Docket Nos. Assignment: (TAC) Prudentia Building at the Village of West Clay (06030007
TAC)
Subject:
I have issued the necessary Docket Number for (TAC) Prudentia Building at the Village of West Clay. It is as follows:
Docket No. 06030007 TAC: Prudentia Building at the Village of West Clay
TAC Application Fee:
Total Fee.:
$267.00
$267.00
Docket No. 06030007 T AC: Prudentia Building at the Village of West Clay
The applicant seeks to construct a 3 story office and retail building. r
The site is located near the NW corner of West New Market Street and Meeting House Roa~, and is zoned PU D.
Filed by Brandon Burke of Schneider Corporation for Prudentia Development (
Petitioner, please note the following:
1. This item will be on the March 15,2006, agenda of the Technical Advisory Committee (T AC).
2. Filing fee is due on or before March 15, 2006. Failure to pay this fee at this time will result in this item being
continued to the April 19th T AC meeting.
3. Project information must be delivered to all T AC members two weeks prior to meeting date.
4. This item is subject to administrative review only.
Department of Community Service's Initial Review Comments:
1. Please provide building elevations. Note that HVAC must be fully screened. Elevations should indicate location of
the HVAC and its method of screening. Please also provide details the dumpster enclosure structure.
2. Please add the docket number (06030007 T AC) on all future plans and correspondence.
PETITIONER:
The comments above specify the Department of Community Service's (DOCS) comments and concerns. There will be no
other review letter from DOCS issued prior to the T AC meeting.
Please wait to submit revised materials until after the Technical Advisory Committee (TAC) has met on this application.
The resubmitted materials should include edits addressing the above comments along with any requirements that arise
from the T AC meeting. Additional comments may be made after the requested revisions have been submitted
Mr. Burke can be contacted at 317.569.8112 or fax 317.826.6410.
Thanks.
Matthew Griffin, AICP
Planning Administrator
Department of Community Services
City of Carmel
One Civic Square
Carmel, IN 46032
P 317.571.2417
f 317.571.2426
1
u
u
DOCKET NO.Ot., () ~OObl
TAC
DATE RECEIVED:
.....---, '1'-,
/'\.~'..:"""'"
" \Y-. ~.' ........
Department of Community Services / // ~ "'\'\
TECHNICAL ADVISORY COMMITrEE RECEIVED \
APPLICATION & PROCEDURE:S;( FEB282006 ),
Fee: $267.00 '\ '\ DO I .'
\ '... CS / i
Property Information . . III II II II .. .. II ... .. ... .. .. .. .. 41 .. . .. .. .. .. .. .. .. .. .. . II III .. II .. .. .. a .. II .. .. .. .. 01 .. .. II . .. . .. .. .. .. .. . .. .. .. . .. .,. .. III III .. .. III .. II .. II D .... ..... I
',";-., / /
ParceIlD*: 17-09-28-00-07-002.000 Area (acres): 0.13 '''-...!'''':'~ -<'.>
~.~-- ------
Property Address: Glebe Street and West New Market Street
Zoning District: PUD Overlay District (If applicable):
Legal Description: To be typewritten separately.
. Please attach a separate list for projects with multiple parcels.
For Department Use Only
Attorney Information
Name:
Address:
Phone:
Email Address:
.................................................................................
Fax:
Engineer Information . " .. II . .. .. . . . . . III . . III III a . .. . ... . II . . . . . .. . . ,. .. .. .. . . . " .. .. .. .. D . . . .. 1lI . . . . . . . . . .. .. .. .. . . . . . . .. .. .. ...... .
Name: The Schneider Corporation
Address: 12821 E NeW Market Street, Suite 301, Carmel, IN 46032
Phone: 317-826-6401
Email Address:bburke@schneidercorp.com
Fax: 317-826-6410
OWner Information .111.. Ill.. a. a..... .llIa......... Ill....... a _. G a III III 0.. .llIa............. III..................... 0...... It. Ill.... 011-8-..
Name: Prudentia Development- Steve Churchill
Address: 12821 E New Market Street, Suite 310, Carmel, IN 46032
Phone
Day: 1-866-885-3249 ext 901
Evening:
Email Address:steve.churchill@preferredpartner.com
ProjectDescripilon .....................................................................................
Please include a brief summary/history of the project: Prudentia Building is located within The Village of WestClay
Village Center Part II, 3001-A, Block "F", The building will be a three story building consisting of office and retail space.
