RE: Th, Shopp".t Provid,n.., Ph." II Con,troction Pians.Pro],ct Review #1 OOIJ~ v> .
Dear Mr. Reynolds: 0101l?~ (
The City has received your conunent letter and drawings dated December 11. 2007 based upon the City
review of October 23,2007.
The conunents from the City review have been satisfactorily addressed with the following exceptions:
DEVELOPMENT PLAN REVIEW COMMENTS
1. PreviouS 'coiTrri,lellt 38~'~~ provide the requisite storm water/drainage information required by
Section 100 Of the Sto=rm' a er Technical Standards Manual on the plan sheets. Thank you.
Certain information shall be placed on the plan sheets.
2. Previous comment 38d. Be advised that the Department of Engineering does not have approval
authority of Landscaping and Lighting. Please do not include these items in future construction
plans submitted for review andlor approval. Thank you. Please remove the landscape plan
from the cover sheet.
3. Previous comment 38p. Please indicate the off.site detention location and verify if off-site
easements are required. Please also verify that detention was previously master planned and that
proposed "c" value is consistent with value anticipated when master planned. We will verify with
Crossroad Engineers.
4. A maintenance of traffic plan is required for entrance construction and right-of-way work. The
Department assumes there will be lane restrictions on Old Meridian. Such plan shall conform
with the INDOT Work Zone Safety Manual. Thank you for adding the plan. Please provide a
plan to restrict a lane if that is necessary. If flaggers are needed, a plan shall be provided for
Daggers as welL
5. Subsurface drain in right-of-way shall be double wall Rancor Hi-Q or equivalent. Thank you for
noting on Sheet C2.t. Please revise details ST-5 and ST.SA. ST-5A is an Indianapolis
DCAM detail.
6. Please add City standard ADA ramp details to the drawing set for ramps in the right-of-way.
Thank you. A type "B" ramp does not appear appropriate to cross the new access. Please
select another INDOT curb ramp type (perhaps type A or G). Add the detail and revise the
plans.
7. Please add the following note: No earth disturbing activity may commence without an approved
storm water management permit. Thank you. Please add note to sheets C1.2, C2.0. C2.1, C2.3,
and C3.0.
8. ADA ramps across southern entrance must align. Thank you. Please see note 6 of this letter.
DEPARTMENT Of ENGINEERING
ONE CrVIC SQUARE, CARMEL, IN 46032 OFFlcr.317.571.2441 FAX 317.571.2439
EMAIL engineering@carl1leLil1.gov
..
Mr. Rick N. Reynolds, RLA, ASLA
February 4, 2008
RE: The Shoppes at Providence, Phase II Preliminary Construction Plans Rev. #1
Page 2 of2
If you have questions, please contact me at 571.2441.
cc: Angelina Conn, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Carmel Utilities
Paul Arnone, Carmel Utilities
Greg IIko, Crossroad Engineers, PC
Matt Griffm, Buckingham Properties
Department ReviewlFile Copy
\ \Apps2\user data\eng\shared\DHill\PROJREV07\SHOPPESA TPROVIDENCEPHIIDEVPLANS#2,doc
c.
IIIl
'FM~"'"' ;: :r~" '"
j 1 "'" ""J
" 9t2 -
~ ~ i '4_ ~ ;,,; ~~ ~~..,!,r!' ~j .
To: Angelina Conn
City of Cannel
Department of Community Services
One Civic Square, 3rd Floor
Cannel, Indiana 46032
From:
Date:
September 5, 2007
Evans, Mechwart, Hambleton & Tilton, Inc.
Engineers, Surveyors, Planners, Scientists
Letter of Transmittal
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[XJ Hand Deliver OU.S. Mail 0 Fed. Ex. OOPS
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 07-30-07 7 Development Plan for The Shoppes at Providence Phase 2
1 09-05-07 Response Letter to TAC review comments
These are transmitted as checked below:
o for approval
00 for your file
o as requested D for review & comment
Dfor execution I signatures
o [other]
Remarks:
If contents are not as stated or you require additional infonnation please contact our office.
EMH&T File
Signed:
Copies To: Matt Griffin, Buckingham
If enclosures are not as noted, kindly notify us at once.
~,,' C I'} /, X V I
7400 North ShacJeicnd A.Y{~nue, Suite j 50, ~r,;c::ionC)pol;), l~,J 46250 ~ Phone 317.9] 3,693G . fox 317.9 j 3.6928
(:t..'::..m;bu~ . Cim;ir1~'.('lt: . lnd::)f"jr,<.ili" . Chlj~1:'";.~t,:;o
ernhl.cGrn
~
IEIIIJ
""CO'T;
;H~
: ",r" ~ =
Evans, Mechwart. Hambleton & Tillon, Inc.
Engineers. Surveyors. Planners. Scientists
August 31, 2007
Ms. Angelina Conn
City of Carmel
Department of Community Services
One Civic Square
Carmel, Indiana 46032
RE: OLD MERIDIAN SHOPPES AT PROVIDENCE - PHASE 2. (07070060 DP I ADLS)
RESPONSE TO TAC REVIEW COMMENTS
Dear Ms. Conn:
The following outlines our responses to the T AC comment letters and related meetings regarding the
review of the Preliminary Development Plans for the above-referenced project. Copies of the revised
Plans are enclosed. Please be advised that response letters are being forwarded to each of the TAC
members that provided review comments. The following identifies our response or action taken to
address each comment relating to the scope of work provided by EMH&T:
Carmel Department of Community Services
From Angelina Conn, Planning Administrator: Letter dated August 9, 2007
/9. Please provide your rot cover percentage, which includes building footprint and pavement. oj
83. qi ('"
The cover percentages have been added to the plans for reference. tl
~o. Show/label easements on the site plan.
The sewer and electric easements have been added to the plans.
vit. Please provide the bike parking details.
Bicycle parking details have been added 10 Ihe detail sheet.
From David Littlejohn, Alternative Transportation Coordinator:
Letter dated August 6, 2007
1. Please see the City of Carmel's Parking Ordinance in order to determine the appropriate locations and
. specifications for bicycle parking and revise the plans to show afl bicycle parking at {east 2' away from a/l
obstructions and note that the parking complies with Carmel's ordinance.
Thirteen bicycle parking spaces are provided on site which meels Ihe ordinance requirement.
Addilional bicycle parking will be added to the existing Shoppes 1 and the gazebo nearby, for a
lolal of 30 spaces, to enhance the availabilily of spaces.
2. Please indicate ADA compliance with all curb ramps at each crosswalk.
A note has been added 10 the plans stating that curb ramps are 10 be ADA compliant.
Ms. Angelina Conn - Carmel DOCS
Old Meridian Shoppes at Providence - Phase 2
August31,2007
Page 2
Carmel Department of Enaineerina
From Amanda Foley, Storm Water Administrator:
E-mail dated August 16, 2007
1. A variance will be needed to be sought for the City's two BMP requirement.
Acknowledged with the understanding of the Engineering Department's support in consideration
of LI D.
2. After further consideration of the roof downspouts, I think this stormwater should be treated. If a green
roof is no longer being considered, a small catch basin insert product (Smart Sponge, Lange Industries,
ete.) to filter the stormwater may be an acceptable practice.
A catch basin filter insert has been indicated on the plans to treat the roof drainage.
Hamilton County Surveyor's Office
From Greg Hoyes, Plan Reviewer:
Letter dated August 7, 2007
4. Please submit an outlet permit, for the indirect discharge into the WR. Fertig Regulated Drain, to this
office.
Acknowledged. The outlet permit request application will be submitted with final plans at a later
date as described in comment item #5.
Duke Enerav
From Shirley Hunter:
T AC meeting comment on August 15, 2007
Will need a 15' easement for primary Jines. Service from Georgetown Lane.
A 15' easement has been indicated on the plans for primary lines to the transformers.
We trust that the responses outlined herein adequately address the written comments included in your
letter and those of others as presented. Should you have any questions regarding this project or the
information contained herein, please do not hesitate to contact us.
Sincerely,
EMH& T, Inc.
Rick N. Reynolds, RLA, ASLA
Project Manager
CC: Mr. Matthew Griffin, Buckingham Companies
.
Evans, Mechwart; Hambleton & Tilton, Inc.
Engineers. Surveyors, Planners. Scientisls
laUer of TransmuUa~
To: Bill Hohlt
Deputy Building Commissioner
Qne Civic Square
Carmel, Indiana 46032
From:
Rick N. Reynolds
Date: JulY 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phas.e 2
We are sending you herewith via:
IXI Hand DetiverDU.S. Mail D Ped. Ex. Dups
The following items:
[i] copies
D originals D [other]
Copies Date Number of Description
sheets
1 7-19-07 Development Plan for The Shoppes at Providence Phase 2
These are transmitted as checked below:
IXI for approval
D for your file
D as requested 0 for review & COlnment
Dror execution / signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August] 5th TAC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
'~JJ IZ
Rick N. Reynolds, RLA, ASLA
If enclosures are not as'noled, kiiJdly noNfy uS at once,
M C I~~ ,f :;:
7400 tl::-.:lrll SI'i(.:d.:;lan~:i /;.v~nu;-:. 5',..iir..~ 150. lndionop(jlis, il'l ~;625D .. Phone 217.9J 3>0-9:~() . ~o;, 31 !.91:i.<i?28
C'_'I\.lri~b'" . 'CU~'c'I',::.~:: . 1'\e:,~I',,::w:'JI:; . C.'b::r':.~;!c:
e;Y~ht ,com
Evens. Mect'lwort. Hombleton & lillan. Inc.
I.:lJgineers. Surveycrs. Planners. Scientists
letter of rrrall11smn:Ha~
To: Matt Griffin
Buckingham
333 N. PClllisylvania St., 10th Floor
lndiallapolis, IN 46204
From:
Date:
Rich Kelly
Augn:;t 2, 2007
Job no.: 2007- 1168
Re: The Shoppes at Providence Phase
2
Weare sending you herewith via:
00 Courier
Du.s. Mail D FecI. Ex.
o UPS
The following items:
[XJcopies
o originals 0 [other]
Copies Date Number of Description
sheets
6 7-19-07 Development Plan for the Shoppesat Providence Ph<lse 2
1 Dr<linage Report
1 7-30.-07 Copy of all TAC trdllsllutlals
These are transmitted as checked b.elow:
D for approval
Dtoryour file
ooas requested DJor review & comment
D for execution I signatures
D[other]
Remarks:
If you have any questions about the enclosed, please contact our office.
Copies To: EMH&T File
Signed:
)G)~
Richard J. Kelly, PE
If enclosures are nol as noted, kindly norify us,al once
,\,1 C !-i~ /. :,; .'/ I
7.-:00 r'.Jc;f~h 5h':!(l".::lond ?,-venlJ~..;. Suitt:' 150. !noi....:hopOtIS. H'l i.6:250 . Ptldr~,: -:n?.913.i,s?~m . Fc:-: 317 ,913.i:}~r,N~
',>,~_,:,';1~l.);"" C;l"'.~:i:'j',:~r:" :..,f,;:~']"'''r..'-Ch= ' CI\:"Ili~cih:;:
f:mhr.CDln
EVans, Mechwari, Hambleton & Tilton, Inc.
Engineers, Surve'fors, Planners, Scienlists
letter o~ lrR"ansmDt~a~
To: Greg Hayes
Hamilton County Surveyor's Office
One Hamilton Sqllare: Suite 1.88
Hamilton County Jtldicial CeTlter
Nbblesville, Indiana 4.6060
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
D Hand Deliver !XI u.s. Mail D Fed. Ex. Dups
The following items:
[i] copies
D originals
D [other]
Copies Date Number of Description
sheets
1 7-19-07 5 DevelapmentPlan for The Shappes at. Providence Phase 2
CI.O, C2.0, C3.0, C3,.I, C4.0
1 Drainage Report
These are transmitted as checked below:
[i]forappfoval
Dforyoilr file
Das requested D for review & comment
D for execution I signatmcs
D [other]
Remarks:
We have req.uested that this projeCt be reviewed at the August 15111 T AC Meeting.
Copies To:
Matt Gri ffin, Buckingham
EMH&T File
Signed: ilL \WL
RickN. Reynolds, RLA, ASLA
If enclosures are 110t as no/ed, kindly /loUr; us at once.
