February 7,2006
CI EL
JAlvlES BR"JNARD, ti'\YOR
Mr. George Zboyovsky, P.E.
Cripe
7172 Graham Road
Indianapolis, Indiana 46250
Dear Mr Zboyonsky:
RE: City of Carmel Water Operations Facility - Project Review #2
The City has received your comment letter and drawings dated January 6, 2006 based upon the City review of
November 3,2005.
The comments from the City review have been satisfactorily addressed with the following exceptions:
COMMENTS-CONSTRUCTION PLANS
10. Please remove landscape plao sheets, L 1 Ol-L 103, from the sets of plans submitted for Department of
Engineering approval. The Department of Engineering does not approve the landscape plan.
II. As we discussed, please continue the process of vacating the right-of-way described for the entire property
and rededicating solely the existing right-of-way for the roadway.
12. Thank you for adding the twenty-foot D.U.E. along the right-of-way of the road frontages and for not
overlapping this easement with a landscape easement.
13. Provide a statement and supporting documentation that the drainage was master planned. Please indicate that.
the area to be improved was included in the watershedlbasin delineation of the original project and that the
final "C" value agrees with what was anticipated when master planned.
14. Please verify stub and existing downstream pipe sizing to collect and convey the runoff from this area.
These comments represent the Department of Engineering's second review of the construction plans for this project.
We reque~t that all responses to our comments be provided in ~riting. Failure to provide written re?ponses may result
in the delay of the review process.
It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any
such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all
revisions. Please notify us of any changes and specifically state any'changes, including changes resulting fronl Plan.
'9ominission,BlAorothercomITiitteerneetings: .1, '. ". "" ..... . '.'
I
All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans.
Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be
obtained prior to Engineering Department approvaL
The Depart~enf reserves the right to provide additional comments based on subsequent reviews.
If you have questions, please contact me at 57 I -2441.
DEPARTMENT or ENGINEERING
ONE Ow: SQUARE, CAK\;[ELj IN 46032 OFFICE 317.571.244] FAX 317571.2439
EMA1L engineerillg@ci.carmeI.in.us
~~.
'",
u
u
cc: Matt Griffin, Department of Community Services
John Duffy, Cannel Utilities
Paul Pace, Cannel Utilities
Greg Hoyes, Hamilton County Surveyor's Office
Greg Ilko, Crossroad Engineers
Project File
Engineering Department Review
S:\DHILL\CARMEL W A TEROPERA TIONSF ACILlTY;;;2
(
I
I
I
:, '.
u
u
0:;( \oa23'TA.:
Project Name: White River North Water Treatment Expansion County: Hamilton
Plan Submittal Date: 12/01105 Hydrologic Unit Code: 5120201090020
Project Location Description: 1/2 mile north of I 116th on the east side of River Road
Latitude and Longitude: Not Provided
Civil ~ Clay Quarter: Section: 34 Township: 18N - 4E
c T
0
'';:; Project Owner Name: V calia Water
G':l
1:
i: Contact:
e
'- Address:
c
....
.... City: Indianap 0 lis State: IN Zip:
'-'
~ Phone: FAX: E-Mail:
'-'
0
l..
~ Plan Preparer Name: Jennifer Brewer
Affiliation: HNTB
Address: III Monument Circle, Suite 1200
City: Indianapolis State: TT\T Zip: 46204-5178
Phone: 317-636-4682 FAX: 317-917-5211 E-Mail:
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Revie\v Date: 12/04/05
.S:' Principal Plan Reviewer: 101m B. South P.E. CPESC
Q.l
.;: Agency: Hamilton County Soil and Warn Conservation District
QJ
Q:; Address: 1108 South 9th Street
...
;; City: Noblesville
s: Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
.j PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice onntent (NOI): Attach a copy of this cover page when suhlnltting the NOI to the bIdlana
Department of Environmental J\1anagemen1. Construction activities may begin 48 hours fallowing the submIttal of
the NO!. A NO! must a/so be sent to the
D A preliminary plan review has been completed; a comprehensive review will not be completed within the 2S-d.1Y
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
DPlease refer to additional information included on the following page(s).
o Submit Notice of 1 ntent (NO I): A ttach a copy of this cover page when submitting the NO! to the Indiana
Department of Environmental Management Construction activities may begin 48 hours follOWing the submittal of
the NOr. A NO! must also be sent to the SWCD,
o PLAN IS JJEFJCJENT: Significant deficiencies were identified during the plan review.
o Please refer tu additional information included on the following page(s).
o no NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deliciencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the
in the Plan Review Section above.
Plan Reviewer identified
DNR, Division ofSoi/ Cunservation
Page 1 of 1
Revised /2/09/03, Form /
O.
u
Cl EL
u
,
,
l"y,
'11'/.'
