HomeMy WebLinkAbout07090101 CorrespondenceTER HORST, LANSSON & P'ISK, INC. `emu CONSULTING ENG[NEEES rely 9,207 Mr. RobertThompson, RLA Hamilton County Surveyor's Office One Hamilton County Square, Suite 189 ,Noblesville, IN 46060 Re: CN ess=Carmel Weston Park TTY Proj ect No. 2 D07-3 99 Dear Mr, Thompson: In accordance with your review, we have completed amendments to the SIATPP, ESCP and Specifications for this project. The following is a summary of the revisions corresponding to your comment form dated 6126/07: Section A 1. The legal description for,the,site;Eas been added to Section A3 on Sheet C43. 2. The identification of all receiving waters has been added to Sheet C4.1. Sections B & C 1. The project S-V?'PPP on Sheet C4.3 addresses the items covered per the standard example sheet format. The provided written plan addresses the information required buy Rule 5 and the Hamilton County Surveyor's Office. 2. A copy of the O&M manual for the proposed BRA is enclosed. 3. Item number 4 was added to Self Monitoring Section (C) of the SVV'fTP to address the requested anneal maintenance and inspection reporting for the BMP. 4. The requirement of scheduling a pre-construction meeting and supplying the N01 prior to earth disturbance was added to the Construction Sequencing Section (D.2) as the initial activity of construction. 5. The owner's representative has been listed as the responsible individual at this point in the review process as yids have not been taken yet and thus the site contractor has not been determined. The selected contractor will be required to have a qualified individual responsible for the S WPPP implementation. 6. The additional contact information has been added to the Spill Prevention and Control Section (F) of the written plan. 7. The required information concerning post construction pollution sources and water quality is included in the section tilled `_Ma.erials and Wastes" which is Section E of the S WPPP plan. Additional information addressing the adequate treatment of pollutants to the maximum extent possible for the specified 13W was added to Section E.4. 8675Pvniue Road 1Lmmapolis,11\ 46268 Phone (317)33 ^^-1500; Fax (317) 334-3552 July 9, 2007 L4 Fitness -Carmel, N Page 2 8. A recornmended location for the NOT, staging area and sanitary facilities was added to the erosion and sediment control plan. See notes and revisions on Sheet C4.1 for the detailed information. 9. The requested note regarding phosphorus use was added to the Specifications Section 2, part 2, "Products" on Sheet C6.5. Please can me if you have any questions or need additional information. Sincerely, Ter Horst, Lamson & Fisk, Inc. Mark N. Obergfell, P.E. AssociateiSite Department Manager Enclosures: Revised Sheets C4.1, C4.3, C6.5 Stormwater Quality B1VIP Unit O&M Manual Copy of your comment form Copy to: Mr. John Turek - LA Fitness Ms. Angelina Conn - City of Carmel P:?200T,10012007-1994Adsi,,\Cove niw=%FICSO recpo.t 07109-2C07.wac.doc Construction/Stormwater Pollution Prevention Plan Technical Review and Comment Form 1 Project Name: LAFitness County: Hamilton Plan Submittal Date: 0622107 Hydrologic Unit Code: 5 1202 01 1200 80 Project Location Description: T1'estoo Park Block '-4' 106tb &: Michigan Rd Latitude & Longitude of point of discharge: Provide Civil Township: Clay Quarter: A Section: 7 Township. 37N Range: 3E 0 •a Project Owner Name: LA Fitness 6 O Contact: John Tmck '~ Address: & L /3576 f g Cify: ludiana_ae3is- Me Ca/rhJ,-lily State: IN Zip: ?Ila6SS .o Phone: 416-8322 FAX: Say- 3132- E-NWI:• s. Q' Plan Preparer Name: Mark Obergfell Affiliation: 'Per Horst Lamson & Fisk Address: 8675 Purdue Rd City: 1neianapolis State: IN Zip: 46265 Phone: 334-1500 FAX: 334-15 2 E-Mail: mobergfell(u)tlf-engineers.com Review Date: 06126/07 3 Principal Plan Reviewer: Robcrt Thompson, RLA Agency: Haadlton County Slsveyor's Office x Address: 1 Hamlton Cmmty Sq. #188 _R City: Noblesville State: IN Zip: 46060 Al Phone: 770-8833 FAX: 776-9625 E-Mail: rct@ce.hamiltcu-m.us Assisted By: PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 IAC 15-5. L7 Please refer to additional informer oaindud. ed ou-the folibiving page(s). , r , . ? Submit Notice of Intent (NOI); Attacli'a c6p Wthis cove?:page-when submitting the NOI to the Indiana Department ofEnvtronmentat ?loan entenr-Cowvuctlon activities m6y_begfn 48 hoursfollowing the submittal of the NOI. A copy of the NOI must aisabe sent to the HCSO. ? A preliminary plan review has4een completed; a comprehensive review wilt not be completed within the 28-day review period. There viewiug.authority reserves ihe`rightto°p'erform a comprehensive review at a later date and revisions to the plao,may-be required at that time`afAartMeficiencies. ? Please refer to additional inforina n Included on ttie f llowing page(s) ?' Submit Notice rif Intent (NOI)lrgc" copy ofthi_FQ 5rpage when submitting the N6l to the Indiana Department o1Environmental Management.: - Contiimcn.on activities m begm 48 hoanfollowin& the submittal of '. °y l _ .. . the NOL A covyofthe NOl must also be seni'ro he HCS0;4_ __ - PLAN IS DEFICIENT,:=Sigoificant deficiencies were idenMed durmgtbe plan review.' 0 Please refer to additional information muluded on the-followin followingpa e(s) Page 4 DO NOT file a Notice of Iuteni for ltitf pr2jeci: -_.? I? DO NOT commence land disturbing activities until all defideacies are adequately addressed, the plan re- submitted, and notification 4asbeebreceived4hat.lhe-minimum requirements have been satisfied. h ?Q Plan Revisions ?? Deficient Items should be wailed of ilelivered to the Principal Plan Reviewer identified in thePlanReview Section above. Hamilton Ccunty Surveyor 62612007 Construction7Stormwater Pollutiou Prevention Plan - Technical Review and Comment (Form I) roject Name: LA Fitnes=_ Date Reviewed: 06/26/07 The technical review and comments are intended to evaluate the completeness ofthe Construction/Stormwater Poilution Prevention Planfor theproject. The Plan submitted was not retdewedfor the adequacy of the engineering design. All measurer included in the plan, as well as those recommended in the comments should be evaluated as to theirfeasibiliy by a qualfied individual with .structural measures designed by a qualified engineer. The Plan has not been reviewed for other local, state, orfederal permits that may be required to proceed trio this project. Additional information, including design calculations may be requested to further evaluate the Plan- Anproposed siormwaterpollution prevention measures and those referenced in this review must meet the design criteria and standards set forth in the "Indrana 3tormwaler Quality Afanual"from the Indiana Department of Natural esources, Division of Sall Conservation as well as the Hamilton County Storarwater Design Manual. lease direct questions and/or comments regarding this plan review to: Thompson, RLA [Robert lease refer to the address and contact Information identified in the Plan Review Section on page 1. Assessment of Construction Plan Elements (Section A) The Construction Plan Elements are adequately represented to complete a plan review: ? Yes ? No The items checked below are deficient and require submittal to meet the requirements of the rule. A A -1 Index shooing locations of required Plan Elements ? 2 11 by 17 inch plat showing building lot iounbers/boundariez and road layout/narnes 3 Narrative describing the nature and purpose of the ? 4 Vicinity map showing project location project 5 Legal Description of the Project Site ? 6 Location of all lots and proposed site (Inclede Latitude and Longitude - NOI RequiremeN_)_,-, _ improvements (, JS, un iieq , rtecua, etc) 7 % - ? Hydrologic unit code ` t (14 Digit) "` y ? `8 Notation of any State cr. Federal water quality ` `_ _ __ i _ - Permits - 9 Specific points where stcrmv4ater-..discharac will leave - I0 Location sbd name of all wetlands, lakes and the site mater courseY ea and adjacent to the site ? III t ' Identification of all recei.Ning waters 12 Identifcaioa ojRtential discharges to ground 4'7i :? c1` rv. water (abandoned wdls;?sinkholes, etc.) ? 13 ., ! "`7:Ca 100 year floodplalns, floodways, and fioodway fi"tge5: ="'_ ?; '!> ;4 Pre-con and-post construction estimate of . , Peak Discharge OQ Year:bmm: event) ? 15 ' "t 1 fl 1 -1-. - Adjacent landu;e, including upstream a2tershed t -' 1 ' 16 1 Locations and approximate boundaries of all t - ,:.• ham. r disturbed areas (Cpusnuctiun Limits) ? 17 ` ' Identification of exstmg'aegetative cover, i _. r 18 ?at1s map including soil descriptions and J R limitations ' ? 19 Locations, size and dinnensions ofpto used storrewater 20 Plans for any off site construction activities -Y systems (e.g. pipcs,'svales and channcls? assod,ated with this?10ject (sewer/water tie-ins) ? 21 Locatons of proposed s9il'stockpiles'and/oT -- 2 2 I Existing site' top Iograpfiv at an interval appropriate borrow/disposal " to indicate drAinage:patterns ? 23 Proposed final topography at as interval appropriate to - -r ,t - - i ___. -- ndicate drainage patterns - - - - , Hamilton Count' Surveyor 6126/2007 2 ComstructionlStormwater Pallution Prevention Plan - Technical Review and Comment (Fonn 1) ojectName; LAr1utess ate RcAewed: 06/26107 Assessment of Stormwater Pollution Prevention Plan (Sections B & Q St ormwater Pollution Prevention Plan - Construction Component (Seetion B) The mnstruarion cnmponent of the Siormwam Pollution Prevention Plan includes srormwarerqualiry measures to addresserosion, szdimenratlon, and otherpollutants arsnrlafed with land disturbance and r canstraciicn actndties. Proper implementation ojtheplan and irrspections o''the construction site are ' necessary m minimise the discharge ofpollutants. The Project Site OKner should be aware that unforeseenc =rucrton activities and weather conditions may affect theperformance ofa practice or the v ;: effectiveness ofthepfon. The plan must be a fterible document, with provisions to modem or substitute Q Z 71 practices as necessary. 0 1 Description of potential pollutant sources associated with construction activities n F-111 a Scqueuce deseribingstormwater quality measure implementation relative to land disturbing l activities ' 3 Stable construction entrance locations and specifications (at all points of ingress and egress) rl ? ? 4 Sediment control measures for sheetflow areas Q ? 5 Sediment control measures for concentrated flow areas ' ? ? 6 Storm sewer inlet prutectii a measure locations and speelfications - ? ?' 7 Runoff control measures (e.g. diversions= mck'check dams, slope drains, ac') ' ? Q 8 Storm water oudetprotectio spceifications Q ? Q 9 Grade stabilization structure locations and spec%fications Q Ie Location, dimensions, specifications, and construction details of each stormwaten quality measure . Q 11 Temporary surfacestabilizaiton methods appropriate for each season (include sequencing) ? 12 Permanent surface stabilization specifications (inelvde sequencing) ? G 13 Material handling and Spill prevenffDn plan-? - --^ -- --.., 14 Fvlanitoriag and maintenance guidelhtes I[vT_egch propgseO stormwafer quallte measure Q '? 15 Erosion & sediment con'trol7specfica6onS for individ'oatbmldiag Pis,- St ormwater Pollution Prevention Plan - Post Construction Component (Section Q *1 1 T, The post ^nnstruction component ofthe Sldrrnskalse rh,Pr? (Jutian Preventran f.{Gn includes the = a a ? s implemenindvnbfstormwalez ualiry measures as dips poli,aarb- that will be'associafed With the R .- 6 final landtere. Pnst constittcrtgn,stnnnwater gtla(rry mecswres should bef-donat upon compfetlon of C the project. Lon?termfuncLOnalsiry vflF.e measvte.are critical to their lierformance and should he a z C atex-Design Manna forgddance. monitored and rnainta%ned. See rtte famrlton r4 unnrStormwawr c ? 1 Descripti. of pdlluta¢ts and fheiivspurcea assarra'ted with the propasedIand use ? r-? I 2 Sequence;due-gibing St ormwaterquality mcasurelmplementation r ? ?] ? 