M C M' .~. ,\; './ I
7400 j-.h:;rr!l Sli(J(jC::~(Jnd A '.'t"::;nlJ 8, Suite. 1 SO. lrioir:moj.)o!is'Jir,} 46250.. Phon:::> 317:913i/~~~O . rO.< ,-317 ,913,.(~~28
.C_'_'~..ln~l';.;J1, . C~~f,i:tr';0~~ . :~lri;Gi\",~y..li, . "'~.i~;r!::.di,~"
etnni.cc((',
Evans. Mechwarl, Hambleton.& Tilian. Inc.
Engineer~, Surveyors, Plonners, Scientisfs
letter of TiraU1lsmJUa~
To: Shirley Hunter
Duke Energy
16475 Soulhpark Drive
Westfield, IN46Q74
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sendihg you herewith via:
o Courier
[X] U.S. Mail 0 Fed. Ex.
Durs
The following items:
!Xl copies
D originals 0 [other)
Copies Date Number of Description
sheets
1 7-]9-07 ] Development Plan forThe Shoppes at Providence Phase 2
CI.O, C2.Q, C3.0
-
These are transmitted as checked below:
IX] for a,pproval
Dial' your fl'le
D as requested Dfat reView & comment
Dfor execution / signatures
o [other]
Remarks:
We have requested that th1"s project be reviewed ,at the August lSlh TAC Meeting.
Copies To: Malt Griffin, BllckTngham
EMH&T File
Signed:
(AJ ~
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted. kindly notiry us at once.
r,~j .:~ 10,1 !. ;.: ~; I
:' '::00 !~I;:;rt!l '5I'iCJd!~I(jr'IL'"i-f. VGilIJe; ,$t-:Jlre 150, IflCjlClc'1QP()lis. Ii'-! ,,16250 .. Pr\On2 31'7 .91:3.:f/};30 " fo:< 31? 9 I ~-j:l;'~9'28
f.~":i~:n:t.!.:,. C:tls:i~~r:.?!'. '~I~~::~",:;;;,'(.Ii:.. (,T'i...;!r"!:.,,
erllni-,corn
Evans, Mechwarl, Hambleton & Tilton, Inc.
'Engineers. Surveyors. PICrlners, Scjentists
letter of rrall1smnta~
To: Gregory IIko, PE
crossRoads Engiii..:;el's
3417 South Sherman Drive
Beech Grove, Indiana 4<:)107
From:
Rick N. Reynolds
Date.: July30, 2007
Job nq.: 2007-11.68
Re: The Sboppesat Providence
Phase.2
We are sending you herewith' via:
o Hand DeliverliJU.S. Mail 0 Fed, Ex. Dups
The following items:
[Xl copies
o origin,als
D [other]
Copies Date Nuniber of Description
sheets
1 7-19-07 5 Development Plan for The Shoppes at Providence Phase 2
C1.0, C2.0; C3.0. C3.}, c4.0
1 Drainage Report
These are transmitted as checked below:
[Xl for approval
DEor yom file
Das requested 0 for review & comment
o for execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the Au&,rust 15th T AC Meeting.
Copies To: Matt Griffin, Bucki/lgham
EMH&T File
Signed:
r.~ \) fl.
Ri'ck N. Reynolds, RLA, ASLA
If enclosures are. not as noted, kindlYila/ify uo' at once.
]40:> iJorrh Sf"l('Jd~~IOhd /\\{(;:'1~h::. SUite '150. lndi(inopnlis; !r J '4\~250 . Phone JJ 7,9'i3,:93G . Fa;, ~~17;913.6928
rA C ("'~ :.,~ "/ I
Cr:i:..mlT.:J! . C;;'.!':~~;:,..;n . :"l~Jkm,~t'd,: . ':'-h'~i!:;t:fl
emht,COrn
Evans. Mechwort, Hambleton & Tilloni Inc
Engineers. Surveyors. Planners. Scienliils
LeUer of TD"alll1lSmHUa~
To: Jason Kirkman
Brl'glithollse Networks
3030 Roosevelt Avenue
Indianapolis, IN 46218
From:
RickN. Reynolds
Date: July30,2007
Job no~: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[i] copies
00 U.S. Mail 0 Fed. Ex.
o UPS
The following items:
o originals D [other]
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan forThe Shoppes at Providence Phase 2
Cl,O, C2.0"C3.0
These are transmitted ascheck'ed below:
Wfar approval
o for your file
o as requested 0 for review & comment
D for execution I signatures
D[other]
Remarks:
We have. requested that this project be reviewed at the August 15th TAC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
e~ N \2--
Rick N. Reynolds, RLA, ASLA
If 8lic/osures are not as noted, kirldly notify liS at once,
!./i C {.:, "<.., \-: ",; I
7400 UC'.~rfh 5110delofl0 r\vr;~'nlJ;:::;~I_tiie ISO. Indionopo!is. l~J 46'250 . Rhone :JI7.9'I:L~~930 .' Fox'JI7,9 i.3.:/l28
~'>:!:m'bl"i . Cinr.ir~i~o:i . t!;'..:'!!~Vl.~~li~ . Ct-,,,,~:~'i~.;.
et'lih1,'COrn
Evans, Mechwdrt. Hambleton s.. Titton, Inc.
Engineers, S~ryeyors. Plannels. Scientists
Letter of Trall1lsmutta~
To: Dave Klingensniith
Carmel Street Departmen!
3400 W. 131 SI Street
WestJield, Indiana46074
From:
Rick IN- Reynolds
Date: July 30, 2007
Job no,; 2007-1168
Re: TheShoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
00 U.s. Mail 0 Fed. Ex.
o UPS
The following item.s:
[i] copies
o originals
D father]
Copies Date Number of Description
sheets
I 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
C1.0, C2.0, C3.0
These are transmitted as checked below;
IX] for approval
DforyoJ,lf file
Dasrequested D for review & comment
D for execution I signatures
o [other]
Remarks:
Wehave.requested that this project.bereviewed at the August 15th T AC Meeting.
Copies To:
Matt Griffin, Buckingham
EMH&T File
Signed:
(r~L
Rick N. Reynolds, RLA, ASLA
If enclosures are not as no/ed, kindly notify us at once.
.'~1 C M .'\: }; "/ I
740D Hc/rii, Sh(lqr.?;lCJnci ~,venu~;;. ~IJ~fe 150. fncli('JnOPOj:~.~ n-! 4b250 . Phonr~ ~fl7~91-:i6930 -Fcx 317_913.,~9/.g
C:.c..'''i'i:!:.'.J;. GI-1(.I~~i~,,~i'. l~ld:~jl\i:t.-~':~J~' :::h~'i;;-:;-I~*
erilhl.c;C:~"l'1
Evans. Mechwart. HOlllblelan & Tilton. Inc.
Engineers. SUlveyors, Planners, SCientists
leHer of Transmnttal
To: BtffiCe Knott
Office of Fire. Chief, Fire Station # 1
Two Civic Square
Carmel, Indiana 46032
From:
RickN. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providenc.e
Phase 2
We are sending'you herewith via:
[XJ Hand Deliver Dus. Mail 0 Fed. Ex. Ours
The following items:
00 copies
o ori:">1n111s
D [other]
Copies Date Number of Description
she~ts
1 7-1gl-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.D, C2.0, C3.0
TheSe are transmitted as checked below:
00 for approval
o for your file
D as requested D forreview & comment
DIar execution I signatures
D [other]
Remarks:
We have requested that this project be reviewed aLthe August 15111 TAC Meeting.
Copies To:
Matt Griffin, Buckingham
EMH&T File
Signed:
L}J V2-.
Rick N. Reynolds, RLA, ASLA
/fenclosures are not as noted, kindly notify us. al'once.
t,,~ C !~~ "~' ),: \' I
7 ;:{}O reJodh 5Ji(".:d/~lonl'i ,;\venue. SL~i;..~ 150. !r~diQ~Klpali::., 'if'c~ -.I.!~2S0 . PhQn,,;-."317,9'13.6930 . Fo.-< ~?il 7 _ 91,~~~-~,'?28
(.C;'j~'i1i~'),';~ ~ (:;T-;:;i',il;;~j('. bd~G"a('cl;::; . (:I~C'.:fif~i~I'
emhI3';:orn
Evons"Mechworl; Hambleton & Tilton, Inc
Engineers, Surveyors, Plonners, Scientisl,
letter of TlI"aU1lSmITtta~
To: Terry Krueskamp
City .of Cannel - Information Systems
Three Civc Square
Cannel, Indiana 46032
From:
RI",k N. Reynolds
Date; July 30,2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
IX] Hand Deliver 0 V;S. Mail 0 Fed. Ex, OOPS
The following items:
[X] copies
o originals
D [other]
Copies. Date Nun;tber of Description
sheets
1 7-19-07 .2 Development Plan for The Shoppes at Providence Phase 2
CloD, C2,g
These are transmitted as checked below:
!Xl tor approval
Orar your file
D as requested D for review & comment
D for execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15thT AC Meeting.
Copies To: Matt Griffin, Buckingham
EMI-I&T File
Signed:
(;p/v\.(.
Rick N.. Reynolds, RLA, ASLA
If enclosur&sare not asnoled, kindly notify us at once.
,\.i c: {.JL :0:: t: \,: I
7400 NOI!h -Sl~(:df:lonci AVf'~nu!~, $u;f~~ 150. Indionopr)Jis_ IN ,16250 . PhQr:e 31I913,i/130 . FOt ~.17.9'13.f.S28
(.'-'''.rl~'~''J~.' ';;il1<:"~,1.~~i. [:I{,-:k;",;.-~d~'. Ch~l:i~.J:~"
!::;nihl.com
Evans, Mechwarf, Hambleton & Tilton, Inc.
Engineers. Surveyors, Planners. .Scientists
letter of "ransm8ttal~
To: Jason Lemaster
Hamilton Courity Hea lih Department
One Hamilton COUlJty Square, Suite 30
NoblesvilIe; IN 46060
From;
Rick N. Reynolds
Date: July 30,.2007
Job no.: 2007-1l68
Re: The Shoppes at Providence
Phase 2
We are sending you herewith v.ia:
o Courier
IXJ U.S. Mail 0 Fed. Ex.
o UPS
The following items:
00 copies
D originals
D [other]
Copies Date N4.rnber of Description
sheets
1 7-1 9~07 3 Development Plan for The Shoppes at Providence Phase 2
C1.0, C2.0, C3.0
These are transmitted as checked below:
[X] for approval
D fOf your file
Oas requested Dforreview & conU11cnt
Dfor execution / signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th TAC Meeting.
Copies To: Matt Griffin, BUBkingham
EMH&T File
Signed:
L)\J IlL
Rick N. Reynolds, RLA, ASLA
If enclosures are /Jot as noted, kindly nolWus .at once.
71.00 r'jor1!l Slx:(jelollci .A.vB"'1~~e, 5'uire'1f.O,kajic:nopoliS, [~J ':.~i250. f!lOn~~H7.9l3~69:-!O. FO;()ll.913.t)rlL'B
r~~ eM,., K '\" j
(:~:-~,,~}~~.~'..:~ '.'Cil'".,,:i~';'..,ti. :~ld:.-';'1:"1p~;iJ~ . ;'~!~.~r!~11.~!
emhl.COf'n
Evons; Mechwarl. Hambletbn& Tilton, Ine.
Engineers. Surveyors. Plonners. Scientists
letter of 1ll"ansmUta~
To: David Littlejolm
TranspmtationSystems Coordinator
One Civic Square, 3 rd. FloQr
Canuel, Indiana 46032
From:
Rick N. Reynolds
Date; July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[Xl Hand Deliver Du.s. Mail D Fed. Ex. Dups
The following items:
00 copies
D originals
o [aLlIer]
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan forTheShoppes at Providence Phase 2
CloO, C2.0, Ll.O
These are transmitted as checked below:
ooforapproval
D for your fik~
D as requested D for review & comment
o for execution / signatures
o (other J
Remarks:
We have requested that this project be reviewed at the August 151h TAC Meeting.
Copies To: Matt Griffin, .Buckin-gham
EMH&T File
Signed:
'([-}J 'YL
Rick N. Reynolds, RLA, ASLA
If enclosures are no! as noted, kindly no/ify us at once.
