Holmes, Christine B
",~"~,..",."-,.,.~,~,~.~",.~,.,,,,,,,,,~,',,,,,"_.,="N~C-:'"~". .n_~~~'O=",~".,,,,,.,,.,",,cc^~~,,,,,=.vs,~~m.,-.~'_~,,,,,,",,",,",,,-'~-A"~"-~'--~-~''''''''''''''''.'.'~''''':''
From: Holmes, Christine B
Sent: Tuesday, December 13, 20052:32 PM
To: Griffin, Matt L; Brewer, Scott I; 'CMeador@amercons.com'; Conn, Angelina V
Subject: RE: Estes Chevrolet Driveway
Dear Christine,
We've been discussing the proposed site plan, in light of the existing vegetation and stub, and would like to suggest angling the
connection south, to run more or less parallel with the retention pond, This would both preserve more of the vegetation, and help
to slow vehicles as they enter the property, The driveway is also proposed to cross a dry detention pond, as shown on site plans
filed with petition 84-00 DP/ADLS; preserving the existing vegetation to the greatest extent possible would help mitigate the
additional pavement in a detention area. I understand you are placing the project on hold, pending possible revisions; please let
us know if the proposed revision would be acceptable.
Thank you,
Christine Barton-Holmes
Planning Administrator
Carmel City Hall
One Civic Square
Carmel, IN 46032
(317) 571-2425
-----Original Messagenm
From: Griffin, Matt L
Sent: Tuesday, December 13, 2005 1:50 PM
To: Holmes, Christine B
11 Subject: FW: Estes Chevrolet Driveway
From: Brewer, Scott I
Sent: Tuesday, November 29, 2005 2: 14 PM
To: 'Meador, Christine'
Cc: Conn, Angelina V; Griffin, Matt L
SUbject: RE: Estes Chevrolet Driveway
Dear Chris
I understand, but you may want to check with the planner Matt Griffin, They may have to have a landscape plan to get
through the planning process. Certainly you will have to have one before they receive building permits,
Of course, my preference would be to keep the large existing shade trees if that is possible.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
~,,,,,~::,,,,:..,,,,,_...,......,,,_.,,,~,,,",,,,..,.~~.~,._,,_~~,,",,,,,,,,,,,,=",~~,^,':~~,,"''"'''''''''''.~.,oo-".,..""",^.,."~,_c..~,-=-~,"""",,,,,"~~=''''' ""-""",,.,,~~:,""'-''''~'~~'''-,,",,^'~~''~-'.."^
From: Meador, Christine [mailto:CMeador@amercons.com]
Sent: Tuesday, November 29,2005 11:01 AM
To: Brewer, Scott I
12/13/2005
Page 2 of 4
Subject: RE: Estes Chevrolet Driveway
Scott - I spoke with the client this morning and they are potentially putting the project on hold until the spring. They do not
have a problem with installation of plantings and those will be incorporated into the plan but we may not revise the plans
until they are closer to actually building the drive in the spring I just wanted to let you know the change in time frame so
you were not waiting on something for 3 months.
Thank you for your assistance and I will forward the revised plans on to you when they are completed.
Chris
Christine Meador
American Consulting, Inc.
7260 Shadeland Station
Indianapolis, IN 46256
317-547-5580
317-543-0270 fax
317-459-3629 cell
WWllt.i3.m~rc::Qn~,C_9JlJ
ve'~~"~""<""""''''''''~'~'~'~.'~'_~-...r"C-~'''-'''''"'''''''''''''~='''';o-~ ~ .~~..~"_""~"'~",::,..,,,~'":~,,,,::::,,:,,~,._,.._ on ... ... "...",...,,,'~,''''''_~',,,u,,,'_''''''~c'-'''~'~'"'~'"''''~V~~~'~'''''AA"'.'^''..^'"'______=~".~,'~"."'''~''~~'>>.L~'.'^'~>>.,,'~'''^'''_.,~,,_~,~.-.~~""""'-~~~""
From: Brewer, Scott I [mailto:SBrewer@carmel.in.gov]
Sent: Monday, November 28, 2005 5:33 PM
To: Meador, Christine
Cc: Griffin, Matt L
Subject: RE: Estes Chevrolet Driveway
Dear Christine:
f>.
