1'~
~~~ ! ~~-~
~h 1 n~
d
p
l ~
~ ~
; S
. '
~ ~
~ 0
~ .
~ ~
e ~
~ ~
g ~
~ ..
. 0
H
f' :
~ ~
, E
~
~
.
~
;S
~~!
~~i
~~.
5~~
h~.
~q:~
if~
)~~
'~m~
~!li ;!'Sl
~~i~
~~~t
iW
Wf
~Hl
hq
m~
~~
~~ ~
~b g ~
"~ ~ "__fJ
i;, ~ ~
m ~ a
~ Il ~ -
"1' ~ ~
~ iF: ~ ~ ~
M -~, j ~ .~
~ ~:\' ~ "
~ ~il" ~~
to li~ ~~! 'I!."
~ ~;! -"\ "
~ ~~I ~~!~ ~;
! I~" ~~ _: l. I
,.<e!"~~ 11,0
!,~~~ ~l '8 i:3~~
'!'~i '~8' !t~ ~
~!i~. i~~~~ ~ li~ j
i.,~~ .~. P .,. h. t
p~G ~~."~"i u~ ~
,'q.. .~. ~IRilofP"q
11~5~,~~li~~~~~!~'~
li~I~.~iJI:l,trii. ~
j" 3"1,!,,~!j'I'".'" .~~!'
ri~I!!~~!~~%~i~!;I~
"I
f ~ ~ ~
~~ ~ I ~ i ~
.~ I" i;,,~! ~
;,~, E~ "! ~ '~.~
"- ~ w ,so ~~ j~
~~!~ ~ e ~f 9~
~~ H ~ ~ L 2~ ~~
,~~~ ~:~;~! ~~
H ~~ ~~ h ~~ ~~ ~~
,~ .~ ~ "r h ~iJ ~l l~
~~ ~~ ~ ~~ ~9 ~~ t~ ~~ ~
,~ r~ ~~~; 10 11" It ~~ ~
!i:..:9 ~~~~'~~...
jHn :~ [ !l ~H~ i
"~ !~ ~~ t' .< ,,~I ';. ~
8 ~~ ~" .~ 'I ~~ ~, ~~ ~
!? ~~ ~~ ::15 ~ ~~ ~r ~~ \If
"... l!!:l!- ~~ I:;~ :,'t\. d :l!~ E!t
'c' ~~ "" "~ '" ~. -, "!' ·
" ,~ ~~ ~, i,: d 8' ~. ~
.l ~ ~ ~ ~ ~ ~ ,~ ~~ :, ~ g ~ '
,," !, ~!o rl ~,~ t2~ x~ f~ -
. .~ ~~ O! ~: ~~"' ,; ~,~ !,
~ 'i E'i ..,;, 'l r; ",!: "-U' d l<. ti: ~
w
W
w
llt.:n
~
~"
~il ..
n ~
l:l ~
i; ~~
,! ~g
:;l6- :3:;;;;
li ~~
!~ ~~
R[; ~3
~~ ~~
h 8~
~ ~~
~~
H~ B~
~~~ ~~
'"~ ,~
~~ ~~
~~~ ~~
~:-, ~~
,~~ L
~~~ ~~
~~~ :;::~
ON~
:.A.8 pA"'1Cl.Olli:J
IOf
~J,S I,.IrlI\,OJQ
0N1\
:l.tJ pau{i!~9(1
':'0-,1-90
:A~O;(] I
olL-lilOl
:'OoN p""rOJd
"
v
"'
&
.
ff
~
~
B
~
~
~ ~
L ~
~~ 1
~~ ~
~~ f
~fi ~
~~ ~
r~ t ~
H I
~~ '
~i ~
~~ ~
!~ w ~ ~
," ! ~ R
!" ~,:!iI H
~ ~H ~ ! ~
~ ~~r, ~ ~ ~
t i 1. '; ;; ~
~,~.~~~~
~
d
ri'"
~g
~g
'l.l(!o
~~
~2'
~~
~ i'~
;. ~ ~
iji
~~;:
~~s
~"3~
~ 0 € ~
~H ~
~ -, ~
~~~ f
. NI '13W~'lf:l
..V.. }4:)018 - )I~'Vd N01S3M
SS3N!I:I "0"
~
1:1'
z
;~I
1
j i~
s~
~lt
~~
~~
o~
[
I
I
o
'"
, I~ ~
.gt.
,~ ~
IH
I'l. ~
P ~ i
H"H J
~ .. I"' '" ..
,; ~ H:q q
: 1;ij (,. ~ . ~ ~ ",k,
~f ~!!~;~"'~~
e~ ~ 'i.:,~e~~~il:l]
~; ~ !fill;;!il!f.-
:i~ ~ ':"'i: "';;.~_-:;;1J~~
V' ~ ~5 nHge"q
~ n . hi hilS ~.. ~ p j ~
~"'\c>R~!.~t ,~"di1"
~~:i';JI~!I!IJfi~:~
~~jl~l~i~i~~lt!~~l~!
~1;1~~!~&~.'llli~i'.1
C; i .,~,,,, ~ " . ! ~ " ~ r · 0
~ ~" ~I[ ~ t E ; .2 i ~ M ~ ~ ~ I ~
:; ~ I ~ g'i . . " ~ ~ ~. 'Ii i ," < !l
~ ~ ~ g DI'~ I ~ ~ ! ~ ~ il~ ! ! ~ ~ E
~ ~ ~ ~ ~ ~ ~ ~ I ~ .~ j ~ ti .. ... - t B
f~.:'S~~~iA.'I!!!.1
~
H'
H
~~
; 5
1::1
-0111
H
~.J...j f'i';: cc' 'ii ~
a..
a..
a..
~
en
"
Q
~ ~ !
"
~
~
~
8
~
~
o
w
w
.
o
~
i!
R
~
~
~
['i
~
o
g:
.
l
] ~
~
~ ~
~ t I
~
~ ~ ;J
1 ~ ~
i 8 @
.1 ~
A ~ t k
.
t j f ~
" .
j f. ~
I ~ "
~ 1
.;
Z
i
.<:
'"
M
.
~
U
b~ t~ lS~ < ~ c g "
'1 , W~ ~~ g ~,ih
if ~~ > ~ 0,. , ,.~
i H c~G~ ~f ~~ ~~ Ii ~l
1 ~~ ~t~~ ~g .1'
~ ~, !~ ~~~~ ;P!ti
~ ~! . ~.~ ~ .G" ]0 ." ~~~@~~ " !', ~
~ ~ laS~ ~'j <9
8 ,~ ..~ e~ ~~ ~' !~I~~ ~~~~':
'~ 1 ~ ~~. .~~ b' ,~
~ !t 1 ~ ~~~~ ~~ i ~ ~I !!~~~ ~'i'g
~ I.-ii , Oe! ~~ H ~!,~"
-. ;. i ~~! ~~~~ :'H~ ~, ,; 0( . !m~
~ .,W ~m ., ~~ 111iPl
i ~l! 6 C:\J r: ~ ~q.~
~~ ~~ 19 " ~~;t:~
~ U ~ ~ 1 ~;~g eo ,e g8
. ~ ~ ! ~}I c;. I~ h~~~ . ~.," ~
~ l ~ ~ ~ ~ g " ! I r ~~~~ ~ p ~~~ ~~~~~ I~;~y
I~ { ~;l; l~ [~h.
~ !. H'~ i~h t ~;jJ lip 1~i~~
h ~ '~ ~ ~ c. .,," i~ H, .~ ~~~t;~
Li . . .,~. . -, " ~n f,~~ ~c>!~~
~ -, S ~ " ~Hli ';" !1. f,,:~ 0: t"i ~~i~~ \'~d
E ~~ > i ~ F. ; ~-" " m n
I;; ~ U j ~ " ~ r!lf~ ~~~~ 1i' ~~~ ~~:~~~ ~"~.
0 ; s~.
l-, ii ~ ]~~~~ ~m ~ " P ! ~ ~d? l>;,~~~ f~if.~
, e' I l ~ I q! ~~~~n
~ C ~ n ~ ~ -'I~l: i~ i~i~
~ U' ~ ~ ~ !ii .~~ i~d~
~ ~~ ~ ~ ~ ~ ~~~ ~H ~ ~~"
"~ e" 'j ~ . ~ e ." ",; ~ U~~~~
~i~ ~~ ~ ~ 1{~ 5 r' "o'H
. ' ~! r'
<.J , ~ i ~ '1 ! r ~~~ ' r,;"~
z ~~ ~ , ~ ~.. ! ~~ ~ i ~ ~~~~,~~
Q ~~~ L~ :~ ;. ~ t
" ~ 0 ~ ~1'; en ~1:'~
n~ l ~" ~,~
" ' f
," 1,< .~ ~ < ;
~ i ~~ ?;~ ~ ' . ~i ~.
~f ~lH ! , ~ u. ~
!~ \!l.~ S, t ~:
1! 1! ~~ ~" R. .-> i
~m ~rt .' l ~ ..-
<\ U ..~ i ~~
~. ,r.!ll.tm: [~ ~~ ~l I
~~'~ " . I "' ,
.f ~~~" ~~ w, ~~ ( ~ ~
~~ ~' ~ " ~
'Ji "'o~ ~~ ~ b ~ :H . ~ .~ U
l" "" ~~~~ ~3 . J ~ ~ ~]
'c i~ ~~ 1 It
. il9 ~w ~~7 Sl ~~ :n . 1
J ~. ~ li ~~ 8"' ~
~ ~~~ !~ 1(( ~'
, < H ..~ ,., ~ ~~
~" ~ ~~~~ ~ ~ ~ .. ~ 1; I!