7A(X)'r"Jol"th Sh.jd~'lCJnc~ '....v-erll~e;.Su~te 1'.50. i~ciiQnap:Olis,.!r.j .j~~25D . Phc')r1~~ 31 ?913;_o?~;O . Fr.JA, 317 .91 :~.692n
!..<, C M ,~ :..: v !
C".\i-."111't.l',,l; . ~-.'jnci~17'.]ii,. j,oi~~1~J""[r~~~F~ . Ci~.'lr":i:-:.i
~~:nihi;C~"1rn
Evans, Mechwail, Hambleton &. Tilfon, Inc.
Engii1eers. Sutveyors. Planners. Scientists
letter of Transn1l Dtta.~
To: David Lucas
Hamilton County Highway Department
1700 South .1 0111 Street
Noblesville, IN 46060
From:
Ride N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: T1W Shoppes at Providence
Phase 2
We are sending you herewith via:
D Courier
00 U.S, Mail 0 Fed. Ex.
o UPS
The following items:
[X] copies
DoriginnJs 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
etO, C2.0
These are transmitted as checked below:
[Xl lor approval
Dfar your file
Das requested o tor review & comment
Dfar execution I signatures
D [ other]
Remarks:,
We have requested that this project be reviewed at the August 1Stll TAC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
eJv ~~
Rick N. Reynolds, RLA, ASLA
Irenc/osUres are. not aSlwled. kindly nolifyus at once,
7400~-IOdh Shr-.,l(Jelond ;':",Vr~nue, SlJHe 150, In(fionOPOlis. iI-,J il6'~50 . P~lOnt~ ,}17_913.69J't} . Fo,o( 317.9 I 3. 692f!
~.~ Q M :~ 'r: ",.' I
C-~~lrT;t-d~_' ....,:i.,..-,lr\"1~.:nj . I."C]~;'~,;'P~ll~ . Ct1".Tf.;;i~'-J
emelt.cern
Evans. Mechwart, Hambleton & Tilton, Inc.
Engineers. Surveyors. 'Planners, ,\c1f'!nHsfs
letter ofTlransmnU'aJ
To: David Malone
Panhandle 'Eastern Pipeline Co.
P.O. Box 30
Zionsville, IN 46077
From:
Rick N. Reynolds
Date: July30,2007
Job no.: 20Q7-1168
Re: The- Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[X] u.s, Mail o Fed. Ex.
OOPS
The following items:
IX] copies
o originals D [other]
Copies Date Number-of Description
'sheets
1 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.G, C2.0, C3.0
These are transmitted as checked below:
00 for approval
Oror your file
Das requested D for review & comment
D for eX,ec.ution I sigpatures
o [other]
Remarks:
We have requested that this project'be reviewed at the August lSlh TAC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
tNL"
Rick N. Reynolds, RLA, ASLA
If enclosures are 1101 i;lS noted, kindly /latify us ilt once,
r~l C l-A ;', _,; .; j
7400 r'-JOr1h S!ieJcJelund A\'~,"bnue:SiJiti::~ 150, ;ndionopa"St' 11\J '~6250 .. r~rl{)n~: j 17.913.~f93G ;: Fa;< 317,913.6928-
('.'];;:1[,:b,J~ . '::'~i;'i~;b;;~,:~::. b,"ii~..~l"'a.'o:..;i;~ . -C:il.-~r:r;I.',.,
~,T,hl.C\.')(l1
Evans; Mechwart. Hdmbleton & Tilton. Inc
Engineers, Surveyors, Planners.Scieniists
letter of Tn-alli1sm~tta~
To: ROi1 Morris
Indianapolis Power and Light, Co.
360b North Arlington Avehtle
Indianapolis, IN 46218
From:
Rick N.Reynolcls
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
D Courier
IX] U.S, Mail 0 Fed. Ex.
o UPS
The following items:
IX] copies
D originals
o [other]
Copies Date NUlT!qer of DE:lsc~jption
sheets
I 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
C1.0, C2,0, C3.0
These are transmitted as ch~cked below:
[iJ for approval
o for your file
D as requested 0 for review & comment
Dfor execution I signatures
o [otber]
Remarks:
We, have requested that this proj'ect-be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed;
,[jrJ \t.
Rick N.Reynolds, RLA, ASLA
/f'enclosures are nor as nored, kindly nolifyus at once.
7t..OO "j,;)dh Sb(JcJ!;jan~:i Av~nu~3~ SLi;t~, 150, ;r:(jk:nupo~i's, if'-' 4,~25D .. PtH'm(-"! 'JI r..::; i.3.-dJ30 . r-CL< 317.91 :1./.92.8
~"\ L ;"~ ,~, >: \/ l
(;".:\li,:b(J~,. ~"I~,dr"\i"\,~!.;' In,,~!-;;i~,-;:i.:'.~i'; . (Jl~lir"I';;.
ern~lj .CGln
Ev~ns, MechwarL Hombletoll.& Tilton, Inc.
Engineers, 5ulveyors. Plenners. Scienfi,15
letter of Transm Hftta~
To: Chuck Shupperd
Vectren Ener.6'Y
P,O. Box 1700
Noblesville, Indiana 4606'1
From:
Rick N. Reynolds
Date: July30,2007
Job no.: 2007-1168
Re: The Shoppes at Pnwidence
Phase 2
We are sending you hereWith via:
o Courier
IX! U.S. Mail 0 Fed. Ex.
o UPS
The following items:
[Xl copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
CI :0, Cl.O, C3.0
These are transmitted as checked below:
[X]for approval
Dfor y04f fik
Das requested D foneview & tamment
Dror execution I signatures
o [other]
Remarks:
We have l-equested that this pfQject be, reviewed at the August 15[h T AC Meeting.
Copies To: Man Griffin, Buckingham
EMH&T File
Signed:
ej\J'L
Rick N. Reynolds, RLA, ASLA
If enclosures are not..as noted.. kindly notify us -at once.
74()() ilo,ihSl1oc!elmid "'.Vi'.<~(Je. Sui!e ISQ, in(~ionOPOlis, n.J "::25D . Phohe.J 17:9136930' FOid17.9136925
t~, C "'~ :~, :< V I
~;_":-:'..r~,l:JlJ:; . C~n(.ii?\~r; . jr'\d::'l11-,~t.~C.~: ; ":I~:;;!r;!!",
en'ih-I.c()!'n
Evans, Mechwart Hamble"on. & Tillon. Inc.
Engineers, Surveyors; Planners, Scientists
letter ofTIl"a.nsmDUa~
To: Postmaster
c/o Dale Sparks
Cannel Post Office
United States Postal Ser:vice
275 Medical Drive
Cannel. Indiana 460J2
From: RickN. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[Xl O..S. Mail D Fed. Ex.
o UPS
The following items:
[Xl copies'
o originals 0 [olher}
Copies Date Number of Description
sheets
! 7-19-07 1 Development Plan for The Shoppes at Providence Phase 2
02.0
These are transmitted as checked below:
[Xl for approval
o for your file
D as. requested D for.review & comment
D for execution! signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th TAC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
[/N L
Rick N. Reynolds, RLA, ASLA
I{enclosures are not as noled. kindly notify us at once.
7~OO i'lcrth SI'1adelcr,d ,b.v~nlje. $lJJh;;:< 150;!ndieiJioPOlis', !r~ 46250 .. Phone 317.9:1J.6l;jO . Fcu:<n 7.91 J.6928
r\rt C M ;~. ,:' \I I
C':,'.T,',c:;, . C~l(;ip"n~;. i:'ld!!:'h:'J[.'_'~I:~ . ()h".:-6,:;i!\~
(o;n1hl,cvrn
Evor\S, Mechwort, Harribtefon,& Tilton, IrlC.
Eng'ineers, Surveycjrs. Planners. Scienfisls
Leite!)" of TrraD1smntta~
To: Mark Weslermeier
Cannel/Clay Parks,Department
760 Thirst AvenueSW, Suite 100
Cam1el, IN 46032
From;
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-116.8
Re: The Shoppes ut Providence
Phase 2
We are sending you herewith via:
o Courier
00 u~s. Mail 0 Fed. Ex.
OOPS
The following items:
[X] copies
D originals
o [other]
Copies Date Num,ber of Description
sheets
1 7-19-0.7 2 Development Plan tor The Shoppes at PI'ovidence Phase 2
Cl.O, C2.0
These are transmitted as checked below:
00 for approval
o foryour file
o as requested 0 forreview & conWellt
o for execution / signatures
D [other]
Remarks:
We have n;guested that this project be reviewed at the August 15th T AC Meeting.
Copies To:
Matt Griffin, Buckingham
EMH&T File
Signed:
VL~)t _
Rick N. Reynolds, RLA, ASLA
If enclosures are not as no/ed, kindly noflfy us at once.
J'~) C '0,'; ,",,: X V I
It:OO I,Jorrh Sh[JcJeICJj.ld,p,v.0r.u~,_ Su;~e I SO, :n;.:fionnpGlis, ir,j ~lb'~5D I PhonE! .317 9:t 3li9.3Q . F:l,o( ~,I 7.913,6928
~>r";,"""~t'..:,: . (-~i'::lrlhGl!i'. tr1iiirJ"'~~~~.J!:~ . ~:.I~"':;::'.;:t~.;,
em~lI.(;(:HYl
Evans, Mechwart, Homblelon& Tilton, Inc.
engineers, Surveyors, Plan ""rs. Scienlisls
letter of rrall1smn.tta~
To: Bill Akers
Cannel Clay Communications
31 First Avenue NW
Carmel, IN 46032
From:
RickN. Reynolds
Date; July 30, 2007
Job no.: 2007-1168
He: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[XJ'U.s. Mail 0 Fed. Ex.
o UPS
The following items:
lXJ copies
o originals
o [other]
Copies Date Number of Description
sheets
I 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.0
These are transmitted as checked below:
00 for approval
o for your file
o as requested 0 forreyiew & comment
o far execution! signatures
Drothcr]
Remarks:
We have requested that this project he. reviewed at the August 15th TAC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
lL^r~
Rick N. Reynolds, RLA, ASLA
If enclosures Bre not as no/ed, kindlynolify lIsalonce.
M C -h' l'i. ;.: V
i~OO r<J(xih ShQ~Jf.;lanl-.: Av~~ntj~? $i;.lir€.:lsQ. !ndi~-:nCJPoJ;s, fr146250. Phone .3l?_9jJ.69,:~O. Fet :11f_91J.o9:::8
C~~-jU!'1i"lJ~ . (:-,:\<;:';'r",,;';:[' l~lU>~"~C":.!;~ .. '::,.Ilur!'~ti~:r
emhi..(;Orn
Evans; Mech\vart, Hamble!on & Tillan, Inc
Engineers. Surveyors. Planrlers, Scientists
letter of lransmntta~
To: Scott Brewer, City Forester
Urban Forestry ,
One Civic Square, 3rdF'loor
Cannel, Indiana 46032
From:
RickN. Reynolds
Date; July.3'O, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[iJ Hand Deliver Du.s. Mail 0 Fed. Ex. Dups
The folJowingitems:
00 copies
D originals 0 [other]
Copies Date N urylber of Description
sheets
1 7-19-07 4 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2,O, C3.0, Ll.O
These are transmitted as checked below:
00 for approval
Dfor your file
o as requested 0 for review & comment
o for execution I signatures
D [other]
Remarks:
We have requested that this project be reviewed at the August 15~h T AC Meeting.
Copies To: Matt Griffin, Buckihgham
EMH&T File
Signed:
(t-fJ ~..
j
Rick N. Reynolds, RLA, ASLA
Ifenclosures are nol as nored, kindly notify liS 81 once,
74CKJ Nodh Sh(J('k:Jqn.;j A-V(jnUt"J',5uiie ISO.lncilooapolis,lrJ '.i!{l250. Pflon~ 3J7.9'f'3.~/)jO. FaK 3't7.9'i.:~.6923
ill ,~ 1\. :oi.. )~. "/ I
~-.:_~1.'f':'l.-.:'.)1''; i..;'[~\:;I:\:':;~~j. hd,:t~,\.-;~...:;,,~. Chm;n!~,~'
wn..,LCOrY1
Evans, MeclwJor(Honible1oJi &. Tillon, Inc.