3 ?escripfioh o#prnpowd pbst-Eoii tr cpossforpryaler gnallty`rneasnre5' (1nclude c wiirter 3escription Qjnow them mehsttre 4li reduce discharge of expected pollutartsJ ? ? 4 Location, dimenSio y,_spedficafiuns', and-constru lien details Hof each stormwater quality measure ?1 Q 5 Description of mainteq+bce guidelipes for post ron@trucfio¢ gtormwater quality measures .1 1 Fa itron Loamy $ury?:or 612Gt2007 3 ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment Pmject'lame: LA Fitness Date Reviewed: 06126107 (. T.avmr oPRhee` C4.3 dnec nnf mar} nivr e}anrlard cheer fnrmar Cee www.rn.hamil}nn in. ,vIr, .,o,, and cee examples of S WPPB sheet layout for technical review (Part A, B and Q. Reviso and re-submit 2. Provide HCSO'a ccpy of the O&M Manual for Post-construction BMW's. 3. Add to Par[ C. Post-Construction BMP :"Owner shall provide copies of ail Wpecton reports and maintenance activities at least annually." 4. A 6A: under construction sequencing 41 shall read: "Schedule a pre-con with the HCSO priorto any earth disturbing activity and furnish a copy of the NOP 5. Provide ECSO proof that the trained individuui (Turek) is trained in sediment and F on control activities. 5. To spi1T prevention add contact infofor IDEM and HCSO in case of spills. 7. Missing Section C which' addresses post-consQUCFion water quality-follow standard sheet form at 8. Show location of NOI posing, staging area and port-a-let locetiori on plans. 9. To seedbed and landscape specifications add " Do not use phoshorous (12-12-12 ) containing fertilizer unless soil test show aplrasphorous de$ciency. Use phosphorous free fertiE zer(12-0-12) i'heso comments reflect only the SW-PPP and do not address other plan review agmeiea. Hamilton County surveycr 6126/2011; 4 Construction/Stormwater PollnfionPrevention Plan Technical Review and Comment Forth 1 Project Name: LA Fmcss County: Hamilton Plan Submittal Date: 06/22/07 Hydrologic Unit Code: 5120201120080 Project Location Descriptioa: Weston Pazk B[ock'A' 106th. Michigan Rd Latitude & Longitude of point mf discharge: Provide q Civil Township: Clay Quarter: MY Section: 7 Township 17ti Raage: 3F 0 a Project Owner Name: LAFimess Conmeh John Tcrek a ? Address: 1061h artd lviichigan Rd City: Indianapolis State: II9 Zip: c Phase: 4164322 FA3i: t-Mail: Plan Preparer Name: Mar{ Obergfell Affiliation: Ter Horst Lamson & Fisk Address: 8675 Purdue Rd City: Indianapolis State: IN Zip: 46268 Phone: 334-1500 FAX: 334-1557 E-Mail: mobercifellatlf-engineers.com Review Date: 06/26107 i Principal Plan Reviewer: Robert Thompson, RL.A Agencv: Hamilton County So[veyar's Office Address: 1 Hamilton County Sq. #188 City: Poblesville State: IN Zip: 46060 6r Phone: 770-8833 FAX: 776-9628 E-basil: rco'a,3co.hamil[on:in.as Assisted By: I PLAN IS ADEQUATE: A comprehensive plan review has been completed and tt has been determined that the plan satisfies the minimum requirements and intent of 327 FAC 15-5. [] Please refer to additional information included ou the following page(s). 0 Sabmit Notice of inicnt (NOn: Attach a copy of this rover page;wheh submitting the N'Of:o -hc Indiana Departme+x cfEnvironmental t{Sanagement, Contraction ecifviries "y begin 48 hoursfollowing the submittal gf the NOL A copy of the NOl must alno 8e sent ro the HCSO. - U A preliminary plan review has Deem completed; a comprehensive review will not be completed within the 28-day review period. The reviewing. authority reserves the r4* td perlorm a comprehensive review at a later date and revisions to the plan may be required at that time to addre?v..d"eiichmcias. -'- ? Please refer to additional information included am fhe following page(s). Submit Notice of Intent (NO[): Affi. wh-a, copy 6f this cover puge when submitting rho VOI to the Indiana Department. of Env[ronmenm! Management. Construction gchvlties, may begin 98 hours following the submit2a! o; the NOL R copy oftlte NOI must sass 5e sent to Maha HCSO! . ?? PLAN IS DEFICIENT:'^Sieniflrarat deficiencies were identified dening he plan review. R Please refer to additional information included on die falfowiag page(s). Page 4 ?? DO NOT file a Notice of Intent for Ibis project - - DO NOT commence land disis birig-activities until all dencienciei are adequately addressed, the plan re- submitted, and notification has,been.received thatthe minimum requirements have been satisfied. ?? Plan Revisions Q Deficient Items sltouldbe mailed oe.delivered to the Principal Plan Reviewer identified in the Plan Review Section sbove. 11amihon County Surveyor 612612007 Construetioni5tormwawr Pollution Prevention Plan - Technical Review and Comment (Farm I) Project Name: LA Fitness ? 13aoe Reviewed: 0612&07 1 The technical review and comments are intended to evaluate the completeness of the Corstructicei(normwater Pollution Prevention Platijor the project. The Plan submitted was not reviewed for the adequacy ofrhe engineering design. Ail measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural measures dzsigned !ry a qualified engineer. 7'he Plan has not been reviewed or other local, state, orjederal permits that maybe required to proceed with this project. Additional information, including design calculations may be requested to further evaluate the Nun- Ali proposed stormwater pollution prevention measures and those referenced in -his review rnusr meet the design criteria and standards set forth in the "Indiana Stormwaeer QualityManual"from the Indiana Department of Naturai Resources, Division of It Conservation as well as the Hamilton County Stormwater Design Manual. Please direct questions andfar comments regarding this plan review to- Robert Thompson, RLA Please refer to the address and contact information identified in the Plan Review Section on page 1. Assessment of Construction Plan Elements (Section A) The Construction Plan Elements are adequately represented to complete a plan review: 21 Yes ? No The items checked below are deficient and require submittal to meet the requirements of the rule. A A 7 Index showing locations of required Plan Elements 2 17 inch plat showing building lot 1 1 by numberslboundaries and road layvWaames 3 Narrative desc. ibing the nature and rmurpose of the ? d Vicinity map showing project location ect project 5 Legal Description ofthe Project Site ? 6 Location of all tors and proposed site (Include Latitude and Longitude - NOI liequirement) improvements (roads, utititics, atrvefwe_, etc.) 7 liycrologic unit code (14 Digit) ? - 8 ation of any State or Federal water quakily Not ' . peiii iie Specific points where stonnwat& discharge will ]cave ? 10 Location and name of all wetlands, lakes mid 9 the site - - water courses. on and adjacent to the site dl Identification ofall recetvmg waters Tdentilicatioo of potential discharges to ground .: water (abandoned wells, sinkholes, etc.) E3 13 100 year floodplains, ttoadways, and floodway fringes ?? '1i{ Pre-construction andpnst cansttuclion estimate o vrarstonn evaatl Peak Discharge (10 ? 15 Ad,Taum(lauduse, including upstream watershed ?' .16 Locanonsand approximate boundanesof all disturbed areas (Canat.ucuon Lvniis) ? 17 identification of existinE.vretahve cover 18 Sails map including soil dcscriuaons and i l mitations- i9 LaMions, siu and dimensions ofp onased etormwatcr ? 20 Plans £pr any off-site consintctinn activities systems(e.g. pipes, s.vales anti channedsj - associated witb this project(sewerlwster de-ins) ? 2 Locations afproposed sail sWCkpdes apolor -, ? Existing site' topography at at, interval appropriate l Lnrrowldispasal areas- 22 to indicate drainage. patterns Proposed final topography at an:interval appropriate to -- 23 indicate drainage patterns "-- - .. Hamilton County Survefor 6/2612007 2 Constructiou/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1) I Proj"t,Vame: LA Fitness Date Reviewed: 06126107 Assessment of Stormwater Pollution Prevention Plan (Sections B & C) Sto rmwater Pollution Prevention Plan - Construction Component (Seedon B) The construction component ofthe Stormwater Pollution Prevention Plan Includes Stormwater quality m: sures to address erosion, sedimentation, and other pollutants associated with lard disturbance and u a construction ccliviiies. Proper implementation of the plan and inspections of the construction site are Q 5? necessaryto minimize the discharge ofpoliarants. The Project Site Owner should be aware that d c unforeseen construction activities and weather conditions may affect the performance ofa practice or the u edjectiveness ofthe plan. ne plan must be a flexihle document, with provisions to modify or substitute Q ? Z R practices as necessary. ? 1 Description of potential pollutant sources associated with construction activities 71 D 2 Sequence describing stormwater quality measure Implementation relative to land disturbing activities ' 3 Stable construction entrance locations and specifications (at all points of Ingress and egress) 71 ? ? A Sediment control measures for sheet flow areas ? ? S Sediment control measures for concentrated flow areas i4 ? ? 6 Storm sewer inlet protection measure locations and specifications ? ? E) 7 Runatf control measures (e.g. diversions, rock check dams, slope drains, etc.) 2 ? ? S Storm water outlet protectina specifieatiow Q ? ? 9 Grade stabilization structure locations and speclreatinns ?J ? 10 Location, dimensions, specifications, and construction details of each stormwater quality measure ? 11 Temporary surface stabilization methods appropriate for each season (include sequencing) 2:1 El 12 Permanent surface stabilization specifications (include sequencing) '? t3 Material handling and split preveation plan ' ? 14 Monitoring and maintenance guidetiaesfar each proposed stormwater quality measure ? 0 I5 Erosion & sediment coutrol'specifcattons for individual building lots Sto rmwater Pollution. Prevention Plan - Post Construction Component (SecdOx C) Prevenium Flan includes the mplemenradorz of siormwarerquality measures that will be associated with the maiianduse. Postconstructionstonaxater quality measures shoutd befu?nctional upon completion of f e project. Long term functionality of the measuresare crifica! [a their performance and should he onitored and maintained. See escription of pollutants and their sources associated with the proposed tied use stormwater, qualitytuacasure iniplementallon equence'deszrihing Description of proposer! past coitstruFtloti'stormwaier grialitymeat!ures' 3 (Include a writran descnplton ofhow these measures wit! reduce dischr ge,ofespected pollutants) L Ll __ ... q Location, dimensions, speefftcatione, and construction details of each stormwater quality measure ? 6 Description of maintenance guidelines for post constructionsiormwater. quality measures ffamikon County Surveyor 6126!2007 3 ConstructioniStonunvater Pollution Prevention Plan - Technical Review and Comment Project Name: LA Fitness Bate Reviewed: 06626/07 1, Layout of Sheet C43 doesnot meet our standard sheet format. Sec www.co.hamilton in. wcleanwaterand see examples of SIYPPP sheet layout for technical review ;Part A, B and C). Revise and msubmit 2. Provide HCSO a copy of the O&M Manual far Post-construction BMP's- 3. Add to Pa,-t C, Post-Construction BMP :"Owner shall provide copies of all inspcc4on reports and maintenance activities at least annually." 4. Add: order construction sequencing Ail shall read: "Schedule a pre-car, withthe IICSO prior to any earth disturbing activity and fumiah a copy of the NO[" '. Provide HCSO proof that the trained individual J'urek) is trainee in sediment and erosion control activities. 6. To spill prevention add contact Ifo fo: IDEM and ECSO in case of spills. 7. Missing SectionC which addresses past-constrvction water quality-Follow standard sheet format 8. Show location of NO[ posting staging area and porra-let location on plans. 