HomeMy WebLinkAboutCorrespondence ~~t ~ C1 {)5! (fooo~J EL November 10, 2005 Mr. James K. Shinneman, P.E. Weihe Engineers, Inc. 10505 North College Avenue Indianapolis, IN 46280 RE: Meadowlark Office Park Relocated Parking-Project Review #2 Dear Mr. Shinneman: The City has received your comment letter and drawings dated October 31, 2005 based upon the City review of October 12, 2005. The conmlents from the City review have been satisfactorily addressed with the following exceptions: CONSTRUCTION PLAN COMMENTS 13. Sheet COOl - Please remove contact information for Clay Township Regional Waste District; this area is not within their jurisdiction. Please revise address for Carmel City Utilities to 160 3rd Avenue SW. 14. There are two sheets designated as C104. Please provide the appropriate building addresses on the Site Plan sheet. 15. Sheets ClOI -;- CIOS - There are two areas labeled "EXISTING.BUILDING 706." Is this an error that needs to be revised? 18. Please explain "CPP" in the legend on Sheet elOS. Please incorporate the above items in the plans that are submitted for approval. All bonds and perfoffilance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments ifthe drawings submitted for approval do not address all of the items outlined above. If you have questions, please call me at 571-2441. DEPARTMENT OF ENGINEERJNG ONE CIVIC SQUARE, C...RIvlH, IN 46032 OFFICE 317.571.2441 F....x 317.571.2439 E/'o!.\lL engineering@ci.carmel.in,us r, Mr. James K. Shiill1eman, P .E. November 10, 2005 Meadowlark Office Park Relocated Parking-Project Review #2 Page 2 of2 cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Greg Ill:eo, Crossroad Engineers Paul Arnone, Carmel Utilities Proj ect File Engineering Department Review S:\DHILL \PROJREV05\\1EADOWLARKOFFICEP ARK#2 i. '^ ~.i OSloeit}().3.:TAC . .- . . ~ RfCttVto Ocr 1 92005 !JOCS CI October 12, 2005 ]A,'vlES BRAJNARD, MA..YOR "- Mr. James K. Shinneman, P.E. Weihe Engineers, Inc. . 10505 North College Avemle Indianapolis, IN 46280 RE: Meadowlark Office Park Relocated Parking-Project Re"iew #1 Dear Mr. Shinneman: We have reviewed the construction plans submitted for this project fOT review for the October 19,2005 Technical Advisory Committee. We offer the following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Streets and Right of Way, Pro Med Lane - City of Carmel . Water ~ Indianapolis Water service area . Sanitary Sewers - City of Carmel Utilities service area . Storm Sewers/Drainage - City of Carmel . Regulated! Legal Drains - Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements: . . Sanitary Sewer Availability - Not applicable for this project. .. Commercial Curb Cut approval- It does not appear that there are additional curb cut. requirements. Ifthere are, Board approval ",'ill be required. For BPWS curb cut requests, please provide 8 y," x II" exhibits of each curb cut requested. Each exhibit should include throat wi,dth, oyeralL width at stree~, radii and all other pertinent data. ..' . . " Temporary C9nstruction Entrance"'::' If applicable andiflocatedat a location other than . planned permanent entrances with the same requirements as curb cuts. (I Please be advised that allY open cuts of existing perimeter-dedicated streets linder City of Carmeljurisdiction will require separate Board of Public Works and Safety approval. . Any permanent improvement (including irrigation syster'ns) to be installed within dedicated right of way or dedicated easements. This approval would require a Consent to Encroach Agreement between the O'lmer and the City of CarmeL o Secondary Plat. approval (if applicable) o Right of Way Dedication (if applicable) I am enclosing a schedule for Board of Public \V arks and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. AllY submission to the Board requires prior approval by tlie Carmel Clay Plall Commission andlor the Board of Zoning Appeals (if applicable) and completion ofreview by tlie Technical Advisory Committee. All writte/l requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan COli/mission and/or the Board of Zoning Appeals (if applicable). 4. T.A.C. ReviewlDrawings submitted for approval: DEP,\RTMENT OF ENGINEERING ONE CiVIC SQUARE, CARMEL, IN 46032 OFFICE 317571.2441 FAX 317.571.2439 EMAIL engineering@ci.carmel.in.us We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for constructiOIl until all Engineering Department and Carmel Utilities issues have been resolved. The design engineer must certify all drawings submitted for final approval. We will require a minimum of four-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and by the Director of Carmel Utilities. One set will be distributed to the Qv,ner/Developerto be maintained on the construction site. Two sets will be retained by the Engineering Department and one-set will be distributed to Carmel Utilities, Ifmore than one approved/signed set is desired, we will approve a maximum of two additional sets for a total of six sets. However, the additional sets must be submitted with the'required four sets. . 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or dedicated easements wiII require a Consent to Encroach Agreement with the City of Carmel's Board of Public Works and Safety. 6. Carmel Utilities/W ater DistributionIW astewater Collection should be provided copies of all dra wings and revisions for review of sanitary sewer issues. They will provide a separate review regarding these issues. 7. Carmel Utilities does not subscribe to "Holey Maley" and should be contacted directly for all sanitary sewer locations. 8. We are enclosing copies of the following information for your use: . Commercial Project Approval Procedures . Building Permits GO Permit Data, Contacts, etc. BONDING REQUIREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performance Guarantees/Engineer's Estimates It does not appear that Performance Guarantees will be required for this project. Right of Way Permit and Bonding Any work in the dedicated right of way of Pro Med Lane will require a Right of Way Permit. A License & Permit typeRight of Way bond will be required in the amount of$2,000.00 per instance of work in the right of way. Any open cut in the pavement of Pro Med Lane will require separate Board of Public Works and Safety approval. 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this ofllce for review. We will share Crossroad's conunents as they are received. When construction plans are submitted for review for this development, please provide 2-sets of plans and calculations to allow us to send the extra set to Crossroad to save some time in the review process. AVAILABILITY AND CONNECTION :FEES 11. Sanitary Sewer Availability (acreage) and Connection Fees are not applicable to this project. CONSTRUCTION PLAN .COMMENTS 12. Please contact Crossroad Engineers to obtain a drainage review checklist. TIle Department will expect the design to adhere to this checklist. The Department of Engineering did not receive drainage calculations with the drawings. If you have not already done so, please submit drainage calculations and a set of drawings to Greg Ilko at Crossroad Engineers. Also, please provide a copy of the drainage calculations to the Carmel Department of Engineering. 13. Sheet COOl - Please remove contact information fOf Clay Township Regional Waste District; this area is not within their jurisdiction. Please revise address for Carmel City Utilities to 160 3'd Avenue SW. 14. There are two sheets designated as Cl 04. Please provide the appropriate building addresses on the Site Plan sheet. 11 15. Sheets CI01- C105 - There are two areas labeled "EXISTING BUILDING 706." Is this an error that needs to be revised? 16. Please confirm that the parking lot in the southwest part of the property was never built or will be removed and that the proposed parking area is less in area than tills area that was previously approved. ] 7. Please show the limits of the flood plain on Sheets C1 02 and C1 03. 18. Please explain "CPP" in the legend on Sheet Cl05. 