Engine""s. Sur"eyors. Plonners:.Scienlist$
letter of TlJ"aJnsmj'ttal~
To: AJ1gie Conn or Christine Barton-Holmes
Dept. of Co mill unity Services
One Civic Square,3rQ H(Jor
Cannel, Indiana 46032
From:
RickN. Reynolds
Date: July 30, 2007
Job no.: 2Q07-U68
Re: TheShqppes at Providenc.e
Phase 2
We are sending you herewith via:
[Xl Hand Deliver Du.s. Mail D Fed. Ex. Dups
The following items:
00 copies
o originals
o [other]
Copies Date Numl;lE~r of Description
sheets
2 7-]9-07 Development Plan for The Shoppes atJ'rovidence Phase 2
1 Drainage Report
1 7-30-07 Copy of all T AC Transmittals
These are transmitted as checked below:
00 for approval
o for your file
Das requested Dfoneview & comment
D fqrexecution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
k-JJ ~-
EMH&T File
RickN. Reynolds, RLA, ASLA
Ifenc/osures are not as noted, kindly notify us al once.
7~(JO t'Jodil Shn~Jeianl"'! J-..\.'~rllJ.t~. SL~i~~~ 1.50, ir~cian(JPO(~, IN 46250 . Phone J 1 i,?'13,ff~i3{) . Fo;-.: 317',913_6928
rv\ C. M X :r; "l j
::>:.Il"n~l-..".i; . C'n\;irWI'~:~. hd!~':(~~"";:;,'qfl;' ~-,'h,..;i,';lt<':
f;mt\1.CQfll
Evans, Mecl1warL Hambleton & Tillon, Inc.
Engineers. SUfYeyols, Planners. Scienlists
letter of Transm~tta~
To: John Duffy
Carmel. City Utilities
760 Third Avenue SW
Cannel, IN 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no',: 2007-1168
Re; The Shop pes at Providence
Phase 2
We are sending you hereWith via;
o Courier
[i] U.S. Mail 0 Fed. Ex.
OOPS
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan for The Shop pes at Providence Phase 2
CI.O, Cl.O. C3.0
These are transmitted as checked below:
!Xl for approval
o for your file
o as requested Drat review & comment
Dfor execution I signatures
o [other]
Remarks:
We have'requested thatthisptojectbe reviewed at the August lYh TAC Meeting.
Copies To: Matt On ftin, Buckingham
EMH&T File
Signed:
/R~.~\ I(~
Rick N. Reynolds, RLA, ASLA
/fene/osures are 110t asnoled, kindly notify us at once.
'~':I (I'r~ /" ;\. \' I
/40CJ I'lorii", ShO(J810t1d A,vcnu~, Suile 150. lr1(:fit.:tno~)oi:s, WJ .t(;-:!5D . F"hDnt~ .J17,913.69~W ._ fox 317.913.6928
r:;c:'~',:'l,~,:J; . (:ir~6')r',.:J1i'.. [.':d~T~\:PC:(: . ~':j'l;';r,..,i~"1
t~h1h1.C:~)rn
Evans, Mechwori, Hombleton.& Tilton, Inc.
. Engineer" Surveyors. Plonners, Scientist,
letter of TD"aU1lsmUta~
To: Gary Duncan or Nick.Redden
Carmel Engineering Department
One Civic Square, lSf Flci'or
Cannel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending ybu hereWith via:
[iJ Hand Deliver 0 U. S. Mail 0 Fed, Ex, OUPS
The following items:
[i] copies
D originals
D [other]
Copies Date Numb.eraf Descriptipn
sheets
I 7 -19-07 5 Development Plan for The Shoppes at Providence Phase 2
C1.0, C2.,0, C3.0, C3.1,C4.0
1 Drainage Report
These are transmitted as Checked below:
00 far approval
Drar your file
o as requested 0 for review & comment
Dfor execution / signatures
D [other]
Remarks:
vVe havcrcquested that this project be reviewed at the August 15th T AC Meeting.
CopiesTo: Matt Griffin, Buckingham
EMH&T File
Signed:
JeAJ\j{___
Rick N.Reynolds, RLA, ASLA
If enclDSUres,are not as /lo/ed, kindly notify us at Oilce,
f','i ;7 r,,' ~i. Y './ I
7400't.J()d'~'0hodeton~i f.'\"f;':n:Jt-~._Sljite 1:5.0, lnc:ior.opc.liS,!H ~6250" rhont;' ~~I?.?.i'~c69~O. FQ~( 317.9'~Lc928
;::~--'5;II';b'.:.'~ ' ~:JI,,-'r;i,.,,:(. Ir1(~:~,~cP';;":'~ . '~Jl..-;-.-,,,I~.-,.
(,~rnht .c:orn
Evans, Mechworf. Hambleton & Tilton, Ine,
Engineer~. Surveyors. Planners, Scientists
letter of TransmDUa~
To: Chris Ellison
Office of Fire Chief, Fire Station #1
Two Civic Square
Canm:l, Indiana 4603'2
From:
Rick N. Reynolds
Date: July 30,2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phnse 2
We are sending you herewith via:
00 Hand Deliver 0 U:S. Mail 0 Fed. Ex. Dups
The following items:
[XJ copies
o originals
D [other]
Copies Date NUri1Qer of Description
sheets
I 7-19-07 J Development Phui for The Shoppes'at Providence Phase 2
C 1.0, C2.0, C3.0
These 'are transmitted as checked below:
OOfor approval
o for yollr file
o as requested 0 for review &. comment
Dfar execution! signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15\h TAC Meeting.
Copies To: MMtGriffin, .Bllckingl~am
EMH&T File
n
Signed: [JJ~
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once.
f\.~ C 1~1 /. ,; \/ I
7400I';lort[J.:ihadC":-luncl ~,Yen'-..It~, -SlJi:e 150; Inc~ir.rl(k)ol;S, iU 46250 .. Pt:lQn~ 3'[ ?;913~693(} . FO.I( :: 17 .91-3.6!28
C":-',I'.1.'''11t'/_J:; .. ':.:;'~K.'i!"',I~;' Ifli'jir.;~',1~di::. ('i....'/:~~rii
emhl.c:crn
EvClIlS, MeChwart, Hambleton & Tilton, Inc,
Engineers, SUNeYOrs. Planners. Scientists
letter of rrallrlJSmUUa~
To: Ron Farrand
Carmel Clay Schools
520] East 131.1 Street
Cannel, IN 46033
From:
Rick N, Reynolds
Date: July 30,2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sendin~ you herewith via:
o Courier
[X] u.s. Mall D Fed. Ex,
o UPS
The following items:
[X] copies
o originals
D (other]
Copies' Date r.Jymbel" of Description
sheets
I 7-19-07 2 Development Plan tor The Shoppes at Providence Phase 2
CI.a, C2.0
These are transmitted as checked below:
00 for approval
Dfor your file
Das requested Dforreview & comment
D for execution / signatures
o (olher]
Remarks:
We have requested that this project be reviewed at the Au,gust 15tH TAC Meeting.
CopiesTo: Matt Griffin, Buckingham
EMH&T File
Signed:
0\j~k-.
Rick N. Reynolds, RLA, ASLA
If enclosuresarenol as no/ed, kindly noli(y us at ance.
.i-...\ C (<,-1 :.-: i: v I
7 400.t'c;rth SI'i(Jd~jnn~"1 A'r'enu~~ ..Suite 150: !h(jj(]()ODO!.is. !i'~ .J\"J2f~O ' Prlon.B .317:9 13.6~~:m.- FCJ< 31?9 ~ :rc'l?28
~'>:i:'Hr';r;.',I: . Cilldr"C'l,:j!;" hd:~J"q."'lll"'_I:: ~ ;;;"h;:rk;lt()
emnt ,c()rYl-
Evans, Mechwart, Hambleton.& Tilton. Inc.
Engineer~, Surve,'ors. Plannef5. Scientists
letter of ID"anSmDUa~
To: Michael Fogarty
Office of Police Chief
Thre.e Ci vic Square
Carmel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30; 2007
Job no.: 2001-n68
Re: The Shoppes at Providence
PhaSe; 2
We are sending you herewith via:
00 Hand Deliver OU.S. Mail D Fed. Ex. OuPS
The following items:
!Xl copies
o originalS 0 [other]
Copies Date NI:llJ1Qer Of Description
sheets
1 7-19-07 I Development Plan for The Shoppes at Providence Phase 2
C2.0
These are tr~nsmitted CIS checked below:
OOfor approval
o foryourfiJe
o as requested Dfor review & comment
D for execution I signatures
D [other]
Remarks:
We have requested that this project be reviewed at the August 15th TAC Meeting.
Copies To: Matt Griftln, Buckingham
EMH&T File
Signed:
.k-;\t'\f
Rick N. Reynolds, RLA, ASLA
If enclosures'Jlf€ notas nored, kindly nO/li'y I./S at once:
..~,y G l~1 :< >: '../ !
7400 -r-forf;i S!1(J(.'~;~OIl,;j A\N3-nui!: SU:l9 ;1 :sq, ;ni)i~JnOpoiis, IN ;.{\")'2.5D I P[)on(~ j 17.9f3;69~10 . FG~ :j '"7,91 :~,c:c/2B
C<)k'n:tJ'~" . ~',"h(:'i::r~':=li I 1~ld;~.ii""Gr.;.-ii; . ~-'h":ri-:";I:,:
em:nt1.con'l
Evans, Mechwart.Hambleton& Tilton, Inc.
Engineers, Surveyors', Plorlllers, S:::ienlists
letter of TlI"all1Jsmutta~
To: Alllanda Foley
Cannel EngineeringDepartment
One Civic Sq:uare, 1st Floor
Cannel, IndiAna 46032
From;
Rick N. Reynolds
Date: July 30,2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith -via:
00 Hand Deliver Du.s. Mail 0 Fed. Ex. Durs
The following items:
00 copies
D originals
D [other]
Copies Date Number of Dese<ription
sheets
1 7-19-07 5 Development Plan for The Shoppes al Providence Phase 2
CI.O, C2.0, C3.0, C3.1, C4.0
1 Drainage Report
These are transmitted as checked below:
00 for approval
o for your file
Das requested 0 forrcview & comment
o for execution! signatures
o [other]
Remarks:
We have requested that this project be reviewed atthe August 15th TAC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T Fife
Signed:
P)\JL
Rick N. Reynolds, RLA, ASLA
/fenclosures are nol as nOled, kindly notify us al once,
7400 lilcrfh 5h(xJeiuniJ A"':BnUe_ Su;~~:, 150.1i-'l(ji9nopoiis. i~! ,,1:]2.11,1 I Phone:1 1'73'13;6930 . Fu:a: 317_91'~.L6928
,~,~ ,~ M ~..; :( './ i
~:~dl.'mf-.IJ} . ~:"b:-;h;~('Ji; . b,j;"J;~~r.cGI~~ . ,\:h,:.,ir;tl,-..
~:;rr;l~11.cc!---:'l
Evans, Mecl.warl. Hdmblelon & Tilton, Inc.
Erigineers,Surveyors, PlcnrJers, Scienfisls
letter of TralnsmoUa~
To: Brooke Gajownik
Hamilton County Sheriffs Office
18100 Cumberland Roaq
NoblesvilIe, IN 46060
From:
RitkN. Reynolds
Date: July 30, 2007
Job no.: 2007-U68
Re: TheShoppes at Providence
Phase 2
We are sending you herewith via:
D Courier
[Xl U.S. Mqil 0 Fed. Ex.
Ours
The following items:
[Xl copies
D originals 0 [other]
Copies Date Number of Description
5 heet~
1 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
Cl.D. C2.D
These are transmitted as checked below:
00 for approval
o far your file
Oas requested Dfor review & comment
o fOr execution I si!P'iatures
D (other]
Remarks:
We have requested that this project be reviewed ai the August 15th TAC Meeti.ng.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
elJ~
Rick N. Reynolds, RLA, ASLA
If enclosures, are not as noted, kindly notify (is at once.