I, hereby swear that I am the owner/contractpurchaser of property involved in this application and that the foregoing signatures, statements
and answers herein contained and t e information herewith submitted are in all respects true and correct to the best of my knowledge and
belief. I, the undersigned, autho' the applicant to act on m behalf with regard to this application and subsequent hearings and testimony.
Date: J - zt.. (}(::;
Signature of 0
(Printed Name)
1 of 2
S:\FORMS\PC Applications - current\TAC only 2006.doc revised: 01/06/2006
,../ ~
.'
RECEiVED
FES 28 2006
\> .. DOCS //,
A part of Block "F" ofthe Village of West Clay, Section 300l-A, Village Center, Pat!.2;~-- ~_
the Secondary Plat of which is Recorded as Instrument Number 199909969687, Plat -- .
Cabinet 2, Slide 363, in the Office of the Recorder, Hamilton County, Indiana, located in
the Southwest Quarter of Section 28, Township 18 North, Range 3 East, Clay Township,
Hamilton County, Indiana, described as follows:
u
u
,
'.
'.
Land Description -Prudentia Development
Commencing at the northwest comer of said Block "F"..thence North 89 degrees 51
minutes 51 seconds East a distance of 221. 82 feet to the northeast comer of said Block
"F" thence South 45 degrees 08 minutes 09 seconds a distance of 41.03 feet to the Point
of Beginning, thence continuing along the north line of Block "F" South 45 degrees 08
minutes 09 seconds East a distance of 71.08 feet; thence South 44 degrees 51 minutes 51
seconds West a distance of77.75 feet; thence North 45 degrees 08 minutes 09 seconds
West a distance of 7 1.08 feet; thence North 44 degrees 51 minutes 51 seconds East a
distance of77.75 feet to the Point of Beginning, containing 0.127 acres, more or less.
N :\] 238\052\docs\LandDese Prudentia Dev.doc
Dee 2/27/06
-'
u
u
S:' .~
t"-'cr.~ ,...,.,
r~c 'l~! if :~L'
VILLAGE OF WEST CLAY -PRUDENTLA BUILDING
FCH 282006
Dess
Report on Water Distribution, Sanitary Sewer and Storm Sewer System
1. Water Distribution
The potable water to the site will be provided by the Indianapolis Water. Connection onto the existing main will be
made at the following location:
· An 8" main will be extended from an existing 12" waterman in Meeting House Road connecting to Glebe
Street. Building will be served by an 1 1/2" water service lateral.
Approval for the extension of water mains will be required from the Indiana Department of Envirorunental
Management, and all mains will be designed and installed in accordance with the Indianapolis Water rulcs and
regulations.
2. Sanitary Sewer
Sanitary sewer eilluent for the site will be accepted by the Clay Township Regional Waste District (CTRWD). A lift
station is proposed along the Eastern boundary of the site which will pump effluent via a force main into the existing
18" interceptor located in Spring mill Road.
Two additional lift stations are proposed within the Village of WestClay to serve areas which cannot be served by
gravity sewers. One will be placed within the common area located along Hoover Road, South of the Claridge Fann
entrance. It will serve the Southern third of the project, and will pump North into the gravity system described
above. The station is temporary in nature, and will be taken off line upon extension of the interceptor proposed to
the South and East shown in the CTRWD's master plan.
The second station is also temporary, and is]ocated along the project's Westernmost boundary near 126th Street.
The station will also pump to the gravity sewers to the East, and it serves the portion of the project located West of
Towne Road.
Proposed Prudentia Building will be serviced by a proposed 6" sanitary lateral connecting to sanitary manhole in the
rear parking lot, in addition a run of sanitary main will be extended in the future area of Block "F".
Approvals for the design and construction of the sanitary sewers must also be obtained, from CTRWD, it's
consultant and from the Indiana Department of Environmental Management.
3. Storm Sewer
The surface runoff on the site will be conveyed by a system of swales and pipes to a network of retention lakes
within the Village of West Clay. In accordance with the requirements of the Hamilton County Surveyor's
requirements, the retention lakes will provide stann water management control in order to restrict the discharge rates
onto the site's various outfall points. The discharge points for the site are as follows:
iii Elliot Creek; which traverses the site along the Northern third, then crosses 131" Street and leaves the site
just East of the existing 8.5 acre lake on the Perez parcel.
III Claridge Farms Legal Drain; which. was sized per the County Surveyor's calculations, to accept a 146 acre
drainage area that lies within the boundary of the Village of West Clay. Connection onto the Claridge Farm
drain will be made at an existing 36" concrete pipe just South of the existing mound bordering the Perez
property, and wil1 address drainage problems evident at that location.