19. Sheet LIDl - Landscape Plan. Please remove the landscape plan from the plans submitted to the Department of Engineering for approval. The Department of Engineering does not approve the landscape plan. 20. The Department of Engineering did not receive drainage calculations with the dra\'\omgs. Uyou have not already done so, please submit drainage calculations and a set of drawings to Greg llko at Crossroad Engineers. Also, please provide a copy of the drainage calculations to the Cam1el Department of Engineering. These comments represent the Department of Engineering's initial review of the development plan for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approvaL The Department reserves the right to provide additional comments based on subsequent reviews and on the grading and drainage system upon receipt of drainage calculations and more detailed construction drawings that provide grading elevations, pipe sizing and invert elevations. If you have questions, please call me at 571-2441. cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Greg Ilko, Crossroad Engineers Paul Arnone, Carmel Utilities Project File Engineering Department Review S:\DH ILL \PROJREV05\M EADOWLARKOFFICEP ARK I 10/11/2005 20:12 31 777~9528 U HAMIL TON CO SURVEYOR ~ ~.~__ P-AGE-- .01/01 . U t- - 05J(OSlOO3~~; :Kenton C 'H,lard, SlIrvevor r {'pllll/le (3l7J 77L~-Si/~)5 'TI/.~ (}1 (1 i7L~.9(;.:l~ $1lI1c 188 Om' :HamiltM C0!/11fy S'l'u!rr ./'/ohl"slliff(, Inn/Will 4(~O(;(1-2.1-Jtl October 11, 2005 Weme Engineerst lnc. A TIN: Jamie Shinneman 1 0505 North' College Avenue Indianapolis, IN 46280 VIA FACSIMILE: 843-0546 ~ ,.~ (~ ~~'V 1? ,\1.- ~ ~~\.J~ Re: Meadowlark Oftice Park Dear Mr. ShinDeman: We have :reviewed the construction plan submitted to the Hamilton County Surveyor1s Offioe on October 4. :Z005 for this project and have the following comments: 1. This project falls. within the incorporated area of the City of CanneL 2. The proposed p(Oject DOES falt in a Carmel Wellhead Protection Area. 3. The proposed project does not fall in a Regulated Drain Watershed. 4. Please direct all drainage questions to the Cannel Engineering Department. 5. Please note the additional comments may be warranted at a later date. Should you have any questions, I can be reached at 317-776-8495. 91-::;~ ~;(yes Plan Reviewer cc: Matt Griffin - Carmel DOCO John South - HCSWCD Dick Hill- Cannel Engineering Mike McBride - HCHD Crossroads Engineering I-- I , I!I!WEIHE ENGINEERS INC9 CIVIL ENGINEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITIAL ~,~ is.:> ...... ~"""a _& ss I\;Y "S. ,<. " -- \- r. I . \ " \ > -- '0.-1" .. / To: Dept. of Community Services > ~~, \~ '/~, ..~._/ ,"~'j.>' "''''-\0-. "\ .' I ,_~ ~'OJ;:nW~,y;.,. r~._ '. ,-, . . OJ: I . ..\ \ \ Project: Meadowlark Office Park One Civic Square Job#: W050557 Carmel,lndiana 46032 Phone: 317.571.2417 Ann: Angie Conn Fax: 317.571.2426 Date: October 11, ?005 Re: T AC Resubmittal We are sending you [gJ Attached 0 Under separate cover via Courier the following items: o Shop Drawings [SJ Prints D Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes ;:1, 0 Samples 0 Change Order(s) D Inspection Report o D SketcheslDrawings 0 Application(s) for Payment [SJ Sets Document Document Description o Copies Date Nwnber 1 Set of Construction Plans 1 Drainage Report These arc transmitted as indicated below: o Approved o Approved as Noted D Not Approved, Revise and Resubmit D Action Not Required o Action Indicated on Item Transmitted D For Signature. Return_Copies to Us ~ For Your Review or Use o For Your Review & Comment ~ As Requested D For Your Records o For Your Approval D Remarks: These revisions are based on comments received from several T AC members_ Please disregard original set and use this set for the T AC meeting. Thank you. By: James K. Shinneman, PE cc: IILL,\N H. WEIHE. ~.E. L.S. -PRESIDENT !D:'3Cl5 NOR.THCOLLEGr.. AV13'.;UE JNfJIAKAPOUS.INDfANA4628C1 W\-\'W.'VEnJENET (17) fl4(,a~W)i 1 ('WOl4.52-640S FAX: (TI7) x"n-(JS<l6 Conn, Angelina V From: Jamie Shinneman [shinnemanj@weihe.net] Sent: Monday, October 10, 20055:17 PM To: Conn, Angelina V Cc: Lisa Dunaway Subject: DOCS comments for Meadowlark Office Park, Lots 2-3 (#05100003 TAC) Angie, 1) We will work with the Urban Forester for an adequate foundation plan. 2) I don't believe the client intends to use the previously approved parking area in the future. 3) The Docket # has been placed on the cover sheet of the plans. 4} Please see the lot cales below. It appears that al] lots are well below the 75% cover allowed. Page 1 of3 We are resubmitting plans tomorrow which address several comments from you, Scott Brewer, Gary Duncan and Mark Westermeier. Please give me a call with any questions or comments. Thanks, Jamie WEIHE ENGINEERS INC. James K. Shinneman, PE Project Manager 10505 North College Ave. Indianapolis, IN 46280 Phone (317) 846-6611 Fax (317)843-0546 Toll Free (800) 452-6408 EmaiI: shinnemanj@weihe.net Website: www.weihe.ncl -m-Original Message--m From: Usa Dunaway Sent: Monday, October 10, 2005 2:57 PM To: Jamie Shinneman Subject: meadowlark areas Lot ml 53,243sf total 1 7A32sf pavt 6,097sf roof 33% impervious without roof!44% impervious with roof 10/1112005 Page 2 of3 Lot ~ 48,844sf total 12,224sf povj 4,1 53sf roof 40% impervious without roof/48% impervious with roof Lot 3 38,7045f total 1 6,077sf pavt 5,984sf roof 42% impervious without roof/57% impervious with roof Lot 4 41 A46sf total 17, 1135f povt 6,245sf roof 41 % irnpervious w!1hout roof/56% impervious with roof LQt5 81.75951 total 30.921 sf pavt 6, 1265f roof 38% impervious without roof/45% impervious with roof Lisa M. Dunaway WEIHE ENGINEERS INC. 10505 North College Ave. Indianapolis, Indiana 46280 www.weihe.net phone 31 7.846.6611 10/11/2005 Page 3 of3 , fax 317.843.0546 toll free 800.452.6408 -----Original Message----- From: Conn{ Angelina V (mailto:Aconn@carmeLin.gov] Sent: Wednesday, October 05, 2005 10:40 AM To: shinnemanj@weihe.net Cc: Griffin, Matt L Subject: Docket No. Assignment: (TAC) Meadowlark Office Park{ Lots 2-3 (#05100003 TAC) Jamie: This letter is in response to your Primary Plat Application for Meadowlark Office Park, lots 2-3. Members at the TAC Meeting will make additional comments on October 19. Please complete the following items after the TAC meeting: 1.) There is concern about no building foundation plantings for the 706 building. Work with the Urban Forester for an adequate landscape plan. 2.) Will the land banked parking area remain as such? 3.) Please place the docket no. on the site plan. 4.) Please provide the percentage of lot cover for each lot (building footprint & paved areas are included in lot cover). The max. lot cover is 75% per lot. Please feel free to call/e-mail me with any questions/concerns. Angie Conn, Planning Administrator Division of Planning & Zoning Dept. of Community Services City of Carmel p.317-571-2417 f.317-571-2426 aconn@carmel.in.gov 10/1112005 i WEIHE<-tNGINEERSiNC. CIVI:L ENGINEERS LAND StJRVEYORS LANDSCAPE ARCHITECTS -. .',:" ~ ~ fJ:.-"'l ~COttlJ IJ. 4200$ VCS ,,: LETTER OF TRANSMITTAL .\ Dept. of Community Services Project: Weihe Engineers Inc. Expansion One Civic Square Job#: W050417 Carmel, Indiana 46032 Phone: 317.571.2417 Angie Conn Fax: 317.571.2426 October 4, 2005 Re: TAC Submittal To: Attn: Date: We are sending you ~ Attached D Under separate cover ,ia Courier the foIlo,ving items: D Shop Drawings ~ Prints D Copy of Letter D Product Data D Specifications D Meeting Minutes D Samples D Change Order(s) D Inspection Report D ~. Sketches/Drawings D Application(s) for Payment D Sets Document Document Description [Z] Copies Date Number 2 Set of Construction Plans 1 TAC fee (check) 1 Copy of transmittal letters to TAC Members 1 TAC application 1 Set of Drainage Calculations 1 Project Narrative These are transmitted as indicated below: D Approved D Approved as Noted D Not Approved, Revise and Resubmit D Action Not Required o Action Indicated on Item Transmitted D For Signature. Return _Copies to Us D For Your Review or Use D For Your Review & Comment D As Requested D For Your Records o For Your Approval o [ Remarks: By: James K. Shinneman. PE cc: ALLAN It \VErnE. "E, LoS. I'RESruliNT Ifljn~NORTJ-t:COLr..r.(iE AVJ:;NUE INDIANA:POL1S-.INDtANA462'80 '>J..'\VW.WGU'it.NET (3 l?) ,fj46-(i6 1,[ eRGO) 452.