J\.' C f.:. ,,\ ,: \r I
7400 "Jorth Sllccjefdr"lo AV€m.h~, Sljlre150. ipc~io,'1ar)olis, IN ~z6250 . Pr10fH;" ~~:r l.9'13.6?:3"() .~ FD:-:,,~, 1 7.913.6928
f..:>;:-~-.'I.,:b'J, . ~'-'r1cil'~!J:: ., 1~ld:~'::f1"j~~{)il~ . ('j""~;:J~!c-
emhl.ccm
.A1igu~t 9, Z007
~
RECEIVED
Aue j 0 2007
DOCS
B U 0 K.I N GHA.M
COM PAN JE S
Ailgelina Conn
Catmel,Depatthleritcff Cdhimunlty Services
1 CIvic Square
Oanl1~],rN 46032
Jill: Old Meridian> Shoppes' at ProviClence,Phase 2 (070700.60 DP/ADLS)
A9gie,
.
Thanks:foryour prornpteol11l11ent letfer; We are committed to resolving an outstanc<fing
cjiie'stiOllS and concern's prior 10 tl1eS~pterribei' i 8th Plan COihfui'ssioh Hearing. Please see
Ollr resp(ihse's to each ofyo.l)rCQi11ment:SNdow:
Cli0 Remen1ber t(J inclu4e the DPapplicationEindfngs ofFactsh(i?t in your injb packets.
These 'Nill be h~cluded' with the packets submitted on September?, 2007.
QJPtoy/de.theJilled 01:1./ t{nih1()farize.rl affidavit of notice ojp1Xblir; hedririg pafjeof the
appl1.c.qtion
QJ Provide the filled olltNotice' of Public Hearing page of the ppp/(cq(;On
Ci[J Providethefilted'out and notcirized Public Notice Sigl1 Placementajfidavitpageoj
ihe'applh;atidrt
QJ Prov,fdf; a"cppY~O.t~ll? OjJJaitd LIs'! o.fAdjacen( Propei.ty Owiiers fiooin t~2e HamiltOn.
C:ountyAyditQ}:'sqfjice;:
These will be',submitted afterpublic notict:; is made (pdqr to August 24Ih),
G;]PLeaserprovide C(;lpieS' rtfyou;, correspondence wi/hTAC 11181nbeFs,
Proof.ofdistributiol1 is attfLs:ned to this mailing. AdditionajIy, I will fdrWa.td you:aIl
letters,corrC?pol1deITce; 9-ncl approvals' qS r i'eceive-the:111.
jZ. Bring mat~rlal/color samples to the Plan Commission meei'ing:
We will do 'this.
(3. $ho}jlth.enu;G.n'a1;Ji'cq{ e.qidpnlem locatf(JI1 qndhmv it is scrr:enei:lJiyJlJJ view.
AlIequipment will be screened f"j'om view. All HVACis centrally located and.:w:ilL b~
;fully screened by the building's pai"apet wall We will.subrnft at0,ortQ.p_exhibit that
identItles, theJ'otatibh of.this equijJment after the August 15th Tic-meedTI=g~ ~
,333 I'!,P"n'1.~yl""ni"'$I,,..t
~oihflo.ot
Iildial1,apol.is> J.N {620,j.
P 3ij'9H';IQ34-
I3L7:974-.!.238
wWWc bucking~am ~ Cl) ,com
'"
02> Please provide youi'lM cove!' pei'centage" which includes bui1ding Jootpriht ani!
pqveiminL
The' Qld Meridim1 VilIagi;: 'Zune (OM-V) dO,es. not have ,a maximqp1 or mil1imuffi
coverage n~quireme;n\,.W;e wi11providethis number as a point of reference with a revised
set after the August 151h TAC meeting.
[jJ}JShbwtlabel ed$eJjle}1t$.Qn the siteilcm.
E,MHPiTwUI provide a current site plan with 'an existingeasel11ents fOllowing the August
15 TAt meeting.
J1. ljriot alFeady,daile, /,()ddriif.,ht o.(lllaynluji/ be dedicate4, per ~h~, 20- Yr ThiJrc.nigl:ifare
Plan. (;qntac.l theD:II]! Engll1~ertng Dept at .5) 1-244Ifi}j'more mfa.
We haye designec1th~':$it~:uJ'accQmmodate the 20 YearT11.oroughfare Plan Proposed
Right orWay,and will commit to its dedication with project approval.
j 12. A traffic. study may bere"qttbied. Orgifirnl this with the Citp Ehgii1?GrblgDept at 571-
244}.
The Qlc:l Meridian District'was master planned (with traffic sttldi€s)d:uring-the creation
and adoption. of the 2000 old Meridiilli TaskFo;'ce Report, As such, additional traffic
sfudfes.:liave notbeel1 teqttited.pfdevel'opmen:t that I11eets the Task FpfceReport and OM
Zqnil1g. Wecpriu'nittQ Qulldiil compliance Viit11 thevisiOll, chag9tet, architequre, and
pen11itte:<luses. outlined in that report (andthe subseqt!ent OM Zpni.ng): We will confil'm
with Carmel Engineering that thi's is still the policy.
(jjJ PleClse prollide coib.rblil/ding,e!evations and/or color renderings. ,
Thes~ will be S:UbJi1itted aftertl)e TAC meeting on Augtlst IStJ1. We want ,to incorporate
any ~hanges thatrt~sqltfrom th!'itnleeting'piior to the creationofihese exhibit's.
rT4) Pleds'e label the' builCling m~ltel!ials on'the building dewaions.
WeconiIl1it t8Jlle"eting the thate;riqls, I:~qujteme~lts of the aMV lon'e. This Quildiilg will
b~ptinlflrily mEtsonryandbev~I;'X sinlilal' to the Phase 1 Shoppes adj~.cent tothe,notth of
this site. We will provide elevations with material call outs after the August lSlh T AC
Meeting.
J 5. Ph{dse change the nf({aSutemr:nfsc.ale 011 the elevCitiomrtolJ1tlIX:h the bUildi11g scale,
This has been Doted, <.\Od will"be revised in the next set of drawings.
J 16. Verif;Y that the l(ght,:{ixiures haWJjldt lenses and90-degree cutoff,:,
All light:fixtures. OlJ,sllewill have flat lenses (or lheitequivalerit} and also be 90 degFee
cutoffs (as indicated in th~ li,ghting plan sheet within.theTAG review 'set .of drawings).
..
,
'~7. Please co.n$iiJej~ H~ingpe.rvi01is. pavel's iii the piii'king tot
, We911rrently a,re proposing perviousconcrete.inthe rear,of ourpatking field to
accommodate;strom\Naterr~noffand quality requirements; See the sile plan from the
submittedTAC set fot IOc,ati6il Cifthis,paving.
jiB Pte.a(iec(j}:~'idel' uSilJ$. L~$D or~'green" buil~i11gp'raJ:t~~e~~,. " .
We are conuHltted to achievmg LEED cerhf'icatlOnwlththls bulldmg/Slte., Our
application proceSs for cetti'fii;ationhas started, and will be teviewecl by the US' Green
Builcfi'ng comic'll afterconstructionisconiplete.
t7W Plecrse sh()wlj)/'Ql~id.e buildiJ1gaddress numbers thatcomply wl'Ih Sign ChqrtC in
Chapter 25.0'~. A~ '. .
'We are currently finalizing 'addtessriUI11 bets for this buildiiilg (along with the, 2existil1g,
buIldings), These signs wjrllli~eJ the requitelllents ofthe Chy in terms of design and
:emetgejlcy r~~pon$e specificatiQIlS;
GJl1 Please provide thedLi;J1p'Stei' enclo.\'ure detaildelevalicms,
These Will be'SlibItiht~d q.ftenhe TACmeeting on August 15.th, We Wantto, iM'corporate
any changes. that result :(romJhat meeting prior to the; creatiOll of th'i;:se c)j.hibits.
UJJ Pleaseproyide the bike parking derails;
We. commit to pt'0vi'ding, all required bike parking racks. The locations ofthese racks
wilrbefinaliz~d at or prIor to the TAd iiieeting 011 August 15th" \Ve\v:ilI makeaJlote to
add the deta.ils (fi'Ql1Ythez,onfng Or.dirtanc~) to our details ,and,speGrhcatiol1s.,~heets. Can
those iJ)tag~s he provid~d ~o us lor Qirect use? (the W ordfile f9r Chapter 27 wl)uld be
suffiCient).
J 22. EZA: avaNance,may be. ne.e.dedfromZO Chap[er20G.05.03.B.4.cfor building widlh
Please verify. .
We have'ob~ained this variance (07060023 V)" as well as a variance for an additional
street cutonOld,Meridian (070600'l1 V). These variances were granted at the: July 23,
2007, BZAHearing OtJicer Meetlilg,
C 2ij BZA: Cl var.l.ance,; mttY bfineed.ed.fi~oll1 zO Chapter 20G, 05, OJ, C. 3 .f6r' therew,.
entl;aFJcesfol' retail. ,Please'ver~fjJ,
We will not need .a variance f6t;Fear enhances. The'se enlrancesare for deliveries and
e'hlployees only. We wiIlnot p,~Fr'l1it signa.ge ilbQve the d()ors Cas shoWri in the
eleyations). Thes.e l'e;;u:etlttaiJ,ceswill Qe used in accordmrceWlth QMY zoning. We will
sub.miLreYisedelevati()n~ :tl1at or.niHhe"signage" ar~0S 011 th~Te<lr !elevation. \
..
7
Do not heslt.<3.te tOPQntflQtme.'With any quesJions, cOll1m~nts,or Sllggestions, We value
your:input into our project, a,ndthan.k you foryonr thorough:xeview,
S"incerel y,
1f/ ,i;J~- " II .~
/'l! llJtt(zGssP. \5~
Matthew L GI"iffiil;, AICP
DeVe!opnient Manager
p~ 317.974.1234 x 216
e.matt0:lbuckingham .COUl
ce (via ernail):
JiniShij-i.a:vcr"Nelso~ and Frankcliberger
Rick r~f;ynolc!s, EMH&T
Mark Bemel;]Y, Derner!)! Architects
FiJe:.'07070060 of> ADLS T ACReview Lettei' Rcspol1s"e
City of Carmel
August 6, 2007
Mr. Matt Griffm
Buckingham Companies
333 N Pennsylvania St, 1 ot~ Floor
Indianapolis, IN 46204
RE: Old Meridian Shoppes at Providence, Phase 2
Dear Mr. Griffin:
The following letter represents comments for this project specifically addressing t11e area of alternative
transportation. I have reviewed the drawings submitted tor the August 15, 2007 Technical Advisory
Committee meeting and offer the following comments:
ALTERNATIVE TRANSPORTATION REVIEW COMMENTS
1) Please see the City of Carmel's Parking Ordinance in order to determine appropriate locations and
specifications for bicycle parking and revise the plans to show all bicycle parking at least 2' away
from all obstructions and note that the parking complies with Cannel's ordinance.
2) Please indicate ADA compliance with all curb ramps at each crosswalk.
We request that all responses to our comments be provided in writing. Failure to provide written responses
may result in delay of the review process.
It is critical that this office be made aware of all modification made 011 the plans being re-submitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
provide revised plans indicating all revisions. Please notifY us of any changes and specifically state any
changes, including changes resulting from Plan Commission, Special Studies or other committee meetings.
The Deparlment of Community Services reserves the right to provide additional comments based on
subsequent reviews.
If you have questions, please contact me at 571-2417
S9->~~_
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Angie COlli, Department of Community Services
Engineering Department Review
Project File
Page I
ONE CIVIC SQUARE
CARtvfEL, INDII\NA 46032
317 /571-2417
(C&rme~
JJliLJI"6nent
August 3, 2007
43 ~
1b'C ~.o~
6';:;,
0(2 ~G70?
~l
Rick N. Reynolds, RLA, ASLA
EM H& T
7400 N. Shadeland Ave., Suo 150
Indianapolis, IN 46250
RE: The Shoppes at Providence Phase 2
Job no.: 2007-1168
Dear Mr. Reynolds:
The information for the above-referenced project has been reviewed.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfu lIy,
~F~~r!rl
Chief of Police
MDF:vb
cc: /[)ept. of Community Services
(3171 &71-2[;00
A Nationally Accredit
forcemenl Agency
IF"" ~3171 571-2512
~.
u
u
o)L. ..r.
C)IL/
()lC.a-:
(Jc/
6\'-7'
Oi7f
0(....;(
8.
tf-)f:
Ot.J{f.
c? YI' .
0'-1-2'.
b~M.
O\LK
O'i- j.8:
oL )4S.,
0'1-14 .
d- }2';
o\L.JH:
20.