~~ i ~ :,."! ~~~ "I ~t H i !I
" 7- ~~~~ ~5
rS ~ k. ~ ; :~ ,
~ ~ ~~~'.i ^~~ H g' 0, ~~
h ! ~ ~ ' ~W i~~ ~r:~ .1 ~~ ~~ !i,
F >ji; "~ ; , ~~
. , . a :< .~i ' ~
w- E ~w !h II H i ~ F.i~
. " E: w ~~, ~~
~ H r i; ~
I c ~ ~I. '<..~ n i~ ~ ,~
.. ~ ., , 5 ~~i~ ~~ t~ ~ ~ ~ ~ '"
~~ H 0 crl I 5 " ,. ~~r t~ ~~
~ , 2J1o'''' ~~ ~ H ,~ 0 ; "~
~ ~ , 0 ~~a~ ~~ ~ ' . .~
~ ,c!: ~ 'l ~ !~~ ~~~ q ; ~ ~~ ~ ~~~
~f.~ 1 H ~~~~~ ~ ~~, ~ ,~ Bi
l~" ~ , ~ ~ ~ ~. ? :, ll' ~' ~.: !' ~~ . H
i ~ ! ~q ~~~ &'1.' ~~
r~ .>-"~ .p' ~ i ~~ ~~ , ~~~
:~ ~ ~~~i ' ~~j ~ 1 ~~ ! ~s
I, i oL ". ,. -.. ~ ~~
i~
,
~
~ ~ ~ -~ Ii
1 'n · "~ h ~
;~ s w ~ , ~~ ~.~.
o,;~ ~ j< '"' R iJ' ~ ~ ~~ ~
1, ! ;, 0' h'~ ~ 0"5 "
,'~ , . . l ~,~" . o~ ~
IDi ! ~, ~ ~ d~ ~~ ~ i. '
.~ ,~I - I l~'~ . ~: ;.
t.~ ~ ~ S; ] ~ ~~~ 3~ ~ ~i ~.",l
~~ ! ~ ; ~ ": !,~~" ~ ~~
i~ i ~ ~ l ~~~ ~S~ ~I ~ ~~ ~~
~ ~~; ~ ~ ~1 ~~~ ~~~ :3 ~ ~ g~ ~~
~ ., c ~ ~ ~i '~i ;~~."~ ~~" ~~ to
. ,~~ ~ ~ ~(c!!" ~~~ ~l ~~~ ~~ !,'~
~ ~t ~ ~ ~ ~;~ J.I~'~ fJ;'iii1f ~'+! ~::.~ ~e: ...'"
~ ,~,. . !~.~~~ ~~~ ~; ~'S e~ l~
~ 11 I i ~I 1;,lla ~~~ ~! ~~~~ ,'I ~~_:.'
". !. ~ u .. !.,!r. oi".~ I.ig~." !"
~Ii!' ~ g I; ;;'il~I=.~ ~l lid~~~I! "
i~I;: I.' I,ll il:i~I~~,!~ Ii ~~ffi~!;~.ji II
q v, 1 ~~'ll~ "cf!".!'. '" """'< ' 11'
~~:'i · .' .~liC.I'~'~ oil ~!~~~I=i! ""
"It ~". ..'!'l."~~ ." .'~I. ;i;,;'~,
!~~~~ ~ ~~;;~~~H-~I~UT i~ .~,~iS~~~ w
i'lle i 1:.~II'tll".11 tliim-i~l, I ;,~,
~~!1~ ~ h~~Fh~~~~G~ ~il~, ~~!j~ i 1..
PIJ~li ~ '~"I!iJI~~~i~~ It!I:~I~~ ! .~
t ~;'U>~:" -oI~"fiI'HIi'. ~~~ oD..tt~~~"lj >;!\~
I!g;~tl~~~ !ili!!~I~..'I~~i".iai'- i !I
!,~I~.~~I&'I~'~lr~i~ I~.I~~~~ I II
.., ::ilr"'~ ,J. T.""" .. -=., ... ~~- .. ..-
~g'l
H..<
~~,,~~
,i!~~iJ
~~~~o
m.~
~~~~l
d~~~
~~~;"~
'l'~"'~ ~
"~1'
~h"~
~;S~,5
,!,!{~..;~
~5~i~
~ .". ~
;~j~~
1'~Z'
.~~~ ,
I'd'
~~i' ,
,.-~!
3 - €" 0
!i~~~:
~~~"~t
r~~~I~
~~h,;
~!"~,~
W~!~
'''~ I.
"~ (
~H
~~ ! ~
r'~~~i ~i
,!>i,~ p '~
. '!. ;, 'ffi
~~ .: ~H ;d~~tf
p~. '" ~^ l~h.
;~~ ~~ ;.i .~~g~
'"fZ ?" G' ~~ii~c
i'~~ ~~ 1! ~..~~
l ~..; ~ '" [l: iJ'" t'j... '"
~" H I; .m~~
!~~~ ~~ ,~~!~~~~
"~i .!lr!~3~'.1
liy? j~.~~~;~~~~
:!f!~ '~~~~!~~~i~
It!~,~~!~~~~~~~~
'~~~it€!~[~~~~~;
j.~~~<"'~.~~I"
~i~fJ~i1~~~r,~~~.~;~
~~~Q'oI~:~I~~i~"'1J~~
"l~f~ 1!.~~~5E<~~
i~~~!;l:~~~~.~~~i'
5f~gIVi.!.'~ !~~R
g~';'I:'B~~~"'r.~~ 'i2'8~
~ <
"
g
ul
~ ~
i ! '
~ ~ f1,~
~ ~ ':
~~ ~ ~
*~ ~ ~
"0 ~ >
h i ~
~~ ~ ~
~~~ ~ .
t::';Ji~ '" ~
~~~ ~
~~" ~
"'~ ,
~~~-~
".,~. e
r.~~~~
~~~~~
if~;l.JLl
~~!~~~
~~~M
~""I'~"
~~9 .;~
~~. ~i
~~_..""
~~ ~t:
f' ~~
~g t"
j~ p~
U. n
~!~ ~~~
~B ~~~
~~~ -;.;'
~~~ ~~~
~,~~ ~~~
~rl~ -'l
.~" ~~i
~d "'!
'''I; R~;
~.~ ~B
ih "~~
l~~~ ~n.
~~. ~~~
m ~!.
H~ ~~~
~~~ ~g
~mm
!
~"
~'
.~ ~;
~~ t~
elf Ii
lo~ in
D~ q~
h h~
Iii ,-Ii
113 2 ~~
l '" ~~~
!l i'<
l:i:, ~
1~ !lie
.' i l~
~ ~ ',:I ~~
~~ ~ 1'1
~i..' m
E, m
;: S ; i-=.'
~-~ ~~~
H. ~ri,~
" ~I~
~ f ~ ~ ~
~~ uh
H iii
.1 "
"I
.
~~~~
~~~~
",~~\':j
~~~i
jU~
Et~~
g~~~ ~,1
~~E5
~Ht ~
um.
~~2~~ ~
~~~h ;
~m~ ,
;:m ~
iW~ ~,;
D~~H ~
~~~;~ i
h;t~" ~"
~ ~-it~ "
p.~~!~ ~~
"
~~ f
~~ ,
~i
i~ ~
'II ~
~~ ~
~..~ ~
~~ 1
~~ ~
7i i; I~
~~~
"~.
m
~f~
~5~
~;M
~~~
""~
in
~~~
::;~i!::
~l~ L IE .~,i !,' ~
~~~ ~\l i\;\1'l ~ 0: :' ~
2~~ ~r w~ ~,j.~ ~,~ ~ ~
E,. ~ i r ~,~ ~~~ i ~
~~~~ ~ ,e !'= '.? ; i,
1.11 I '. ~II 5~. :~ Ii
~~i~ ~ ~~ l~~ ~r~ ~, Ii
II~~~ ~.~ u. me; j' ~.
~~g8 ~ ~~ ~~z ~~~~ ~~ ~~
~~~~ ~ f~ ~~~ g~~~ ~~ ~~
~~i; g ~~ 0'. "e" .8 t.
~~~~ ~ ~,~b., ~~~ ~~f~ ~~ ~~
.,;<"1 ~ ,,~~ :C'~~ ~~ ~g
~~~~ ~ ~~e e~~ Qg~~ ~~ ~~
I;I~ ! !ri ~~,; li~~ fi !.~
~~$~ ' B~~ 10" a;~~ ~. ~o
g~~.' ~ 1" !~~ ~~"~ ~s t.f
~-, . "it. '1<6 ",l~ .~ ;&
~=!! ~ =11 1;! ~;~. ~~ i"1
.~~~, ; ,0" ~" ~.,,~g ~" '"
g~g~ " .'~ I;~; ,.~o <' .j
~gi~ ~ ~~! ~~I "s~~ ~~ ~=
~.'!~~ ~ ~~~ 2~~ ~!~~ ~~ -!