9. To seedbed and landscape specifications add " Do not use phoshorous (12-12-12) comainirng fertilizer unless soil test show a phosphorous deficiency. Use phosphorous free fertilizer (12-0-12) These comments reflect only the S W PP? and do not address other plan review agencies. Hamilton County Surveyor 6!2612007 4 Page Iof I Mark Obergfell From: Robert Thompson [rct@co.hamilton_in. us] Sent: Friday, July 13,•2007 7:33 AM To: Mark Obergfell Subject: RE:'SIAIPRS P-L-ATFitness Need a ful I set of plans Xpbert Thompson RLA, CLAD Program Manager Hamilton County Sun•eyor's Office I Hamilton Cu. Square, Suite 188 Noblesville, IN 46060 ® 517-776-8395, sax: 317-776-9628 f 1l ratVca.hamilton.€n. us '4?atck overyourwatersfxd -you drinkwhat runs off ?» On 7/12/2007 at 3:32 PM, in message <383C662F646298438.AA9D6EA8A8C6550195E76@tlfmail.tlf.local>, "Mark Ohergfell" <mebergfe11@11f- engfnecrs.com> wrote: Robert- Attached is an updated SWPPP hopefully conforming to your standard format. Please let me know if you need a hard .copy mailed. to you or if any other concerns or issues. Thanks, Mark Obergfell From: Robert Thompson [mailtc:rd@co.hamilton.in.usj Sent: Monday, July 09, 2007 11:07 AM To., Mark Obergfeil Subject: 5WPPP LA Fitness Mark I received plans that do not follow our standard format I made the comment on the previous review. It may seem like a minor point but that is what we require for all SWPP plans. 7?pbert q-hompson, RLA, CLAD Program Manager Hamilton County Sun•eyor's Oftce I Hamilton Co. Square, Suite 188 Noblewillc. IV 46060 Q7317-776-8495. fax: 317-776-9628 (D rci]a co.hamllton.in. us Watch overyourwatersFed- you drink-what ranf off, 994812007 Page i of 1 Mark Obergfell From: Robert Thompsonlrot@co.hamilton.in.us] Sent: Friday, July 13, 2007 7:51 AM To: Mark Obergtell Subject: ?RE?SV,VP_A_ P -!;A:FitrfessYour Section C Post-construction EIMP is not for erosion control and construction activity--only for Pcst- Construction I31vLP's. I'11is needs revised to reflect how you will address water quality once construction is finished Rg6ert 27ampson, RLA, CLA4(B Program Manager Hamil[uroCouNs Surveyor's Office 1 Hatriltar, Co. Square, Suite 188 Nobtcsville, IN 46060 c'2) 317-776-8445, fax 317-775-9628 ED rct@co-harriltcn.in.us %wchaveryour waterfied-youdrinkwhatm soff >>> On 7;12l2007 at 3:32 PVI, in message <B83C662E646298438AA9D6EA8A8C6550195E7 attlfmail.tif.local>; "Mark Obergfcll" <mobergfelnatlf-engineers.com> wrote: Robert- Artached is an updated SWPPP hopefully conforming to your standard tormat. Please let me know if you need a hard ccpy mailed to you or it any other concems or issues. Thanks, Mark Obergfell From., Robert Thompson [mail to:rct@ce.ham! Iton.1n.us] Sent: Monday, July 04, 2007 11:07 AM To: Mark Obergfell Subject: SWPPP L4 Fitness Mark I received plans that do not follow our standard format. I made the comment on the previous review. It may seem tike a minor point but that is what we require for all SWPP plans. &bert 2Tiompson, (Rf-,4, CLAD ?rogram Manager Hamilton County Su ,reyur 5 Office I Hamilton Cc- Square, Suite 198 Noblesville, IA' 46060 1 317-776-8495, fat: 317-776-9623 i'D rct@cp.hamiltonJn,us Watch o uyo:rrwal-mfied- you drinkwhat runs off 911 8120 0 7 Page 1 of 1 Mark Obergfell From: Robert Thomason lrct@cohamilton.in.usl Sent: Friday, July 13, 2007 7:53 AM To: Mark Obergfell Subject: RE: SUdPPP? include the 14CSO in spill notification >>> On 7J12J2007 at 3:32 PM, in message <B83C662E646298438AA9D6EA8A8C6550195E76@tlfiiail.tlflocal>, "NlarkOhergfell" <nobergfell@llf- engmeers.com> wrote: Robert- Attached is an updated SWPPP hopefully conforming to your standard format- Please let me know if you need a hard copy malted to you or if any other concerns or issues: Thanks, I Mark Obergfell From: Robert Thompson [mallto:rct@co.hamilton.in.Lis] Sent: Monday, July 09, 2007 11:07 AM To: Mark obergfell Subject: SWPPP L4 Fitness vlark I received plans that do not follow our standard format. I made the comment on the previous review. It may seem like a minor point but that is what we require for all SWPP plans. l g6ert 2Tomp,5x4 iii, CLaPk?b Program hlanag..er Hamilton County Surveyor's Office 1 Hamilton Co. Square, Suite 188 Nobiesvilie, IN 46660 317-776-8495,`&x:317-776-9628 Et -r1 co.hamilton.in.us 'Watch overyvur watershed- you rf ink,what raps off 9/ 1 812 0 07 Page 1, of-, Mark Obergfell From: Robert Thompson [rclQco.harniltonJn.us] Sent: Friday. July 13, 2007 8:11 Aft To: Mark Obergfelt Subject:"RE SS"OPaLfEFitness add : under sequence #1. Schedule pre-can with HCSO prior to any earth disturbing activity owner shall provide copy of.NOI at that time in seed bed specs and landscape specs add: Do not use phosphorous containing fertilizer unless soil test indicate a phosphorous deficiency, use phosphorous free fertilizer 12-0-12. Change the term'Erosion Control Plan(s) to S WPPP add to Section C post-construction BMP #5 Owner shall provide copies of all inspection and maintenance reports to the KCSO at least annually use dewatering bag for all dewatering actNities Robert `£humpson, RL,4, CL qQ Program Marager Ha niltoa County Surveyor's Office I Hamilton Co. Square, Suite 188 Nablesville, 314 46060 Ol 317-776-8495, fax: 317-776-9628 U?I rct6co.hamilton.in.us Watch over y our warmked - you drink,what rays off >>> On 7/12/2007 at 3:32 P?A, in message <B83C662E646298438AA9D6EASA8C6550195E76@tlfmail.tlflocal>, "Mark Obergfell" <mobergfelLa,:tlf-- engineers.com> +NTOte: Robert- Attached is an updated 5VVPPP hopefully conforming tc your slandard formal, Please let me know if you need a hard copy mailed to you or it any other concerns or issuas. Thanks, Mark Obergfell From: Robert Thompson [mailto:rct@co.hamiltort.in.us]. Sent: Monday, July 09, 2007 11:07 AM To: Mark Obergfell Subject: SWPPP LA ritness €vlark 9/18/2007 Page I of 1 Mark Obergfoll From: Robert Thompson [rct@co.hamilton.in.usl Sent: Friday, July 13, 2007 9:38 AM To: Mark Obergfel! Su6ject?`R?ES181?LA?Fitness . make the changes and address Greg's comments then resubmit plans to us >>> On 711212007 at 3:32 PM, in message <BS3C662E646298438.AA9D6EA8A8C6550195E76@tlfmail.tlflocal>, "Mark Obergfell" <mobergfell(q,)tlf- e; lgmeers,com> wrote. Robert- i Attached is an updated SWPPP hopefully conforming to your standard format. Please let me know if you need a hard copy mailed to you or if any what concerns or issues. Thanks. Mark Oberafell From: Robert Thompson [mailto:rctCco,hamilton.irnusj Sent: Monday, July 09, 2007 11:07 AM To: Mark Obergfell Subject: SWPPP LA Fitness Mark I received plans that do not follow our standard format. I made the comment on the previous review. It may seem like a minor point but that is what we require for all SWPP plans 1&6en Thompson, qzf--A, CGf'UU Program Manager Hamilton County Surveyor's Office I Hamilton Co. Square; Suite 188 Noblesville, IN :6060 (3) 317-776-8495, fax: 317-776-9628 i:TD rct@co.hameton.in us 'Watch overyour watershed- you drink what mns off 9/18/2007 Page 1 of 5 Mark Obergfell From: Robert Thompson [rct@co.hamitton.in.usJ Sent: Wednesday, July 18, 2007 B-00 AM To: Mark Obergfell Cc: John Turek; Angelina V Conn; Greg Hayes Subject:(RE: $WP2PL9:F,rtness There was no mention about your structural BMPs (hydrodynamic separators and how they address water quality in your revised Section C5, Also there is an opportunih' to turn the Saale on the west side info a bioswale to increase water quality efficiency. Erosion Contro3 Plans are no longer an acceptable term to describe the requirements for post-construction water quality so MS4's are using the term SWPPP on documents. What pollutants and BI-P's will be used to treat contaminates from dumpsters? Could use curb turn outs into the bioswale. I will await a set of plans for any additional comments. >>> On 7117,!2007 at 3:41 PM, in message <B83C662E646298438AA9D6EA8A8C6550196192@tlftnail.tlf.local>, "Mark Obergfell" <mobergfell1@tlf- engineers.com> wrote: Robert- guess I am confused on your expectations. The text we added at the top of the third column, item C6, specifically addresses and explains what post-construction BMP's are being proposed forth is project, in addition to the structural storm treatment units, and how each of these measures helps improve water quality. I don't think I am confused on construction BMP's with post-construclion water quality as we have thoroughly addressed both construction and post-construction, Mark N. Oberglell, P.E. Ter Horst, Lamson & Fisk, Inc. ph: 317-334-1500 fax 317.334-1552 From: Robert Thompson [maJtc:rct@co.hamilton.[n.us] Sent: Tuesday, July 17, 2007 3:26 PM To: Mark Cbergfell Cc: John Turek; Angelina V Conn; Greg Hayes Subject: RE: SWPPP LA Fitness I noticed your section C still fails to address and explain what post-construction BMP s are being used and how they will address water quality-do not confuse construction LIMPS with Post-Construction Water Quality BMP's. These comments are also project specific ,RobertTohompson, RLX, CLAW Program Manager Hamilton County Survevor's Office 1 Hamilton Co. Square, Sa3te 188 Noblesville, IN 46060 317-776-8495, fax: 317-776-9628 CL r t@co hamittcn in us Watch overyourwatershed- you dnn wFiat runs off 8 /2 712 0 0 7 Page 1 of 1' Liliard, Sarah N From: Akers, William P Sent: Wednesday, August 08, 2007 3:40 PM To: Campbell, Scott; Daley, Penny J; Duffy, John M, Ellison, Christopher M; Harding, Brent S; Hill, Dick B. Jason Kirkman; Jennifer Marlett; Kempa. Lisa L; Knott, Bruce; Krueskamp, Theresa A; Lillard, Sarah N; McCoy, David W; MELONNY WILSON; Poulter, Scott A; Ron Morris; Spears, Jack J cc: 'Brooke Gajownik' Subject: New address assigned An address has been assigned to the future L.A. Fitness building that will be constructed in the Weston Park - Block A. The address assigned will be 10574 Workout Way. It is located on the parcel that is on the South West corner of W 100r1 St and N Michigan Road. There will be two other buildings built in this area as well, they also will have a Workout Way address to be determined at a later date. Thanks Bill Alters Carmel Communications Center 911 Operations Manager IDACS Coordinator Office # 571-2577 Celli 727-8507 Pager# 553-1919 Fax# 571-2585 912 412 0 0 7 Hamilton Co.; IN - Online Reports Page 1 of 1 1. report type 2. property sea rch 3. view reports Rene[ new 9earea general parcel infc. spring rax statement tax paYmen[s prnpeny card call [ax statement Disclaimer: The information available through this program is current as of 91412007. This program allows you to view and print certain public records. Each report reflects information as of a specific date; so the informatio different reports may not match. All information has been derived from public records that are mnstahtty undergoing change and is not warranted for accuracy. It may not reflect the current information, pertaining to the property of interest. Parce[ flies: 17-13-07-00-3.8-004-000 Property Address: No Street 23ONSVILLE, IN 46077 Deeded Owner: Kite Michigan Road LLC - Owner Addre55: 30 Mendian St S Ste 1100 INDIANAPOLIS, IN 46204 Legal Description: WESTON PARK BLOCK A Section/7ownship/Range: 07117/03 Subdivision. Name; WESTON PARK Block: Deeded Acres: 10.14 Political Township: Clay Lot Number(s): Most Recent Recorded Date:. 3/1212004 (Recorded Date might be due to a variety of changes; sudr as annexation, right-of-way, split, or deed.) This application is developed and maintained by the Information System Services Department. If you have any questions or ccmnents, please contact I C 2005 Hamilton Co, yycwte Suggestion4 or Issues Conditions of Use I Privacy Pclicy I Site May I Technical Help I HOME CF) 2006, Hamilton County, Indiana - all riah[s :eser-ed. http:!%www.co.hamilton. in.us/apps rreports!rptparcelinfo. asp7sparcelno=1 71107001900400... 