Loading...
HomeMy WebLinkAbout07100052 Site PlanCONDITIONS PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES FOUND 135 00' GRAPHIC SCALE UPON THIS DRAWING SHOULD BE REPORTED TO MILLER SURVEYING, INC , IMMEDIATELY, FAILURE TO DO SO WILL RESULT IN THE CONTRACTORS ASSUMPTION OF LIABILITY. & NOTE: THE BASEMENT ELEVATION DEPICTED HEREON HAS BEEN 1 E, 00 SO. FT. CCOO NC . ° sp { 0 15 30 60 DETERMINED AND BASED UPON THE PAD GRADES AND OR CONTOURS I E n TAKEN FROM THE CONSTRUCTION PLANS FOR THE SUBDIVISION. UNLESS ?? z SCALE_ 30' STATED_ NO-INFORMATION ABOUT FLUCTUATING WATER TABLES,.SOIL Z _ CONDITIONS OR SOIL TYPES WITHIN THE BUILDING AREA HAS BEEN P5. SITE PLAN PROVIDED OR STATED ON SAID SITE PLAN. IF DURING THE EXCAVATION { ? 46 0' I JOB NO. 831879 PROCESS. ANY GROUNDWATER IS WITNESSED ADDITIONAL . CONSTRUCTION TECHNIQUES SHOULD BE INCORPORATED TO ALLEVIATE m ° O LEGEND FUTURE PROBLEMS. p I w 2.0' { 41.0' CD b sD = STABILIZED CONSTRUCTION DRIVE THE ELEVATIONS FOR THIS HOUSE WERE DETERMINED BASED OFF OF THE HAMILTON COUNTY CIS MAP THESE O N 4.6.0' 0OO 10.0'= 2.0' Ps { SUMP { Ps =PERMANENT SEED /SOD IMMEDIATELY . o m AFTER CONSTRUCTION ELEVATIONS SHOULD BE FIELD VERIFIED BEFORE n m CONSTRUCTION. { ? a z n II I { O ? II _ , SANITARY B. L, = BUILDING LINE THE UTILITIES SHOWN HEREON THIS SITE PLAN ARE AT A { J 6 0 amd o o 4 4 w 0 {? { D. & U-E. - DRAINAGE & UTILITY EASEMENT PROPOSED LOCATION. NO DEVELOPMENT PLAN FOUND ° +n OR PROVIDED. THESE UTILITIES SHOULD BE FIELD VERIFIED OIL PROTECTION 0' ° 6 WATER U BEFORE CONSTRUCTION. I AREA . { ` ? ^ Z PS ° z ? m ? ? i ?I I I Q W? { I { LL _ LLI_ DESCRIP11ON N Ld LOT 104 IN WOODFIELD, SECTION SIX, PHASE ONE AS FACIte ^1 PER PLAT OF SAID ADDITION RECORDED AS INST. { 16,250 SC. FT. { ! x/8909768 IN PLAT CABINET 1 SLIDE 19 IN THE OFFICE OF THE RECORDER OF HAMILTON COUNTY, INDIANA. { { THE WITHIN SITE PLAN WAS PREPARED WITHOUT { { THE BENEFIT OF A CURRENT TITLE POLICY AND ARE PAGE: 1 OF 2 THEREFORE SUBJECT TO ANY STATEMENT OF FACTS REVEALED BY EXAMINATION OF SCHEDULE "A" AND { I {I I SCHEDULE "B" OF A TITLE POLICY. N " 0'? uq 4 r ' ¢ GiSTHq+?ri =?} _. _. ..... L----------------_._. No- n STATE OF ?;ql9 l:?P?:PpQnhl Qni min Apnl lr ` - - 2. CONIHACIOH SHALL COMPLY WITH ALL SIAFE AND LOCAL ORDINANCES THAT APPLY. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 4. ADDITIONAL-EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 5. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 6. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 7. SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUM- ULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 8. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND RE- DISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS UO ALLOWED ON SITE. (HOMEOWNER SHALL CLEARLY MARK ANY EXISTING TREES OR STRUCTURES THEY INTEND TO KEEP) 11. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY THE ENGINEER. b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. SEASONAL ROIL PROTEC11ON CHART sAwQAnw PR cna EEH VAN. IM. x.. .EIIE JULr ALG WT. MY. Nw. DEC IvN.NwT SSSONG A • // ///n // r DMNMr »Aw D N sEm.c scaoRw --N /// 4///, D - .OMG A - NENMw "OMS$ IM MR, /ACND G .. mUl 1. IM LrS./ACiC' P IS a ,ws T Al ¢ILM/I M ADD NMUAL 11YFDfASS m Iffi/AOG. D - MNL =111@U$$ ,m L /AwF: O MW N r ISD IBS/AMC KUs a TNS STUN M=H/ILAC OR ADD NNUAL TIPNU4 M lH1/AQS C - SALIxL Mrz } e,Allp9/AQf D: HEAT OR Att a MISN[LS/AOQ E - ".x RT.Q SS .D NHS./AGE (I IH/ID00 MIT.) F - 900 D - STMN NM.w a WINS/AO,e: •nh - -WD M NRIVM EXIRYID Al C MLY. ntlBT N /Q ?P¢NMn •• - IRUGiNW IEEDFD FQ a iD ] N¢6 u'rtR SUPRmID 90D SE3.B® R MATION M PNWAMFNT 2£DING, I.RST SOL ro ¢IBeer W AxD IRDAdT ILIQS (LVwrAm oaNTr swD G OpOgATIK aTDTSON w,¢ mR ASasTM¢ AND 90Lt 9rYYlYATO{ Mtl1W.. AYA/An[ TSINY YTQS) z r 90l PN B UIEIrAB1I F011 IK Mcas ro S 5®!D. MPIT LrE AOLORCND lD 1[iT RLNMOOATAN$ 1 PR,EIII Af IIED]NOtm t1 M SR T9,. I OF PORK MV DDNE. M. NTLINY Aoo-ov wN01a Ix-Ia-la Mu.m, G Ewvuan. FG,umL • TLL 1V >d. IO GTYI A UI6pe1 9BLEm. NgWIC M fG1YIIA N4 IK NIO >K 9w. x-N AIE+O om MN A EMA G A nA¢ wvnn .Lnos$ TIE aac NAL a WE NL bSI111OD) MW T Y W R ROI rQ 15 Wn 9 WK NA FA 9rMEIIATION M . MpI fAM1I ¢MigN$ PID.gIT RM G WMHAT W g tNDI a,/.c YuQ au ¢ usm ro ExxR[ Gp9o ttMDC/,tnl AEDIR?41If ME NET. i xv flL1fA FA94C .A? ?i pq,e y,4L NALE 1 YNIUY 1FMCM K FLOW sxAU M: NvoD. $Rn OR snLTncr,c, u? WL K ¢ vATUIrt $TP?¢rN ro AFAS, vuuD' vuwc nsuunw My ,v su$m, ArAnrn Lens. I FASTC Y. ¢ A Nn x ¢vTrn$ r oe cwvsnxc ¢ sNQq w, RrnsrAS, =12 wr$rAxT ro DErzMQAnw rRax ' \L111AN0.[i 1M NUi NOANZ SILT FENCE CONSTRUCTION NTS MANTENMICE: INSPECT THE SILT FENCE PERIODICILLY AND AMR EACH STORM EVENT. IF FENCE FABRIC TEARS. STARTS TO DECOMPOSE OR IN My RAY BECOMES NEFKCTYL RERACE THE AFFECTED PORTION IMMEDUTTI.Y. REMOVE DEPOSITED SEDIMENT Y9ET1 IT REACHES HA' THE HEIGHT OF THE FENCE AT ITS LOKST PONT OR IS CAUSING ME FABRIC TO BULGE IME CARE TO AMD UNOD INNG ME FENCE WRING QEMTDIIT. AFTER THE C 7111 R11IHC DIWNAFE AREA HAS BEEN STABIUZED REMOVE THE FEACIE AND SEDIMENT DEPOSrTS, BRING THE DISTNLBCD AREA TO GRAOE AND STADIUM r? E wDUM>? PLAN VIEW STABILIZED CONSTRUCTION ENTRANCE MS MAINTENANCE: INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER EACH STORM EVENT OR HEAVY USE. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL TOP DRESS WITH CLEAN STONE AS NEEDED. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC/PRIVATE ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. SECTION 102.07 NOTES 1) BUILDER TO INSTALL TEMPORARY CONSTRUCTION ENTRANCE PRIOR TO ANY EARTH DISTURBING ACTIVITY. 11) BUILDER TO INSTALL SILT FENCE OR APPROVED EQUAL. BUILDER TO INSTALL AND/OR MAINTAIN INLET SEDIMENT PROTECTION. III) BUILDER TO CLEAN MUD FROM STREETS AND ALLEYS DAILY. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED ON IN A MANNER COMPLIANT WITH ALL STATUTES AND REGULATIONS. IV) BUILDER MUST COMPLY WITH ALL ORDINANCES GOVERNING SITE EROSION AND SEDIMENT CONTROL AND THE APPROVED EROSION CONTROL PLAN FOR THE DEVELOPMENT. V) BUILDER SHALL NOT ALTER ELEVATIONS OF ADJOINERS LOT. BUILDER TO ENSURE SEDIMENT / EROSION DOES NOT LEAVE THE LOT. VI) THE OVERALL SELF MONITORING PLAN AND PROCEDURES AS APPROVED FOR THE DEVELOPMENT SHALL BE USED IN CONJUNCTION WITH THIS PROPOSED SITE PLAN. VII) BUILDER TO OBTAIN A REFERRAL FROM THE DEVELOPER FOR THE "QUALIFIED INDIVIDUAL" IN CHARGE OF THE MANDATORY STORM WATER POLLUTION PREVENTION SELF MONITORING PROGRAM FOR THIS PROJECT SITE. BUILDER TO ENSURE THE NECESSARY DOCUMENTS PLANS AND PROCEDURES ARE IN PLACE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. VIII) BUILDER IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SITE IS STABILIZED. SITE PLAN PAGE: 2 OF 2 JOB NO. B31879 rrAA ar,4 ``VVYIIIIpT1II D. No 0 S0083 STATE OF I HEREBY CERTIFY THAT THE DRAINAGE WAYS, PAD ELEVATIONS. AND EROSION AND SEDIMENT CONTROL MEASURES ARE CONSISTENT WITH THE OVERALL DEVELOPMENT PLANS A A ". ?/ F?_ ry,?, iA . SEP 1 2 2007