-[)408 FAX; {3J7),~4'~-fJ5<i6 \ ~;; CIVI.LENGINEERS WEIHE ~GINEERS me. - _ .. __ ,.L ~. K_~t\j ~~(.\.,\; ". 'l.~~ ... / t.:. : j,;' ~\J\'S LAND SURVEYORS LANDSCAPE ARCHITECTS" ". , :;: LETTER OF TRANSMITTAL To: Carmel Engineering Project: Weihe Engineers Inc. Expansion One Civic Square Job#: W050417 Carmel, Indiana 46032 Phone: 317.571.2441 Gary Duncan I Nick Redden Fax: 317.571.2439 October 4, 2005 Re: T AC Submittal Attn: Date: We are sending you [2J Attached 0 Under separate cover via Courier the following items: o Shop Drawings [SJ Prints 0 Copy of Letter D Product Data 0 Specifications D Meeting Minutes o Samples 0 Change Order(s) 0 Inspection Report o [SJ SketchesiDrawings D Application(s) for Payment o Sets Document Document Description [8J Copies Date Number 1 Set of Construction Plans 1 Set of Drainage Calculations 1 Project Narrative I These are transmitted as indicated below: o Approved o Approved as Noted o Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted o For Signature. Re~n_Copies to Us o For Your Review or Use o For Your Review & Comment o As Requested o For Your Records o For Your Approval D I Remarks: Bv: James K. Shinneman, PE cc: ALLAN R 'VETHE. r.E. LoS. . P.RE$lDENT 1 D5{)~ NORTH C'OlLEGI: .-\''liJ?-;lJE INDiANAI'OLfS. D\;"D1ANA462~O \\'\-V\~"_\;rETI-H,;~N-'nT (.317) ~4(-).-6br 1 (~[lD) 452-6403 FAX: (3'17\ 8-'n-D546 .<' f U . UIWEIHE ENGINEERS Me. CfVIL ENGINEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: CrossRoads Engineering Project: Weihe Engineers Inc. Expansion 3417 South Sherman Orive Job#: W05D417 Beech Grove, Indiana 46107 Phone: 317.780.1555 Gregory IIko, PE Fax: 317.780.6525 October 4, 2005 Re: TAC Submittal Attn: Date: We arc sending you l8J Attached 0 Under separate cover via Courier the following items: o Shop Drawings 0 Prints 0 Copy of Letter o Product Data D Specifications 0 Meeting Minutes o Samples 0 Change Order(s) 0 Inspection Report o l8J Sketches/Drawings 0 Application(s) for Payment o Sets Document Document Description o Copies Date Number 1 Set of Construction Plans 1 Set of Drainage Calculations 1 Project Narrative I I These are transmitted as indicated below: o Approved o Approved as Noted o Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted o For Signature. Return--,--Copies to Us o For Your Review or Use o For Your Review & Comment o As Requested o For Your Records o For Your Approval o I Remarks: Bv: James K. Shinneman, PE cc: ALLAN ll. \\'E)][[:, PeE. L.S. PRESiDeNT lrFH1~ NOR-TFl COLLEGE ,~"IB.r\JE NDIANAI'OLfS. fi\'TI-IAN"A.ifi:2UI '\.\"Vl\V:WcTHE.NET (317) g4{",.6611 (~OOj 452-MOR FAX; G~ 17) &43.:.054<i t glWEIHE E~GlNEERS I~C. CIVIL ENGJNEERS LAND SURVEYORS LANDSCAPE r\RCHlTECTS LETTER OF TRANSl\1ITIAL To: Carmel Clay Communications ~ect Weihe Engineers Inc. Expansion 31 First Avenue NW Job#: W050417 Carmel, Indiana 46032 Phone: 317.571.2586 Bill Akers Fax: 317.571.2585 October 4, 2005 Re: T AC Submittal Atto: Date: We are sending you ~ Attached D Under separate cover via Courier the following items: D Shop Drawings D Prints 0 Copy of Letter o Product Data D Specifications 0 Meeting Minutes o Samples D Change Order(s) 0 Inspection Report o [Z] Sketches/Drawings D Application(s) for Payment o Sets Document Document Description [Z] Copies DaLe Number 1 , Set of Construction Plans These are transmitted as indicated below: o Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted o For Signature. Retum_Copies to Us o For Your Review or Use o For Your Review & Comment D As Requested o For Your Records D For Your Approval D I Remarks: .. By: James K. Shinneman, PE cc: ALL.ANH. \li'EIJiE,-P.E; L_S. - PREsrnrNT ! o5rf5 NOJi::rH COLLEGE A VrNUE fNDJAr~AP01..TS_ n:tnIANA 462BO Vlrv:Vl.\Io/E-IflE.NET (317.) !=;46~6611 (l"'WQ) 452~640S FAX: {3 17J K43-054-11 .iIWEIHE E~GINEERS me. CIV1LENGl1\.'F.ERS LAND SURVEYORS LANDSCAPE ARcmTECTS LETTER OF TRANSlVIITTAL To: Brighthouse Networks Project Weihe Engineers Inc. Expansion 3030 Roosevelt Avenue Job#: W050417 Indianapolis, Indiana 46218 Phone: 317.632.9077 x291 Brandy Earl Fax: 317.632.5311 . October 4, 2005 Re: T AC Submittal Attn: Date: We are sending you [gJ Attached 0 Under separate cover via Courier the following items: D Shop Drawings D Prints D Copy of Letter D Product Data D Specifications D Meeting Minutes D Samples D Change Order(s) D Inspection Report D [;g] SketcheslDrawings 0 Application(s) for Payment D Sets Document Document Descripti on [:zJ Copies Date Number 1 Set of Construction Plans I These are transmitted as indicated below: o Approved D Approved as Noted D Not Approved, Revise and Resubmit D Action Not Required D Action Indicated on Item Transmitted o For Signature. Return_Copies to Us D For Your Review or Use o For Your Review & Comment D Az, Requested o For Your Records o ForYourApproval o I Remarks: I) By: James K. Shinneman, PE cc: Al.LAN H. WEJHE, FE, L.S. .l'Rl"SlD2NT .!05{)5 .N"ORTT1COLLEGE A'VB><"1;JE INDIAN;\POL1S_ D'."D!ANA-462~n !';\"N\\',\:\{ErHE.NET CJ17)fl4E.~nf~11 (ROO) 4:;;2-6403 FAX: (3i 7}K43-1J546 u .- WEIHE ENGINEERS I~C. CIVIL ENGINEERS LAND SURVEYORS LANDSCAPEARCHTTECTS LETTER OF TRA.NSMITTAL To: Hamilton County Sheriff's Office Projtct: Weihe Engineers Inc. Expansion 18100 Cumberland Road Job#: W050417 Noblesville, Indiana 46060 Phone: 317.773.1872 Brooke Gajownik. Fax: 317.776.9896 October 4, 2005 Re: T AC Submittal At.tn: Date: We are sending you l'SJ Attached D Under separate cover ,,;a Courier the following items: o Shop Drawings 0 Prints D Copy of Letter D Product Data 0 Specifications D Meeting :Minutes D Samples 0 Change Order(s) D Inspection Report D ~ SketcheslDrawings D Application(s) for Payment D Sets Document Document Description [Sl Copies Date Number 1 Set of Construction Plans I These are transmitted as indicated below: D Approved D Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required D Action Indicated on Item Transmitted D For Signature. Return_Copies to Us o For Y OUT Review or Use o For Your Review & Comment D As Requested D For Your Records D For Your Approval o I Remarks: By: James K. Shinneman, PE cc: ALLAN H. \Vl::nll:,r.E., L..S. - PRriSIDENT IUS-OS NORTHC()"LLBGE A V8'<f.JE INDiANAPOLis. TND-lANA 4f)J'gti '\.\'\V\\',\VEU:lLNCT (317)'84{~~661l {~oo} 451-{)4{/8- J',..\X~ i"3(7) h'43-U546 .. u u "iii!WEIHE ENGINEERS INC. CIVIL ENG!1\TEERS LAND slfrniEYORS LANDSCAPE ARCHrTECTS LETTER OF TRANSMITTAL To: Clay Twnshp Regional Waste DistrictProject Weihe Engineers Inc. Expansion - 10701 North College Avenue, Suite A Job #: W050417 Indianapolis, Indiana 46280-1098 Phone: 317.844.9200 At1n: Candy Feltner Fax: 317.844.9203 Date: October 4, 2005 Re: T AC Submittal We are sending you cg] Attached D Under separate cover via Courier the following items: o Shop Drawings 0 Prints 0 Copy of Letter D Product Data D Specifications D Meeting Minutes o Samples D Change Order(s) 0 Inspection Report o IS] Sketches/Drawings 0 Application(s) for Payment o Sets Document . Document Description IS] Copies Date Nwnber 1 Set of Construction Plans : These are transmitted as indicated below: o Approved o Approved as Noted o Not Approved, Revise and Resubmit D Action Not Required o Action Indicated on Item Transmitted o For Signature. Return_Copies to Us o For Your Review or Use o For Your Review & Connnent o A2 Requested o For Your Records o For Your Approval o I Remarks: By: James K. Shinneman, PE cc: , ;to. u _' II! WEIHE ENGINEERS I~C. CIVILENGlNEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMIITAL To: Vectren Energy Project: Weihe Engineers Inc. Expansion 15900 Allisonville Road Job#: W050417 Noblesville, Indiana 46060 Phone: 317.776.5535 Chuck Shupperd Fax: 317.776.5553 October 4, 2005 Re: T AC Submittal Attn: Date: We are sending you [2] Attached 0 Under separate cover via Courier the follo",ing items: o Shop Drawings 0 Prints 0 Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes o Samples 0 Change Order(s) D Inspection Report o IZI SketcheslDrawings 0 Application(s) for Payment- o Sets Document Document Description [2] Copi es Date Number 1 Set of Construction Plans I These are transmitted as indicated below: D Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required D Action Indicated on Item Transmitted D For Signature. Return_Copies to Us o For Your Review or Use o For Your Review & Comment o As Requested o For Your Records o For Y OUT Approval D I Remarks: Bv: James K. Shinneman, PE cc: ALLAN FL \VEIHE; P.E, L.S, PRE5itDENT J fJ505 NORTH-COLLEGE A\/j3'\UE JNDIANAPOLJK Th"DJANA 462~W \.