9/24,12007 Parcel Information Report Page 1 of I Lillard, Sarah N From: Lillard, Sarah N Sent: Wednesday, September 12, 2007 3:19 PM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P;'grh@co.hamilton.in.us';'rct@co.hamillon.in.us'; 'Ryan.harlman@ctrwd.org';'del@cc.hamilton.in.us; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A; 'rl72J@sbcglobal.net' Cc: 'rnnuckols@architectsforumllc.com' Subject: Pre-Submittal for LA Fitness Club @ Weston Park Blk A The Dept. of Community Service, Building & Code Enforcement division, has received a request to meet for the purpose of submitting to obtain a building permit for the below-mentioned project, PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the meeting and submittal, even if all offices have not responded. Project:' LA FITNESS CLUB (10574 Workout Way. Parcel 1D # 1713070018004000.) Meeting Date: PENDING Time: PENDING Related Planning 8, Zoning docket numbers: 07070006 DPIADLS Again, if there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this e-mail. Representative: Michelle Nuckols Architects Forum mnuckols@architectsforumllc.com Ph. (317) 842-8500 9/12/2007 Page 1 oft Lillard, Sarah N From: Lillard, Sarah N Sent: Wednesday, September 12, 2007 3:20 PM To: Lillard, Sarah N; Conn, Angelina V; Hili, Dick 8; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hambton.imus ; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org; del@co.hamilton.in.us'; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A; 'rl72if@sbcglobal.net' Cc: 'mnuckols@architectsfcrumllc.com' Subject: RE: Pre-Submittal for LA Fitness Club @a Weston Park Bilk A Michelle, The following requests for copies of certain parts of the approved plan come from members of i our Planning and Zoning office. Verification that copies have been received and stamped as approved will be required for Submittal for the building permit. 1. Please submit three (3) copies of the approved site plan to Scott Brewer, DOGS, One Civic Square, Carmel, IN, 46032. You will be notified when your stamped copies are ready for pickup. Contact: Scott Brewer, City Forester/Environmental Planner. One Civic Square; Carmel. M 46032. Phone: (317) 571-2478. FAX (317) 571-2426 2, Please submit two (2) copies of the. architectural elevation drawings for the structure to Angelina Conn, DOCS, One Civic Square, Carmel, IN, 46032. You will be notified when your stamped copies are ready for pickup Contact Angie Conn, Planning Administrator. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2417. FAX (317) 571-2426.1 Also, we tivill need to confirm with Dick Hill of the City Engineer's office ancll'or with John Duffy of Carmel Utilities if there will be a waterlsewer connection and/or availability permit due for. this building. If there is, you will need to either pay for this permit ahead of time, or bring a check to the submittal meeting. %,Vc will need the name of the contractor who will be doing the excavation of the exterior, lateral connection to the utility line. That contractor must hold a current bond w-irh the City. Additionally, some of these fees may have to be approved through the Board of Public Works and Safety. Please contact Dick Hill, at dhill@i carmel-in.gov or at (317) 571-2441, for more information regarding this issue. Thaz you, Sarah Sttrali. LiICA-r? Building & Code Services City of Carmel Ph. (317) 571-2475 Fax (317) 571-2449 slitlard@L Carmel, in.goy -----Original Message----- From: Lillard, Sarah N 9/12/2007 Page 1 of? Lillard, Sarah N From: Conn, Angelina V Sent: Wednesday, September 12, 2007 3:21 PM To: Lillard, Sarah N Cc: 'mnuckols@ arch itectstorumllc.corn'; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William p; 'grh@co.hamillon.in.us'; 'rct@co.hamitton.in.us'; 'Ryan.hartman@ctrwd.org; del@co.hamilton.imus', Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A;'rl72jf@sbcglobal.net' Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park Blk A Planning/zoning has no outstanding issues.' Angie Conn, Planning Administrator V' Dept. of Community ServiCeS - Planning & Zonino 1 Civic Square. 3rd Floor City of Carmel, IN 46032 p. 317-571-2417 D 317-571-2426 acorngr rmel,in gov From: Lillard, Sarah N Sent: Wednesday, September 12, 2007 3:19 PM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.tn.us'; 'rd@co.hamiltcn.in.us'; 'Ryan.hartman@ctrwd.oi del@co.hamilton.tn.us ; Foley, Amanda 1; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A;'rl72jf@sbcglobal.net' Cc: 'mnuckols@ arch itectsforumllc.com' Subject: Pre-Submittal for LA Fitness Club @ Weston Park Blk A The Dept. of Community Service, Building & Code Enforcement division, has received a request to meet for the purpose of submitting to obtain a building permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the meeting and submittal, even if all offices have not responded. Project: LA FITNESS CLUB (10574 Workout Way. Parcel ID # 1713070018004000.) Meeting Date: PENDING Time: PENDING Related Planning & Zoning docket numbers: 07070006 DPJADLS Again, if there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this e-mail. 9112/2007 Page 1 of 2 Lillard, Sarah N From: Robert Thompson [rct@i;o.hamilton.in.us] Sent: Wednesday, September 12, 2007 3:23 PM To: Conn, Angelina V; Foley, Amanda J; Ellison, Christopher M; Hill, Dick B; Littlejohn, David W; Duncan, Gary R; Blanchard, Jim F; Duffy, John M; Mascari, John A; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan, Veronica A; Akers, William P; David Lucas; Greg Hoyes; Ryan.hartman@ctrwd.org; rl72jf@sbcglobal.net Cc: mnuckols@architectsforumllc.com Subject: Re: Pre-Submittal for LA Fitness Club @ Weston Park Blk A Our office has not approved the SRYPP and I believe that Greg also has not approved plans yet. Xo6ert qI ompson, XL,4, CLl"lWfl Program Manager Hamilton C'ounly Surveyor's Office 1 Hamilton Co. Square, Suite 188 Noblesville, IN 46060 317-776-8495. fax:_17-776-9628 Ct rctflrg. cc.hamilton.in.us www_co.h am i lion. in. us/cl eanwater Z?atch oaeryovrwatershed-you drinkwhat runs off >>> On 9/12/2007 at 3:18 PM, in message <533BF727978408408313D0378A586D8E30423F825@eserver3.cityofcarnlel.net>, "Lillard, Sarah N" <SLillard@carmetin.gov> wrote: The Dept. of Community Service, Building S Code Enforcement division, has received a request to meet for the purpose of submitting to obtain a building permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the meeting and submittal, even if all offices have not responded. Project: LA FITNESS CLUB (10574 Workout Way. Parcel ID # 9793070018004000.) 91,1212007 Page I of 2 Lillard, Sarah N From: Ryan Hartman [Rya n. Hartman @CTRWD.ORG] Sent: Wednesday, September 12, 2007 3:45 PM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan. Veronica A; Akers, William P; grh@co.hamilton.in.us; ret@co.hami€ton.in us; del@co.hamiltorr.in.us; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A; rl72jf@sbcglobal.net Cc: mnuckols@architectsforumllc.com Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park l l A Sarah; Plan review is not yet complete. A final plan set with requested changes has yet to be delivered. Thanks! Ryan C. Hartman .+:rict :uczneer. Tl?d a '2 95 Dire et.' 317-844-9200 Fax: 317-844-9203 ryan.ha=tman?cL rwd.orcr From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov] Sent: Wednesday, September 12, 2007 3:19 PM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott f; Dolan, Veronica A; Akers, William P; grh@co.hamilton,in.us; rct@co.hamilton.in.us; Ryan Hartman; del@co.hamilton.in.us; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, Jahn A; rl72jf@sbcglobai.net Cc: mnuckols@architectsforumllc.com Subject: Pre-Submittal for LA Fitness Club @ Weston Park Blk A The Dept. of Community Service, Building & Code Enforcement division, has received a request to meet for the purpose of submitting to obtain a building permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU. HAVE OUTSTANDING ISSUES. After some time, we may proceed with the meeting and submittal, even if all offices have not responded. Project: LA FITNESS CLUB (10574 Workout Way. Parcel ID # 1713070018004000.) Meeting Date: PENDING Time: PENDING Related Planning & Zoning docket numbers- 9!1212007 Page '1 of 2 I Lillard, Sarah N From: Ron & Judy Hagan [r172jf@sbcglobal.net] Sent: Wednesday, September 12, 2007 6:58 PM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; grh@co.hamilton.ln.us, rct@co.hamilton.in.us; Ryan.hartman@ctrwd.org,,de!@co.hamilton.in.us; Foley, Amanda J; Littlejohn, David W; Duncan. Gary R; Redden, Nick; Duffy, John M; Mascari, Jahn A Cc: mnuckolsParch itectsforumIlc.com Subject: Re: Pre-Submittal for LA Fitness Club @ Weston Park Bilk A Sarah, There are no Park and Rec. issues on this project. Judy Hagan Original Message ----- From: Lillard, Sarah N To: Lillard, Sarah N ; Cann Angelina V ; Hill Dick B Ellison Christopher M ; Blanchard, Jim E ; Brewer, Scott I ; Dolan, Veronica A Akers, William P ; grh@co,hamilton.i n_ us ; rct@ce-hamilton.in.us Ryan.hartman@ctrwd.org ; del co.hamilton,in.us ; Foley Amanda J ; Littlejohn David UV ; Duncan Gary R Redden Nick ;Duffy -John M ; Nlascari, John A ; rl72jf@sbeglobal,net Cc: mnuckols(aarchitectsforumllc.com Sent: Wednesday, September 12, 2007 3:18 PM Subject: Pre-Submittal for LA Fitness Club @ Weston Park Blk A The Dept. of Community Service, Building & Code Enforcement division, has received a request to meet for the purpose of submitting to obtain a building permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the meeting and submittal, even if all offices have not responded. Project: LA FITNESS CLUB (10574 Workout Way. Parcel ID # 1713070018004000.) Meeting Date: PENDING Time: PENDING Related Planning & Zoning docket numbers: 07070006 DPIADLS Again, if there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this e-mail. Representative: Michelle Nuckols 9113/2007 Page] of? Lillard, Sarah N From: Duncan, Gary R Sent: Thursday, September 13, 2007 10:07 AM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P;'grh@co.hamilton.in.us''rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org'; 'del@co.hamilton.in.us'; Foley, Amanda J; Littlejohn, David W, Redden, Nick; Duffy, John M; Mascari, John A; 'rl72jf@sbcglobal.net' Cc: 'mnuckols@architectsforumllc.com' Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park Blk A I believe this project is out of current Engineering jurisdiction. Gary R Duncan Jr., P.E. Assistant City Engineer City of Carmel Department of Engineering One Civic Square Carmel, Indiana 46032 (317) 571-2441 (317) 571-2439 (fax) gduncan@carmel.in.gov -----Original Message----- From: Lillard, Sarah N Sent: Wednesday, September 12, 2007 15:19 To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org'; 'del@co.hamilton.in.us'; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A; 'rl72jf0o-sbcglobal. net' Cc: 'mnuckols@architectsforumllc.com' Subject: Pre-Submittal for LA Fitness Club @ Weston Park Blk A The Dept. of Community Service, Building & Code Enforcement division, has received a request to meet for the purpose of submitting to obtain a building permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the meeting and submittal, even if all offices have not responded. Project: LA FITNESS CLUB (10574 Workout Way. Parcel ID # 1713070018004000,) Meeting Date: PENDING Time: PENDING 9/13/2007 Page 1 of,8 Lillard, Sarah N From: Duffy, John M Sent: Monday, September 17, 2007 10:19 AM To: Mark Obergfell Cc: Lillard, Sarah N Subject: RE LA-Fitness: Carmel Weston Park Plan Review Mark, Do you have any additional info on the retail for the LA fitness project? I also need to know what the acreage is to determine the availability fee. They are in the process of obtaining a building permit so please let me know as soon as you can. Thanks J Duffy 571-2451 From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com] Sent: Monday, August 27, 2007 10:13 AM To: Duffy, John M Cc: Hill, Dick B Subject: LA Fitness - Carmel Weston Park Plan Review John- I