~
OIL )1
~.
City of Carmel
Augustl,2007
Via email: matt@buckingham-co.com
Original by mail
Matt Griffin
Buckingham Companies
333 N Pennsylvania St., lOll) Fir
Indianapolis, IN 46204
RE: Old Meridian Shoppes at Providence, Phase 2 (#07070060 DP/ADLS)- Development Plan and
Architecture, Design, Landscaping, Lighting & Signage Applications
Dear Mr. Griffin:
This letter is in response to your DP/ADLS Applications for Old Meridian Shoppes at Providence, Phase 2.
Members at the T AC Meeting will make additi onal connnents on August 15. Please complete the following
items:
Remember to include the DP application Findings of Fact sheet in your info packets.
Provide the filled out and notarized affidavit of notice of public heanng page of the application.
Provide the filled out Notice of Public Hearing page of the application.
Provide the filled out and notarized Public Notice Sign Placement affidavit page of the application.
Provide a copy ofthe Official List of Adjacent Property Owners fTOm the Hamilton County Auditor's
Office.
Please provide copies of your correspondence with T AC members.
Bring material/color samples to the Plan Commission meeting.
Show the mechanical equipment location and how it is screened from view.
Please provide your lot cover percentage, which includes building footprint and pavement.
Show/label easements on the site plan.
lfnot already done, road right of way must be dedicated, per the 20-Yr Thoroughfare Plan. Contact the
City Engineering Dept at 571-2441 for more info. f. . \'"
A traffic study may be required. Confirm this with the City Engineering Dept at 571-2441 \0 et- (,et5 c0
Plcase provide color building elevations and/or color renderings.
Please label the building materials on the building elevations.
Please change the measurement scale on the elevations to match the building scale.
Verify that the light fixtures have flat lenses and 90-degree cutoffs.
Please consider using pervious pavers in the parking lot.
Please consider using LEED or 'green' building practices.
Please show/provide building address numbers that comply with Sign Chart C in Chapter 25.07. A.
Please provide the dumpster enclosure details/elevations.
Please provide the bike parking details.
BZA: a variance may be needed from ZO Chapter 20G.05.03.BA.c for building width. Please verify.
BZA: a variance may be needed from ZO Chapter 20G.05.03.C.3 for the rear entrances for retail. Please
verify.
Page 1
ONE CIVIC SQUARE
CARMEL, INDL'\NA 46032
317/571-2417
.~
u
u
If you have any questions or ifI may be of assistance, please feel free to call or emajl me at
aconn@carmel.in.gov.
Sincerely,
-IhLfl' C8rvv~
Angelina Conn
Planning Administrator
Fi Ie: 07070060D P ADLS. ProvidenceShoppesP h2 .doc
cc: Pile
Page 2
ONE CIVIC SQUi\.RE
CAR1\.1EL, INDIANA 46032
317 /571-2417
1111]
., -:" T" ""j
'1:1' ,
I . <:.0'
. &,'9 '
, ,
, '
.",
ni j. t. "
, " ,\,
Evans, Mechwart, Hamblelon & Tilton, Inc.
Engineers, Surveyors, Planners. Scientists
Letter of Transmittal
-"--",.
Zo:-=~:iEje Co~r C~isti.ne ~arton-Holmes
Dept. of Commumty ServIces
One Civic Square, 3rd Floor
Carmel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[X] Hand Deliver D U.S. Mail D Fed. Ex. OOPS
The following items:
00 copies
D originals D [ other]
Copies Date Number of Description
sheets
2 7-19-07 Development Plan for The Shoppes at Providence Phase 2
1 Drainage Report
1 7-30-07 Copy of all TAC Transmittals
These are transmitted as checked below:
00 for approval
D for your file
D as requested D for review & comment
D for execution I signatures
D [other]
Remarks:
We have requested that this project be reviewed at the August lSlh T AC Meeting.
Copies To:
Matt Griffin, Buckingham
EMI-I&T File
Signed:
\QN 'e-.
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once,
.~~ C M ,~ ^ V I
7400 1',Jorth Shodelon~j ,\venue, SuitG 50,.!nCiianopoiis, iN 46250. Phon~~ 317,91~3_69~30,~ Fo;-( 317.913_6928
C.-:i~!I1;b\}~ . CiilClnt,~Jt; . Indif1,~opGil~ . Chmk:>I!f::
enlhl.C0rn
IIlII
Evans, Mechwort, Hambleton & Tilton, Inc.
Engineers, Sur{eyors, Planners. Scientists
,"tH""- ''"-:-:^' "T~ ,."
r':'l ft. tJ>i ..
, , ,
- "' . ' ,
,. ,
, .
, l C ~ (l
Letter of Transmittal
'I'
To: Bruce Knott
Office of Fire Chief, Fire Station #1
Two Civic Square
Cannel, indiana 46032
From:
Rick N, Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
00 Hand Deliver Du.s. Mail 0 Fed. Ex. OUPS
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan for The Shoppcs at Providence Phase 2
CI.D, C2.D, C3.0
These are transmitted as checked below:
00 for approval
Dfor your file
o as requested 0 for review & comment
Dfor execution / signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 151h T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
eAJ '[
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once,
M C r,/t >': x v ,
7400 i"iorth Shod(:lonc~ AI.,-Ienue. Suits lSO, in(jiC:ic:po!is~ 1~~ 46250. Phon~; .3i7.913.6930. Fox .317,vl::.6928
C'L'Iru~'~b'_):;; . Cin,jr::~.;:J'!~ . Irv.:k.,lQf-'e;lis . Ch.)r[.;;I;e
e!llhl.cOt~
JjJ[I]
Evans, Mechwart, Hambleton & fillon. Inc.
Engineer~, Surveyors. Planners, Sdenti~ls
H;- ;,eT'''." ~~:
~I &.. '.
~:: J ,~1 , '
... _ "" VI"'" ~ ';l' -II
Letter of Transmittal
To: Bill Hohlt
Deputy Building Commissioner
Otie Civic Square
Carmel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence'
Phase 2
We are sending you herewith via:
[XJ Hand Deliver Du.s, Mail 0 Fed. Ex. Dups
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 Development Plan for The Shoppes at Providence Phase 2
These are transmitted as checked below:
[X] for approval
o for your file
o as requested 0 for review & comment
D for execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
1LJ\j ~L.
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once.
.H C J"/: ,': >~ V I
7400 t',JDrfh Shcc1ek.mci Avs-nue. Suite J 50. lnc..lionopo!;s, iN 46250 . Prrone 317.913.(:;930. Fax 31 /'.9l3J,9?8
~.::...'i:_ln~h!-'i or :::in;:;ir",.-jE; . ind:"?,~r'K;Ji-'cii:;: . ChLJr::~:~~
emh~.c';)rn
!Jill
Evans, Mechwart. Hombleton & Tillon, Inc.
Engineers, Surveyors, Planners, Scientisls
l . - ;C-/T' " ~ "
o~ ;
~H~; .'
r _ ~ 'Ill "'to<>-"- . ...
Letter of Transmittal
To: Chris Ellison
Office of Fire Chief, Fire Station #1
Two Ci vic Square
Carmel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[Xl Hand Deliver Du.s. Mail 0 Fed. Ex, Dups
The following items:
[X] copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.0, C3.0
These are transmitted as checked below:
[X] for approval
Dfar your file
o as requested 0 for review & conunent
o for execution! signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th TAC Meeting.
Copies To: Matt Griftln, Buckingham
Signed:
VI ~l ';7
t l\j 1,-
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once.
;v1 C/o,; ,'''. >~ V I
7400 North SI'1oc!",lon,) A V6rlUe, Suite 150. L-,oianopall>, i~j 46250 . Phone 317.91369:}O . Fa.< 317913.6928
r::~k.ill::b'j~ . ("ir-.Cr;,.:{;l~i . inj:~1nup(-;!i;; . C'h,~{>)lr....
(:~mh'J.C0nr!
lIlII
Evans, Mec~w/arL Hambleton 8. Tillon, Inc.
Engineers, Surveyors, Planners, Scientisfs
":'H'" , -H" ~"T-" " '-~,
~ ",
,~ ~
,r. -y . I, "","" ": ~ '
Letter of Transmittal
To: Michael Fogarty
Office of Police Chief
Three Civic Square
Cannel, Indiana 46032
From:
Rick N_ Reynolds
Date: July 30, 2007
Job no.: 2007~1168
Re: - The Shoppes at Providence
Phase 2
We are sending you herewith via:
!Xl Hand Dc1iverDU.s. Mail 0 Fed. Ex. OUPS
The following items:
!Xl copies
o originals 0 [other]
Copies Date Number of Description
sheets
I 7-19-07 I Development Plan for The Shoppes at Providence Phase 2
C2.D
These are transmitted as checked below:
[XJfor approval
Dfar your file
o as requested D for review & comment
o for execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
'K/Ve-
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once.
\-1 C 1,,1 x ): v I
7400 Nor'''l Shooclarid A,venue, Suil<: 150, ,,,,jjanapolis, !N 46250 . Phone 317.'1i 3.6930 . Fo,{ .317:;>136928
C~~,-lrl'blJ" . C.~in(:ii.,,~~.r: . !r1(~kl'1L~jpcli. . Ch,:Jr;~i!c
emhi .c(xn
lEIfIl
Evans, Mechwart, Hambleton & Tilton, Inc.
Engineers, Surveyors. Planners, Scienfists
~-H' ,; ".~ :~O:T"' . ~~.
~ - . *E II' -._} :
I I. _ _
Letter of Transmittal
To: Postmaster
c/o Dale Sparks
Cannel Post Office
United States Postal Service
275 Medical Driv~
Carmel. Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The ShQPpes at Providence
Phase 2
We are sending you herewith via:
o Courier
00 U.S. Mail 0 Fed. Ex.
o UPS
The following items:
[Xl copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 1 Development Plan for The Shoppes at Providence Phase 2
C2.0
These are transmitted as checked below:
IX] for approval
o for your file
o as requested 0 for review & comment
o for execution / signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
(E-AJ \L
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify liS a/ once,
M C M .V: >;- \i I
7400 ~k:'rth Shade/and Avenu~, Sl..)it,~ J 50. !nclionooojis. H'.I 46250 . Phon~: 31 7.9 ~3.69,-'30 . Fo;< 31 :.913.6928
C-:..ci;.'n:b'.)" . Cin!,:jr.;~(~:i . Irl,-!FQ:Kl~[jk . CJi\~:Jjj~;l~oi:I
(-:'iYlhLcorYi
11111
Evans, Mechwart, Hambleton 3. Tilton, Inc.
Engineers, Surveyors, Planners. Scionlisls
, lL.J~~~I~
",nrs, .' :1 ~t
!t 1..1 lo, fl. "
, ,
Letter of Transmittaf
To: Ron Farrnnd
Cnm1e1 Clay Schools
5201 East 131 S[ Street
Cannel, IN 46033
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
00 U.S. Mail 0 Fed. Ex,
o UPS
The following items:
[XJ copies
o originals 0 [other]
Copies Date Number of Description
sheets
I 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
Cl ,0, C2.0
These are transmitted as checked below:
[XJ for approval
o for your file
o as requested 0 for review & comment
o [other]
o for execution / signatures
Remarks:
We have requested that this project be reviewed at the August lS'h T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed: Jl\)VL
Rick N. Reynolds, RLA, ASLA
If enclosures are nol as noted, kindly notify us at once,
?400 Nor'ih Six;de-!ond p.,ven~}ej Suite 150, !ndionopOlis: iN 46250. Phone 317.9j3.6930. Fax 317.9i3.6928
fA c: fA :-:: X \,' I
CQ;tlrnbi~': . Ci[1{;ir'."(];' . [r1d;~;"OpCri~ . Ch,.,~~;,;.!~*
enlhj.~:Cr'()
[Ill
Evans, Mechwarf, Hambleton & Tilton. Inc.
Engineers. Surveyors. Planners, Scientists
I"H" >"n, '"T"P!l"~;.
e., .
~ ,iD~.
.(X:: ,
I -~ ,
.
.: ~ - -(J ,
letter of Transmittal
To: Bill Akers
Cannel Clay Conununications
31 First A venue NW
Carmel, W 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1] 68
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
fX] U.S. Mail 0 Fed. Ex.