Here is the ordinance that does apply to your plat, you can follow the imbedded link to see that landscaping
tables. What I was hoping was that since you were removing a significant area of trees (and once they were
removed ~ they wouldn't be coming back), you would be willing to put some back since you didn't know what
you were going to do ultimately with the property. I would think that would appease the plan commission,
rather than just saying that Estes isn't proposing any land5caping,
Your own photographs show large significant shade trees there. It would seem that planting trees along the new
roadway or around the drainage pond in places that would not be further developed in the future, wouldn't be
much ofa problem.
26.04 Perimeter Buffering Requi.rements.4
26.0401 Thc rcquircmcnts ofthis Section shall apply to all Special Uses, Subdivision Plats, propcl1ics
containing multi-family uses, and properties within all Business, Manutacturing, and I.ndustrial
districts, unless other buffer or perimeter planting standards are. specified witbin an individual
district or zone.
26.04.02 Wherc requ ired, perimeter buffering shall be located along the front, side and rear lot lines of a
lot/parcel and shall extend the entire length of the front, side and rear lot lines.
26.04.03 Where residential or other buildings back onto a public thoroughfare, butler plantings shall occur
outside ofthe public right-of-way, per the Tables below.
4 Section 26. OJ adopted per OrdillUJ1i;e Nu. 2-365-01: as amended per Ordin(fnce No Z-4711-05. SP
CITY OF CARJ\'IEL ZONING ORDINANCE
Cllapter 26: Additional Height, Yard, Lot Area and Buffering Regulations
26-4
as amended per 2-318, 2-320; Z-327; Z-365-01; 2-369-02: Z-382-02. Z-453-04: Z-470-05, Z-478-05
SlIllll11er 2005 v]
26.04.04 Perimeter buffering shall not be located within any portion of a dedicated public street right-or-way, private street right-of-
way, orCoullty regulated drain easement.
26.04.05 Existing vegetatioll may be used to achieve project butfering if:
(a) the vegetation located upon the subje<:t parcel is of a quality and state of health to achieve
buffering, and,
12/13/2005
Page 3 of4
(b) the vegetation is proposed to be preserved using accepted best management practices for
tree protection during construction.
26.04.06 To determine the applicable bufTeryard requirements:
(a) Use the Table/or Bl!Ueryard Determination to identify the land LIse category of the
proposed project use.
(b) Use the TableJor Bufferyard De/ermina/ion to identify the land use(s) orthe adjoining
propeliies, or identify the street classification adjoining the proposed use by referring to
thc Official Thoroughfare Plan of Carmel-Clay Township.
(c) Determine the bufferyard(s) required on each boundary (or segment thereof) of the
subject parcel by referring to the Table fur Bufferyard Determination.
ll.t t~ P :LJ "J1F1~1.~.t.'mr;:a..:En\s,_1 . i Il.-l~"3 / ~3"'.f_~v.:..l c.~_S.jI:.lO_C9 / DOC S ? (JiJ5~Q~h.J?tTS.LZ_Q~_?.Q~ h'~ ? 0 ? (SJ>2.l1A_0.ciit:j:.Q.Q':l:1":,
? OHeiqht'5 2 OYardC~? OLot>,';?OArea% 20Buffering~5;;: 0 (Summe:cZi2 02 0 (] 5"\ 2 0,(1) . pdf
5 Table/Of" Bujje!yard DerermillallOI1 amended per Ordinance No. 2-470-05, ,\''1: Z-478-05, j'd
Please email me back with further questions or comments.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
<"_"......',.."".._''^~,-.""-'...,,...,..-'.~~,~u.,..._'^'"_~.~.~~' ....,""""~~_.~~~."....",..,"<=~..,......>"""-,.,.'_'"w~""~^'.~m.-__.,x~..,.."...""..",.."h"".,w.:....."""~nw=<--",.,~-..."~ ,_,."_""",,,,...,,,-,.,,,,,~'_~,,-""""'~'A~-_~~'~---'_'.'._..,,..