have not seen anything yet. Thanks, Mark Obergfell From: Duffy, John M [mailto:JDuffy@carmel.in.gov] Sent: Thursday, August 09, 2007 12:36 PM To: Mark Obergfell Cc: Hill, Dick B Subject: RE: LA Fitness - Carmel Weston Park Water Service/Fees Mark, The water distribution staff reviews plans on Thursday morning so you should expect a comment letter in a day o so. J Duffy -----Original Message----- From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com] Sent: Thursday, August 09, 2007 11:01 AM To: Duffy, John M Cc: Hill, Dick B; Lillard, Sarah N Subject: RE: LA Fitness - Carmel Weston Park Water Service/Fees John- Thanks for the fee info. We will be working with the people doing the retail development also, so will get back with you on any refinements on that. In the meantime, any comments on the site utility plan for the LA Fitness water service? The Carmel Fire Dept has reviewed the plans already. Thanks 9,' 1 T i2007 Lillard, Sarah N From: David Lucas [del@co.hamillon.in.us] Sent: Monday, September 17, 2007 12:26 PM To: Conn, Angelina V; Foley, Amanda J; Ellison, Christopher M; Hill, Dick B; Littlejohn, David W, Duncan, Gary R; Blanchard, Jim E; Duffy, John M; Mascari, John A; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan, Veronica A; Akers, William P; Greg Hoyes; Robert Thomp"son; Ryan. hartman@ctrwd.org; rl72jf@sbcglobal.net Cc: mnuckols@architectsforumllc.com Subject: Re: Pre-Submittal for(tWFi nt ess:Club @ Weston Park Blk A The Eighway has no further comments concerning LA Fitness at this time Sincerelv, David E. Lucas ECHD Staff Engineer/Road 1700 South 10th Street Noblesville, IN 46060 (317) 773-7770 - Office (317) 776-9814 - Fax e-mail: delaco.hamilton.in.us website: aa.co.hamilton.in.us >>> "Lillard, Sarah N" <SLillard@carmel.in.gov> 9/12/2007 3:18 PM >>> The Dept. of Community Service, Building & Code Enforcement division, has received a I request to meet for the purpose of submitting to obtain a building permit for the below- mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the meeting and submittal, even if all offices have not responded. Project: LA FITNESS CLUB (10574 Workout Wav. Parcel ID 4 1713070018004000.) Meeting Date: FENDING Time: PENDING Related Planning & Zoning docket numbers: 07070006 DF/ADLS Again, if there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this e-mail. Representative: 1 Mark Oberafell From: Robert Thompson Irct@co.hamilton.in.us) Sent: Tuesday, September 18, 2007 8:55 AM To: Hoyes, Greg; Mark Obergfell; SLillard@carmel.in.gov Cc: Nuckols, Michelle; Rexing, Kristy; John Tierney; Turek, John Subject: RE: ee,SP` u'bm ttal fo-r GCFi nes`s-sCtut,@ Weston Park Blk A Attachments: Text.htm; ATT27819.jpg; Hamilton County Rule 5 PlanReview Form-LA Fitness-def.pdf 6 io ICJ Text.htm (27 ATT27819.jpg Hamilton KB) (1 KB) ity Rule 5 PlanR i'.a rk Upon looking at the piaus a little closer it seems that none of my co.mme-:ts were addressed' in my previo'as review dated 6/26/07. Therefore 1 will respectfully ask you to address these comments and re-subn_t plans. T:-,ere shall be no earth distu-biac or clearing activity until plans are approvec and N0I obtained. Attached is a copy of t cse conments. Please address the commr.ents listed below as well as those attached. Resubmit and 1 will continue my review. Mark I get the SWPPP this AM--I w'11 be sending you my comments, but FYI the lavcut and content on sheet C4.3 does not follow cur requ-_red standards. See cur webeite (www.co.ha:ni iton.in.us/clea-:water) for example on sheet layout and content. Also I do not see a min. 10 mil liner en the concrete washout detail. I will send you my fora,al review r_odav c- tomcrroww. Robert Thompson, RLA, CLARK Program Manager Hamilton County Surveyor's Office 1 hemiltoa Co. Square, S3-te ley Ncblesville, IN 46060 31t7-776-8495, fax: 317-776-9628 - rot@co.hamilton.in..;s www.co.hamilton.in.us/cieanwater Watch over your watershed - you drink what runs off >>> On 9/13/2007 at 4:06 ?M, in message <B93C6627-6-06298438AA9D6EA8A6C6550224A.24 @t lfmail.tlf. local>, "Mar:< 0bergfel.1" <mobergfeli@tlf-engineers.com> wrote: Robert and Greg- Revised plans, cutlet request and non-enforcement petition will be delivered to your office tomorrow. I was waiting on signed forms back and a copy of the warranty deed, whit`', I received j-ast now. I believe we have addressed all of your comments. The client 1 L[Ilard, Sarah N From: Robert Thompson [rct@co.hamilton.in.us] Sent: Tuesday, September 18, 2007 8:55 AM To: Hoyes, Greg; Obergfell. Mark; Lillard, Sarah N Cc: Nuckols, Michelle; Rexing, Kristy; Tierney, John; Turek, John Subject: RE: Pre-Submittal for'Fitness Club'@}Weston Park Blk A Text.htm (28 KB) ATT6975535.jpg (1 Hamilton County KB) Rule 5 PtanRev... Mark Upon looking at the plans a little closer it seems that none of my comments were addressed in my previous review dated 6/26/07. Therefore I will respectfully ask you to address these comments and re-submit plans. There shall be no earth disturbing or clearing activity until plans are approved and NOI obtained. Attached is a copy of those comments. Please address the comments listed below as well as those attached. Resubmit and i will continue my review. I Mark I got the SWPPP this A"•1--I will be sending you my comments, but FYI the layout and con-lent on sheet C4.3 does not follow our required standards. See our website (iwrorw.co.hamilton.in.us/cleanvater) for example on sheet layout and content. Also I do rot see a min. 10 mil liner in the concrete washout detail. I will send you my formal re,.{iew today or tomorrow. Robert Thompson, RLA, CLARB Program Manager Hamilton County Surveyor's Office 1 Hamilton Co. Soruare, Suite 188 Noblesville, IN 46060 317-776-8495, fax: 317-776-9628 rct_Qco.hamiltcn.in.us wrww. co.hamilton. in. us/cleanwater watch over your watershed - you drink what runs off >>> On 9/13/2007 at 4:06 PM, in message >>> <B83C662E646298438AA9C63ABA8C6550224A24C?tlfmail.tlf.lccal>, "Mark >>> Obercfell" <mobergfellatlf-engineers.com> wrote: Robert and Greg- Revised plans, outlet request and non-enforcement petition will be delivered to your office tomorrow. I was waiting on signed forms back and a copy of the warranty deed, which I received just now. I believe we have addressed all of your comments. The client would appreciate a quick turnaround as they would like to pull the building permit with Lillard, Sarah N I From: Mark Obergfell [mobergfell@tlf-engineers.comj Sent: Wednesday, September 19, 2007 9:37 AM To: Robert Thompson Cc: Lillard, Sarah N; Hoyes, Greg; Turek, John; Nuckols, Michelle; Rexing, Krisly; surveyor@co.hamilton.in.us; Conn, Angelina V Subject: ALA Fitnes Weston Park Blk A - Rule 5 Review Comments iCSO Rule 5 review 09-19-2007.... Robert- A copy of our response is attached. Sincerely, Mark N. Obergfell, F.E. Ter Horst, Lamson & Fisk, Inc. ph. 317-334-1500 fax 317-334-1552 -----Original Message----- From: Robert Thompson [mailto:rctrc;co.hamilton.in.usl Sent: Tuesday, September 16, 2007 8:55 AM To: Hoyes, Greg; Mark Obergfell; SLillard@carmel.in.gov cc: Nuckols, Michelle; Rexing, Kristv; John Tierney; "'.trek, John Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park Blk A Mark Upon looking at the plans a little closer it seems that none of my comments were addressed in my previous review dated 6/26/07. Therefore I will respectfully ask you to address these comments and re-submit plans. There shall be no earth disturbing or clearing activity until plans are approved and NOI obtained. Attached is a copy of those comments. Please address the comments listed below as well as those attached. Resubmit and I will continue my review. Mark I got the SWPPP this AM--I will be sending you my comments, but FYI the layout and content on sheet C4.3 does not follow our reauired standards. See our website (v,,?-co.hamilton.in.us/cleanwater) for example on sheet layout and content. Also I dolnot see a min. 10 mil liner in the concrete washout detail. I will send you my formal review today or tomorrow. Robert Thompson, RLA, CLARB Program Manager Hamilton County Surveyor's Office 1 Hamilton Co. Square, Suite 188 Noblesville, IN 46060 TER HORST, LA6ISON & FISK, INC. "ire TLF Mumma CONSULTING ENGINEERS September 19, 2007 Mr. Robert Thompson Hamilton County Surveyor's Office One Hamilton County Square, Suite 188 Noblesville, W 46060 Re: `LA'Fttness-.Weston Park Block A Carmel, IN TLF Project No. 2007-199 Dear Mr. Thompson: I am in receipt of your two emails dated September 18, 2007. I respectfully disagree with your statements and assessment of the Rule 5 submittal for subject project. Specifically: 1. We made the initial submittal of this project to your office on 6/22/07 as required by the City of Carmel TAC/ADLS process. 2. We received your initial response via the Technical Review and Comment Form dated 6/26/07 and responded via a letter to you dated 7/9/07. In that letter, we addressed each of the noted deficiencies and submitted revised plans and the BMP unit Operations & Maintenance manual. Based upon the &26107 review, it appeared that almost all of the required elements had been addressed in our initial submittal as very few missing or deficient items were noted. The items were for the most part related to very specific things on specific items. 3. On 7/9107, we received an email noting that you had received the plans but the SWPP plan needed to follow your "standard sheet format", noting "examples" that could be found on your website. 4. On 7/12/07, we emailed you an updated SWPP plan following the example to make sure we had addressed all required SWPPP items applicable to this project. 5. On 7113107, in reply to our 7/12/07 transmittal, we received a series of five (5) emails with additional comments. 6. On 7/17/07, we responded via email to the 7/13/07 comments and specifically addressed all eight (8) items in response to the latest comments. 7. On 7/17/07 and 7/18/07, we exchanged correspondence regarding specific items related to post- construction B,MP's. You noted you would "await a set of plans for any additional comments". 8. Subsequent to the last correspondence, I spoke with Mr. Hoves regarding your request that we turn the west side ditch into a bioswale. Mr. Hoyes indicated that this could not be done as it was part of the regulated drain. In addition, we were required by your office to pipe and 511 the west ditch. 9. Upon completion of the site plans and addressing all known comments from city and county agencies and utilities, we submitted another set of plans to your office on 9114i07. On Sheet C4.3, specific language was added to address your 7/17 and 7/18 emails. 