I ~-;.
,/ '
JAMES BRAINARD, 1\iA.YOR
OF;
.;'0r>
....v
November 3,2005
ML George Zboyoysky, P.E.
Cripe
7172 Graham Road
Indianapolis, Indiana 46250
RE: City of Carmel \Vater Operations Facility - Project Review #1
Dear MT. Zboyonsky:
We have preliminarily reviewed the plans submitted for this project and offer the following comments:
GENERAL INFORMATION
1. The project site is located within current City of Carmel Corporate Limits,
2. Jurisdictions:
· Streets and Right of Way- City of Carmel.
· Water - City of Carmel Utilities.
Sanitary Sewers ~ Clay Tmvnship Regional Waste District
· Storm Sewers/Drainage.- Hamilton County Surveyor's Office / City of Carmel.
· Regulated! Legal Drains - Hamilton County Surveyor's Office.
3, Board of Public Works and Safety Requirements:
· Water Availability
]f an irrigation system is planned for this development, additional Board of Public Works and Safety
approval will be required.
· Temporary Construction Entrance (if applicable and iflocated at a location other than planned
permanent entrances) ,
· Please be advised tltat any opell cuts of dedicated streets will require separate Board of Public Works
and Safety approvaL
· Any permanent improvement (including irrigation systems) to be installed within dedicated right of way
or dedicated easements: ~This approval would require a Consent to Ericroach Agreement between the
Owner/Devcloper and the City of Carmel. .
I am also enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for
your use. Please use the Engineering Department deadlines for submissions to the Board.
Any submission to tlte,Board requires prior approval by the Carmel Cia)' Plan Commission alld/or the
Board ofZolling Appeals (ifapplicable) ami completion of review by tlte Technical Advisor)' CommiTtee.
All writteJl requests to be placed 011 the Board's agenda must include the appropriate Docket Number aHd
the date (or dates) of appro val by the Plall COII/missioll and/or the Board of Zoning Appeals (if
applicable).
4. T.A.C. RcviewlDrawings subrnitted for approval:
We request that all comments and comment letters generated by this office be answered in writing and be
accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all Engineering Department and Utility Department issues and all Hamilton County
Surveyor issues have been resolved~ The design engineer must certify all drawings submitted for final
approval. Because of the dual jurisd iction between the City of Carmel ~nd the Hamilton County Surveyor,
this office will require a minimum of eight-sels of drawings for approval after all issues have been resolved.
The drawings will be stamped as approved and will be signed by the City Engineer and the Director of
Carmel Utilities, The eight sets will then be sent to the Hamilton County Surveyor for approval and
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARViEL, IN 46032 OFl'JCE 317.571.2441 FAX 317~571.2439
E~lI\jL engineering@ci.carmeLin.us
u
u
Signatures Three approved sets are to be returned to the City of Carmel. The Hamilton County Surveyor
\ViII retain roo sets. The Developer, Engineer and Contractor will each receive one set.
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or
dedicated easements will require a Consent to Encroach Agreement with the City ofCarrnel 's Board_oj
Public WorJ"sand Safetv
6. Carmel Utilities should be provided drawings for review of water issues. They will provide a separate review
regarding.these issues.
7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main
locations.
BONDING REQUiREMENTS
8. The following bonding requirements may apply to this project:
Performance Guarantees
It does not appear Performance and Maintenance Guarantees will be required.
9. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted
to this office. If you have not already done so, please provide a set of plans and drainage calculations to Greg
Ilko at Crossroad Engineers, PC for the drainage review.
COMMENTS~CONSTRUCTION PLANS
10. Please remove landscape plan sheets, LI 01-L1 03, from Ihe sets of plans submitted for Department of
Engineering approval. The Department of Engineering does not approve the landscape plan.
1 I. As we discussed, please continue the process of vacating theright-of-way described for the entire property
and rededicating solely the existing right-of-way for the roadway.
12. Thank you for adding. the twenty-fool D.U.E. along the right-of-way of the fOad frontages and for not
overlapping this easement with a landscape easement.
13. Provide a statement and supporting documentation that the drainage was master planned. Please indicate that
the area 10 be improved was included in the watershcdlbasin delineation of the original project and that thc
final "C" value agrees with what was anticipated when master planned.
14. Please verify stub and existing downstream pipe sizing to collect and convey the runoff from this area.
These COI11I1lents represent the Depaitment of Engineering's initial review of the construction plans for this project. We
request that all responscs to our COlnments be provided in writing. Failure to provide written responses may result in
the delay of the review process.
It is critical that our offiee be made aware of all modifications made on the plans being resubmitted, particularly if any
such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including illl
revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan
Commission, HZA or other cOI11I1littee meetings.