From: Meador, Christine [mailto:CMeador@amercons,com]
Sent: Monday, November 28! 2005 4:04 PM
To: Brewer! Scott I
Subject: Estes Chevrolet Driveway
Scott:
We are trying to finalize the Estes driveway plan set and the only item remaining is to address your concerns from the
T AC. This project is not within the Michigan Road/US 421 overlay. I have attached several photos of the area in
question, It is basically an overgrown tree line with a few scattered mature trees and lots of smaller trees and saplings.
As we are not developing the parcel at this time, Estes is not proposing any landscaping. The proposal includes only a
driveway internal to the Estes parcel.
We appreciate your assistance in this project and look forward to finalizing the plans as quickly as possible. If you have
any questions or comments please contact me. I will be in the office most of the week.
Thank you
Chris
DISCLAIMER:
This message contains confidential information and is intended only for the individual named. If you are notthe
named addressee, you should not disseminate, distribute, or copy this e-mail. Please notify the sender
immediately bye-mail if you have received this e-mail by mistake, and delete this e-mail from your system. E-
mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted,
corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept
liability for any elTors or omissions in the contents of this message which arise as a result of e-mail
transmission. If verification is required, please request a hard-copy version. American Consulting, Inc., 7260
Shadel and Station, Indianapolis, IN 46256, USA, http://Vv\l\-w.amcrcolls.com/'
12/13/2005
)
.I
Road Construction 2005
Paving Projects
Roads
Interstate
US Highway
State Road
Major Roads
Minor Roads
Subdivision Roads
New Subdivision Roads
Private Road or Drive
Parcels: September 2005
l:8iI Color Ortho Photo 2004
D Corporation Boundary
~ Pending Annexation
Map1
.tT
::JIf'
.... '"
~~
-'e.
,.".
-
.
SCALE 1 : 1 ,683
!~
y/'
~ ~ '"""1 I I
100 0 100 200
FEET
http://216.37.62.70/map/carmel.mwf
~
300
dVl1 cfete/M-101l ~
Tuesday, December 13, 2005 9:09 AM
~
Pacre 1 of2
o ,
Conn, Angelina V
From: Schmitt, Jeremy [JSchmitt@amercons.com]
Sent: Wednesday, October 12, 20057:45 AM
To: Conn, Angelina V
Cc: Griffin, Matt L
Subject: RE: Docket No. Assignment: (TAC) North American Park - Bill Estes Chevrolet (#05100001 TAC)
Angie:
Thank you for the quick response to our petition. Sorry it has taken me so long to get back to you. We offer the
following responses to your comments:
1. We have provided a typical pavement detail and cross section along with specifications on Sheet 4 of the
plans. Please let me know if you need additional information.
2. The driveway will have a short transitional section of curbing where it ties into existing curbing at the east
end of the project. A detail is provided on Sheet 4 of the Plans. The remainder of the driveway will have
no curbing. .
3. Bill Estes Chevrolet, Inc. currently owns all parcels we are crossing. I am assuming we do not need a
letter since they are the project owner. Please let me know if that is not the case.
Please let me know if you need anything else.
Sincerely,
Jeremy Schmitt
American Consulting, Inc.
."''''~~"''~'~~"^"'-~=.'~''''''''''''^-'''''''-''''',.~-~~=-c....",........,,-~~___._~_.,.._._'~"""""_~~_.."..,.,..".....,.,..~,
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Tuesday, ,October 04, 2005 9:29 AM
To: Schmitt, Jeremy
Cc: Griffin, Matt L
Subject: Docket No. Assignment: (TAC) North American Park - Bill Estes Chevrolet (#05100001 TAC)
Jeremy:
This is a preliminary review letter for the driveway from the Bill Estes site, which will connect to another parcel.