~~- ~ ~~~ ~~~ ~~~~ ~~ 9~
~", . "r- ,.... ~'g. ,,' ..
~ i.~ ~~~ d.~ ~" ~[
~.:.;;.,,:.",,~ ~ .'~ ~~, ~i~0 .~ ~~
. ~-.. ~ ~~t; f!;~~ s~w~ ~~ t'~
~ ~ rl ~ ~ ~ ~
~J
" l:""~.
~~"
m
m!l~
~~.
~"'
~~~
~~~
~O"
;;~~
:;:"i"~
r:'~
~~~
.~~
~~~
~ ~~~
~ ~,~~
3 ~~~
1 ~Cl~~
~ i i!~~
~ ~ ~,~~
;; ; ~ ~~"
~ ~ ~."'
, ' is~~
"~ ~ ~!~~
~
)~,~
~y.~ ~
Iii:'
\ to '.! ~
Hii
g~l 0
"~g~
,~~~.
~~~~
~g~::
~ffi ,~
~~~i
~~~~
~ge=
~"w8q
~~;~~!
c, ".j.
~~M~t
~~~~~
~~~~to
B@~;~
~ ,,:~~~
~~~.~
P<r.~
~~~~.
il~~5~
~~~~^
~[~~~
i~a~~
~!t~~~
dd
,~~ ~
~;. .
W~
~~! ~
~i~ ~
~~H
~~H
~~, ~
~~n
~.J. f
~!~ ~
~~~ ~~
~~& H
~~~ f,.;
H:~ ~~
~ f? ~ e li
;~~ ~~
m ~~
~ ;',1
"
"i
i,~"
,~o
H~
~ ;~~
f~~o~
h~;~~
~I I ~ I :J.-"
~~,:s~U
~ ~,J ...;;, "" '"
, ~.,~~~
,;"f.~~~ "
~~~igh
~~~~~i~~
,
~
,
!
l
t.
!
~
,.
!~" ,,';:i.. .'~I
.
tj~
~j
,h
~ t'
jl
H
I'
:!
~~
.~
~~
..
6~
~~
~~
H
"
H
r!
,.,
n
~'t.
~~
t.~
>=-S'o;
~~~
~B'
~~1
! ~
~ t' #. ~
~Qi~~
!1!i!
~~;s~ R
~m; ~
~;~~~ #
~l~l\ d
s~Jal ,
?;igj: ~
t~a~~ ~
~l ~:;\ ~,
.,hr ~
~~m g
~~~o~ ~
~~~~E 1
~,~~~~~ ~
",'I' ~
! fR~l ~
~P~"~ l
W~~ ~
<~.~& j
~ ~~~H ~ {
~r ~~~~~ ~j ~
;I
5
"~~ >'
b ~~
m ~!
~~~ ~~
~~~ ;~
!~l n
m ~.
H i!
i~~ ~~
f~2 i~
~~,,~ ~~.':
;~i~
-c"' P
/.lo!l!l" .e;
!'~l i~
~;~~ ~~
"~ ,~
~.''i H
~sg~ ~.
~~-B .~
J~;i h
hH !~
"' l< ~ J
i~~B ~~
~~~~ Q~
<~""" !;
"~" a!
~:id "'
,~
i
~
~ .
" i
t ':
~l.-
!i
$~
~:;
'0
~!
~~
.'
a.
~~
~"
i~
~~
~~
~ ~~.
@~~
lie~
i~"i
,.<
1m
~ ~~5
~ ! ""' '"
,1l~
~ ~~~
~
Date:
Place:
Time:
9:00 a.m.
9:15 a.m.
9:25 a.m.
9:35 a.m.
9:45 a.m.
CARMEL TECHNICAL ADVISORY COMMITTEE AGENDA
REVISED
July 18,2007
Department of Community Services Conference Room
3rd Floor - Carmel City Hall
9:00 AM
TABLED: Docket No. 07050017 Z: 96th Street Crossing PUD
The applicaAt seeks appm\'al to rezone I G.99 acre:~ from S 2/Residcnoe to PUD!PlanFled
Unit Dcvel0!3fnent for an 0ffice/retail.'hotel dc\'elo~men1. The site is located at the
northv,'cst comer of 96\11 81. and SpriB~ Mill Rd.
filed CAarlie Frankcnber~er of Nelsofl& FraRkeRber;er for JeflRifer Bur" of Dub~
Realt)' Limited Pal1Rcrship.
Docket No. 07070003 Z: 146th & Gray Rezone (146th St Office Complex)
The applicant seeks appmval to rezone 11.6 acres from S-IIResidence to B-I/Business
for an office development. The site is located at the southeast corner of 146~' St. and
Gray Rd. Filed by Kelli Lawrence of Hearthvicw Residential, LLC.
_ Not within the District's sewer service area.
Docket No. 07070004 PP: 14Mh St Otlice Complex
The applicant seeks primary plat appmval for 5 lots on 11.6 acres.
The site is located at the southeast corner of I 46th S1. and Gray Rd. and is zoned S-
I/Residence, pending a B-I/Business rezone. Filed by Kelli Lawrence of HCaI1hview
Residential. LLC.
-Not within the District's sewer service area.
Docket No. 07070005 DP/ADLS: Old Meridian Professional Village
The applicant seeks site plan and design approval for 7 buildings on 6.25 acres.
The site is located at 12346 Old Meridian S1. and is zoned OM/O - Old Meridian
District, Office. Filed by Paul Reis of Bose McKinney & Evans for AL T A Business
Communities, LLC.
_ Not within the District's sewer service area.
Docket No. 07070006 DP/ADLS: Weston Park, Block A (L A Fitness)
The applicant seeks site plan and design approval for 3 buildings on 10.14 acres.
The site is located southwest of I061h S1. and Michigan Rd. and is zoned I-l/Tndustrial
within the US 421 Ovcrlay. Filed by John Turek of L A Fitness International, LLC.
_ Currently under review, please provide sewer application to finish review. Applications
can be found at www.ctrwd.org.
Docket No. 07070007 DP AmendlADLS: Weston Pointe - Outlot 3
The applicant seeks site plan and design approval for a multi-tenant retail building.
The site is located at 11145 N Michigan Rd. and is zoned B-2/Business within the US
421 Overlay. Filed by Darci Pel 10m of Civil Designs, LLP.
_ Currently under review, please provide sewer application to finish review. Applications
can be found at www.ctrwd.org.
Page 1 of 2
City of Carmel
~jl1, 2007
Mr. John Turek
L A Fitness International LLC
13570 Marjac Way
McCordsvilLe, IN 46055
RE: Weston Park. Block A (L A Fitness)
Dear Mr. Turek:
\
The following letter represents comments for this project specifically addressing the area of alternative
transportation. I have reviewed the drawings submitted for the July 18,2007 Technical Advisory Committee and
offer the following connnents:
ALTERNATIVE TRANSPORTATION REVIEW COMMENTS
1) Please revise the plans to conncct all internal sidewalks as much as possible
We request that all responses to our comments be provided in writing. Failure to provide written responses may
result in delay of the review process.
It is critical that this officc be made aware of all modification made on the plans being fe-submitted, particularly if
any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans
indicating all revisions. Please notify us of any changes and specifically state any changes, including changes
resulting from Plan Commission, Special Studies or other committee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent
reviews.
If you have questions, pleasc contact me at 571-2417.
Sincerely,
9~~
David Littlejohn
Alternative Transportation Coordinator
Department ofConnnunity Services
cc: Angie Conn, Department ofCommunily Services
Engineering Department Review
Project File
Page I
ONE crV1C SQUARE
CARMEL, INDlAt"fA 46032
317/571-2417
HAMILTON COUNTY
HIGHWAY DEPARTMENT
July 10, 2007
Ben Knoop
TLF Consulting Engineers
8675 Purdue Road
Indianapolis, IN 46268
RE: LA Fitness - Weston Park, Block A
Site Plans and Details
S of 106th Street / W of Michigan Road
Clay Township
Dear Mr. Knoop:
This letter serves to acknowledge receipt of a transmittal received 07/02107 containing the Site
Plans and Details for review. After reviewing the plans the Highway Department has the
following comments:
1. Please include this statement on the Plans: Decorative signs, sprinkler systems, trees,
landscaping mounds, fences, light poles or other such amenities are not permitted within
the Right-of-Way.
2. Further comments may be needed at a later date.
If you have any questions or comments concerning this letter, please feel free to contact me at
anytime.
s~,rreIY,
iuwfcfJl~
David E. Lucas
Staff Engineer
OLdl
07 -09-07. a
Cc: Greg Hoyes - HCSO
G :\USE RS\del\Commercialllubavitch070907
1700 South 10'" Street
Noblesville, Ill. 46060
"''r\w.co.hamilton.in. us
Office (317) 773-7770
Fax (317) 776-9814
HAMILTON COUNTY
HIGHWAY DEPARTMENT
CARMEL T.A.C. AGENDA
Date: July 18, 2007"0.......
From: David Lucas - HCHD
9:00 a.m. Docket No. 07050017 Z: 96th Street Crossing PUD.
Tabled.
9:15 a.m. Docket No. 07070003 Z: 146th & Gray Rezone. .
This department has no objections to the requested rezone.
Docket No. 07070004 PP: 146th Street Office Complex.
See attached comments letter.
9:25 a.m. Docket No. 07070005 DP/ADLS: Old Meridian Professional Village.