\.'\V~~.wr::H-rE,NET {317) 84(.-G6 ] 1 (~no) 4.'52-(i4{l:-\; FAx.: 01- t 7) X4:-;~n:S4r\ , . " WEIHE E~GINEERS Me. CIVIL ENGINEERS LAND Sl.iRVITORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Carmel Post Office Project: Weihe Engineers'lnc. Expansion 275 Medical Drive Job#: W050417 Carmel, Indiana 46032-9998 Phone: unpublished Cindy Klaiber Fax: 317.846.3135 October 4, 2005 Re: T AC Submittal At1n: Date: We are sending you ~ Attached 0 Under separate cover via Courier the foUo",ing items: o Shop Drawings 0 Prints D Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes o Samples 0 Change Order(s) D Inspection Report o I2J SketcheslDrawings 0 Application(s) for Payment o Sets Document Document Descriptjon I2J Copies Date Number 1 Set of Construction Plans These are transmitted as indicated below: o Approved D Approved as Noted o Not Approved, Revise and Resubmjt D Action Not Required o Action Indicated on Item Transrnjtted o For Signature. Return_Copies to Us o For Your Revjew or Use D For Your Reyjew & Comment o As Requested o For Your Records D For Your Approval D I Remarks: By: James K.. Shinneman. PE cc: .'\LL~N H. \\':SHI.91 T':E.,.L,S, PRESJDENT H1SfJS NORTH'CXjLLEGE AV8-.:1JEmD1ANAI-'OLlS~ IND1ANAA6-2gn \',..~vw,v....rr::rf-IE.NET (J 17) :;:4{',-(l()! 1 {;":"(JlJi 4.52~f)40fl FAX; (3 [7) 8-43-0546 '} - . w IIi WEIHE ENGINEERS me. CrvIL ENGlNEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANS:MITTAL To: Cinergy Project Weihe Engineers Inc. Expansion 1441 South Guilford Road Job#: W050417 Carmel, Indiana 46032 Phone: 317.581.3041 Dean Groves Fax: 317.581.3031 October 4, 2005 Re: T AC Submittal At1n: Date: We are sending you [2J Attached D Under separate cover via Courier the folloViing items: D Shop Drawings 0 Prints 0 Copy of Letter o Product Data D Specifications D Meeting Minutes D Samples 0 Change Order(s) 0 Inspection Report o [S] SketcheslDrawings 0 Application(s) for Payment o Sets Document Document Description [g] Copies Date Number 1 Set of Construction Plans These are transmitted as indicated below: o Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted o For Signature. Return_Copies to Us o For Your Reyjew or Use o For Your Review & Comment D As Requested o For Your Records D F or Your Approval D I Remarks: By: James K. Shinneman. PE cc: ALLAN H, WElHE,l'.E, LX - PRESIDENT U}j{)5 NORTH COLLEGE. l.:V2'-~ INDI,.o\'NAPOUS. T"t>.TITANA46280 "'V\V\V.\~FEIf'lE_NET (31';') ~4t)...;6611 UH)()) 452-6408 Ft-\X: (::; 17) ~4~-(J:'=i46 . . Uu 'WEIHE ENGINEERS INC. CIVILENGII'rEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Mark Swanson Associates, Inc Project Weihe Engineers Inc. Expansion 10610 North Park Avenue Job#: W050417 Indianapolis, Indiana 46280 Phone: 317.844.1315 Dennis Lockwood Fax: 317.844.1758 October 4, 2005 Re: Adjoiner Notification List At1n: Date: We are sending you [gJ Attached 0 Under separate cover via Courier the following items: D Shop Drawings D Prints 0 Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes D Samples D Change Order(s) D Inspection Report IS] Adioiner list 0 SketcheslDrawings 0 Application(s) for Payment o Sets Document Document Description [29 Copies Date Number 1 Adjoiner list I These are transmitted as indicated below: o Approved D Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required D Action Indicated on Item Transmitted o For Signature. Return_Copies to Us [Zl For Your Review or Use o For Your Review & Comment D As Requested D For Your Records D For Your Approval o Remarks: By: James K. Shinneman, PE cc: ALLAN H. WElln:. P.E.. LS. . PR13StDi:NT 105('r:5 NORTH COLLEGE AVf.Nl)~ INDl:i(}-"~Al-'OLts_ TN-DIAr-:.~A 46J}m \.\'\-V\V.\l,?ETf.jE.NET (317)-f;4('.;.()61 J omm 45:1Aj4{)f]. FAX; (.~t 7) 843-\1:}46 WEIHE E~GINEERS me. CIVIL ENGINEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Office of Fire Chief, Fire Station #1 ~ect Weihe Engineers Inc. Expansion Two Civic Square Job#: W050417 Carmel, Indiana 46032 Phone: 317.571.2600 Attn: Gary Hoyt Fax: 317.571.2615 Date: October 4, 2005 Re: T AC Submittal We are sending you [g] Attached D Under separate eover via Courier the following items: o Shop Drawings 0 Prints D Copy of Letter D Product Data D Specifications D Meeting Minutes o Samples 0 Change Order(s) D Inspection Report o 0 SketcheslDrawings D Application(s) for Payment o Sets Document Document Description ~ Copies Date Number 1 Set of Construction Plans -~ I These arc transmitted as indicated below: o Approved o Approved as Noted o Not Approved, Revise and Resubmit D Action Not Required D Action Indicated on Item Transmitted D For Signature. Return _Copies to Us D For Your Review or Use o For Your Review & Comment D As Requested D For Your Records o For Your Approval D I Remarks: By: James K. Shinneman. PE cc: ALLAN FL WEIHE,P:E, t,S. PRESLDENT W5{l';; NORT}j COU__F.GE AVE-.'1:JE JN1)lANAPOU,S. f1'.<nIANA 46':!8U "\VvV\V:Vo/ElflE.NET (17) ~~16~6611 (~nn)45;2-.640& FAX~ C;l 7) M1-0S46 "lliWEIHE E~GlNEERS Me. CIVIL ENGINEERS LAND SlffiVEYORS LANDSCAPE ARCHTTECTS LETTER OF TRANSMITTAL To: Hamilton County Surveyor's Office Project: Weihe Engineers Inc. Expansion One Hamilton Square, Suite 188 Job#: W050417 Noblesville, Indiana 46060 Phone: 317.776.8495 Greg Hayes Fax: 317.776.9628 October 4, 2005 Re: T AC Submittal Attn: Date: We are sending you fZJ Attached D Under separate cover via Courier the follo"ing items: D Shop Drawings . fZJ Prints' D Copy of Letter D Product Data D Specifications D Meeting Minutes D Samples D Change Order(s) D Inspection Report D fZJ SketcheslDrawings 0 Application(s) for Payment D Sets Document Document Description fZJ Copies Date Nuinber 1 I Set of Construction Plans 1 I Set of Drainage Calculatiqns I I These are transmitted as indicated below: D Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted o For Signature. Return_Copies to Us D For Your Review or Use o For Your Review & Comment D As Requested D For Your Records o For Your Approval o I Remarks: By: James K. Shinneman, PE cc: !I.LLAN fl. WEIHE, P:E., LS. - PRESlr,SNT 1(J5D~ :NORTH COLL'FGE AVJ?,:1JE INDIANAPOLT8o fI'I.:'TI-IAN.", 4n:g(l \'V\\,\\,.\ll/EIHE::.r.:.'i:.T (317) :;;4<'-()l"Jll (ROO) 452-6408 FAX: (317) 843~U546 ~ " IIi WEIHE E~GINEERS Me. ClVIL ENGINEERS LAND SURVEYORS LANDSCAPE ARCI-TITFCTS LETTER OF TRANSMITTAL To: Hamilton County Health Dept. Project: Weihe Engineers Inc. Expansion One Hamilton Cty. Square, Suite 30 Job #: W050417 Noblesville, Indiana 46060-2229 Phone: 317.776.8500 Attn: Jason Lemaster Fax: 317.776.8506 Date: October 4, 2005 Re: T AC Submittal We are sending you [SJ Attached 0 Under separate cover "ia Courier the follmving items: o Shop Drawings 0 Prints 0 Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes o Samples 0 Change Order(s) 0 Inspection Report o ~ Sketches/Drawings 0 Application(s) for Payment o Sets Document Document Description [SJ Copies Date Number 1 Set of Construction Plans These are transmitted as indicated below: o Approved o Approved as Noted o Not Approved, Revise and Resubmit D ActionNot Required o Action Indicated on Item Transmitted D For Signature. Return~Copies to Us D For Your Review or Use o For Your Review & Comment o As Requested D For Your Records o For Your Approval D I Remarks: Bv: James K. Shinneman, PE cc: ,ALLAN R WEIHE, PeE, r"B. - PRESIDENT wsns NORTH COLLEGE AVEN1.rE fND1ANAl-"OLIS, rr-.'Ul..;NA46280 \\I\V\>V .W~Err.IE.NET (317) 846-(;611 owm 4,)2-6408 F....