Additional comments may be made at the Oct. 19 TAC meeting. Please complete the following:
1.) Provide pavement specs/details of the driveway.
2.) Will the driveway have curbing?
3.) Provide correspondence from eaCh parcel property showing each property owner supports this driveway
across his/her parcel.
Please do not make revisions until you receive correspondence fro the other TAC members. Please call or email
me if you have any questions or concerns.
Sincerely,
Angie Conn, Planning Administrator
Division of Planning & Zoning
Dept. of Community Services
City of Carmel
p.317-571-2417 f.317-571-2426
aconn@carmel.in.gov
10/12/2005
."
"'"
Page 2 of2
DISCLAIMER:
This message contains confidential information and is intended only for the "individual named. If you are
not the named addressee, you should not disseminate, distribute, or copy this e-mail. Please notify the
sender immediately bye-mail if you have received this e-mail by mistake, and delete this e-mail from
your system. E-mail transmission cannot be guaranteed to be secure or error-free as information couLd
be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender
therefore does not accept liability for any errors or omissions in the contents of this message which arise
as a result of e-mail transmission. Ifvetification is required, please request a hard-copy version.
American Consulting, Inc., 7260 Shadeland Station, Indianapolis, IN 46256, USA,
htt12jL~wF.(ll1JgIg_Qns_,!;;Qml
bttlJ:/LW}y'y'{,_~Inq.i.J~li..~.~lnin1S~I~,G_Qml
10/1212005
10/11/21211215 19:3121
3177769528
- - .
U
HAMILTON CO SURVEYOR
PAGE 01/1212
v
C--TJ5'1-Q~~l\()O~"--{ -~.
'--" _. _ . _ J~_J_ __ _ ...r
~Kenrol1 C. "Ward, SIITtlCVOr
I
'T/i,me U l7.J 77l,-S4:t5
'rax (Pi) 77l;-51t;;!.~
Suire ,68'
OIIC .1(rlJ!lilt~/1 Cmmfy SqUill"(
.l{ob/m'ill,'. IlInirmn 46C'6r1-::2.W
October 11, 2005
Am.ericatl Consulting, Inc.
ATrn: Michael Jett
7260 Shadeland Station
Indianapolis,lN 46256-3917
VIA F ACSIM1LE: 543..0270
~
'O'i-t'0.~t~
" t'j '1..~~~
~\l-
~\:Jt~
Re: Bill Estes Driveway
Dear Mr. Jett:
We have reviewed the construction plans submitted to the Hamilton County Surveyor~s
Office on October 4. 200S for this project and have the following comments:
1. The proposed project falls in unincorporated Hamilton County.
2. The proposed site DOES NOT fall in a C~el Wellhead Protection Area.
3. Does the existing pond ba.ve storage capacity to hold the increase runoff from the new
impervious area?
4. The Hamilton County Surveyor's Office would like to see supporting data for the
amount of watershed the drains through this open channel and the siring of the pipe
. under the new driveway. While it is not a regulate4 drain. we believe tbllt a pipe
larger then tln:: 12u Rep is needed to properly drain the upstream watershed.
5. The HCSO has been in contact with potential buyers of the property at approximately
98th Street and Michigan Road (west side) which is cUl'I"entlya vacant lot. It would
appear that this site drains to this open swale and may need to use this swale as the
outlet for that s.ite. Any contact regarding this possible: ,eenano would come from the
potential buyer and would be made 'With the land owner of the parceL This could
contribute more water to this swale in the future.
6. No permits will be needed from this office.
10/11/2005 19~30
3177759628
U
HAMILTON CO SURVEYOR
U
PAGE 02/02
'"
7. Please Dote that further comments maybe'Dece$sary at a later date.
Should you have any questions, I "can be reached. at 317~776~8495.