This project is located outside HCHD jurisdiction.
9:35 a.m. Docket No. 07070006 DP/ADLS: Weston Park, Block A (L A Fitness)
See attached comments letter dated 07/10107.
9:45 a.m. Docket No. 07070007 DP Amend/ADLS: Weston Pointe - Outlot 3.
Does not appear to affect the RNV of Hamilton COUAty.
9:55 a.m. Docket No. 07070010 PP: Trillium.
This project is located outside HCHD jurisdiction.
10:05 a.m. Docket No. 07070013 SP: Cobblestone Commons. Plat..
This project is located outside HCHP jurisdiction.
10:15 a.m. Docket No. 07070011 TAC: Wilson Office Plaza Building.
This project is located outside HCHD jurisdiction.
10:25 a.m. Docket No. 07070009 ADLS: Holiday Inn at Pro Med Ln.
This project is located outside HCHD jurisdiction.
10:35 a.m. Docket No. 07070012 SU: Lubavitch of Indiana.
See attached comments letter dated 07/09/07.
GIUSERS\del\TAC\Carmel TAC\July 2007
1700 South 10'h Street
Noblesville, In. 46060
www.co.hamilton.in.us
Office (317) 773-7770
Fax (317) 776-9814
"
City of Carmel
Via emai1: johmturek@ao1.com
Original by mail
July 9, 2007
John Turek
LA Fitness lntemational, LLC
13570 Marjac Way
McCordsville, IN 46055
RE: Weston Park, Block A (LA Fitness) (#07070006 DP/ADLS) - Development Plan and Architecture,
Design, Landscaping, Lighting & Signage Applications
Dear Mr. Turek:
This letter is in response to your DP/ ADLS Applications for Weston Park, Block A (LA Fitness). Members at
the TAC Meeting will make additional comments on July 18. Please complete the following items:
1. Remember to include the DP application Findings of Fact sheet in your info packets.
2. Provide the filled out and notarized affidavit of notice of public hearing page.
3. Provide the filled out and notarized Public Notice Sign Placement affidavit.
4. Provide a copy ofthe Officiallisl of Adjacent Property owners from the Hamilton County Auditor's
Office. Make sure you also get the Official list of Adjacent Property owners from the Boone County
Auditor's Office.
5. Bring material/color samples to the Plan Commission meeting.
6. Provide an aerial photo with site plan overlaid on it.
7. Show the mechanical equipment location and how it is screened from view.
8. LA Fitness Signage: you propose two wall signs, each 238.54 sq ft. The Sign Ordinance only pennits a
lIssq ft sign facing 106th Sl. and a 90 sq ft Sign facing US 421. Please reduce the signage size or seek
variance approval from the BZA.
9. Signage: please provide signage details/cut sheets.
10. Lighting: please provide lighting fixture detaiJs/cut sheets.
11. Please verify measurement scale on building elevations.
12. Please provide bike parking, per Chapter 27.06 of the Zoning Ordinance.
13. Please add Y2 RlWto the 50-ft measurement on I06u, Street, per the 20-Yr Thoroughfare Plan. Verity this
R1W with the County Highway Dept.
]4. Please consider using pervious pavers in the parking lot.
15. Please consider using 'green' building practices.
16. Provide pedestriawbicycle connections within the site, and to the streets.
17. Site Plan: Show/label the bufferyard/landscape setbacks; see chapter 26.04 and 23C.IO of the Ordinance.
18.. Building Material: What is alumina specialty finish coating most similar to? Stucco?
19. Architecture: variance approval from the BZA may be required for favade projections/recession; see
chapter 23C.09.D of the zoning ordinance.
20. Please provide the building material percentage breakdown. Stucco, dryvit, or equivalent cannot make up
more than 20% ofthe overall non-window fa.;ade area, per chapter 23.09.K.2.e of the ordinance.
Page I
ONE CIVlC SQUARE
CAfuvfEL, INDIANA 46032
317/571-2417
21. Future Retail Building: will the elevations, signage, lighting, landscaping be submitted for approval at a
later date under a separate docket no.?
22. The maximum parcel coverage (buildings an pavement) is 90%. Please provide your lot coverage.
23. Please show/provide building address numbers that comply with Sign Chart C in Chapter 25.07.
24. Show/label the 15-ft front yard setback along l06th Street.
25. Work with Scott Brewer, City Forester, on the landscape plan approval and number ofplantings required.
If you have any questions or If I may be of assistance, please feel free to call or emai1 me at
aconn@carme1.in.gov.
Sincerely,
Angelina Conn
Planning Administrator
File: 07070006 DPADLS-WestonPark,BlkA-LAFitness.doc
cc: File
Mark Obergfell mobergfell@tlf-engineers.com
Page 2
ONE CIVIC SQUARE
CARMEL, INDL\Ni\ 46032
317/571-2417
~\
,- ---:::;;;-- --.._-_.=-~
1.
2.
3.
ovt.
......
8.
o 9.
.e;: 10.
@
{:Jt-12.
~
_.O~J5.
16.
_17.
18.
City of Carmel
Via email: johnrturek@aoLcom
Original by mail
July 9, 2007
John Turek
LA Fitness International, LLC
13570 Marjac Way
McCordsville, IN 46055
RE: Weston Park, Block A (LA Fitness) (#07070006 DP/ADLS) - Development Plan and Architecture,
Design, Landscaping, Lighting & Signage Applications
Dear Mr. Turek:
This letter is in response to your DP/ADLS Applications for Weston Park, Block A (LA Fitness). Members at
the T AC Meeting will make additional conunents on July 18. Please complete the following items:
5.
6.
7.
Remember to include the OP application Findings of Fact sheet in your info packets.
Provide the filled out and notarized affidavit of notice of public hearing page.
Provide the filled out and notarized Public Notice Sign Placement affidavit.
Provide a copy of the Official list of Adjacent Property owners from the Hamilton County Auditor's
Office. Make sure you also get the Official list of Adjacent Property owners from the Boone County
Auditor's Office.
Bring material/color samples to the Plan Conm1ission meeting.
Show the mechanical equipment location and how it is screened from view.
LA Fitness Signage: you propose two wall signs, each 238.54 sq ft. The Sign Ordinance only pem1its a
115 sq ft sign facing 106(Jl St. and a 90 sq ft sign facing US 421. Please reduce the signage size or seek 1
variance approval from the BZA.
Signage: please provide signage details/cut sheets.
Lighting: please provide lighting fixture details/cut sheets.
Please verify your building height and measurement scale on building elevations.
Please provide bike parking, per Chapter 27.06 of the Zoning Ordinance.
Please add .;6 R/W to the 50- ft measurement on 106tl1 Street, per the 20- Y r Thoroughfare Plan. Verify this
R/W with the County Highway Depi- - . ~l
Please consider using pervious pavers in the parking lot. - \...)\\.1... \iVIJi UW.."
Please consider using 'green' building practices.-
Provide pedestrianlbicycle cOlmections within the site, and to the streets.
Site Plan: Show/label the bufferyardllandscape setbacks; see chapter 26.04 and 23C.1 0 of the Ordinance. .
Building Material: What is alumina specialty finish coating most similar to?
Future Retail Building: will the elevations, signage, lighting, landscaping be submitted for approval at a
later date under a separate docket no.?
The maximum parcel coverage (buildings an pavement) 1S 90%. Please provide your lot coverage.
Please show/provide building address numbers that comply with Sign Chart C in Chapter 25.07.
Show/label the 15-ft front yard setback along 106th Street
Page 1
19.
20.
21.
ONE ClV1C SQUARE
317/571-2417
Ci\R1ffiL, INDI;l.Nt\ 46032
i.
22. Architecture: variance approval from the BZA may be required for fa9ade projections/recession; see
chapter 23C.09.D of the zoning ordinance.
23. Please provide the building material percentage breakdown. Stucco, dryvit, or equivalent cannot make up
more than 20% of the overall non-window fayade area, per chapter 23.09.K.2.e of the ordinance.
24. Work with Scott Brewer, Ci Forester, on the landsca e number of required.
25.
If you have any questions or jf I may be of assistance, please feel free to call or email me at
aconn@carmel.in.gov.
Sincerely,
Angelina Conn
Planning Administrator
File: 07070006 DPADLS-WestonPark,81kA.LAFil11ess.doe
cc: File
Mark Obergfell mobergfell@tlf-engineers.com
Page 2
ONE CIVIC SQUARE
CARt-fEL, INDIA.N/l. 46032
317 /571-2417
::i/it1?JJ,Tf//r'L 7-IO~o;
July 2, 2007
RECEIVED
JUL 0 9 2007
EL
]Al\lES BIWNARD, MAYOR
fER HORST, LAMSON &: FISK, INC.
Mr. Ben Knoop
Ter Horst, Lamson, and Fisk, Inc.
8675 Purdue Road
Indianapolis, Indiana 46268
RE: LA Fitness and Retail Center-Weston Park, Block" A"
Dear Mr. Knoop:
/"
This project, scheduled for the July 18, 2007 Technical Advisory Committee meeting, is located outside the
current corporate limits of the City of Cannel and therefore, outside of the Department of Engineering
jurisdiction.
Sincerely,
.~~A-- J
Nicholas J. Redden, P.E.