· Clay Creek; Which traverses the site along the Southern third, then crosses Hoover Road near the proposed
cornmon area South of Claridge Farm entrance.
... Brendle Legal Drain; which flows along the site's Western boundary, then crossed I26th Street West of
N:\ 1238\052\docslsewreprt.doc
u
u
Towne Road.
Prudentia Building will have stoml sewer extended for the parking lot expansion, surface water will be collected by
proposed and existing stonn sewer facilities that ultimately drain to Elliot Creek
It is the intent that all main stonn sewer lines and all lines interconnecting lakes and serving as outlet points be
petitioned to be accepted by the County Surveyor as regulated drains. A limited portion of the stoml sewers that
serve to drain rear and side yards may remain within the maintenance jurisdiction of the project's homeowner's
association; however, most stann sewers and all retention lakes ,viii be maintained by the County Surveyor.
Subsurface drains, or pavement base drains, are proposed to be installed under the street curbs, in order to provide an
outlet point to home sump pumps, and in order to intercept groundwater seepage before reaching and compromising
the pavement stability.
4. Erosion Control
During all phases of the construction the Site General Contractor and all Subcontractors shall exercise measures to
prevent the erosion of soils due 10 the action ofwaler and wind. All erosion and sediment control measures shall be
implemented prior to earth moving activities.
Sediment in run-off water shall be trapped by the use of such methods as debris basins, siltation sumps and silt
fence/> until the disturbed area is stabilized. These shall be in place before any land alterations/grading.
Trapping devices shall be periodically inspected during dry periods and after each rainfall event by the Site
Contractor. Trapping devices shall be replaced if determined to be incapable ofperfonning intended function of
sediment trapping.
The Contractor shall have available on the construction site a water source capable of applying water to dry exposed
soil in order to prevent wind erosion. The application rate and manner shall be such that soil moisture is attained and
no surface run-off is created.
N: \ 123 8\0 5 2 \docs'c<;cwrcprt. doc
~~
Schneider
INDIANA
Corporate Headquarters
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216
Phone: 317.8267100
Toll.Free: 866.973.7100
Fax: 317.826.7200
Lafayette Office
3725 Rome Drive
Park 26
Lafayette, IN 47905
Phone: 765.448.6661
Fax: 765.448.6665
Carmel Office
12821 E New Market Street
Suite 100
Carmel, IN 46032
Phone: 317.569.8112
Fax: 317.826.6410
Avon Office
~Building 1000
--='5250 [= US Highway 36
Suite 250
Avon, IN 46123
Phone: 317.7459926
Fax: 317.745.9973
Merrillville Office
9800 Connecticut Drive
Suite 81-508
Merritlville, IN 46307
Phone: 219.644.3692
Fax: 219.644.3682
NORTH CAROLINA
Charlotte Office
2151 Hawkins Street
Suite 201
Charlotte. NC 28203
Phone: 704.333.8360
Fax: 704.333.8362
IOWA
ProMap Office
1531 Airport Road
Suite 2
Ames, IA 50010
Phone: 515.233.3311
Fax: 515.233.4575
u u
The Schneider Corporation
12821 E New Market Street. Suite 100 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410
February 28, 2006
/~.;~-~
/~~""
1/ ~ .'\..., '\
I " . A>Sn 4(',\
.; -/ t,'llllJ: '\
1'1 'ta 'f.::lJ .
\ I 2{h f I
. ~\ /). <'006' /'
\ '\ Vcs I ;
",^ / .
~ J';-! ..... -'" ..
\1,'.- '...... /
'''-...~. .. .c. ~' /
--.
--__..1.
Matt Griffin
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: VILLAGE OF WESTCLAY, PRUDENTIA BUILDING
Dear Matt,
Please find enclosed the following materials related to the above referenced project:
1, 2 sets of the Site Construction Plans
2. T AC Application
3. Land Description
4. Sewer Service Report
5. Copies of letters to TAC members
The above referenced materials are for your review and suggestions with respect to
Secondary Platting, It is my understanding thai this matter will be on the agenda of the March
15, 2006 Technical Advisory Committee meeting. In the interim, if you should have any
questions, or are in need of additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
'<-:2 '-. .~ "-
I"~~' ,<--------
~ -
Brandon T. Burke, P.E.
Project Manager
Enclosure
N: \ 1238\052\docs\Gtiffin022806.doc
.www.schneidercorp.com