Sincerely,
2k4~
Greg Hoyes
Plan Reviewer
cc: Matt Griffin - Cllt1l1el DOCD
John South - EICSWCD
Dick. Hill - Carmel Engineering
Mike McBride - HCHD
Crossroads Engineering
C<8lJrm.eR
i.0eLcrooo./1
u
u
f
1,~~~!.:rl
.....,~iJPl.&J["frmeJITL t
}.:::.:~;~,~;W
, i'f
}l 60 32
October 7,2005
;'JJ \ i.Dii/ ~ '"
,\;;;:- _.~~....,(: ,:.
}-'-'. ,. /
,:.)-;' , .' ,
/~,'1 RtCll!le '~'"
I."~ I OCr; 1 lJ I.
.. 2005
., IJOCS
Michael B. Jett
American Consulting, INC.
, 7260 Shadeland Station'
Indianapolis. IN -.46256
- r ':<,. \
RE: Bill Estes Driveway
Dear Mr. Jett:
I have received and reviewed the plans submitted for the above-mentioned
project
At the present time, I see nothing in the 'plans that would hamper law enforce-
ment efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~~~;:~
Chief of Police
MDF:vb
cc: Dept. of Community Services
A Nationally Accredit
CH?) 571-2&00
forcement Agency
]Fa"liU 71 571-2512
.-
. -;--UJOOOO I
rO:5'L - .-- ,'-
.-,
. ,/
- j
u
u
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: I .Bill Estes Chevtble.t'b.riVe.wa~~i(l!9Jl.Q!L-J County: Hamilton
Plan Submittal Date: 10/04105 Hydrologic Unit Code:
Project Location Description: 4510 W. 96th Street, Indianapolis
Latitude and Longitude:
Civil - . Clay Quarter: Section: 7 17N n 3E
::: ....
.=
..... Project Owner Name: Bill Estes Chevrolet
~
::
i: Contact:
.Q 4510 West 96th Street
- Address:
c:
..... Indianapolis State: IN Zip: 46268
.... City:
~
Q.l Phone: FAX: E-Mail:
......
e
;..
~ Plan Preparer Name: Jeremy Schmitt
Aftiliation: American Consulting Engineering
Address: 7260 Shadeland Station
City: Indianapolis State: IN Zip: 46256
Phone: 317-547-5580 . FAX: E-Mail:
Review Date: 10/07/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
Q,l
.~ Agency: Hamilton Counry Soil and Water Conservation District
Q,l
r::::: Address: 1108 South 9th Sh'cet
.; City: Noblesville
=.. Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd,org
PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional informatioIl included on the following page(s).
D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of EnvironmentalManagemenl. Construction activities may begin 48 hours following the submittal of
the NOl. A NO] must also be sent to the
D A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
D Please refer to additional information included on the following page(s).
D Submit Notice ofIntent (NOI): Attach a copy of this cover page when submitting the Nor to the rndiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOJ. A NOI must also be sent to the SWCD,
D PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
D Please refer to additional information included on the following page(s).
D DO NOT file a Notice of Intent for this project.
D DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
D Plan Revisions D Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR. Division ofSoii Conservation
Page 1 of 8
Revised 12/09/03, Form 1
u
u
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Bill Estes Chevrolet Driveway Construction
Date Reviewed: 10/07/05
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution
Prevention Plan for the project, The Plan submitted was not reviewed for the adequacy of the engineering design. All
measures included in [he plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed
'01' other local, state, orfederal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to further evaluate the Plan.
All proposed stormwaterpollution prevention measures and those referenced in this review must meet the design criteria
and standards set/orth in the "Indiana Storm water Quality MWJual"from the indiana Department afNatural
Resources, Division of Soil Conservation or similar Guidance Documents.
Please direct questions and/or comments regarding this plan review to: .
John B. South P.E. CPESC
Please refer to the address and contact information identified in the Plan Review Section on page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
o Yes D No
The items checked below are deficient and require submittal to meet the requirements of the rule.