Plan Review Coordinator
Department of Engineering
~
cc: Angelina Conn, Department of Community Services
Greg Hoyes, Hamilton County Surveyor's Office
Greg Ilko, Crossroad Engineers, PC
Engineering Department Review
Project File
S:\PROJREV07\LAFITNESSANDRETAILCENTER-\VESTONP ARK
DEPARTMEKT Of ENGIl'EERING
ONE CIVIC SQW,RE, CARMEL, TN 46032 OFFTCE 317.571.2441 FAX 317.571.2439
EMAIL engineering@carmel.in.gol'
Page 1 of 1
Conn, Angelina V
From: Wood, Mark A. [MarkWood@SUG.com]
Sent: Friday, July 06, 2007 1 :45 PM
To: Conn, Angelina V
Subject: RE: July 18 TAC agenda
Panhandle Eastern Pipe Line Company has no conflicts with the items listed on this agenda. Thanks
-----Original Messagenm
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Friday, July 06, 2007 1: 11 PM
To: Akers, William P; Blanchard, Jim E; Boone, Rachel M.; Brewer, Scott I; Brook Gajownik; Carter, Ronald E;
Chuck Shupperd; Dale Sparks; David Lucas; Malonel David G.; DeVore, Laura B; Donahue-Wold, Alexia K; Duffy,
John M; Duncan, Gary R; Fogarty,Michael D; Foley, Amanda J; Foster, Jim P; Greg Hayes; Greg Ilko; Hancockl
Ramona B; Hill, Dick B; Hohlt, William G; Hollibaugh, Mike P; Holmes, Christine B; Hoyt/ Gary A; Jason Kirkman;
Jason LeMaster; Jennifer Bruner; Jennifer Marlett; Joel Thurman; Keeling, Adrienne M; Klingensmith, David W;
Krueskamp/ Theresa A; Larry Castetter; Lillard, Sarah N; Littlejohn, David W; Marilyn Anderson; Wood, Mark A.;
McBride, Mike T; Pace, Paul V; Redden/ Nick; Richard Heck; Ron Farrand; Ron Morris; Ryan Hartman;
Schmiesing, Rebecca; Shirley Hunter; Snyder, M Todd; Stewart, Lisa M; Tingley/ Connie S; Westermeier, Mark
Cc: Charlie Frankenberger; Kelli Lawrence; jthomas@hearthview.com; Reis/ Paul; John Turek; dpellom@civil-
designs.com; dolmstead@stoeppelwerth.com; Dave Coots; Sawbuilder@aol.com; justinmoffett@aol.com
Subject: July 18 TAC agenda
Good morning,
Please see attached agenda for the July 18 Technical Advisory Committee meeting Let me know if you did not
receive plans for an item.
{Petitioners, please distribute necessary plans to all TAC members (list attached) if you have not already done
so.) If you have any questions, please don't hesitate to email me.
Thanks,
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
p. 317-571-2417 f. 317-571-2426
aconn@carmel.in.gov
Private and confidential as detailed here. If you cannot access hyperlink, please e-mail sender.
7/6/2007
TER HORST, LAMSON & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46263
Phone (317)334-1500; Fax (317) 334-1552
TLF
LETTER OF TRANSMITTAL
CONSULTlNG ENG[NEE~,
TO: Carmel Fire Department DATE: July 10, 2007
Two Civic Square RE: LA Fi1ness - Weston Park Block A
Carmel, IN 46032 PROJECT NO.: 2007-199
ATfN: Chris Ellison FROM: Ben Knoop
WE ARE SENDING HEREWITH:
[8J Dra~ing Prints D Engineering Report
D Drawing Plots D Shop Drawings
0 Specifications D Other:
WE ARE SENDING VIA:
!Zl Regular Mail D DHLlVlorldwide Express
0 Hand Delivered
0 NOW Courier Economy Ground 0
(3 hr del. If picked up before 11 :OOam)
D NOW Courier Standard 2nd day by 5:00 0
(3 hr delivery bv 5:00p)
0 NOW Courier Express (90 nrin)' Next afternoon 0
,by 3:00p
, I Express - del.
D NOW Courier (1 Hour) 0
by noon
0 To Be, Picked up by Recipient 0 Other:
COPIES DRA WINO NO. DATE DESCRJPTION
I 7 6/22/07 Site Plans and Details ,
THESE ARE TRANSMnTED:
o For Approval
o For Your Use
rzJ As Requested
D For Review and Comment
D As Noted
o Revise and Resubmit
D Return Corrected Prints
D Rcjected
o Other:
REMARKS: I
These plans are being transmitted to you as part of the City of Carmel TAC review process. Please call me or email to:
bknoop@t1f-engineers.com if you have any questions or need additional infonnation,
Copies To: [g] File
o
[;gJ MNO
o
File Name P:\2007\1 00'2007-1 99\Admin\Transrnittals\CEllison,cfd.07-1 0-2007 ,doc
TER HORS T, LA1\-ISON & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334~1552
TLF
~
CONSULTING ENGINEERS
LETTER OF TRANSMITTAL
TO: Carmel Engineering Dept DArE: June 29, 2007
One Civic Square, 1st Floor RE: LA Fitness - Weston Park Block A
Cannel, IN 46032 PROJECT NO.: 2007-199
ATIN: Nick Redden FROM: Ben Knoop
WE ARE SENDING HEREWITH:
I2J Dra\\wg Prints 0 Engineering Report
0 Drawing Plots 0 Shop Drawings
D Specifications 0 Other:
WEARE SENDING VIA:
0 Regular Mail 0 DIll/Worldwide Express
0 Hand Delivered
0 NOW Courier Economy Ground IS]
(3 b:r del. If picked up before 11 :OOarn)
0 NOW Courier Standard 2nd day by 5:00 0
(3 hI delivery by 5 :O()P)
0 NOW Courier Express (90 min) Next afternoon D
by 3:00p
D NOW Courier (1 Hour) Express - del. 0
by noon
D To Be Picked up by Recipient 0 Other:
COPIES DRAWING No. DATE DESCRIPTION
1 18 6/22/07 Site Plans and Details
THESE ARE TRANSMITTED:
D For Approval
o For Your Use
[8J As Requested
o For Review and Comment
o As Noted
o Revise and Resubmit
o Return Corrected Prints
o Rejected
o Other:
REMARKS:
These plans are being transmitted to you as part of the City ofCarmeI TAC review process. Please call me or emaj1 to:
bknoop@tlf-engineers.com if you have any questions or need additional infOffi1ation.
Copies To: [8J File
o
lS1 MNO
o
Fi Ie Name P:\2007\1 00\2007 -1 99\Admin \ Transmifutls\RHaTiman .CTRWD. 06-29-2007 .doc
TER HORST, LAMSON & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334-1552
TLF
......
LETTER OF TRANSJ\lllTT AL
CONSULTING BNGINEERS
TO: Hamilton County Highway Dept DATE: June 29,2007
1700 South lOth Street RE: LA Fitness - Weston Park Block A
Noblesville, IN 46060 PROJECT NO.: 2007-199
ATfN: David Lucas FROM: Ben Knoop
WE ARE SENDING HEREWITH:
[8J Drawing Prints D I Engineering Report
D Drawing Plots D Shop Drawings
D Specifications D Other:
WE ARE SENDING VIA:
D Regular Mail ['J DHLfW orldwide Express
D Hand Delivered
D NOW Courier Economy Gronnd [8J
(3 hr del. If picked up before 11 :OOam)
0 NOW Courier Standard 2nd day by 5:00 D
(3 ill deliverv by 5;OOp)
0 NOW Courier Express (90 min) Next afternoon D
by 3:000
0 NOW Courier (1 Hour) Express - del. D
by noon
0 To Be Picked up by Recipient D Other:
COPIES DRA WING NO. DATE DESCRIPTION
1 18 6/22/07 Site Plans and Details
THESE ARE TRANSMUTED:
D For Approval
o For Your Use
[8J As Requested
o For Review and Comment
o A.s Noted
D Revise and Resubmit
o Return Corrected Prints
D Rejected
D Other:
REMARKS:
These plans are being transmitted to you as part of the City of Cam1el T AC review process. Please call me or email to:
bknoop@t1f-engineers.com if you have any questions or need additional information.
Copies To; [8J File
o
[8J MNO
.0
File Name P :\2007\ 100\2007 -1 99\Admin \ Transmittals\DLucas.HCHD.06-29-Z007.doc
TER HORST, LAMSON & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334-1552
TLF
......
LETTER OF TRANSJVllTTAL
CONSUl.TlNG ENGINEERS
TO: Clay TO'VV11ship Regional Waste Distnct DATE: June 29, 2007
10701 NOlih College Avenue, Suite A RE: LA Fitness - Weston Park Block A
Indianapolis, IN 46280 PROJECT NO.: 2007-199
AnN: Ryan Hartman FROM: Ben Knoop
WE ARE SEI\1])ING HEREWITH:
[SI Drawing Prints D Engineering Rep011
0 Drawing Plots D Shop Drawings
0 Specifications 0 Other:
WE ARE SENDING VIA:
0 Regular Mail [SI DHLlWorldwide Express
0 Hand Delivered
0 NOW Courier Economy I Grolmd [6J
(3 hr del. If picked up before 11 :OOam)
0 NOW Courier Standard 2nd day by 5:00 0
(3 hr delivery by 5:00p)
0 NOW Courier Express (90 rnin) Next afternoon 0
bv 3:00p
0 NOW Courier (1 Hour) Express - del. 0
by noon
0 To Be Picked up by Recipient 0 Other:
COPIES DRAWING NO. DATE DESCRIPTION
1 18 6/22/07 Site Plans and Details
THESE ARE TRANSMITTED:
o For Approval
D FOT Your Use
[g] As Requested
o F or Review and Comment
o As Noted
o Revise and Resubmit
o Rehrrn Corrected Prints
D Rej ectcd
o Other:
REMARKS:
These plans are being transmitted to you as part of the City ofCarrnel TAC review process. Please call me or email to:
bknoop(a),tlf-engineers.com if you have any questions or need additional infoffi1ation.