\X; (3 t7) K43.:.D54(i l '. u u Iii WEIHE ENGINEERS INC. CIVILENGINEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANS:MITTAL Attn: I ndianapolis Water Company Project Weihe Engineers Inc. Expansion 1220 Waterway Blvd. Job#: W050417 Indianapolis, Indiana 46206 Phone: 317.639.6336 Jennifer Marlett Fax: 317.263.6452 October 4, 2005 Re: T AC Submittal To: Date: We are sending you ISI Attacbed 0 Under separate cover via Courier tbe following items: o Shop Drawings 0 Prints 0 Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes D Samples D Change Order(s) D Inspection Report o ISI SketcbeslDrawings 0 Application(s) for Payment o Sets Document Document Description ISI Copies Date Number 1 Set of Construction Plans I These are transmitted as indicated below: D Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required D Action Indicated on Item Transmitted o For Signature. Return _Copies to Us o For Your Review or Use D For Your Review & Comment D As Requested D For Your Records D For Your Approval o I Remarks: Bv: James K. Shinneman, PE cc: ALLAN H. WEIHE. PL, L,S. - PRESlDSNT J050$ NORTI-lCOLLF.OE A V[NUE rND1ANAP01.~rs. 11...,'DiANA462~W lJ."\V\V.\VErflE-NET (3-T'7}R46-661l (lion) 452-6403 FAX; (317) M3..()S46 ~ w u 'UliWEIHE ENGINEERS INC. CIVIL ENGD.\TEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Assistant Building Commissioner Project: Weihe Engineers Inc. Expansion One Civic Square Job#: W050417 Carmel, Indiana 46032 Phone: 317.571.2444 Attn: Jim Blanchard Fax: 317.571.2499 Date: October 4, 2005 Re: T AC Submittal We are ~ending you [g] Attached 0 Under separate cover via Courier the foUomng items: D Shop Drawings D Prints D Copy of Letter D Product DatLl D Specifications D Meeting Minutes D Samples 0 Change Order(s) D Inspection Report D [SJ SketcheslDrawillgs D Application(s) for Payment D Sets Document Document Description I'2l Copies Date Number 1 Set of Construction Plans These are transmitted as indicated below: o Approved D Approved as Noted o Not Approved, Revise and Resubmit D Action Not Required o Action Indicated on Item Transmitted D For Signature. Return_Copies to Us D For Your Review orUse o For Your Review & Comment D As Requested o For Your Records D For Your Approval o I Remarks: By: James K. Shinneman, PE cc: ALLAN FL \VmHE: P-:E, LS. PRESIDENT fOS05 NDRTHCOL.Cf.GE ..~',v0.:lJE INDIANAPOL"r3. INDTANA 46:JSO W'J.i.r\V~V.lEH.rE.N.rrr (3!;)8'4(.-66i 1 '~fJn) "15~Ay:n8 Ff\X; (JI7) :fl4J-D546 ~ " u U i! WEIHE ENGINEERS INC. CIVTLENGlNEERS LAND SURVEYORS LA1'-o"DSCAPE ARCHITECTS LETTER OF TRANSMITTAL Attn: Carmel City Utilities Project: Weihe Engineers Inc. Expansion 760 Third AvenueSW Job#: W050417 Carmel, Indiana 46032 Phone: 317.632.9077 x291 John Duffy Fax: 317.571.2642 October 4, 2005 Re: T AC Submittal To: Date: We are sending you ~ Attached 0 Under separate cover via Courierthe following items: o Shop Drawings D Prints 0 Copy of Letter o Product Data D Specifications D Meeting Minutes o Samples D Change Order(s) 0 Inspection Report o L2J Sketches/Drawings 0 Application(s) for Payment o Sets Docmncnt Document Description ~ Copies Date Nwnber 1 Set of Construction Plans I I I These are transmitted as indicated below: D Approved D Approved as Noted D Not Approved, Revisc and Resubmit o Action Not Required D Action Indicated on Item Transmitted o For Signature. Return ~Copies to Us D For Your Review or Use o For Your Review & Comment o As Requested . o For Your Records D For Your Approval D Remarks: By: James K. Shinneman, PE cc: ALLAN ll. WEIHE. )';E,L..S. PRESIDENT .W.5fJ's NORTH COLLEGE A V'B'\' UE rNT)lA:J'\:AJ'OLfS~ fi'.;~1 ANA4fi2gn ",V\V\V .\\'ETflE.J~E. T (:3 1"7) R41<;r66} 1 (~()O) 452-15408 fAX~ 01 ?) g43-0~4(, .. w u 'UliWEIHE ENGINEERS INCa CIVILENCINEERS LAND SURVEYORS LANDSCAPE ARCHfTECTS LETTER OF TRANSMITTAL To: Hamilton Cty. Soil & Water Cons. Project: Weihe Engineers Inc. Expansion 1108 South 9th Street Job#: W050417 Noblesville, Indiana 46060 Phone: 317.773.1406 John South Fax: 317.776.1101 October 4, 2005 Re: T AC Submittal Atto: Date: We are sending you ~ Attached D Under separate cover "ia Courier the following items: D Shop Drawings D Prints D Copy of Letter o Product Data D Specifications 0 Meeting Minutes D Samples 0 Change Order(s) 0 Inspection Report o [:g] SketcheslDrawings 0 Application(s) for Payment o Sets Document Document Description [g] Copies Date Number 1 Set of ConstructIon Plans I I These are transmitted as indicated below: o Approved D Approved as Noted D Not Approved, Revise and Resubmit D Action Not Required D Action Indicated 011 Item Transmitted o For Signature. Return~Copies to Us D For Your Review or Use o For Your Review & Comment D As Requested o For Your Records D For Your Approval o I Remarks: Bv: James K. Shinneman, PE cc: .'\LLAN it WErHE,P:E. U':.. PRESIOENT W50S-NOKTH COLLEGE A VEJ\"lJE INDIAJ\i\.-POLTS. Il"-.'T)l~\NA 46280 \V\V\V.\o\jElHE.NET (.:3 17) R4(.-6611 (;;<,no) 452-640:--1 FAX: (317) 84JAjS46 u u I WEIHE ENGINEERS INC. CrVILENGfNEERS LAND SURVE'{ORS LANDSCAPE ARCHITECTS LETTER OF TRANSl\1IITAL To: Carmel Clay Parks Dept. Project: Weihe Engineers Inc. Expansion 760 Third Avenue SW, Suite 100 Job#: W050417 Carmel, Indiana 46032 Phone: 317.848.7275 Mark Westermeir Fax: 317.848.2468 October 4, 2005 Re: T AC Submittal Attn: Ddte: We are sending you ~ Attached 0 Under separate cover via Courier the following items: o Shop Drawings 0 Prints 0 Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes o Samples 0 Change Order(s) 0 Inspection Report D fZ] Sketches/Drawings 0 Application(s) for Payment o Sets Document Document Description fZ] Copies Date Number 1 Set of Construction Plans I These are transmitted as indicated below: o Approved D Approved as Noted o Not Approved, Revise and Resubmit o Action Not Required D Action Indicated on Item Transmitted o For Signature. Return----.:.Copies to Us' D For Your Review or Use D For Your Review & Comment D As Requested D For Your Records D For Your Approval o I Remarks: By: James K. Shinneman. PE cc: ;,!...LLi\N E. \VE~HE, P"t, LS. - PRESIDth'T 10505 NORTHCOLLEGE AVl?.l:JE. INDIANAPOLIS. TNDfl...NA 4fi~r:.{] \.\'\\'W.WEIHE.NET (J17)'84(i~{}611 vmo) 452-6408 FAX: (3 i 7,lS4:3..0546 W -v-U-r ; WEIHE ENGINEERS INC. CIVIL ENGINEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSlVUTTAL To: Office of Police Chief Project Weihe Engineers Inc. Expansion Three Civic Square Job#: W050417 Carmel, Indiana 46032 Phone: 317.571..2500 Michael Fogarty Fax: 317.571.2512 October 4, 2005 Re: TAC Submittal Attn: Date: We are sending you [Sl Attached D Under separate cover via Courier the foUowing items: o Shop Drawings 0 Prints 0 Copy of Letter D Product Data D Specifications D Meeting Minutes D Samples 0 Change Order(s) 0 Inspection Report D [Sl SketcheslDrawings D Application(s) for Payment D Sets Docwnent Document Description kZI Copies Date Number 1 Set of Construction Plans I These are transmitted as indicated below: D Approved o Approved as Noted o Not Approved, Revise and Resubmit D Action Not Required o Action Indicated on Item Transmitted D For Signature. Return_Copies to Us D For Yom Review or Use D F or Your Review & Comment D As Requested o For Your Records D For Your Approval D I Remarks: By: James K. Shinneman, PE cc: ALL/..;.N'.rI. WBu.m,'p_E, LS. PRESIDENT W505- NORTHCOtLEGE A,.....8\f";JE JNf)lANA.r'OLTS. D\'Dlr\NA46-:!fW \.\'W\\-T.\;VErHE.NET (J17) 84<:i~{i6l1 (;i{OO) 452-G~08 _F.-\X; (3-17) S43-054Ci " .;l ... u ... WEIHE ENGINEERS ~C. CIVIL ENGINEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Hamilton County Highway Project: Weihe Engineers Inc. Expansion 1700 South 10th Street lob#: W050417 Noblesville, Indiana 46060 Phone: 317.773.7770 Mike McBride Fax: 317.776.9814 October 4, 2005 Re: T AC Submittal A.ttn: Date: We are sending yon [S] Attached 0 Under separate cover via Courier the follo",ing items: o Shop Drawings 0 Prints D Copy of Letter D Product Data 0 Specifications D Meeting Minutes D Samples D Change Order(s) D Inspection Report D [S] SketcheslDrawings D Application(s) for Payment o Sets Document Document Description [SJ Copies Date Number 1 Set of Construction. Plans I I These are transmitted as indicated below: o Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required D Action Indicated on Item Transmitted o For Signature. Return_Copies to Us o For Your Review or Use D For Your Review & Comment D As Requested D For Your Records D For Your Approval o I Remarks: By: James K. Shinneman. PE cc: ALL,\N H. WGlH[;,P"E.. L:S. - PRESIDENT j(}50~ NORTH COLLEGE. Av~rUE INDIAi\cAPOLlS_ INOJc\N:.r'\' 4r;?;;::n "\.