A
D
Index showing locations of required Plan Elements
o 2 11 by 17 inch plat showing building lot
numbers/boundaries and road layout/names
o 4 Vicinity map showing project location
D Narrative describing the nature and purpose of the
3
project
D 5 Legal Description of the Project Site
(Include Latitude and Longitude - NOT Requirement)
D 6 Location of a11lots and proposed site
improvements (mads, utilities, structures, etc,)
iD
D 8 Notation of any State or Federal water quality
permits
D Specific points where stormwater discharge \villleave 0 Location and name of all wetlands, lakes and
th t 10 d d' h'
9 e si e water courses on an a Jacent to t e site
o Identification of potential discharges to ground
12 water (abandoned wells, sinkholes, etc.)
O 0 Pre-construction and post construction estimate of
13 100 year tloodplains, floodways, and floodway fringes 14
Peak Discharge (10 Year storm event)
o 6 Locations and approximatc boundaries of all
1 disturbed areas (Construction Limits)
o Soils map including soil descriptions and
18 limitations
20 Plans.for anyoff-site co.nstruction activities
assOCIated WIth this project (sewer/water tie-ins)
D Existing site topography at an interval appropriate
22 . d' dr .
to m Icate amage patterns
o 11 Identification of all receiving waters
D 7 Hydrologic unit code (14 Digit)
15 Adjacent landuse, including upstream watershed
o 17 Identification of existing vegetative cover
O Locations, size and dimensions of proposed stom1water 0
19 . I d
systems (e.g, pIpes, swa es an channels)
D 2 Locations of proposed soil stockpiles and/or
1 borrow/disposal areas
D Proposed [maL topography at an interval appropriate to
23 - d' d'
III lCate _ ramage patterns
DNR, Divisioll a/Soil COlisen'atioll
Page 2 of 8
Revised 12/09/03, Form 1
u
u
Construction/StormwaterPollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Bill Estes Chevrolet Driveway Construction
Date Reviewed: 10/07/05
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
~. ..
.... =
~ ~
::I ....
~r.;
-Q,,). ,......
"Cl~
~ ~
DD
DD
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation uf the plan and inspections of the construction site are
necessary to minimize the discharge of pollutants. The Project Site Owner should be aware Ihal
unforeseen construction activities and weather conditions may ciffect the performance of a practice or the
effectiveness of the plan. The plan must be a flexible document, with provisions to modify or substitute
practices as necessary.
Description of potential pollutant sources associated with construction activities
Sequence describing stormwater quality measure implementation relative to land disturbing
activities
Stable construction entrance locations and specifications (at all points of ingress and egress)
Sediment control measures for sheet flow areas
Sediment control measures for concentrated now areas
Storm sewer inlet protection measure locations and specifications
Runoff control measures (e.g. diversions, rock check dams, slope drains, ete.)
Storm water outlet protection specifications
Grade stabilization structure locations and specifications
10 Location, dimensions"specifications, and construction details of each .stormwater quality measure
11 Temporary surface stabilization methods appropriate for each season (include sequencing)
12 Permanent surface stabilization specifications (include sequencing)
13 Material handling and spill prevention plan
14 Monitoring and maintenance guidelines for each proposed stormwater quality measure
15 Erosion & sediment control specifications for individual building lots
DDD
DDD
DDD
DDD
DDD
DDG
DD
DD
DD
DD
DD
DDD
~ .....
..... c
~ QJ
;r .u
~ ."'"
"Cl 't
~ Q
DD
DD
DD
DD
DD
The post construction component of the Storm water Pollution; Prevention Plan includes the
implementation of stomiwater quality measures to address pollutants Ihat will be associated with the
mallanduse. Post construction stormwater quality measures should be functional upon completion of
the project. Long term functionality of the measures are critical to their performance and should he
monitored and maintained.