Copies To: [2] File
o
I?:5J MNO
o
File Name P:\2007\1 00\2007 -199\Admin\ Transmittals\RHartman.CTR WD .06-29-2007, doc
TER HORST, LAMSON & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334-1552
TLF
...~
LETTER OF TRANSl\1ITTAL
CDNSULT1NG ENG1NEERS
TO: CrossRoad Engineers DATE: June 29,2007
3417 South Sherman Drive RE: LA Fitness ~ Weston Park Block A
Beech Grove, ill 46107 PROJECT NO.: 2007-199
ATIN: Gregory Ilko, PE FROM: Ben Knoop
WE ARE SENDING HEREWITH:
[gJ Drawing Prints IZJ Engineering Report
D Drawing Plots 0 Shop Drawings
D Specifications 0 Other:
WE ARE SE1\TDING VIA:
0 Regular Mail [g] DHLlW orld\vide Express
0 Hand Delivered
0 NOW Courier Economy Ground [g)
(3hr del. Ifpicked up before 11 :OOam)
0 NOW Courier Standard 2nd day by 5:00 0
(3 hr delivery bv 5 :OOp)
D NOW Courier Express (90 min) Next afternoon 0
bv 3:000
0 NOW Courier (1 Hour) Express - del. 0
bv noon
0 To Be Picked up by Recipient 0 Other:
COPIES DRAWING NO. DATE DESCRIPTION
1 18 6/22/07 Site Plans and Details
1 -- -- Drainage Report
THESE ARE TRAl'\ISMITTED:
0 For Approval 0 For Review and Comment 0 Return Corrected Print.;;
0 For Your Use 0 As Noted D Rejected
0 As Requested 0 Revise and Resubmit 0 Other:
REMARKS:
These plans and drainage report are being transmitted to you as part of the City of Cannel T AC review process. Please
call me or email to:bknoop@tlf-engmeers.comif you have any questions or need additional infoIDlation.
Copies To: ~ File
o
[8J :MNO
o
File Name P:\2007\1 00\2007 -I 99\,A.dmin\ Transmittals\GIlkO.Cfossroad. 06-29-2007 doc
TER HORST, LAlVISON & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334-1552
TLF
LETTER OF TRANSMITTAL
CONSULTlNG ENGINEERS
TO: Indianapolis Water Company DATE: June 29, 2007
1220 Waterway Blvd RE: LA Fitness - Weston Park Block A
Indianapolis, IN 46206 PROJECT NO.: 2007-199
ATIN: Jennifer Marlett FROM: Ben Knoop
WE ARE SENDING HEREWITH:
[2J Drawing Prints 0 Engineering Report
0 Drawing Plots 0 Shop Drav.wgs
0 Specifications 0 Other:
WE ARE SENDING VIr'\.:
rzl Regular Mail 0 DHLlWorldwide Express
0 I-land Delivered
0 NOW Courier Economy Ground 0
(3 hr deL If picked up before 11 :OOam)
0 NOW Courier Standard 2nd day by 5:00 0
(3 hr deliveryby 5:00p).
0 NOW Courier Express (90 min) Next afternoon 0
by 3:00p
0 NOW Courier (1 HOllI) Express - deL 0
by noon
0 To Be Picked up by Recipient 0 Other:
COPIES DRAWIN"G NO. DATE DESCRIPTION
1 C5.1 & C6.3 6/22/07 Site Utility Plan & Site Details
THESE ARE TRANSMITTED:
o For Approval
[Z] For Your Use
o As Requested
o For Review and Comment
o As Noted
o Revise aud Resu bruit
o Return Corrected Prints
o Rej ected
o Other:
REiV1ARKS:
These plans are being transmitted to you as part of tbe City of Cannel T AC review process. Please call me or email to:
bknoop(O)tlf-engineers.com if you have any questions or need additional information.
Copies To: [g] File
o
[ZJ MNO
o
File Name P:\2007\1 00\2007-199\Admin\TransmittalsIJMarlettIW"C.06-29-2007 .doc
TER HORST, LAlVISON & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334-1552
TLF
LETTER OF TRANSMITTAL
CONSUl.TtNG ENGINEERS
TO: Vectren Energy DATE: Jtme 29, 2007
P.O. Box 1700 RE: LA Fitness - Weston Park Block A
Noblesville, IN 46061-1700 PROJECT NO.: 2007-199
ATfN: Chuck Shupperd FROM: Ben Knoop
WE ARE SENDING HEREWITH:
[8J Dra'Wing Prints 0 Engineering Report
0 Drawing Plots 0 Shop Drawings
0 Specifications 0 Other:
WE ARE SENDING VIA:
[SJ Regular Mail 0 DHL/Worldwide Express
D Hand Delivered
0 NOW Courier Economy Ground 0
(3 hr del. Ifpicked up beforc 11 :OOam)
0 NOW Courier Standard 2Dd day by 5:00 0
(3 hr delivery bv 5:00p)
0 NOW Courier Express (90 min) Next aftemoon 0
bv 3 :OOu
0 NOW Courier (1 Hour) Express - del. 0
bv 1100n
0 To Be Picked up by Recipient 0 Other:
COPIES DRAWING NO. DATE DESCRIPTION
1 C5.1 6/22/07 Site Utility Plan
THESE ARE TRANS1vlITTED:
o For Approval
[8] FOl Your Use
o As Re'luested
D For Review and Comment
o As Noted
o Revise and Resubmit
o Return Corrected Prints
D Rejected
D Other:
REMARKS:
This plan is being transmitted to you as part ofthe City ofCarrnel TAC review process. Please call me or email to:
bknoop@t1f-engineers.com if you have any questions or need additional information.
Copies To: ~ File
o
[ZJ MNO
o
File N aIDe P :\2007\100\2007 -199\/\.dmin \ Transmittals\CShupperd. v ectren 06- 29-2007 doc
TER HORST, LAl\1S0N & FISK, INC.
8675 Purdue Road
Indianapolis, IN 46268
Phone (317) 334-1500; Fax (317) 334-1552
TLF
.6~
LETTER OF TRANSMlTTAL
CON"SULTING ENGINEERS
TO: Carmel Clay Communications DATE: June 29, 2007
31 First Avenue NW RE: LA Fitness - Weston Park Block A
Carmel, IN 46032 PROJECT NO.: 2007-199
ATTN: Bill Akers FROM: Ben Knoop
WE ARE SENDING HERE'\V1TH:
[gJ Drawing Prints D Engineering Report
D Drawing Plots D Shop Drawings
D Specifications D Other:
WE ARE SENDING VIA:
~ . Regular Mail D DHL/Worldvlide Express
0 Hand Delivered
D NOW Courier Economy Ground 0
(3 hr del. If picked up before 1 1:00am)
0 NOW Courier Standard 2nd day by 5:00 0
(3 ill delivery bv 5;OOp)
0 NOW Comicr Express (90 min) Next afternoon 0
bv 3:001'
0 NOW COllrier (1 Hour) Express - del. D
bv noon
D To Be Picked up by Recipient D Other:
COPIES DRAWING NO. DATE DESCRLPTION
1 C2.1 & C5.1 6/22/07 Site Plan and Utility Plan
THESE ARE TRANSj\,.lITTED:
o For Approval
o For Your Use
[gJ As Requested
D For Review and Comment
o As Noted
o Revise and Resubmit
o Retum Corrected Prints
D Rejected
o Otber:
REMARKS:
This plans are being transmitted to you per your email request as part of the City of Carmel T AC review process. Please
call me or email to:bknoop(a)tlf-engineers.comifyou have any questions or need additional infmmation.
Copies To: r?;;J File
o
[SJ MNO
o
File Name P :\2007\1 00\2007 -199\Admm \ Transmittals\BAkers.ccc. 06-29-2007 . doc
TER HORST, LAMSON & FISK, INC.
3675 Purdue Road
Indianapolis, 1.\1 46263
Phone (317) 334-1500; Fax (317) 334-1552
TLF
.....