8675 Purdue Road Indianapolis, Ul 46268 Phone (317) 334-1500; Fax (317) 334-1552 September 19, 2007 LA Fitness - Cannel, I\ Page 2 10. Yesterday, we received two emaiIs with additional comments: a. See item 2 above which addressed the review dated 6/26/07. We did respond to your comments. b. We are not aware of any mandate for a liner on the concrete washout detail; no other jurisdiction has required a liner and your detail on the example sheet does not have a liner. However, we have added one at your request. A copy of the revised detail is attached. c. In regard to sheet format, we note the following from your website: Two (2) examples (Example A and Example B) of detail sheets that meet the Hamilton County requirements are available. While these are good examples ofacceptable plan detail sheets that meet requirements, each project is different and requires a Stormwater Pollution Prevention Plan that is specific to the project site and conditions. With our plan, we meet or exceed the following requirements/standards: i. 327IAC 15-5-6.5 and 15-15-7 regarding the requirements for the Construction Plan and the specific elements of the plan along with the required index indicating where the required elements can be found on the plan. it. Hamilton County Ordinance No. 5-09-05B regarding stormwater runoff. iii. Hamilton County Draft Stormwater Technical Standards Manual, including the site inspection and maintenance checklist which is taken directly from the Manual. Furthermore, as noted on the website, the plan needs to be tailored to the specific site and conditions. Some of the items noted in the example plan are not applicable to this project so it did not make any sense to reflect them on the plan, which could confuse the contractor and potentially make them wonder if any of the plan was applicable. In order to meet the Rule 5 requirements and ensure that all required elements are included (and can be easily located by the review agency), we included the required S WPPP index. Our plan specifically addresses all required items with key elements as follows: SWPPP index q Project narrative, technical plans, soils types, hydrology etc. Construction sequence, activities, specific measures Monitoring guidelines and checklist N1 Vehicle and equipment maintenance and fueling 4 Solid waste management 4 Spill prevention, control and alert procedures d Concrete washout J Dcwatering and pumping q Post-construction components tit Monitoring checklist It appears we have addressed all required items based upon the specific comments we received through this review process. d. We understand there can be no land-disturbing activity until we receive acceptance of the plan and submit the Notice of Intent to IDFM. It is our professional opinion that the plans meet the Rule 5 requirements for erosion and sediment control and storm water pollution prevention plans. TLF firmly believes in detailed and thorough submittals; the plans we submitted for this project are more detailed than what is accepted on a regular basis by other central Indiana counties. Therefore, we respectfully request your approval so that this project can be permitted and construction can commence. September 19, 2007 LA Fitness - Carmel, IN Page 3 Sincerely, Ter Horst, Lamson & Fisk, Inc. Mark N.Obergfell, P.E. Associate/Site Department Manager Enclosures: Revised Detail 3/C4.2 Copies of correspondence Copy to: Mr. Kenton Ward - Hamilton County Surveyor Mr. Greg Hoyes - Hamilton County Surveyor's Office Ms. Sarah L<llard, Ms. Angelina Conn- City of Carmel Mr. John Turek, Mr. Jon Zaich - LA Fitness Ms. Kristy Rexing, Ms. Michelle Nuckols - Architects Forum P:12007110012007-199VAdnrin'Corr pmdencelHCSO Rule 5 n:eim 09.19-2007.dm GROUND SURFACE -,A MIN. 10 MIL LINER MOUNDS CONSTRUCTED OF COMPACTED FILL MATERIAL STONE ACCESS DRIVE CONSTRUCTED ACCORDING TO CONSTRUCTION ENTRANCE DETAIL NOTES: 1. PLACE IN CONSPICUOUS LOCATIONS WHERE CONCENTRATED SURFACE DRAINAGE IS NOT LIKELY TO CONTACT THE WASHOUT AREA 2. CONSTRUCT A CONTINUOUS MOUND NECESSARY TO ENVELOP THE WASHOUTAREA 3. INCLUDE A SIGN INDICATING THAT THE AREA IS FOR WAS[ IOUT OF CONCRETE TRUCKS AND PUMPS AND HAND TOOLS 4. PLACE SIGNS AT THE SITE CONSRUCTION ENTRANCES INDICATING WHERE THE CONCRETE WASHOUT AREAS ARE LOCATED 5. INSTALL A SUFFICIENT NUMBER OF WASHOUT AREAS PRIOR TO ANY CONSTRUCTION WORK REQUIRING DELIVERY OF CONCRETE MAINTENANCE: 1. WASHOUT AREAS REQUIRE PERIODIC INSPECTION AND REPAIR 2. REPAIR THE STONE ENTRANCE ACCORDING TO MAINTENANCE EFFORTS DESCRIBED FOR A CONSTRUCTION ENTRANCE 3. REMOVE DRIED CONCRETE WASTE WHEN THE WASHOUT AREA IS 12 FULL. TREAT DRIED CONCRETE AS SOLID WASTE ACCORDING TO SOLID WASTE DISPOSALS GUIDLINES 4. AFTER COMPLETION OF CONCRETE OPERATIONS REMOVE TIME WASHOUT AREA ENTIRELY AND DISPOSE OF WASTE. REGRADE THE AREA AND PROVIDE SOIL STABILIZATION CONCRETE WASHOUT AREA SCALE:NTS ce Lillard, Sarah N From: Robert Thompson [rct@co.hamilton.in.usj Sent: Wednesday, September 19, 2007 9:53 AM To: Mark Obergfell Cc: John Turek; Kristy Rexing; Michelle Nuckols; Conn, Angelina V; Lillard, Sarah N; Greg Hoyes; CoRu ty.Suweyor? Subject: Pe lA•Fitness---Weston P,_ TarW Blk A - Rule 5 Review Comments Mark Make sure the following changes have been made and send me a copy of the SWPPP (not pdf) and the plans will be approved. Please call if this is not acceptable. i. Provide HCSO a copy of the 0&M Manual BMP's 2. Add to Part C, Post-Construction BMP reports and maintenance activities at le annually." 3. Add: under construction sequencing #1 for Post-construction :"Owner shall provide copies of all inspection ast shall read: "Schedule a pre-con with the HCSO prior to any earth disturbing activity and furnish a copy of the NOI" 4. To spill prevention add contact info for IDEM and HCSO in case of sp_lls. 5. Show location of NOI posting, staging area and port-a-let location on plans. 6. To seedbed and landscape specifications add " Do not use phoshorous (12-12-12) containing fertilizer unless soil test show a phosphorous deficiency. Use phosphorous free fertilizer (12-0-12) Regards Robert Thompson, P.LA, CLARB Program Manager Hamilton County Surveyor*s Office 1 Hamilton Co. Square, Suite 188 Noblesville, TN 46060 )317-776-8495, fax: 317-776-9628 -rctCco.hamilton.in.us 4ww.co.hamilton.in.us/cleanwater Watch over your watershed - you drink what runs off >>> On 9/19/2007 at 9:36 AM, in message <383C662E646298438PA9D6EA8A8C6550224EO2@ttlfmail <mobergfell@tlf-engineers.com> wrote: Robert- A copv of our response is attached. Sincerely, Mark N. obergfell, P.E. tlf.local>, "Mark Obergfell" 1 Page 1 of 4 Lillard, Sarah N From: Robert Thompson [rct@co.hamillon.in.us] Sent: Wednesday, September 19, 2007 10:17 AM To: Mark Obergfell Cc: John Turek; Kristy Rexing; Michelle Nuckols; Conn, Angelina V; Lillard, Sarah N; Greg Hoyes; County Surveyor Subject: ReaLA.Fitness Weston Park Blk A - Rule 5 Review Comments if not all MS4's are requiring concrete washout liners they will be based upon EPA guidelines. (see attached) >>> On 9/19.%2007 at 9:36 AM, in message <1383C662E646298438AA9D6EA8A8C6550224EOB itlfmaiI.tlf.local>, <mobergfell@.tlf-engineers.com> wrote: Robert- A copy of our response is attached. Sincerely, Mark N. Oberefell, P.E. Ter Horst, Lamson & Fisk, Inc. ph. 317-334-1500 fax 317-334-1552 "Mark Ober.-fell" -----Original Message----- From: Robert Thompson [mailto:rct@co.hamilton.in.us] Sent: Tuesday, September 18, 2007 8:55 AM To: Hoves, Greg; Mark Obergfell; SI-illard@icarmel.in.gov Cc: Nuckols, Michelle; Rexing, Kristy; John Tierney; Turek, John Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park Blk A Mark Upon looking at the plans a little closer it seems that none of my comments were addressed in my previous review dated 6/26/07. Therefore I will respectfully ask you to address these comments and re-submit plans. There shall be no earth disturbing or clearing activity until plans are approved and NOI obtained. Attached is a copy of those comments. Please address the comments listed below as well as those attached. Resubmit and I will continue my review. 91/19/2007 EPA - Stormwater Menu of BMPs Page t of 4 ' t? m U.S. Environmental Protection Agency National Pollutant Discharge Elimination s System (NPDES) b`?r5t ?1po` Recent Additions Ceniact Us Print Version Search NPDES: I EPA. Home > 01W Home > 01NM Home > NPDES Home > Stermwater> Menu of BMPs Menu of BMPs Home Search BMPs Filter by Minimum Browse Search Measure Go Fact BMP Background Sheets Help Public Education tt Outreach on Concrete _ Stormwater Impacts - a Washout Click hereto comment ,or this facCsfieeY' Public Involvement/ Participation Illicit Discharge Detection 8 Elimination Construction Site Storm water Runoff Control Post-construction Stormwater Management in New Development & Redevelopment Pollution PreventionlGood Housekeeping for Municipal Operations Measurable Goals Stormwater Home Minimum Measure: Construction Site Stormwater Runoff Control Subcategory: Good HouskeepinglMaterials Management Description Concrete washouts are used to contain r concrete and liquids when the chutes of concrete mixers and hoppers of concrete pumps are rinsed out after delivery. The washout facilities consolidate solids for _ easier disposal and prevent runoff of liquids. The wash water is alkaline and , . contains high levels of chromium, which _ can leach into the ground and contaminate groundwater. It can also migrate to a storm f' drain, which can increase the pH of area An example of a prefabricated waters and harm aquatic life. Solids that concrete washout container are improperly disposed of can clog storm drain pipes and cause flooding. Installing concrete washout facilities not only prevents pollution but also is a matter of good housekeeping at your construction site. This fact sheet describes the different types of concrete washout facilities that can be used at your site and outlines how they should be sited, designed, and maintained. Types of Concrete Washout Facilities Prefabricated washout containers A growing number of companies offer sturdy, prefabricated concrete washout containers that are delivered to the site. Some services provide the containers alone without providing maintenance and disposal of materials, while other companies offer complete service that includes delivery of containers and regular pickups of solid and liquid waste materials. The prefabricated containers resist damage example of a self-installed rcrete washout structure http:; %cfpub.cpa.govtnpdes/stormwater/menuofbmps/index.cfm?action=browse&Rbulton=... 8%28%2007 EPA - Stormwater Menu of BMPs Page 2 of 4 , and protect well against spills and leaks, and the full-service option relieves the site superintendent of the burden of disposing of materials. To prevent leaks on the jobsite, ensure that prefabricated washout containers are watertight. Additionally, some companies offer prefabricated washout containers with ramps to accommodate concrete pump trucks. When selecting a company to handle concrete waste, ensure that they are properly disposing of all materials, and give preference to companies that recycle collected materials. Self-installed concrete washouts You can also build your own concrete washout facility, although self-installed structures are much less reliable than prefabricated containers and are prone to leaks. There are many design options for the washout, but they are preferably built below-grade to prevent breaches and reduce the likelihood of runoff. Above- grade structures can also be used if they are sized and constructed correctly and are diligently maintained. One of the most common problems with self-installed concrete washout facilities is that they can leak or be breached as a result of constant use, so you should take care to use quality materials and inspect the facilities on a daily basis. You should size your washouts to handle solids, wash water, and rainfall to prevent overflow. Concrete Washout Systems, Inc., (2006) estimates that 7 gallons of wash water are used to wash one truck chute and 50 gallons are used to wash out the hopper of a concrete pump truck. For larger sites, a below-grade washout should be at least 10 feet wide and sized to contain all liquid and solid waste you expect to generate in between cleanout periods (CASQA, 2003). Washouts at smaller sites, such as a single-family residential lot, should be sized to accommodate the expected load and can be smaller than 10 feet wide. Include a minimum 12-inch freeboard in the sizing calculations. Line the pit with plastic sheeting of at least 10-mil thickness that has no holes or tears to prevent leaching of liquids into the ground (CASQA, 2003). Concrete wash water should never be placed in a pit that is connected to the storm drain system or that drains to nearby waterways. At larger sites, build an above-grade washout at least 10 feet wide by 10 feet long and size it to contain all liquid and solid waste you expect to generate in between cleanout periods. Washouts at smaller sites can be smaller according to the expected capacity needed. Include a 4-inch freeboard in the sizing calculations (CASQA, 2003). You can make the structures from staked straw bales or sandbags double- or triple-lined with plastic sheeting of at least 10-mil thickness that has no holes or tears. Siting According to CASQA (2003), you should not place concrete washout facilities within 50 feel of storm drains, open ditches, or waterbodies. You should place them in a location that allows convenient access for concrete trucks, preferably near the area where the concrete is being poured. Appropriate gravel or rock should cover paths to concrete washout facilities if the facilities are located on undeveloped property. These areas should be far enough away from other construction traffic to reduce the likelihood of accidental damage and spills. The number of facilities you install should depend on the expected demand for storage capacity. On large sites with extensive concrete work, washouts should be placed in multiple locations for ease of use by concrete truck drivers. http:li cfptib.epa. gov,lnpde s,%stormwaterlmenuofbntpslindex.cfni?action=browse&Rbutton=... 