All bonds and performance guarantees must be posted prior to Engineering Depart;nent appro\'al of construction plans.
Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be
obtained prior to Engineering Department approval.
The Depm1ment reserves the right to provide additional comments based on subsequent reviews and on the grading and
drainage system upon receipt of drainage calculations and more detailed construction drawings that provide grading
elevations, pipe sizing and invert elevations. These comments may affect the drainage system and lot and street layout
presented on the primary plat. .
If you have questions, please contact me at 571-2441.
cc: Matl Gri ftin, Department of Community Services
.
u
u
cc: Matt Griffin, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Carmel Utitities
Greg Hoyes, Hamilton County Surveyor's Office
Greg IIko, Crossroad Engineers
Project File
Engineering Department Review
S:\DHILL\CARIvfELW A TEROPERA TIONSF ACrUTY
Page 1 of 2
u
u
(6)\OOd~ ,-A!-
DeVore, Laura B
Sent:
To:
From: Jennifer Bruner [Jennifer.Bruner@CTRWD.ORG]
Wednesday, November 16, 2005 8:23 AM
Griffin, Mat1 L; Keeling, Adrienne M; Blanchard, Jim E; Brook Gajownik (E-mail); Chuck Shupperd;
Cinthia Klaiber (E-mail); Conn, Angelina V; Tingley, Connie S; Dean Groves; DeVore, Laura B; Hill,
Dick B; Andrew Williams; Duffy, John M; Duncan, Gary R; Greg Hoyes; Gregory J. IIko (E-mail);
Holmes, Christine B; Hoyt, Gary A; Jason LeMaster; Jennifer Marlett; Foster, Jim P; John South;
Klingensmith, David W; Krueskamp, Theresa A; Larry Castet1er (E-mail); Littlejohn, David W;
Snyder, M Todd; Mark Wood (E-mail); Fogarty, Michael D; Hollibaugh, Mike P; McBride, Mike T;
Mike McBride (E-mail); Pace, Paul V; Morrissey, Phyllis G; Hancock, Ramona B; Redden, Nick;
Richard Heck (E-mail); Ron Booher (E-mail); Ron Farrand; Ron Morris; Lillard, Sarah N; Brewer,
Scot1l; Shirley Hunter (E-mail); Teresa Magee; Westermeier, Mark; Akers, William P
Subject: R E: November 16 T AC Agenda
The fallowing comments are regarding this months TAC items. Additional information, such as the District
Application and Specifications, are available at our website www.ctrwd.org.
Clarian North Expansion - The existing sanitary sewer main extension must be dedicated to the District before
sanitary sewer permits may be issued in this area. Sanitary sewer construction plans need to be submitted for
review to the District. The District has not received sewer service plans. A District project application needs to be
completed.
Grandin Hall Section 2 - Outside service area.
College Park Baptist Church Parking Lot Expansion - Plans were received and reviewed. No action needed.
Stratiord Assisted Living at the Village of West Clay - Plans and District application have been received and
reviewed. Comment letter to follow shortly. An IDEM construction permit for sanitary sewer will be needed. All
IDEM submi1tal information should be provided following the District's review and approval of final plans.
Kendal Wood - The plans and application have been received last week. An IDEM construction permit for
sanitary sewer will be needed. All IDEM submittal information should be provided fallowing the District's review
and approval of final plans.
Sanders Plat -- Not received by District. Please submit for review.
Mayflower Storage Condos - Plans have been received and reviewed. Additional information will be requested.
A CTRWD Application is needed.
Old Meridian Place -- Out of service area.
Brownstone Homes at Guilford Reserve Section 2 - Please resubmit plans and application.
Laurel Ridge - Plans received.
Carmel Water Operations Facility - Plans received and reviewed. A District Application needed. Additional
information will be requested.
Old Town Apartments, Robinson - Outside service area.
Baby Tracts, lots 20-21 - St. Mary & S1. Mark Coptic Orthodox Church -- Plans were received and reviewed. No
action needed.
Martin Marietta Materials - Mueller Property South - Out of service area.
12/28/2005
..