Description of pollutants and their sources associated with the proposed land use
Sequence describing stormwater quality measure implementation
Description of proposed post construction stormwater quality measures
(Include a written description of how these measures will reduce discharge of expected pollutants)
Location, dimensions, specifications,. and construction details of each stormwater quality measure
Description of maintenance gu~delines for post construction stormwater quality measures
DNR, Division o/Soil Conservation
Page 3 of8
Revised 12/09/03, Form I
u
u
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment
Project Name: Bill Estes Chevrolet Driveway Constmction
Date Reviewed: 10/07/05
This project disturbes less than one acre ofland. A SWPPP is not required. This project was not
revi ewed.
cc: Carmel, Surveyor, File
DNR, Division o.(Soil Conservation
Page 4 of 8
Revised /2/09/03
u
u
Construction/Stormwater Pollution l~revention Plan - Technical Review and Comment
Project Name: Bill Estes Chevrolet Driveway Construction
Date Reviewed: 10/07/05
DNR, Divison oj Soil Conservation
Page 50f8
Revised i 2/09/03
u
u
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment
Project Name: Bill Estes Chevrolet Driveway Construction
Date Reviewed: 10/07/05
DNR, Division of Soil Conservation
Page 6 of 8
Revised 12/09103
u
u
Constructioll/Stormwater Pollution Prevention Plan - Technical Review and Comment
Project Name:
Date Reviewed:
Bill Estes Chevrolet Driveway Constmction
10/07/05
DNI?, Division of Soil Conservation
Page 7 of 8
Revised 12/09103
u
u
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment
Project Name: Bill Estes Chevrolet Driveway Construction
Date Reviewed: 10/07/05
DNR, Divisio/l of Soil COllsen1atiofl
Page 8 of 8
Revised J 2/09/03
Cr
EL
JAMES BRAINARD, :N1A.YOR
October 5, 2005
~
RECEWED
OCT'" 2005
DOGS
Mr. Michael B. Jett
American Consulting, Inc.
7260 Shadeland Station
indianapolis, IN 46256
RE: Bill Estes Chevrolet drive,yay
Dear Mr. Jett:
This project, scheduled for the October 19,2005 Technical Advisory Committee meeting, is located outside
the current corporate limits of the City of Carme I and therefore, outside of the Department of Engineering
jurisdiction.
Gary R. D can, Jr., P.E.
Assistant ity Engineer
Department of Engineering
cc: Matt Griffin, Department of Community Services
Greg Hayes, Hamilton County Surveyor's Office
John South, Hamilton County Soil & Water
Greg Ilko, Crossroad Engineers
Mike McBride, Hamilton County Highway Department
Engineering Department Revic\v
Project File
DEPARTMENT OF ENGINEERING
ONE C!VIe SQUARE, C\R!>IEL, IN 46032 OFFICE 317.571.2441 FA,\ 317571.2-'139
EMML cnginee ['j ng@cLcarl11e].in.us
u
u
Page 1 of 1
Conn, Angelina V
From: Conn, Angelina V
Sent: Tuesday, October 04, 2005 9:29 AM
To: 'jschmitt@amercons.com'
Cc: Griffin, Matt L
Subject: Docket No. Assignment: (TAC) North American Park - Bill Estes Chevrolet (#05100001 TAG)
Jeremy:
This is a preliminary review letter for the driveway from the Bill Estes site, which will connect to another parcel.
Additional comments may be made at the Oct. 19 TAC meeting. Please complete the following:
1.) Provide pavement specs/details of the driveway.
2.) Will the driveway have curbing?
3.) Provide correspondence from each parcel property showing each property owner supports this driveway
across his/her parcel.
Please do not make revisions until you receive correspondence fro the other TAC members. Please call or email
me if you have any questions or concerns.
Sincerely,
Angie Conn, Planning Administrator
Division of Planning & Zoning
Dept. of Community Services
City of Carmel
p.317-571-2417 f.317-571-2426
aconn@carmel.in.gov
10/4/2005
AMERICXN CONSUL~fING, INC.
Architects
Consultallt\.