8/28112007 EPA - Stonnwater Menu of BMPs Page 3 of4 Operation Inspection Check all concrete washout facilities daily to determine if they have been filled to 75 percent capacity, which is when materials need to be removed. Both above- and below- ground self-installed washouts should be inspected daily to ensure that plastic linings are intact and sidewalls have not been damaged by construction activities. Prefabricated washout containers should be inspected daily as well to ensure the container is not leaking or nearing 75 percent capacity. Inspectors should also note whether the facilities are being used regularly; if drivers have washed out their chutes or hoppers in other locations, you may need to provide more education, install additional signage, or place additional washouts in more convenient locations. Material Removal Concrete washouts are designed to to promote evaporation where feasible. However, if stored liquids have not evaporated and the washout is nearing capacity, vacuum and dispose of them in an approved manner - check with the local sanitary sewer authority to determine if there are special disposal requirements for concrete wash water. Remove liquids or cover the structures before predicted rainstorms to prevent overflows. Companies that offer prefabricated and watertight washout containers generally offer a vacuum service to remove the liquid material. You can remove hardened solids whole or you can break them up first depending on the type of equipment available at your site. You can then reuse the solids onsite or haul them away for recycling - crushed concrete makes excellent aggregate for roadbeds and other building applications. Check with your local recycling agency to identify opportunities for concrete recycling. When you remove materials from the concrete washout, build a new structure or, if the previous structure is still intact, inspect the structure for signs of weakening or damage and make any necessary repairs. Line the structure with new plastic that is free of holes or tears and replace signage if necessary. It is very important that new plastic is used after every cleaning because pumps and concrete removal equipment can damage the existing liner. Education for Concrete Subcontractors An important factor that dictates the success of concrete washout facilities is whether or not concrete truck drivers use concrete washouts. You need to make them aware of the presence of these facilities. Your site superintendent can educate concrete subcontractors, post signage indicating the location and designated use of these areas, and provide careful oversight to inspect for evidence of improper dumping of concrete waste and wash water. Include requirements in contracts with concrete delivery companies that drivers must use designated concrete washout facilities. Resources CASQA Concrete Waste Management Fact Sheet in the California BMP Handbook: Construction: [http:/twwv; abmphandbooks.com/Cori tructio_n.asp [PDF - 127 KB - 7 pp] '.Ehlr Disclaimer I. References http:/!c fpub. epa. gov,inpdes.%Storrnwater lmenuofbinps/index.cfm?action=browse& Rb utton=... 8'28'2007 EPA - Stormwater Menu of BN1Ps Page 4 of 4 California Stormwater Quality Association (CASQA). 2003. Stormwater Best Management Practice Handbook: Construction. [httpa/www.cabmphandboo_ks_com/Construction.asp exU!gisv krt-rl) Accessed May 8, 2006. Concrete Washout Systems, Inc. 2006. Industry Problems: Facts and Figures. [4M,.16vww.con cretewashout. com/ pages&dustrv_lroblems/concrete washout facts figures/L>?T_.osasn r][_ Accessed May 10, 2006. -77 ` Click here td,comfn6nton this factfsheet f Office of Water I Office of Wastewater N1anagement I Disclaimer I Search EPA EPA Home I Privacy-and Secunty Notice I Contact Us Last updated on April 05, 2007 11:51 AM URL: http:,"cfpu b.epa. g ovinpdes/stormwa ter/m e n uofbmpslnd ez,cfm http:llcfpub.epa. eovlnpde s,l storm waterlme n uofbmpslindex.cfm?action=browse&R b utton-... 8'28!2007 Page I of 6 Lillard, Sarah N From: Mark Obergfell (mobergfell@tlf-engineers.com] Sent: Wednesday, September 19, 2007 10:36 AM To: Robert Thompson Cc: John Turek; Kristy Rexing; Michelle Nuckols; Conn, Angelina V; Lillard, Sarah N; Greg Hoyes; County Surveyor Subject: RE: LA Fitness - Weston Park Bilk A - Rule 5 Review Comments Robert- I am in receipt of your emails this morning. • last email - the revised concrete washout detail was included in the pdf - page 4 (right after the cover letter). • second email - understood. • first email - we will deliver a copy of revised Sheet C4.2 with the revised washout detail to your office today along with copies of C4.1 and C4.3 again. The items noted below were addressed in our previous submittals in July: 1. Provide HCSO a cop!: of the O&M Manual for Post-construction 3MP's The O&M manual was transmitted to your office on with our July 9 letter. We will deliver another copy along with the drawings this afternoon. 2. Add to Part C, Post-Construction BM? :"Owner shall provide copies of all inspection reports and maintenance activities at least annually. Sheet C4.3 Please refer to C. Self Monitoring Program, item 4. 3. Add: under construction sequencing #1 shall read: "Schedule a pre-con with the HCSO prior to ar_y car--h disturbing activity and furnish a copy of the VOI" Sheet C4.3 Please refer to D. Construction Operations, item 2. 4. To spill prevention add contact info for IDEM and HCSO in case of spills. Sheet C4.3 Please refer to F. Spill Prevention and Control, item 5. 5. Show location of NOI posting, staging area and port-a-let location on plans. Please refer to Sheet C4.1, Keynote 12. 5. To seedbed and landscape specifications add ', Do not use phoshorous (12-12-12) containing fertilizer unless soil test show a phosphorous deficiency. Use phosphorous free fertilizer (12-0-12) Please refer to Sheet C6.5 Soil Preparation Paragraph 2.1 A. We look forward to your approval upon receipt of the copies this afternoon and we would appreciate notification to Carmel so they can issue the building permit. Please send your approval letter to me so we can file the NOI. Thank you. Sincerely, Mark N. Obergfell, P.E. Ter Horst, Lamson & Fisk, Inc. ph. 317-334-1500 fax 317-334-1552 From: Robert Thompson tmailto:rct?cc.hamilton.in.usl 9!19,%2007 Pa.-e 1 of 6 Lillard, Sarah N From: Robert Thompson [rct@co.hamilton.in.us] Sent: Wednesday, September 19, 2007 11:45 AM To: Mark Obergfell Cc: John Turek; Lillard, Sarah N Subject: RE: LA Fitness - Weston Park Blk A - Rule 5 Review Comments Sarah GreL, still has not approved the plans yet. I will send the approved SWPPP when Greg issues his approval. >>> On 9/19%2007 at 10:35 .A 4, in message <B83C662E646298438AA9D6EA8A8C6550224E400a tlfmail.tlf.local>, "Mark Ober-fell" <mobergfell atlf-engineers.com> wrote: Robert- am in receipt of your emails this morning. last email - the revised concrete washout detail was included in the pdf - page 4 (right after the cover letter). second email - understood. first email - we will deliver a copy of revised Sheet C4.2 with the revised washout detail to your office today along with copies of C4.1 and C4.3 again. The items noted below were addressed in our previous submittals in July: 1. Provide HCSO a copy of the O&M Manual for Post-construction BMP's The O&M manual was transmitted to your office on with our July 9 letter. We will deliver another copy along with the drawings this afternoon. 2. Add to Part C, Post-Construction BMP :"O,.vner shall provide copies of all inspection reports and maintenance activities at least annually." Sheet C4.3 Please refer to C. Self Monitoring Program, item 4. 3. Add: under construction sequencing 41 shall read: "Schedule a pre-con with the HCSO prior to any earth disturbing activity and furnish a copy of the NOI" Sheet C4.3 Please refer to D. Construction Operations, item 2. 4. To spill prevention, add contact info for IDEM and HCSO in case of spills. Sheet C4.3 Please refer to F. Spill Prevention and Control, item 5. S. Show location of NOI posting, staging area and port-a-let location on plans. Please refer to Sheet C4.1, Keynote 12. 6. To seedbed and landscape specifications add " Do not use phoshorous (12-12-12) containing fertilizer unless soil test show a phcsphorous deficiency. Use phosphorous free fertilizer (12-0-12) Please refer to Sheet C6.5 Soil Preparation Paragraph 2.1 A. We look forward to your approval upon receipt of the copies this afternoon and we would appreciate notification to Carmel so they can issue the building permit. Please send your approval letter to me so we can file the NOL Thank you. 9 /19/2 00 7 Pave 1 of 5 Lillard, Sarah N From: Robert Thompson [rct@co.hamilton. in.us] Sent: Wednesday: September 19, 2007 2:53 PM To: Mark Obergfell Cc: John Turek; Kristy Rexing; Michelle Nuckols; Conn, Angelina V; Lillard, Sarah N; Greg Hoyes; mfisk@tlf-engineers.com Subject: Re: LA Fitness - Weston Park Blk A - SWPPP denial Mark f just got your SINPPP, See pages 110-7.8, and 9 of our Stormwater Manual for SWPPP content requirements which your plans do not follow to the letter--Where is the description of potential pollutant sources associated with the construction activities? My suggestion would be to follow the SN PPP guidelines for content and layout. Had comments from June been followed you would have received approval much earlier. When Greg has comments resolved I will send you the approval letter Regards. Wobert Thompson, L q, CL qgo Program Manager Hamilton County Surveyor's Office 1 Hamilton Co. Square, Suite 188 Noblesville, N 46060 0,-317-776-8495, fax: 317-776-9628 tD rct@co.hamilton.in.us w?cw.co.ham ilton. in.us/cleanwater 'tlfatch overyour watershed- you drinkrvhat runs off >>> On 9/1912007 at 9:36 AM, in message <B83C662E646298438AA9D6EASA8C6550224EOB a;tlfrnaiLtif.local>, "Mark Ober-fell" <mobergfell @tlf-engineers.com> wrote: Robert- A copy of our response is attached. Sincerely; Mark N. Obergfell, P.E. 9/19i2007 Page 1 of 1 Lillard, Sarah N From: Conn, Angelina V Sent: Thursday, September 20, 2007 9:28 AM To: 'Michelle Nuckols' Cc: 'Mark Obergfell'; Lillard, Sarah N Subject: la fitness building elevation ready for pick up Michelle: One copy of the submitted building elevations is stamped/approved by the planning/zoning dept and ready for pick up for you, for your records. Just come in and ask one of the secretaries for it. It will be in the PICK UP box.. Thanks, Angie Conn, Planning Administrator Dept. of Community Services - Planning & Zoning 1 Civic Square. 