\"\V\V~\VEHJE.NET (317) &4(,-(}611 (:-;LJU) 4.52-ii-4iJR FA~ C: 1 J'; S43~O:<;46 " ,; . "II! WEIHE E~GrNEERS Me. CIV[LENGINFERS LAND SURVEYORS LANDSCAPE ARCBTTECTS LETTER OF TRANSl\1ITTAL To: Carmel/Clay Schools Project Weihe Engineers Inc. Expansion 5201 East 131st Street Ioh#: W050417 Carmel, Indiana 46033 Phone: 317.844.9961 Ron Farrand Fax: 317.844.9965 Odober 4, 2005 Re: TAC Submittal Attn: Date: We are sending you !SJ Attacbed 0 Under separate cover via Courier the following items: D Shop Drawings D Prints 0 Copy of Letter D Product Data D Specifications 0 Meeting Minutes D Samples 0 Change Order(s) 0 Inspection Report D . [3J SketchcsIDrawings D Application(s) for Payment D Sets Document Document Description IZl Copies Date Number 1 Set of Construction Plans I I I These are transmitted as indicated below: o Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted D For Signature. Return_Copies to Us o For Your Review or Use o For Your Re\~ew & Comment o As Requested o ForYoUT Records o For Your Approval D I Remarks: By: James K. Shinneman, PE cc: .itLL!\N H, \VEJUE, P:E., LS. - PRE:;';IDENT !(J5(}5 NORTH COLLEGE ,.b"'\;"D'~!E ml)lAJ\cAPOLlS~ INDIANA 462g0 \'V\V\V,VI/T::ff-IE,XET ,(3-17) .;';46-6(-;'11 (ROO,4S2-64()fj, FAX: (317) 8.'13-054(-, ~ .d ~ WEIHE E~GINEERS I~C. CIVIL ENGfNEERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Indianapolis Power & Light Co. Project Weihe Engineers Inc. Expansion 3600 Arlington Avenue Job#: W050417 Indianapolis, Indiana 4621 B Phone: 317.261.5265 Ron Morris Fax: 317.261.5201 October 4, 2005 Re: T AC Submittal Attn: Date: We are sending you [gJ Attached 0 Under separate cover ,ia Courier the follO\wng items: o Shop Drawings 0 Prints 0 Copy of Letter D Product Data 0 Specifications D Meeting Minutes o Samples 0 Change Order(s) 0 Inspection Report o [8J SketcheslDrawings 0 Application(s) for Payment D Sets Document Document Description /2J Copies Date Number 1 Set of Construction Plans I I I I These are transmitted as indicated below: D Approved D Approved as Noted o Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted o For Signature. Return _ Copies to Us D For Your Review or Use o For Your Review & Comment o As Requested o For Your Records o For Your Approval o J Remarks: By: James K. Shinneman, PE cc: ;-\LLAN H. \\'Ellm, P.E.. LS.. PRESJDENT 10505 NORTH C()LLEGE _",',V8'-.'UE fNDIANAPOLIS. n..,rDIANA..:Jf.:;:>gO \V\i?\.V.\VEf!-TE.NET (317) i';4(-"'-(nSll (~aO) 452-()4()R FAX: (3!7.l B43-054<;: " d " WEIHE E14GINEERS Me. CIVIL ENGIl';'EERS LAND SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSl\fiTTAL To: Dept. of Community Services Project: Weihe Engineers Inc. Expansion One Civic Square Job#: W050417 Carmel, Indiana 46032 Phone: 317.571.2478 Scott Brewer Fax: 317.571.2426 October 4, 2005 Re: T AC Submittal Attn: Date: We are sending you !2<J Attached D Under separate cover \ia Courier the following items: o Shop Drawings 0 Prints 0 Copy of Letter D Product Data D Specifications D Meeting Minutes D Samples 0 Change Order(s) D Inspection Report D !2<J Sketches/Drawings D Application(s) for Payment D Sets Document Document Description [SJ Copies Date Number 1 Set of Construction Plans I I These are transmitted as indicated below: o Approved o Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required D Action Indicated on Item Transmitted D For Signature. Return_Copies to Us o For Your Review or Use o For Your Review & Comment o As Requested o For Your Records o For Your Approval o I Remarks: By: James K. Shinneman, PE cc: ALLAN H. WEIHE, FE, LS - PRESlDENT 10:)05 NORTH COLLEGE A,V8'-'l.JE INDIANAPOLI&.. TNDTANA462~\i'J v..~V\-\'.\V1:::tHE.NET LH"7,) &4(,~G6-11 (lmn) 452-1\40:;;; F.-\X~ (317,lS4J-U5-46 " II .p WEIHE E~GINEERS Me. CIVIL ENGINEERS LAND StfRVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Panhandle Eastern Pipeline Co. Project: Weihe Engineers Inc. Expansion 9371 Zionsville Road Job #: W050417 Indianapolis, Indiana 46268 Phone: 317.873.2410 Teresa Magee I Mark Wood Fax: 317.773.3204 October 4, 2005 Re: T AC Submittal Attn: Date: - We are sending you 18J Attached 0 Under separate cover via Courier the folloy,ing items: o Shop Drawings 0 Prints 0 Copy of Letter o Product Data 0 Specifications 0 Meeting Minutes o Samples 0 Change Order(s) D Inspection Report o rzl SketcheslDrawings 0 Application(s) for Payment o Sets Document Document Description ~ Copies Date Number 1 Set of Construction Plans I I I These are transmitted as indicated below: D Approved D Approved as Noted D Not Approved, Revise and Resubmit o Action Not Required o Action Indicated on Item Transmitted o For Signature. Return _Copies to Us o For Your Review or Use D For Your Review & Comment D i\S Requested o For Your Records o For Your Approval o I Remarks: By: James K. Shinneman, PE cc: ALLAN lJ. "VEntE, P-E,LS.. PRESiDENT '1n:'iOS NORT.H COLLEGE ,.; -,,.rJ3'.<'UE lND1ANA.POLlS, [l"'."DJANA46280 W\V\.\'~\VEIHE.NE-r (Jlr)'f;4(,~(j:(;ill (ROlJ) 452-o,iOIS FAX: (:~l7) f;43~054G I .. u u \'(5101)OP~ -, " Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: lMeadowlark OfficeParkPaiking Expansion j County: Hamilton Plan Submittal Date: 10/04/05 Hydrologic Unit Code: Project Location Description: 703 Pro-Med Lane, Carmel Latitude and Longitude: c: Civil Clay Quarter: Section: Township: .:: .... Project Owner Name: Meadowlark Office Park c; E Contact: Steve Dauby ... .0 - Address: = ,~ State: TN Zip: 46032 .... City: Cannel ... Q,) Phone: 317-815-6140 FAX: E-Mail: ..., e ... c.. Plan Preparer Name: James ~.. Affiliation: Weihe Engineering Address: 10505 N. College Avenue City: Indianapolis State: IN Zip: 46280 Phone: 3] 7 -843-0546 FAX: E-Mail: Review Date: 10107/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC " '5:' Agency: Hamilton County Soil and Water Conservation District Q,) 0:'. Address: 1108 South 9th Street ;; City: Noblesville c:: Phone: 317-773-2]81 Assisted By: FAX: State: IN 317-776-1101 Zip: 46060 E-Mail: jolm-south@iaswcd.org IU PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of327 lAC 15-5. o Please refer to additional information included on the following page(s). D Submit Notice of Intent (NOl): Attach a copy of this cover page when submitting the NO! to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A copy of the NO! must also be Sent to the Reviewing Authority (e.g. SWCD, DNR). o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and I revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice ofIntent (NOI): Attach a copy afthis cover page when submitting the NOI to the indiana Department of Environmental Management. Construction activities may begin 48 hours following the suhmittal of the NOl. A copy of the NO! must also be sent to the Reviewing Authorily (e.g. SWCD, DNR). D PL...'\N IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). o DO NOT file a Notice of Intent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. D Plan Revisions D Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division a/Soil Conservation Paget of 8 Revised 12/09/03, Form 1 / u u ConstructionfStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1) Project Name: Meadowlark Office Park Parking Expansion Date Reviewed: 10/07/05 The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All measures included in the plan, as well as tlioserecommended in the comments should be evaluated as to their feasibility by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed Ifor other local, state. orfederal permits that may be required to proceed with thisproject. Additional information, including design calculations may be requested to Jilrther evaluate the Plan. A II proposed storm water pollution prevention measures and those referenced in this review must meet the design criteria and standards setforth in the "Indiana Stormwater Quality Manual"from the Indiana Department of Natural Resources, Division of Soil Conservation or similar Guidance Documents. Please direct questions and/or conupents regarding this plan review to: John B. South P,E. CPESC Please refer to the address alld contact inforDlation identified in the Plan Review Section on page 1. Assessment of Construction Plan Elements (Section A) The Construction Plan Elements are adequately represented