LETTER OF TRANSMITTAL
CONSULTING ENGINEERS
TO: Cannel Post Office DATE: June 29, 2007
275 Medical Drive RE: LA Fitness - Weston Park Block A
Indianapolis, IN 46032-9998 PROJECT NO.: 2007-199
ATTN: Dale Sparks FROM: Ben Knoop
WE ARE SENDING HEREWITH:
[2] Drawing Prints 0 Engineering Report
0 Drawing Plots D Shop Drawings
D Specifications D Other:
WE ARE SENDING VIA:
[S] Regular Mail D DHLIW orld\vide Express
D Hand Delivered
D NOW Courier Economy Ground D
(3 hr del. If picked up before 11 :OOam)
D NOW Courier Standard 2nd day by 5:00 D
(3 hI' delivery by 5:00p)
D NOW Comier Express (90 min) Next afternoon D
by 3:00p
D NOW Courier (1 HOllr) Express - del. D
by noon
D To Be Picked up by Recipient 0 Other:
COPIES DRAWWGNO. DATE DESCRIPTION
1 CS & C2.1 6/22/07 Cover Sheet & Site Plan
THESE ARE TRANSlYfITTED:
0 For Approval 0 For Review and Comment 0 Return Corrected Prints
[SJ For Your Use D As Noted 0 Rejected
0 As Requested 0 Revise and Resubmit 0 Other:
REMARKS:
There plans are being transmitted to you as part of the City of Carmel TAC review process. Please call me or email to:
bknooR@tlf-engineers.com if you have any questions or need additional infonnation.
Copies To: ~ File
o
r:8:] "t\1NO
o
File Name P'\2007\l00\2007- I 99V,dmin\Transmittals\DSparks.USPS.06-29-2007 .doc
TER HORST, LA~lS0N & FISK, INC.
8675 Purdue Road
Indianapolis, IN" 46268
Phone (317) 334-1500; Fax (317) 334-1552
TLF
LETTER OF TRANSMITTAL
CONSULTING ENGINEERS
TO: Cannel Water Department DATE: July 27, 2007
3450W.13lstSt. RE: LA Fitness - Weston Park Block A
Westfield, IN 46074 PROJECT NO,: 2007-199
ATTN: John Duffy FROM: Ben Knoop
WE ARE SENDING HEREWITH:
~ Drawing Prints 0 Engineering Report
0 Drawing Plots 0 Shop Drawings
0 Specifications 0 Other:
WE ARE SENDING VIA:
0 Regular Mail 18] DHLlWorldwide Express
0 Hand Deli \fered ..
0 NOW Courier Economy Ground 0
(3 hr del. If picked up before 11:00am)
0 NOW Courier Standard' 2nd day by 5:00 D
(3 hr delivery by 5:00p),
0 NOW Courier Express (9.0 min) Next afternoon D
by 3 :000
0 NOW Courier (1 Hour) Express --" del. 0
by noon
0 To Be Picked up by Recipient 0 Other:
COPIES DRAWING NO. DATE " DESCRIPTION
1 17 7/27/07 Site Plans and Details
THESE ARE TRANSMITTED:
D For Approval
o For Your Use
o As Requested
D For Review and Comment
o As Noted
o Revise and Resubmit
D Return Corrected Prints
o Rejected
o Other:
REMARKS:
These plans are being transmitted to you as patt of the City of Carmel TAC review process. Please call me or email to:
bknoop@t1f-engineers.com if you have any questions or need additional information.
Copies To: [8] File
D
k8'l MNO
o
Fi 1 e Name P: '2007\1 00\2007 -199\Adm in\TransmittalsUDurry. cwd. 07 -26-2007. doc
Page 1 of2
Mark Obergfell
From: Greg like [gilko@crossroadengineers.com]
Thursday, June 28, 20072:58 PM
Ben Knoop; 'Conn, Angelina V'; 'Holmes, Christine B'; Wakers@carmel.in.gov; sbrewer@carmel.in.gov;
mfogarty@carmel.in.gov; cellison@carmel.in.gov; gduncan@carmel.in.gov; nredden@carmel.ingov;
whohlt@carmel.in.gov; jduffy@carmel.in.gov; d littlejohn@carmeLin.gov; tkrueskamp@carmel.in.gov;
del@co.hamilton.in.us; jtl@co.hamilton.in.us; bmg@co.hamilton.in.us; shirley. hunter@duke-energy.com;
rfarrand@ccs.k12.in.us; david.malone@sug.com; mwestermeier@carmel.in.gov; grh@co.hamilton.in.us;
jason. kirkman@mybrighthouse.com; jen n ifer. marlett@veoliawaterna.com; ryan. hartman@ctrwd.org;
ron.morris@aes.com; dale.m.sparks@usps.Qov; afoley@carmel.in.gov; dklingensmith@carmel.in.gov;
csh u pperd@vectren.com
Cc: 'John Turek'; Mark Obergfell; bknott@carmel.in.gov; John Tierney
Subject: RE: Resending: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Sent:
To:
Ben,
I require a full size (24" x 36") set of plans and drainage calculations for my review. They can be mailed/delivered to my
attention.
Thanks,
Gregory J. IIko
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
office: 317.780.1555 ext. 112
fax: 317.780.6525
web: www.crossroadengineers.com
From: Ben Knoop [mailto:bknoop@tlf-engineers.com]
Sent: Thursday, June 28, 2007 11:08 AM
To: Conn, Angelina V; Holmes, Christine B; Wakers@carmel.in.gov; sbrewer@carmel.in.gov; mfogarty@carmel.in.gov;
cellison@carmel.in.gov; gduncan@carmel.in.gov; nredden@carmel.in.gov; whohlt@carmel.in.gov; jduffy@carmel.in.gov;
dlittlejohn@carmel.in.gov; tkrueskamp@carmel.in.gov; del@co.hamilton.in.us; jtl@co.hamilton.in.us;
bmg@co.hamilton.in.us; shirley.hunter@duke-energy.com; rfarrand@ccs.k12.in.us; david .malone@sug.com;
mwestermeier@carmel.in.gov; grh@co.hamilton.in.us; jason. kirkman@mybrighthouse.com;
jenn ifer. marlett@veoliawaterna.com; ryan. hartman@ctrwd.org; ran. morris@aes.com; gilko@crossroadengineers.com;
dale. m.sparks@usps.gov; afoley@carmel.in.gov; dklingensmith@carmel.in.gov; cshupperd@vectren.com
Cc: John Turek; Mark Obergfell; bknott@carmel.in.gov; John Tierney
Subject: Resending: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Pt2:
From: Ben Knoop
Sent: Thursday, June 28, 2007 11:06 AM
To: 'Conn, Angelina V'; 'Holmes, Christine B'; Bill Akers (Wakers@carmel.in.gov); Scott Brewer (sbrewer@carmel.in.gov);
Michael Fogarty (mfogarty@carmel.in.gov); Chris Ellison (cellison@carmel.in.gov); Gary Duncan
(gduncan@carmel.in.gov); Nick Redden (nredden@carmel.in.gov); Bill Hohlt (whohlt@carmel.in.gov); John Duffy
(jduffy@carmel.in.gov); David Littlejohn (dlittlejohn@carmel.in.gov); Terry Krueskamp (tkrueskamp@carmel.in.gov);
David Lucas (del@co.hamilton.in.us); Jason Lemaster (jtl@co.hamilton.in.us); Brooke Gajownik (bmg@co.hamilton.in.us);
Shirley Hunter (shirley.hunter@duke-energy.com); Ron Farrand (rfarrand@ccs.k12.in.us); David Malone
(david.malone@sug.com); Mark Westermeier (mwestermeier@carmel.in.gov); Greg Hoyes (grh@co.hamilton.in.us);
Jason Kirkman (jason.kirkman@mybrighthouse.com); Jennifer Marlett (jennifer.marlett@veoliawaterna.com); Ryan
7/6/2007
Page 2 of2
Hartman (ryan.hartman@ctrwd.org); Ron Morris (ron.morrls@aes.com); Gregory IIko (gilko@crossroadengineers.com);
Dale Sparks (dale.m.sparks@usps.gov); Amanda Foley (afoley@carmel.in.gov); Dave Klingensmith
(dklingensmith@carmel. in .gov); Chuck Shupperd (cshupperd@vectren.com)
Cc: 'John Turek'; Mark Obergfell; Bruce Knott (bknott@carmel.in.gov); John Tierney
Subject: Resending: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Apparently, my earlier email was larger than 10 MBs, so I'm resending the TAC submittal sheets in 2 separate emalls.
apologize for the confusion.
From: Ben Knoop
Sent: Thursday, June 28, 2007 10:57 AM
To: 'Conn, Angelina V'; Holmes, Christine B; Bill Akers (Wakers@carmel.in.gov); Scott Brewer (sbrewer@carmel.in.gov);
Michael Fogarty (mfogarty@carmel.in.gov); Chris Ellison (cellison@carmel.in.gov); Gary Duncan
(gduncan@carmel.in.gov); Nick Redden (nredden@carmel.in.gov); Bill Hohlt (whohlt@carmel.in.gov); John Duffy
(jduffy@carmel.in.gov); David Littlejohn (dlittlejohn@carmel.in.gov); Terry Krueskamp (tkrueskamp@carmel.in.gov);
David Lucas (del@co.hamilton.in.us); Jason Lemaster Utl@co.hamilton.in.us); Brooke Gajownik (bmg@co.hamilton.in.us);
Shirley Hunter (shirley.hunter@duke-energy.com)i Ron Farrand (rfarrand@ccs.k12.in.us); David Malone
(david.malone@sug.com); Mark Westermeier (mwestermeier@carmel.in.gov); Greg Hayes (grh@co.hamilton.in.us);
Jason Kirkman (jason.kirkman@mybrighthouse.com); Jennifer Marlett (jennifer.marlett@veoliawaterna.com); Ryan
Hartman (ryan.hartman@ctrwd.org); Ron Morris (ron.morris@aes.com)i Gregory llko (gilko@crossroadengineers.com);
Dale Sparks (dale.m.sparks@usps.gov); Amanda Foley (afoley@carmel.in.gov); Dave Klingensmith
(dklingensmith@carmel.in.gov); Chuck Shupperd (cshupperd@vectren.com)
Cc: John Turek; Mark Obergfell; Bruce Knott (bknott@carmel.in.gov); John Tierney
Subject: LA Fitness ~ Carmel Weston Park 106th & Michigan Rd.