Dups
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.D
These are transmitted as checked below:
[XJ for approval
o for your file
Das requested 0 for review & comment
o tor execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 151h T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
.tl\) \L
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at ollce.
f,'~C.M/XVI
7 400 ~.JC)I in Shod,,;imK.i A V0flU",. SuiTe 150, inCiionapoliS, +J 46250 . Phon" 31 7.913.69:JO . FOx 317.913.,;921\
Ct.',::'In;b;~ * ::-:iil,:,(,c,",~1i . ,~)c~b"'JP-(;It.:; . \.J~"lriDhr;,
t?mh~ .C()fn
I!IIII
Evans, Mechwart, Hamblefon & Tilton, Inc.
Engineers. Surveyors. Planners. Scienlisls
'J', -" ,.~ ," O'T':"" "''',.
H"p,,,
, ,} ~!
. . ~
. >
:: ~ - ... ~ I I . "- ,_
<<' _ l ,
letter of Transmittal
To: Mark Westerrneier
Carmel/Clay Parks Department
760 Thirst Avenue SW, Suite 100
Camlel, IN 46032
From:
Rick N. Reynolds
Date: July 30,2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[Xl U.S. Mail 0 Fed. Ex.
o UPS
The following items:
[X] copies
o originals 0 [other]
Copies Date Number of Description
sheets
I 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.D
These are transmitted as checked below:
[i] for approval
Dfor your file
o as requested 0 for review & comment
D for execution! signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
~~t-.
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once.
~...-1C(...~XXVI
74{)() Ncrr!l ShQdelonci Av€cnue, Suite 150, incjionopol,s, 'I'! 4625D . Phon" 317.913.6'.'30 . Fox 3i7.913.6928
C~~jlln~b~J~ . CinGir~:"';J~: . l~lC~!~.l;'u~~-:;;li; .. C1~(lriulk
Qnlnl.COrn
11111
Evans, Mechwmf, l'lamb/elan & Tilton, Inc
Engineers. Surveyors. Planners. Scientists
"';'17";
~ "II
, 1&'1: "
PI.., .
_-.' ,_. :r
letter of Transmittal
To: David Lucas
Hamilton County Highway Department
1700 South lotll Street
Noblesville, IN 46060
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[XJ U.S, Mail 0 Fed. Ex.
o UPS
The following items:
[X] copies
o originals D [other]
Copies Date Number of Description
sheets
I 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.0
These are transmitted as checked below:
[Xl for approval
o for your file
Das requested 0 for review & comment
o for execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
ii2-A) tC
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once.
,'>'1 C L~ :..: x v I
7400 Njrth Shexleiond ~,ven...re, .suiTe r 50, lnc~jonapofi~.. ir.,j 46250 .. Phone3l7_91 :L693G . Fox 317.913.6928
C~;urt'bi"'';; . (:iIK;ir,_",--::~' . 1~',ljiGnnJ-~di5 . Ci"h...r!:'.-';,i~""
c(ohi ,CerYl
11111
Evcms, Mechwor1, Hambleton & Tilton, Inc.
Engineers. Surveyors, Planners. Scienlisls
~.I.:j~~~,.
, r~~1t" . .'1,,. .
_ ~ I'"
Letter of Transmittal
To: Tcrry Krueskamp
City of Carmel - Information Systems
Three Civc Square
Cannel, Indiana 46032
From;
Rick N. Reynolds
Date; July 30, 2007
Job no.; 2007-1168
Re: The Shoppcs at Providence
Phase 2
We are sending you herewith via:
[Xl Hand DelivcrDU.S. Mail 0 Fed. Ex. Durs
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
I 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
CI.O, C2.0
These are transmitted as checked below:
IX] for approval
Dfor your file
o as requested D for review & conllnent
o for execution I signaturcs
D[other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
i:[JJ L
Rick N. Reynolds, RLA, ASLA
If enclosures ere not as noted, kindly notify us al once.
\/ C {'.r x)~ \! I
7400 rJ01'rl Shoc!€lond fl. n)ilue. Suite 150, ;nciiQ~wpo!'$, 'N 46250 . Phone 31 ! ,91 :t,,93G . Fo.( 3 F, 913.6,'28
(>:I;'.-'t~.,:::',)~ . .(~I-m:!r~n[jr.' , Irdi(;;,h"",lFG!i~ . Chm::)i~e
em;;i.com
[Iii]
Evans, MechwarL Hambleton & Tilton, Inc.
Engineers, Surveyors. Planners, Scientists
":.,~ :'T~> i.
'Hi~ ""
I ~ t
, ,
... ~~ ~ l
, ,
~ _' ~ I ~ ,,,,
Letter of Transmittal
To: Brooke Gajownik
Hamilton County Sheriffs Office
18100 Cumberland Road
Noblesville, IN 46060
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
00 U.S. Mail D Fed. Ex.
OOPS
The following items:
00 copies
D originals 0 (other]
Copies Date Number of Description
sheets
1 7-19-07 2 Development Plan for The Shoppes at Providence Phase 2
Cl.0, C2.0
These are transmitted as checked below:
00 for approval
o for your file
Das requested 0 for review & comment
Dfor execution I signatures
o (other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
iE 1\j 't
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures are not as no/ed. kindly notify us at once.
M C, r,.1 ,,": >: v J
7400 NQr-Hi Sh(KJ"elcHld }.....vE:.nut? $i.)te ! 5,0. ineiionopolis. ~~-t 4,,)250 . PhGr~e. ,] i 7.9 ~ 3.6930 . Fox .317,913,6928
C~:.;;.mt:u:. . Ci.nc.:ir;;-,~~i . jm.ji~Jn..]~~rJli:,: . CticricH.=,-
f~nlhr .C~)IY;
III1J
Evans, Mechwart, Hambleton & Tilton, Inc.
Engineers, Surveyors. Planners, Scientists
~~H"f- 0 ,-, '~T
" '& '
~ I~ I'~ ,..;j'
"', ~ '" ~ - \\_~
Letter of Transmittal
To: John Duffy
Cannel City Utilities
760 Third A venue SW
Cam1el, IN 46032
From:
Rick N. Reynolds
Date: July 30,2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[Xl U.S. Mail 0 Fed. Ex.
Dups
The following items:
00 copies
o originals 0 C other]
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl .0, C2.0, C3.0
These are transmitted as checked below:
[X]for approval
o for your file
o as requested 0 for review & conunent
o for execution I signatures
o Cather]
Remarks:
We have requested that this proj ect be reviewed at the August] Slh T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
;~ I\) 't-
Rick N. Reynolds, RLA, ASLA
If enclosures are not liS noted, kindly notify us at once.
j.A c: t.,; ;~: )~ v I
74CJO ~~cnh SilOcJ0lOr'ld ,'-venue. Suire 150, indionopol,s, '~146250' Phon", ,]\7.913.6930' Fox 317S13.6928
(:~tul'ib\.JS . Cincir';'cJ!~. 111~~!:"~,\OPC'i; . {'hor~Gh.:;
Ornh! .com
IIfIJ
Evans. Mechwart. Hambleton & Tilton. Inc.
Engineers. Surveyors. Planners. Scientists
';H"""'l'T' -
" (
, ~;
~~ ~ ,
-~ :: '. I _ ~ /1" I
Letter of Transmittal
To: Ron Morris
Indianapolis Power and Light, Co.
3600 North Arlington Avenue
Indianapolis, IN 46218
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1 ]68
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[X) U.S. Mai] 0 Fed. Ex.
o UPS
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 3 DevelopmeIlt Plan for The Shoppes at Providence Phase 2
C] .0, C2.0, C3.0
These are transmitted as checked below:
00 for approval
Dfor your file
o as requested 0 for review & comment
Dfor execution / signatures
o [other]
Rell13l1<s:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: . Matt Griffin, Buckingham
Signed:
[~'~
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once.
M C (,,1 ,~: x v f
7400 Hc-dh Shodek)nd (\.venue. Suit~) 150. 1nc:iU7IGpOiis-, !~,~ 46250 11 Phon~ 31 7,913.6930 . Fox 317 < 9 13.6928
C!_'!l'/j~blJJ . CinciL'''.-:J~~ . I..!:~:!~;.,,")pa!i.;. . Chm:~,t~.".
ern!lLcc;,~
I!IlI
Evans, MechwarL Hambleton & Tilton, Ine.
Erlgineers, Surveyors, Planners. Scientisls
",,", I "T-:;-- ~"
'H"
, ,~r "
",.. _I, ).
Letter of Transmittal
To: Chuck Shuppcrd
Vectrcn Energy
P.O, Box 1700
Noblesvi1le, Indiana 46061
From:
Rick N. Reynolds
Date: July 30,2007
Job no.: 2007-1168
Re: The Shoppesat Providence
Phase 2
We are sending you herewith via:
D Courier
00 U.S. Mail 0 Fed. Ex.
Dups
The following items:
IXJ copies
o originals 0 [other]
Copies Date Number of Description
sheets
I 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.0, C2.0, C3.0
These are transmitted as checked below:
[Xl for approval
o for your file
Das requested Dfar review & comment
Ofar execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
rt~L
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once,
j\~ C '\", :'i: x v )
7400 r"~o:'rn :)hOd(;!Ond AVfHlue, $l..Jite 150~ indionopOI~s, ~f,J 46250. Phone 2.17.913.6930. rox 317.913_6928
C::;>j;,m,bus . ,--Jlidr~,~G:i . :n<:ii~'~:1Cpd:~ . CP-'L:l{,;lff.i
emht .Corn
1111
Evans, Mechwart Hamblelon & Tilton, Inc.
Engineers. Surveyors. Planners. Scientists
F, ,,; '~":ll,' 'T'" ,
I'H
~ ..: \ ,.
1 ' ,
I . "
. ,
- . ~ T
letter of Transmittal
To: David Malone
Panhandle Eastem Pipeline Co.
P.O. Box 30
Zionsville, IN 46077
From: Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1 168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[X] U.S. Mail D Fed. Ex.
o UPS
The following items:
[XJ copies
o originals 0 [other)
Copies Date Number of Description
sheets
1 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2,O, C3.0
These are transmitted as checked below:
00 for approval
o for your file
D as requested 0 for review & comment
Dfar execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
~~.<<-
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once.
ltlcrv~,-';>~VI
7 400 ~,Jodh Shcoelond A ~'enue. SU~T('3 i 50. ~n(irC;lOpOr~-" H'J 46250 . PhCr.f:~ .31 7. 9}3,6930 . Fax 3l ? _ 913.6928
"-:~_';un,~')\):; . Cirldr!rl.."l~1 . l:'l.j;...,'opc-li~ . Ch:::r!-:;!;.ct
ernhlcc)r'1
11[1
Evans, Mechworl, Hambleton & Tilton, Inc
Engineers. Surveyors. Planners. Scientists
~H~:T'
.. . 1 q _ 1 ~ ~ ~ :.!
Letter of Transmittal
To: Jason Lemaster
Hamilton County Health Department
One Hamilton County Square, Suite 30
NablesviUe, IN 46060
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
Ii] U.S. Mail 0 Fed. Ex.
OOPS
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
I 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.D, C3.0
These are transmitted as checked below:
00 far approval
o for your file
o as requested 0 far review & comment
o far execution I signatures
o [ather]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
~.N\L
Rick N. Reynolds, RLA, ASLA
If e/lclosures are not 8S noted, kindly notify us at once.
I,.i C fA :-:: ,J': v I
7400 r\J(":rth Shc:delond Avenue, -Suite 150. !nG'iQ~lOpol:s... ir\l 46250 . Phon~~ 317,9] 3_-6930 . Fax 317.9 i 3.6928
CDiL1l'\;t",t.!, . Cin(;;r,,;Gt' . r~lC!-::;,~Qf:.~cli:; . Chl.,rbil*
ernh'j . cor:.
11111
Evans, Mechworl, Hambleton & Tilton, Inc.
Engineers, Surveyors, Planners. Scientisfs
'H'~' .,-- :T' 'I
" ~ ~l
; ,~
" ,
~ ,.~ 4-'
Letter of Transmittal
To: Dave Klingensmith
Carmel Street Department
3400 W. 131 st Street
Westfield, Indiana 46074
From:
Rick N. Reynolds
Date: Ju]y 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[X] U.S. Mail 0 Fed. Ex.