Engineers
7260 Shadelallcl Station, Indianapolis, IN 46256
(317) 547-5580 FAX: (317) 543-0270
info@amercons.com
LETTER OF TRANSMITTAL
Date: 8/19/05
Project Name: Bill Estes Driveway
Project Number: IN20050564
We are [gJ Enclosed via 0 Mail [6] Messenger D Overnight
sending you: 0 Separately 0 As Requested [6] For Your Review & Comment [6] For Your Information
Deliver by: Time:
From: Michael B. Jett
Remarks: The attached items are being submitted for your review. This project has been filed at the Carmel Department of
Community Service for an TAC Application Review. If you have any questions regarding this project, please contact our office.
Th L
an ;, you.
o John Duffy o Cindy Klaiber
Carmel City Utilities Carmel Postmaster
130 First Aven ue SW United States Postal Service
Carmel, IN 46032 275 Medical Drive
Carmel, IN 46032-9998
o Bill Akers D Mark Westermeir D Ron Farrand
Carmel/Clay Communications Carmel/Clay Parks Department Carmel/Clay Schools
31 First Avenue NW 760 Third Avenue SW 5201 East 131 st Street
Carmel, IN 46032 Carmel, IN 46032 Carmel, IN 46033
D Dean Groves o Jim Blanchard
Cinergy Asst. Building Commissioner
1441 S. Guilford Road One Civic Square
Carmel, IN 46032 Carmel, IN 46032
o Candy Feltner o Scott Brewer o Gary Duncan/Nick Ridden
Clay Township Regional Waste District Dept.of Communily Services Dept of Engineering
10701 N. College Ave., Suite A One Civic Square One Civic Square
Indianapolis, IN 46280-1098 Carmel, IN 46032 Carmel, IN 46032
D Steve Broermann o Jason LeMaster
Hamilton Co. Engineering/Hamilton Co. Hamilton County Health Department
Highway Hamilton Co. Judicial Center, Suite 30
1700 South 10th Street One Hamilton Square
Noblesville, IN 46060 NOblesville, IN 46060-2229
D Robert Hendricks o John South o Greg Hayes
Hamillon County Local Emergency Hamilton County Soil & Water Hamilton County Surveyor Office
Planning Committee Conservation One Hamilton Square, Suite 146
18100 Cumberland Road 1108 South 9th Street Hamilton County Judicial Center
Noblesville, IN 46060-1624 Noblesville, IN 46060 Noblesville, IN 46060
u
u
AMERICAN CONSULTING, INC.
Architects
Consultants
Engineers
7260 Shadeland Station, Indianapohs, IN 46256
(317) 547-5580 FAX: (317) 543-0270
info@amercons.col11
LETTER OF TRANSMITTAL
We are [2J Enclosed via D Mail
sending you: 0 Separately D As Requested
Deliver by: Time:
From: Michael B. Jett
Remarks: Bill Estes Driveway
[gJ Messenger
~ For Your Review & Comment
D Overnight
o For Your Information
Date:
D Chuck Shupperd D Ron Morris D Jennifer Marlett
Indiana Gas Co. ; Indianapolis Power & Light Co. Indianapolis Water Co.
PO Box 1700 3600 N, Arlington Avenue PO Box 1220
16000 Allisonville Road Indianapolis, IN 46218 1220 Waterway Blvd.
Noblesville, IN 46060 Indianapolis, IN 46206
D Brandy Earl D Gregory IIKO, PE D Gary Hoyt
Brighthouse Networks Crossroads Engineering Office of Fire Chief, Fire Station #1
3030 Roosevelt Avenue 3417 South Sherman Drive Two Civic Square
Indianapolis, IN 46218 Beech Grove, IN 46107 Carmel, IN 46032
o Michael Fogarty o Teresa Magee/Mark Wood D Sharon Prater
Office of Police Chief Panhandle Eastern Pipeline Co. Panhandle Eastern Pipeline Co.
Three Civic Square PO Box 38 PO Box 38
Carmel, IN 46032 9371 Zionsville Road 9371 Zionsville Road
Zionsville, IN 46077 Zionsville, IN 46077
D Mike McBride
Hamilton County Highway
1700 South 10th Street
Noblesville, IN 46060