Page 2 of 2
~
u
lJ
Jennifer Bruner
District Engineer
Clay Township Regional Waste District
10701 N. College Ave. Suite A
Indianapolis, Indiana 46280
jennifer,bruner@ctrwd.org
(317) 844-9200
(317) 844-9203 fax
From: Griffin, Matt L [mailto:mgriffin@carmel.in.gov]
Sent: Tuesday, November 08,2005 7:18 PM
To: Adrienne Keeling; Blanchard, Jim E; Brook Gajownik (E-mail); Chuck Shupperd; Cinthia Klaiber (E-mail);
Conn, Angelina V; Connie Tingley; Dean Groves; DeVore, Laura B; Dick Hill; Andrew Williams; Duffy, John M;
Duncan, Gary R; Greg Hoyes; Gregory J. IIko (E'-mail); Griffin, Matt L; Holmesl Christine B; Hoyt, Gary A; Jason
LeMaster; Jennifer Bruner; Jennifer Marlett; Jim Foster; John South; Klingensmith, David W; Krueskamp, Theresa
A; Larry Castetter (E-mail); Littlejohn, David W; M Snyder; Mark Wood (E-mail); Michael Fogarty; Mike
Hollibaugh; Mike McBride; Mike McBride (E-mail); Paul Pace; Phyllis Morrissey; Ramona Hancock; Redden, Nick;
Richard Heck (E-mail); Ron Booher (E-mail); Ron Farrand; Ron Morris; Sarah Lillard; Scott Brewer; Shirley Hunter
(E-mail); Teresa Magee; Westermeier, Mark; William Akers
Subject: November 16 TAC Agenda
Please see the attached agenda.
Contact me with questions.
Matthew L Griffin, AICP
Planning Administrator
Department of Community Services
City of Carmel
One Civic Square
Carmel, IN 46032
phone: 317.571.2417
fax: 317.663.3208
email: mgriffin@carrn~Lill.gQ...
12/28/2005
11/14/2005 16:14
317776'3528
W
HAMILTON CO SURVEYOR
U
PAGE 01/02
.'Kenton C 'U'atd, Sllm~yor
"PfrIIllC (1 J. 7) 7iti-S,/-:lS
'T-a.. (JI7) "''''~'c'f~~
November 14,2005 - ".
Slfir,' J<'i,~
D're J{amilftJlI ComJl)' SiIIlDI'~
.?voMl',ldltl', IlIdimrCl 1-6('(';(1-~;;'.lO
Paul I. Cripe, Inc.
A TTN: George Zboyovsky
7172 Graham Road
Indianap[)lis. IN 46250
VIA FACSIMILE: 841-4798
RE: Carmel Water Operation Facility
Dear Mr. Zboyovsky:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's
Office on November 1, 2005 for this project and have the following comments:
1. The proposed project falls in the incorporated area of the City of Carmel.
2. The proposed project DOES NOT fall in a Carmel Wellhead P,rotection Zone.
3. The proposed project falls in the r.w. Brendel Regulated Drain Watershed.
4. While the majority of the existing storm sewers on this site are regulated drains,
the new proposed stonn sewers wUJ not become regulated drain and will be the
maintenance responsibility of the City of Carmel.
5. All storm sewer issues will be reviewed by Carmel -Engineering and Crossroad
Engineering. The HCSO does have some concerns that is appears the total system
flow is higher then the pipe capacity in the drainage calculations.
6. Please provide HeSO will copies of any revisions to the drainage caleulations or
construction plans.
7. Please submit an outlet pennit to the J.W. Brendel Regulated Drain. This request
will need to be for 2'outlets at Point 1007 and 1009. The application is available
on our websiteat htt:D:IIW\VW.c().hami1tonjn.us~go to Departments. Surveyor. and
Forms. The fees for this outlet pennit are waived beeause this i$ a project being
constructed by another governmental agency.
11/14/2005 16:14
3177769628
U
HAMILTON CO SURVEYOR
U
PAGE 132/132
8. Please note the additional commentS may be warranted at a later date.
Should you have any questiolU, I can be reached at 317-776-8495.
:~~
Greg HlJyes
Plan Reviewer
--
.~ \. I
~I' ""_
r/~ ,,~. ~ '
/"~- ~
L"- ~tCt.~", 1- '
:" ~\)\! \ u. :. J" ;:.': '
- ,:\ ~\)~~ ~:~
<). / ~"I .
.' /~ ..-:'1f!\'Y"
. <:.')'-' ': l!J;:.:Y
cc: Matt Griffin - Carmel DOCD
Dick Hill - Carmel Engineering
John South - HCSWCD
Mike McBride ~ HeRD
Crossroads Engineering
w
C<8lJr:meli
u
November 14. 2005
/ :<~J -ilIJ
.;" y /'
\~J.-' ., \
I "~/~ ~, ~ ~...
;.~~' ,,~I~~Cf/~fD
--I ~ .';, ~c,l?'
': \~~, DOc.'S
, ,~
,/
'<$"1
~ w-I
Mr. George Zboyovsky
Cripe
7172 Graham Road
Indianapolis, IN 46250
RE: City of Carmel Water Operations Facility
Dear Mr. Zboyovsky:
I have received and reviewed the information for the above-mentioned'
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of a'ny further assistance to you, please contact us.
Respectfully,
,;?JuuwP j) ,L4
Michael D. Fo~:J~
Chief of Po.lice
MDF:vb