D originals D [other]
DlJPS
The following items:
00 copies
Copies Date N umber of Description
sheets
1 7-]9-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.0, C3.0
These are transmitted as checked below:
00 for approval
Dfor your file
o as requested 0 for review & conunent
Dfar execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed: L 1\\ t-
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once,
fA C M :w; )~ v ~
7400 N':-Jdh Shc.:dJ.3k:nv:i Avenue, Suire t 50. inciioifopol;:;., ir'~ 46250 . Phone -317.913.6930 . Fox 317_v13.6928
C~'i<.;ll~b\,J~ . Ciflcl,'}r'im' . Ir\~:ii;"'j(ll--'-cli,: . (~I"''),~~~rte
...-~rnh.i.C:()fY'l
11111
Evans, Mechwarf, Homl)leton & Tilton, Inc.
Engineers, Surveyors, Planners, Scientists
H~T',
=< ~ -; ".
Letter of Transmittal
To: Jason Kirkman
Brighthouse Networks
3030 Roosevelt Avenue
Indianapolis, IN 46218
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1] 68
, Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
[XJ u.s. Mail 0 Fed. Ex.
o UPS
The following items:
!Xl copies
o originals
o [other]
Copies Date Number of Description
sheets
I 7-19-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.0, C3.0
These are transmitted as checked below:
!Xl for approval
o for your file
o as requested 0 for review & comment
o far execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
~l\j 't.-
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once,
~__1 C lvi Y. X V I
7 400 I~ort!l ShC1cj~,!ond Avenue. Suite 150, indlOrfopofis, ir".l .:16250 .. Phone :3 j 7.9 i 3.6930 . Fox 317.91 :;.6928
(~::;'C;~JI1-,b'J:, . (:irwi~,!"o~i . !ndirE;CJpuii~ . c:.:hQ~if.:-fjt'::
~7i'n~L(:orYi
I!I[I]
Evans, MechwarL Hambleton 8. Tillon. Inc.
Engineers. Surveyors. Planners. Scienlists
:, '"T'"
~H~ ...
,sc,'.,. . If
Letter of Transmittal
To: Shirley Hunter
Duke Energy
] 6475 Sou!hpark Drive
Westfield, IN 46074
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Courier
00 U.S. Mai] D Fed. Ex.
o UPS
The following items:
IX] copi es
D originals 0 [other)
Copies Date Number of Description
sheets
I 7-]9-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.0, C3.0
These are transmitted as checked below:
/Xl for approval
,
o for your file
Oas requested 0 for review & comment
Dfor execution / signatures
o (other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To:
Matt Griffin, Buckingham
Signed:
~kJL-
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once,
I'd C r~1 .": X if ~
7 400 N~:;rHl Sh:"JdeloriC Avenue, Sljte 150, i0oic::nopohs, ~N 46250 . Phone .317.913.69:~n . Fox 317. 913.692H
C~.}:-,.'n'b'_J~ . Cir'c.:-fr;;;Q;i. Iml'.,Jil,'pc_li.;: . Ch,.!{~::i~,-
c:~rrti')f .c:....~nl
GIll
Evans. Mechwart, Hambleton & Tilton, Inc.
Engineers, Surveyors. Planners. Scientisfs
.H~T
-, ~ ~
letter of Transmittal
To: David Littlejohn
Transportation Systems Coordinator
One Civic Square, 3rd Floor
Cannel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-] 168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[Xl Hand DeliverOU.S. Mail 0 Fed. Ex. Dups
The following items:
[i] copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-]9-07 3 Development Plan for The Shoppes at Providence Phase 2
Cl.O, C2.0, Ll.O
These are transmitted as checked below:
[XJ for approval
o for your file
Das requested 0 for review & comment
o for execution / signatures
o rather]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
t~\L
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once.
fA .C !,A /. X V !
7 400 ~,lodh ShQQE'!cJrvi A,venue, Suire 150. Jndicnopoiis, 11'>J 46250 . Phone 3l 7.9 j 3.6930 . Fox 3 r 7.913JlJ2B
C~":llli;l"'U$ . C.~rm~;n';D!i . rr1{'!:::cn~"'i2:.'!i. . CJk]r:~~~~r.c-
,?m!ILcCi"':'1
11111
Evans. Mechwart. Hambleton & Tilton. Inc.
Engineers, Suryeyors, Planners. SClenlis!s
HaZr
I ~ . - ./;', ,
Letter of Transmittaf
To: Scott Brewer, City Forester
Urban Forestry
One Civic Square, 3rd Floor
Cannel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[X] Hand Deliver Dus. Mail D Fed. Ex. Dups
The following items:
[X] copies
o originals D [other]
Copies Date Number of Description
sheets
1 7-19-07 4 Developmcnt Plan for The Shoppcs at Providence Phase 2
Cl.O, C2.0, C3.0, Ll.O
These are transmitted as checked below:
[XJ for approval
Dfor your file
o as requested 0 for review & comment
Dfar execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To:
Matt Griffin, Buckingham
Signed:
ctN~
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once.
7400 ~,Jorth Sbadelona /\'venue. Sui~i~ 150. !n(jionopO!is. I~J 46250.. Phone 317_913.-6930 . FOJ( 317.9 J3.6928
MCM:~X'YI
(j_\'~'Ij~bw.;; . Ci,lcirtnn1~ . 1n.;jk~'K;L--Glic: . Cijcri:;I~~
en1hl.colY1
IiIlIJ
Evans, Mechwart, Hambleton & Tilton, Inc.
Engineers, $urteyors, Planners, Scientists
:'H"'O. . 'R?:T~'"
, . ' . i.
letter of Transmittal
To: GregOIY ]lko, PE
CrossRoads Engineers
3417 South Shennan Drive
Beech Grove, Indiana 46107
From:
Date;
Rick N. Reynolds
July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
o Hand DeJiverOOU.S. Mail 0 Fed. Ex. OUPS
The following items:
[i] copies
o originals
D [other]
Copies Date Number of Description
sheets
1 7-19-07 5 Development Plan for The Shoppesat Providence Phase 2
Cl.a, C2.0, C3.0, C3.1, C4.0
1 Drainage RepOIt
These are transmitted as checked below:
[XJfor approval
Dfar your file
o as requested 0 for review & conunent
Ofar execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griftin, Buckingham
Signed:
12J\j XL
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures ere not as noted, kindly notify us at once.
......t C t.,~ >': >: V I
7400 North Sho(jelond fwenuf,. Suite 150. inciior,opol,s. i~! -16250 . Phon-" 317913.69:30 . Fa:< :117313.6928
c: :;;'~~lIril-..1J~ . Cin('hnLj~; . Ir,di-r;:1c1p/C,:i-: . (:I-':(J(j-;;h~
em:'1'I.Corn
IIlIl
Evans, Mechwart, Hambleton &lilfon, Inc
Engineers, Surveyors, Planners, Scientists
.~"'., . ~"'T'
>'<H,g.'
, ~~~ .
.... --' I ~ ::J
Letter of Transmittal
To: Greg Hayes
Hamilton County SU1l!eyor's Office
One Hamilton Square, Suite 188
Hamilton County Judicial Center
Noblesville, Indiana 46060
From:
Rick N, Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppcs at Providence
Phase 2
We are sending you herewith via:
D Hand Deliver rx.JU.S. Mail D Fed. Ex. Dups
The following items:
[i] copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 5 Development Plan for The Shoppesat Providence Phase 2
C1.0, C2.0, C3.0, C3.1, C4.0
I Drainage Report
These are transmitted as checked below:
(XJfor approval
D for your tile
D as requested 0 for review & comment
o for execution I signatures
o [other)
Rel'11al1<s:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
EMH&T File
Signed:
~N\L
Rick N. Reynolds, RLA, ASLA
If enclosures are not 8S noted, kindly notify us 8t once.
,:"..1 C i.,\ j~ X 'v I
7400 N;)r;h Shc:dslond AVGr,ue, SU;'8 150, !ndiC!r1opol';, IN 46250 . PhOne 31 7.91 3. 69:JD . fox 317.913.69;;8
C-D;Unlt'A..J~ . Cim;ir':,,-J!: . 1~ldk:F)apdl.\ . C'h.,~:~.J.I~c"
ernni.CGM
1111
Evans, MectlwarL H(Jmbleton & Tilton, Inc.
Engineers, Surveyors, Planners, Scientists
,H;~T
Letter of Transmittal
To: Amanda Foley
Carmel Engineering Department
One Civic Square, 1 sl Floor
Carmel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30,2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[XJ Hand Deliver 0 U.S. Mail 0 Fed, Ex, 0 UPS
The following items:
00 copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 5 Development Plan for The Shoppcs at Providence Phase 2
Cl.O, C2.0, C3.0, C3.1, C4.0
1 Drainage Report
These are transmitted as checked below;
[X] for approval
o for your file
o as requested 0 for review & comment
o for execution I signatures
o [other]
Remarks;
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Grit1in, Buckingham
Signed:
(LN't
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once,
M C f.,~ :.: x \1 i
7400 r~c;rjh S!,o(jelon,~ Avenue, 5U':8 150, !ndiOrlopOlis}, 46250. Phor,," 317.913.69.30. Fox 31 7.913.6928
C~i~lrr;b',)i . Cincim~.:'l;!. ~r)d~"',K;P(;!i~ . ('I,.)r~~';-!~f:
crnhl.CCfY)
filii
Evans, Mechwarl, Hambleton & Tilton, Inc.
Engineers, Surveyors, Planners. Scientists
, ::) T7
, .
" .
,H", "
Letter of Transmittal
To: Gary Duncanor Nick Redden
Cannel Engineering Department
One Civic Square, l,t Floor
Cannel, Indiana 46032
From:
Rick N. Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: The Shoppes at Providence
Phase 2
We are sending you herewith via:
[i] Hand Deliver 0 U.S. Mail 0 Fed. Ex. DUl>s
The following items:
[i] copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 7-19-07 5 Development Plan for The Shoppes at Providence Phase 2
C1.0, C2.0, C3.a, C3.l, C4.0
1 Drainage Report
These are transmitted as checked below:
00 for approval
Dfor your file
Das requested 0 for review & comment
Dfor execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
~}\J~
Rick N. Reynolds, RLA, ASLA
EMH&T File
If enclosures are not as noted, kindly notify us at once.
fA C. M,~. ){ ~/ I
74GJ rJolrh Shodelancl :-venue, S'Ae 150. :nci,cno~~oj,s. n~ 46250 . Phone 317.913.6Y:\0 . Fox 317.9J 3.6928
(>:_':umhu~ . (rnC::f;",.!i . h{~'Io':';;j~"~Gli; . C:har_:~.lf~""
emh'-cG,"':"~
1111
EVans, MechWarf, Hambleton & Tillon, Inc
Engineers, Surveyors, Planners, Scienlists
l-I&T
Letter of Transmittal
To: Angie COllil or Christine Barton-Holmes
Dept. of Community Services
One Civic Square, 3rd Floor
Carmel, Indiana 46032
From:
Rick N., Reynolds
Date: July 30, 2007
Job no.: 2007-1168
Re: ' The Shoppes at Providence '
Phase 2
We are sending you herewith via:
00 Hand Deliver OU.S. Mail 0 Fed. Ex, OUPS
The following items:
[X] copies
o originals 0 [other)
Copies Date Number of Description
sheets
2 7-19-07 Development Plan for The Shoppcs at Providence Phase 2
I Drainage Report
1 7-30~O7 Copy of all T AC Transmittals
These are transmitted as checked below:
[i]for approval
o for your file
o as requested 0 for review & comment
OfaT execution I signatures
o [other]
Remarks:
We have requested that this project be reviewed at the August 15th T AC Meeting.
Copies To: Matt Griffin, Buckingham
Signed:
\QJ\J e-
EMH&T File
Rick N. Reynolds, RLA, ASLA
If enclosures are not as noted, kindly notify us at once,
:\1 C i,,~ X >: V I
7400 rJodh ShDd:;~lond Avenue. Suif::: :50, inClionopolis, i~j -16250 . Prior,e 317.913.6930 . Fox 317.913.6928
(",~~;;;,.r,,-,bIJ~ . Cin,:in=:<:cii . irl0i-G'lC1p('~li~ - (~hor1dii:
()mhi.com