As required by the City of Carmel for T AC review, attached is a pdf of the following files for the subject project:
CS - Cover Sheet
C2.1 - Site Plan
C3.1 - GradingfDrainage Plan
C5.1 - Site Utility Plan
L 1.1 - Landscape Plan
2 - Building Elevations
Please advise if you would like copies of any of the other sheets listed on the cover sheet (ie detail sheets) or if you would
like a hard copy sent to you. The complete set of plans has already been sent to the City DOCS, Surveyor's Office and
the County SWCD. We will be delivering a full set of plans to the CTRWD also.
Thanks and please call me or Mark Obergfell with any questions or concerns.
Benjamin P. Knoop, EI.T.
Tar Horst, Lamson & Fisk, Inc.
8675 Purdue Road
Indianapolis, IN, 46268
317-334-1500 (phone)
317 -334-1552 (fax)
7/612007
Page 1 of2
Conn, Angelina V
From: Ben Knoop [bknoop@tlf-engineers,com]
Sent: Thursday, June 28, 2007 11 :08 AM
To: Conn, Angelina V; Holmes, Christine B; Akers, William P; Brewer, Scott I; Fogarty, Michael D; Ellison,
Christopher M; Duncan, Gary R; Redden, Nick; Hohlt, William G; Duffy, John M; Littlejohn, David W;
Krueskamp, Theresa A; del@co,hamilton.in.us; jtl@co.hamilton.in.us; bmg@co.hamilton.in.us;
shirley. hunter@duke-energy.com; rfarrand@ccs.k12,in.us: david.malone@sug.com; Westermeier,
Mark; grh@co.hamilton.in. us; jason.kirkman@mybrighthouse.com;
jennifer .marlett@veoliawaterna,com; ryan .ha rtman@ctrwd .erg; ran. morris@aes.com;
gilko@crossroadengineerscom; dale,m.sparks@usps.gov; Foley, Amanda J; Klingensmith, David W;
cshupperd@vectren.com
Cc: John Turek; Mark Obergfell; Knott, Bruce; John Tierney
Subject: Resending: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Attachments: 27199C5.1.pdf; 27199L.1.pdf; ELEV2.pdf
pt 2:
"'~."~'~m~"'_~,"_m"m~".~~,.,....-~n~n~~ ~. .~_~,~..~.._.,.______~m~~W",'''M'''''~'_''^'"_'''OO~~'~''~'..~,..~..,.~"'~ _ ~'___""'___~_'_'_ .~_~.____... ,'" ""_"~_"~""'"M'
From: Ben Knoop
sent: Thursday, June 28, 2007 11:06 AM
To: 'Conn, Angelina V'; 'Holmes, Christine B'; Bill Akers (Wakers@carmel.in.gov); Scott Brewer (sbrewer@carmel.in.gov);
Michael Fogarty (mfogarty@carmel.in.gov);Chris Ellison (cellison@carmel.in.gov); Gary Duncan
(gduncan@carmel.in.gov); Nick Redden (nredden@carmel.in.gov); Bill Hohlt (whohlt@carmel.in.gov); John Duffy
(jduffy@carmel.in.gov); David Littlejohn (dlittlejohn@carmel.in.gov); Terry Krueskamp (tkrueskamp@carmel.in.gov);
David Lucas (del@co.hamilton.in.us); Jason Lemaster (jtl@co.hamilton.in.us); Brooke Gajownik (bmg@co.hamilton.in.us);
Shirley Hunter (shirley.hunter@duke-energy.com); Ron Farrand (riarrand@ccs.k12.in.us); David Malone
(david.malone@sug,com); Mark Westermeier (mwestermeier@carmel.in.gov); Greg Hayes (grh@co.hamilton.in.us);
Jason Kirkman (jason .kirkman@mybrighthouse.com); Jennifer Marlett (jennifer.marlett@veoliawaterna.com); Ryan
Hartman (ryan.hartman@ctrvvd.org); Ron Morris (ron.morris@aes.com); Gregory lIko (gilko@crossroadengineers.com);
Dale Sparks (dale.m.sparks@usps.gov); Amanda Foley (afoley@carmel.in.gov); Dave Klingensmith
(dklingensmith@carmel.in.gov); Chuck Shupperd (cshupperd@vectren.com)
Cc: 'John Turek'; Mark Obergfell; Bruce Knott (bknott@carmel.in.gov); John Tierney
Subject: Resending: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
Apparently, my earlier email was larger than 10 MBs, so I'm resending the T AC submittal sheets in 2 separate emails.
apologize for the confusion.
.u.._'",..____4-.._,,~,~_~~..~..~._~..~..~u.~W~"U____~"'...,., ow,c_..~~,,~---.__.,..... ,"c.'..~.".~O.,~..",.~~__W;M'_.'__.,_ ..,........._.._."'..",.._ ,._.,_~~,~'.~,_..",.^'".>>,..."",~,.~._~~~"~~m~.~~x_".,-,.""">>,,~,,~.<<,,.''''_._'---'~-'_-----.~--~'-~'---'"--",
From: Ben Knoop
Sent: Thursday, June 28, 2007 10:57 AM
To: 'Conn, Angelina V'; Holmes, Christine B; Bill Akers (Wakers@carmel.in.gov); Scott Brewer (sbrewer@carmel.in.gov);
Michael Fogarty (mfogarty@carmel.in.gov); Chris Ellison (cellison@carmel.in.gov); Gary Duncan
(gduncan@carmel.in.gov); Nick Redden (nredden@carmel.in.gov); Bill Hohlt (whohlt@carmel.in.gov); John Duffy
(jduffy@carmel.in,gov); David Littlejohn (dlittlejohn@carmel.in.gov); Terry Krueskamp (tkrueskamp@carmel.in.gov);
David Lucas (del@co.hamilton.in.us); Jason Lemaster (jtl@co.hamilton.in.us); Brooke Gajownik (bmg@co.hamilton.in.us);
Shirley Hunter (shirley.hunter@duke-energy.com); Ron Farrand (riarrand@ccs.k12.in.us); David Malone
(david.malone@sug.com); Mark Westermeier (mwestermeier@carmel.in.gov); Greg Hoyes (grh@co.hamilton.in.us);
Jason Kirkman (jason.kirkman@mybrighthouse.com); Jennifer Marlett (jennifer.marlett@veoliawaterna.com); Ryan
Hartman (ryan.hartman@ctrwd.org); Ron Morris (ron.morris@aes.com); Gregory IIko (gilko@crossroadengineers.com);
Dale Sparks (dale.m.sparks@usps.gov); Amanda Foley (afoley@carmel.in.gov); Dave Klingensmith
(dklingensmith@carmel.in.gov); Chuck Shupperd (cshu pperd@vectren.com)
Cc: John Turek; Mark Obergfell; Bruce Knott (bknott@carmel.in,gov); John Tierney
Subject: LA Fitness - Carmel Weston Park 106th & Michigan Rd.
6/28/2007
J;
317-773-2181 '
Fax: 317-776-1101
1108 South 9tb Street Q Noblesville 0 IN 0,46060-374:5
June 26, 2007
Mark N. Obergfell, P.E. .
'fer Horst, Lamson & Fisk; Inc.
867.5 Purdue Road
Indianapolis, IN 46268
!;- :;; ~{
t;.
11r. Obergfell,
, We have.received theplan~ and pydrology r,eport for the LAfitncss-Weston Park Block
A project. Our office cllrrently does not do plan reviews.
Judy Wilkinson'
Office Coordinator
iRfCEWED
JUNt 7 2007
HI, HQRS'" l.AM30!\J &. fISK. iNC.
CONSERVATION ~DEVELOPMENT ~SELF-GOVERNMENT
"AN EQUAL OPPORTUNITY E)"IPLDYER"
City of Carmel
June 11, 2007
Mr. JOM Turek
L A Fitness International LLC:
13570 Marjac Way
McC:ordsville, IN 46055
RE: Weston Park, Block A (L A Fitness)
Dear Mr. Turek:
The following letter represents comments for this project specifically addressing the area of alternative
transportation. I have reviewed the drawings submitted for the July 18,.2007 Teclmical Advisory Committee and
offer the following comments:
AI. TERNATIVE TRANSPORTA nON REVIEW COl\'IMENTS
1) Please revise the plans to connect all internal sidewalks as much as possible
We request that all responses to our comments be provided in writing. Failure to provide written responses may
result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if
any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans
indicating all revisions. Please notify us of any changes and specifically state any changes, including changes
resulting from Plan Commission, Special Studies or other conm1ittee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent
reViews.
If you have questions, please contact me at 571-2417.
Sincerely,
tJ/~
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Angie COHn, Department of Community Services
Engineering Department Review
Project File
Page I
ONE CIVIC SQUARE
Ci\R--rvillL, INDIANA 46032
317 /571-2417