to complete a plan review: o Yes 0 No The items cheeked below are deficient and require submittal to meet the requirements of the rule. A o 1 Index showing locations of required Plan Elements O Narrative describing the nature and purpose of the 3 . project o 5 Legal Description of the Project Site (Include Latitude and Longitude - Nor Requirement) o 7 Hydrologic unit code (14 Digit) 0 9 Specific points where stonnwater discharge will leave 0 the site 0 11 Identification of all receiving waters 0 0 13 100 year floodplains, floodways; and floodway fringes 0 D 15 Adjacent landuse, including upstream watershed 0 0 17 Identification of existing vegetative cover 0 Locations, size and d. imensiollsofproposed stormwater 0 19 t (' d sys ems' e.g. pIpes, swales an channels) o Locations of proposed soil stockpiles and/or 21 borrow/disposal areas O Proposed [mal topography at an interval appropriate to 23 . d' d' m lcate ramage patterns o DNR, Division of Soil Conservation Page 2 of 8 o 2 11 by 17 inch plat showing building lot llumberslboundaries and road layout/names o 4 Vicinity map showing project location o 6 Location of all lots and proposed site improvements (roads, utilities, structures, etc,) o 8 Notation of any State or Federal water quality permits o Location and name of all wetlands, lakes and 1 water courses on and adjacent to the site Identification of potential discharges to ground 12 . .... . water (abandoned wells, smkholes, etc.) Pre-construction and post construction estimate of 14 Peak Discharge (10 Year storm event) 16 L?cations and approximate boundaries of all dIsturbed areas (Construction Limits) Soils map including soil descriptions and 18 l' . . llTI1 tatlOns Plans for any off-site construction activities 20 . d "thhi . associate WI t s project (sewer/water tie-ins) o 22 Existing site topography at an interval appropriate to indicate drainage patterns Revised 12109103. Form 1 u u Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1) Project Name: Meadowlark Office Park Parking Expansion Date Reviewed: 10/07/05 Assessment of Stormwater Pollution Prevention Plan (Sections B & C) The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality measures to address erosion, sedimentation. and other pollutants associated with land disturbance and construction activities. Proper implementation of the plan and inspections of the construction site are necessary to minimize the discharge of pollutants. The Project Site Owner should be aware that unforeseen construction activities and weather conditions may affect thepeiformance of a practice or the effectiveness of the plan. The plan must be a flexible document, with provisions to modifY or substitute practices as necessaI}!, Description of potential pollutant sources associated with construction activities Sequence describing stormwater quality measure implementation relative to land disturbing activities Stable construction entrance locations and specifications (at all points of ingress and egress) ODD ODD ODD 0007 ODDs DD09 DO DO DO DO DO ODD 4 Sediment control measures'for sheet flow areas 5 Sediment control measures for concentrated flow areas 6 Storm sewer inlet protection measure locations and specifications Runoff control measures (e.g. diversions, rock check dams. slope drains, etc.) Storm water outlet protection specifications Grade stabilization structure locations and specifications 10 Location, dimensions, specifications, and construction details of each stormwater quality measure 1] Temporary surface stabilization methods appropriate for each season (include sequencing) 12 Permanent surface stabilization specifications (include sequencing) 13 Material handling and spill prevention plan 14 Monitoring and maintenance guidelines for each proposed stormwater quality measure 15 Erosion & sediment control specifications for individual building lots ~ i-' .... c: ~ ~ = ... Q" (.J Q.) J.... 'C q;; ~ Q DO 0,0 DO DO DO The post construction component of the Stormwater Pollution Prevention Plan includes the implementation of stormwater quality measures to address pollutants that will be associated with the lI1allanduse. Post construction stormwater quality measures should he functional upon completion of the project, Long termfunctionality of the measures are critical to theirpeiformance and should be monitored and maintained. De~cription of polIutants and their sources associated with the proposed land use Sequence describing stormwater quality measure implementation Description of proposed post construction stormwater quality measures (Include a written description of how these measures will reduce discharge of expected pollutants) Location, dimensions, specifications, and construction details of each stormwater quality measure Description of maintenance guidelines for post construction stormwater quality measures DNR, DiVIsion of Soil Conservation Page 3 of 8 Revised 12/09103, Form 1 u u Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment Project Name: Meadowlark Office Park Parking Expansion Date Reviewed: 10/07/05 This project disturbs less than 1 acre. A SWPPP is not required. cc: Carmel, Surveyor, File DNR, Division of Soil COllservation Page 40f8 Revised 12/09/03 u u Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment Project Name: Meadowlark Office Park Parking Expansion Date Reviewed: 10/07/05 DNR, DivisOll of Soil Conservation Page 5 of 8 Revised /2/09/03 lJ u ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment Project Name: Meadowlark Office Park Parking Expansion Date Reviewed: 10/07/05 DNR, Division of Soil Conservation Page 6 of 8 Rel'ised J 2/09/03 u u COllstruction/Stormwater Pollution Prevention Plan - Technical Review and Comment Project Name: Meadowlark Office Park Parking Expansion Date Reviewed: 10107/05 DNR, Division of Soil Conservation Page 7 of 8 Revised J 2109/03 u u Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment Project Name: Meadowlark Office Park Parking Expansion Date Reviewed: 10/07/05 DNR, Division afSoil Conservation Page 8 of 8 Revised 12/09/03 u u Page 1 of 1 Conn, Angelina V From: Conn, Angelina V Sent: Wednesday, October 05,200510:40 AM To: 'shinnemanj@weihe.net' Cc: Griffin, Matt L Subject: Docket No. Assignment: (TAC) Meadowlark Office Park, Lots 2-3 (#05100003 TAC) Jamie: This letter is in response to your Primary Plat Application for Meadowlark Office Park, Lots 2-3. Members at the TAC Meeting will make additional comments on October 19. Please complete the following items after the TAC meeting: 1.) There is concern 'about no building foundation plantings for the 706 building. Work with the Urban Forester for an adequate landscape plan. 2.) Will the land banked parking area remain as such? 3.) Please place the docket no. on the site plan. 4.) Please provide the percentage of lot cover for each lot (building footprint & paved areas are included in lot cover). The max. lot cover is 75% per lot. Please feel free to call/e-mail me with any questions/concerns. Angie Conn, Planning Administrator Division of Planning & Zoning Dept. of Community Services City of Carmel p.317-571-2417 f.317-571-2426 aconn@carmel.in.gov 10/5/2005 ~71 ~ OSM = ~~: u L Y-r--- YNYIONI 'HW~'tf:> ':iN"" 03WO~d >UI'o'd :1:)1:1:10 >nlv'Moav~w ..._.......__<A.H'~ - "'.--~--. _..~.......'" 3i'11~J".iI'IVZ ~ lfoNN~.:;ID.-a i' W::I mNaJd ~=t:I- ~ _'-':',.';::;:: !iiQl!l!i-PIW "..o.s 03ft'8:Id NVld HIS I ~ m ~i ~ ~ . t ! ~" ; :~: ~ ~.~ ~~ . ~ ~:: ~~;i; d I .~ih ~~~i~~ ~~ · ij5~3 ~j'~i;; ~~ rd: ;;.~ . i~. ~. ~~~~t~1 lr~~";;O~ It~ iii.5i.~~ ~~~ !~,j! !.l"~: .~ I~J~ ~ ~hW~"~r ;; . j.ii'5~i~..i , :1 1i~~~~.~~~~ iI ~ ~ ..;n.d.. ..:.. ..l ~ :::.'~ ~. ~! 'f ~. Ji~~ s ~i~~' ~ ~ 8 ~i!;~ ~! ~! ~ ~..":., -' ~ a ~ , a ~; hd~! o eee88C0 ! ~ ~ I , ~ % ~ ~i~ i~ I~ ~ li !~ : ~~ Ii Ii ~j ..: i!' II <1--1.~~~ I I li~1 -- I '.... - I I!!! I' l"' <jl I I I .j I I I .. ~ i~:~ ---s. 0 ~ g . . . . ~ . ~ 8::::::;1:., ~ ~~;;~-: '-;"~fj: 8=~~r ~~!!! ; "'---s. 8' -D ~~. a~2 hol ~ ~ . U ~~~! t\ ..~! ~ i~,,:~ ::i~~~~U .::~~V>~~O ~~-h~! ~~~;nU .j~:!II.Q,\1: ~l ggU !:i ./- .~ ~ r;:t-L- <:r~~ ~...... ::J '3 d 9 1tr~ ~i1 ~l: \ --n ,- " ~ ~ 9:l ~~~ 6) "3 c;. ~~ 390- a Ij~ ==y , ~~ ~.i:1 ~1~ t~ ~i~ :~ V"" ~~l\ ; ,! ~'51 ~ ~ Ii ""!' t I 02 G I I --- ... " u u Corm, Angelina V From: Sent: To: Cc: Subject: Conn, Angelina V Monday, August 15, 200512:39 PM 'Jamie Shinneman' Griffin, Matt L; Brewer, Scott I RE: Meadowlark Office Park Preliminary Layout Jamie: this will be able to go through TAC, as stated before, pending the resolving of the landscaping and other issues that other departments may have. There are issues with the building foundation landscaping requirements and other landscaping issues, that this proposal changes. so, is the land banked parking going to become open space where additional landscaping may occur? thanks, angie -----Original Message----- From: Jamie Shinneman [mailto:shinnemanj@weihe.net] Sent: Monday, August IS, 2005 11:57 AM To: Conn, Angelina V Cc: Griffin, Matt Lj Brewer, Scott Ij 'sdauby@doz.net'; 'soconnor@DOZ.net'j 'npolley@doz.net' j Shaun Ryan Subject: RE: Meadowlark Office Park Preliminary Layout Angie, It appears that we would only be at 48% impervious with this new layout. This site has large open areas especially along the back yards where a 60' BSL is required. Since we are under the 75% impervious, does this site look like something staff would support assuming we work with Scott on any additional landscaping requirements? Thanks, Jamie -----Original Message----- From: Conn, Angelina V [mailto:Aconn@carmel.in.govJ Sent: Monday, August 15, 2005 9:05 AM To: shinnemanj@weihe.net Cc: Griffin, Matt Lj Brewer, Scott 1 Subject: RE: Meadowlark Office Park preliminary Layout Jamie: maximum lot coverage is 75%. what will the new lot coverage be with the proposed parking areas? ( a variance may be needed) TAC only would be the best route to send a proposal like this. the next deadline for TAC is Sept 6 (you will have to mail site plans and a short narrative to all TAC members) to be heard at the Sept 21 TAC meeting. additional landscaping may be required, also. Sincerely, Angie Conn Planning Administrator Division of Planning & Zoning Department of Community Services City of Carmel 1 .. One civic Square Carmel, IN 46032 wwW.carmel.in.gov aconn@carmel.in.gov u u P 317.571.2417 f 317.571.2426 -----Original Message----- From: Conn, Angelina V Sent: Monday, August 15, 2005 8:53 AM To: 'shinnemanj@weihe.net' Cc: Griffin, Matt L; Brewer, Scott 1 Subject: FW: Meadowlark Office Park preliminary Layout I will take a look at it. thanks, angie -----Original Message----- From: Jamie Shinneman [mailto:shinnemanj@weihe.net] Sent: Monday, August 15, 2005 8:37 AM To: Conn, Angelina V Cc: Griffin, Matt L Subject: FW: Meadowlark Office Park Preliminary Layout Angie, Would you mind taking a look at th~s for me and giving me a call to discuss? Thanks, Jamie > -----Original Message----- > From: Jamie Shinneman > Sent: Friday, August OS, 2005 2:22 PM > To: 'mgriffin@carmel.in.gov' > Cc: Shaun Ryan > Subject: Meadowlark Office Park Preliminary Layout > > Matt, > Following is a layout for a revised parking lot in the Meadowlark Office > Park. I believe you have had some conversations with Dave Barnes from my > office regarding this site. As you know, there is an approved parking > area at the SW corner of the park that has 17 parking spaces. Apparently > the owner would like to not build that parking area and would like to move > it to the area highlighted on this PDF document. I was hoping to get your > initial feedback on this before we went much further. We've got the > parking area up against the prbperty line, but I noticed the north portion > of this office park has its parking lot up against the property line as > well. Please' give me a call to discuss this when you get a chance. > Thanks, > Jamie > <<prelim layout.PDF>> > WEIHE ENGINEERS INC. > James K. Shinneman, PE > Project Manager > 10505 North College Ave. > Indianapolis, IN 46280 > Phone (317) 846-6611 > Fax (317) 843-0546 > Toll Free (80,0) 452-6408 > Email: shinnemanj@weihe.net > website: www.weihe.net > > ********************************************************************** 2 & lJ' ' ) > This email and any files transmitted with it are confidenti~ > and intended solely for the individual or entity to > whom they are addressed. If you have received this email > in error destroy it immediately. > ********************************************************************** > Weihe Engineers, Inc. Confidential > ********************************************************************** > > 3 u u Conn, Angelina V Subject: Jamie Shinneman [shinnemanj@weihe.net] Monday, August 15, 2005 11 :57 AM Conn, Angelina V Griffin, Matt L; Brewer, Scott I; 'sdauby@doz.net'; 'soconnor@DOZ.net'; 'npolley@doz.net'; Shaun Ryan RE: Meadowlark Office Park Preliminary Layout From: Sent: To: Cc: prelim layout.PDF (640 KB) Angie, It appears that we would only be at 48% impervious with this new layout. This site has large open areas especially along the back yards where a 60' BSL is required. Since we are under the 75% impervious, does this site look like something staff would support assuming we work with Scott on any additional landscaping requirements? Thanks, Jamie -----Original Message----- From: Conn, Angelina V [mailto:Aconri@carmel.in.gov] Sent-: Monday, Augvs t 15, 2005 9: 05 AM To: shinnemanj@weihe.net Cc: Griffin, Matt L; Brewer, Scott 1 Subject: RE: Meadowlark Office Park Preliminary Layout Jamie: maximum lot coverage is 75%. what will the new lot covera,ge be with the proposed parking areas? ( a variance may be needed) TAC only would be the best route to send a proposal like this. the next deadline for TAC is Sept 6 (you will have to mail site plans and a short narrative to all TAC members) to be heard at the Sept 21 TAC meeting. additional landscaping may be required, also. Sincerely, Angie Conn Planning Administrator Division of Planning & Zoning Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 P 317.571.2417 f 317.571.2426 www.carmel.in.gov aconn@carmel.in.gov -----Original Message----~ From: Conn, Angelina V Sent: Monday, August 15, 2005 8;53 AM To: 'shinnemanj@weihe.net' Cc: Griffin, Matt Li Brewer, Scott I Subject: FW: Meadowlark Office Park Preliminary Layout I will take a look at it. u u thanks, angie -----Original Message----- From: Jamie Shinneman [mailto:shinnemanj@weihe.net] Sent: Monday, August 15, 2005 8:37 AM To: Conn, Angelina V Cc: Griffin, Matt L Subject: FW: Meadowlark Office Park Preliminary Layout Angie, Would you mind taking a look at this fo.r me and giving me a call to discuss? Thanks, Jamie > -----Original Message----- > From: Jamie Shinneman > Sent: Friday, August 05,20052:22 PM > To: 'mgriffin@carmel.in.gov' > Cc: Shaun Ryan > Subject: Meadowlark Office Park Preliminary Layout > > Matt, > Following is a layout for a revised parking lot in the Meadowlark Office > Park. I believe you have had some conversations with Dave Barnes from my > office regarding this site. As you know, there is an approved parking > area at the SW corner of the park that has 17 parking spaces. Apparently > the owner would like to not build that parking area and wou)d like to move > it to the area highlighted on this PDF document. I was hoping to get your > initial feedback on this before we went much further. We've got the > parking area up against the property line, but I noticed the north portion > of this office park has its parking lot up against the property line as > well. Please give me a call to discuss this when you get a chance. > Thanks, > Jamie > <<prelim layout.PDF>> > WEIHE ENGINEERS INC. > James K. Shinneman, PE > Project Manager > 10505 North College Ave. > Indianapolis, IN 46280 > Phone (317) 846-6611 > Fax ( 3 1 7 ) 843 - 0 54 6 > Toll Free (800) 452-6408 > Email: shinnemanj@weihe.net > Websi tOe: www.weihe.net > > ********"*******,*******************.************************************ > This email and any files transmitted with it are confidential > and intended solely for the individual pr entity to > whom they are addressed. If you have received this email > in error destroy it immediately. > ****,************************.****************************************** > Weihe Engineers, Inc. Confidential > ********************************************************************** > > 2