3rd Floor City of Carmel, IN 46032 p. 317-571-2417 f. 317-571-2426 aconn@r mel.in.gov 9/2V2007 Page 1 of 1 Lillard, Sarah N From: Mark ObergPell [mobergfell@tlf-engineers.com] Sent: Thursday, September 20, 2007 9:55 AM To: Conn. Angelina V; Lillard, Sarah N Cc: Michelle Nuckols Subject: RE: la fitness building elevation ready for pick up Angie or Sarah- Could you give me an update where you think things stand with signoffs by the various agencies? I know you are still probably waiting on the surveyors office but has John Duffy OK'ed the water and has CTRWD gotten you the CK? Anyone else still outstanding? Thanks, Mark Obergfell From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Thursday, September 20, 2007 9:28 AM To: Michelle Nuckols Cc: Mark Obergfell; Ill Sarah N Subject; la fitness building elevation ready for pick up Michelle: One copy of the submitted building elevations is stampedlapproved by the planningizoning dept and ready for pick up for you, for your records Just come in and ask one of the secretaries for it. It will be in the PICK tip box. Thanks, Angie Conn, Planning Administrator Dept. Of Community Services - Planning & 7oninn 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317-571-2417 If. 317-571-2426 aeonngcarmel,in.gov 9121x2007 Lillard, Sarah N From: Dolan, Veronica A Sent: Thursday, September 20, 2007 2:56 PM To: Blanchard, Jim E; Lillard, Sarah N Subject: LA Fitness Kristy Rexing has requested a pre-submittal meeting for Monday, 9/24 for 9:00 am. Should you need to reach Kristy,fher number is 842-8500. C r Thank you. Veronica ` ` ??? G c Pagel of? Lillard, Sarah N From: Lillard, Sarah N Sent: Friday, September 21, 2007 10:12 AM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, I Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.ham! lton.in.us'; 'rct@co.hamiltonJn.us'; 'Ryan.hartman@ctrwd.org'; 'del@co.hamilton.in.us'; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A; 'd72jf@sbcglobal.net' Cc: 'mnuckols@architectsforumllc.com` 'Mark Obergfell' Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park Blk A At the present time, I am finding that the following offices still have outstanding issues. Until I hear from them that their issues are resolved/approved, we are unable to schedule the submittal meeting. John Duffy of Carmel Utilities requested additional information so that the water fees could be "l??t• determined. To my knowledge, this has not occurred, and I have not received notification from Mr. Duffy regarding the total fee amount for water that will be due at submittal. (I2i (a carmel.in.goClv) Tn fro ay Township Regional Waste District has not been approved, as far as the e ?a t email I have from Ryan Hartman. The plan will have to be approved, and you must obtain 1At"ceZa?d bring a copy of your sewer permit to the submittal meeting. (ryan.hartman@ctrwd.or9 ,. Issues and plan reviews with Robert Thompson of Soil & Water and Greg Hoyes of the County Surveyor's office have not yet been resolved. (rct@co.hamilton.in.us and grh@co.hamilton.in.us) 4. Scott Brewer, our environmental planner has not yet indicated that he has signed off/stamped approved copies of the submitted landscape plan. Again, once we have these approvals, we will be able to schedule the submittal meeting. I will be contacting Kristy Rexing that the meeting that was tentatively scheduled for Monday, 9/24/07, at 9:00 PM cannot take place unless all of the above are resolved by that time. If you have any other questions, please let me know. Thank you, Sarah Lillard SarxA Litlxra Building & Code Ser%lces Cii6 of Carmel Ph. (317) 51-2475 Fax (317) 571-2499 slillard@carmel. in.gov -----Original Message----- From: Lillard, Sarah N Sent: Wednesday, September 12, 2007 3:19 PM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan. hartman@ctrwd.org'; 'del@co.hamilton.in.us'; Foley, Amanda J; Littlejohn, David W; Duncan, Gary; R; Redden, Nick; Duffy, John M; Mascari, John A; 'rl72jf@sbcglobal.net' Cc: 'mnuckols@architectsforumllc.com' Subject: Pre-Submittal for LA Fitness Club @ Weston Park Blk A 91/21/2007 Lillard, Sarah N From: Duffy, John M Sent: Friday, September 21, 2007 11:43 AM To: Lillard, Sarah N Cc: mobergfell@tdf-engineers.com; Spearman, Ted A Subject: FW: LA Fitness - Carmel Weston Park Water Approval Sarah, Page 1 of 9 Sorry, I thought I had sent over the following information for LA Fitness. The fees are as follows: Water Connection Fee $22,559.36 Water Availability Fee $10,241.40 Review Fee $150.00 Total Water Fess $32,950.76 Please let me know if there are questions. J Duffy 571-2451 From: Mark Obergfell [mailto:mobergfell@df-engineers.com] Sent: Friday, September 21, 2007 11:26 AM To: Lillard, Sarah N; Duffy, John M Cc: John Turek; Michelle Nuckols; Kristy Rexing; John Tierney Subject: RE: LA Fitness - Carmel Weston Park Water Approval f, ? ? b5 Sarah- This is the last email we had from John so it was my assumption that he was OK with everything and had all of the information he needed. Perhaps you have not received the final fee numbers from him? Thanks, Mark N. Obergfell, P.E. Ter Horst, Lamson & Fisk, Inc. ph. 317-334-1500 fax 317-334-1552 From: Duffy, John M [mailto:JDuffy@carmel.in.gov] Sent: Monday, September 17, 2007 11:05 AM To: Mark Obergfell Cc: Lillard, Sarah N Subject: RE: LA Fitness - Carmel Weston Park Plan Review Mark, Thanks for your quick reply and I am fine on the retail question. Thanks J Duffy From: Mark Obergfell [mailto:mobergfell@tlf-engineers.com] 9/21/2007 Pagel of? Lillard, Sarah N From: Ryan Hartman [Ryan. Hartman @CTRWD.ORG] Sent: Friday, September 21, 2007 1:01 PM To: Lillard, Sarah N Subject: FW: Pre-Submittal for LA Fitness Club @ Weston Park Blk A Sarah, We currently have no issues with LA Fitness. Thanks! Ryan C. Hartman Di __Br. ..eer 0.1av o:,ns,`:1r is r. ;:oaa1 i+725?e Diszri::! 1071G1 Cc loge AvI., .._ e Li?iisner?oiis, IId ?6230-?_098 Direct: 317-844-9200 Fax: 317-844-9203 ryan. h artman@c t rtvd. OrGJ From: Ryan Hartman Sent: Thursday, September 20, 2007 11:53 AM To: 'Lillard, Sarah N'; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us; del@co.hamilton.in.us; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A; rl72jf@sbcglobal.net Cc: mnuckols@architectsforumllc.com Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park Bilk A Sarah, CTRWD has resolved all outstanding issues with LA Fitness and at this time, upon submittal of invoice payment, a permit can be issued and picked up. Ryan C. Hartman Enqine?r _i=v To,n :n Fe:: a; l G:'a _ istric 10101 Al. .._11ea= i3:-_. ., _r_ A _ndianaoo l.s, ?N 46200-1 09-- Direct: 317-844-9200 Fax: 317-844-9203 r?an.hartmanectrwd.C2g From: Lillard, Sarah N (mailto:SLillard@carmel.in.gov) Sent: Wednesday, September 12, 2007 3:19 PM To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Ellison, Christopher M; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us; Ryan Hartman; del@co.hamilton.in.us; Foley, Amanda J; Littlejohn, David W; Duncan, Gary R; Redden, Nick; Duffy, John M; Mascari, John A; rl72jf@sbcglobal.net Cc: mnuckols@architectsforumllc.com Subject: Pre-Submittal for LA Fitness Club @ Weston Park Blk A The Dept. of Community Service, Building & Code Enforcement division, has received a request to meet for the purpose of submitting to obtain a building permit 9/21/2007 Page I of 4 Lillard, Sarah N From: Robert Thompson Irct@co.hamilton.in.usj Sent: Monday, September 24, 2007 12:11 PM To: Conn, Angelina V; Foley, Amanda J; Ellison, Christopher M; Hill, Dick B; Littlejohn, David W; Duncan, Gary R; Blanchard, Jim E; Duffy, John M; Mascari, John A; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan, Veronica A; Akers, William P; David Lucas; Greg Hoyes; Ryan. hartman@ctnad.org; r172jf@sbcglobal.net Cc: mnuckols@architectsforumllc.com; Mark Obergfell Subject: RE: Pre-Submittal for IA Fitness Club @ Weston Park Blk A Sarah I will issue an approval letter for the SWPPP when Greg finishes his approval. There are some deficiencies in his SWPPP plans but these are more formatting issues. In the future S?VPP plans will not be reviewed unless they meet the requirements of our Stormwater Standards Manual. Thanks Ro6ert Thompson, RLA, CLA , Program Manager Hamilton County Surveyor's Office 1 Hamilton Co. Square, Suite 188 Noblesville. IN 46060 0) 317-776-8495, fax: 317-776-9628 11 rct@co.hamilton.in.us www xo.hamitton.in.usMeanwater Watch overyour watershed- you drinkwhat runs off >>> On 9%2112007 at 10:12 AM, in message v33EF7279784084083BDOB78A586D8E30423F861@eserver3.cityofcarmel.net>, "Lillard, Sarah N'•' <SLillard@carmel.in.gov> wrote: At the present time, I am finding that the following offices still have outstanding issues. Until I hear from them that their issues are resolved/approved, we are unable to schedule the submittal meeting. John Duffy of Carmel Utilities requested additional information so that the water fees could be determined. To my knowledge, this has not occurred, and I have not received notification from Mr. Duffy regarding the total fee amount for water that will be due at submittal. Oduffy@carmel. in.gov) The plan review fro Clay Township Regional Waste District has not been approved, as far as the last email I have from Ryan Hartman. The plan will have to be approved, and you must obtain and bring a copy of your sewer permit to the submittal meeting. 9./24%2007 Lillard, Sarah N From: Greg Hoyes [grh@co.hamilton.in.usj Sent: Monday, September 24, 2007 1:19 PM To: Conn, Angelina V; Foley, Amanda J; Ellison, Christopher M; Hill, Dick B; Littlejohn, David W; Duncan, Gary R; Blanchard, Jim E; Duffy, John M; Mascari, John A; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan, Veronica A; Akers, William P; David Lucas; Robert Thompson; Ryan.hartman@ctrwd.org; rl72jf@sbcglobal.net Cc: johnrturek@aol.com; krexing@architectsforumlle.com; mnuckols@architectsforumllo.com; jtierney@tlf-engineers.com; Mark Obergfell Subject: RE: Pre-Submittal for LA Fitness Club @ Weston Park Blk A Sarah While HCSO and the site engineer are still working out some final details, we have nol problem with the submittal meeting and building permit moving forward on this project,. On this project, they must still have an on-site pre-construction meeting with us before:thev can move ar_y dirt and all our issues will be resolved before that point. If you have any questions, please let me know. Greg Hoyes HCSO Plan Rev-ewer >>> "Lillard, Sarah N" <SLillard@carmel.in.gov> 10:12 AM Friday, >>> September 21, 2007 >>> At the present time, I am finding that the following offices still have outstanding issues. Until I hear from them that their issues are resolved/approved, we are unable to schedule the submittal meeting. 1. John Duffy of Carmel Utilities requested additional information so that the water fees could be determined. To my knowledge, this has not occurred, and I have not received notification from Mr. Duffy regarding the total fee amount for water that will be due at submittal. (jduffy?-carmel.in.gov <mailto:jduffy@carmel.in.gov> 1 2. The plan review fro Clay Township Regional Waste District has not been approved, as far as the last email I have from Ryan Hartman. The plan will have to be approved, and you must obtain and bring a copy of your sewer permit to the submittal meeting. (ryan.hartman@ctrwd.org <mailtc:ryan.hartmangctrud.org> ) 3. Issues and plan reviews with Robert Thompson of Soil & Water and Greg Hoyes of the County Surveyor's office have not yet been resolved. (rct®co.hamilton.in.us <mailto:rct?1co.hamilton.in.us> and grh@co.hamilton.in.us <mailto:grhoco.hamilton.in.us> 1 4. Scott 3rewer, our environmental planner has not yet indicated that he has signed off/stamped approved copies of the submitted landscape plan. Again, once we have these approvals, we will be able to schedule the submittal meeting. I will be contacting Kristv Rexing that the meeting that was tentatively scheduled for Monday, 5/24/07, at 9:00 PM cannot take place unless all of the above are resolved by that time. If you have any other questions, please let me know. Thank you, Sarah Lillard Sarah Lillard 1 Lillard, Sarah N From: Greg Hoyes [grh@co.hamiltonJn.usj Sent: Monday, September 24, 2007 2:24 PM To: Lillard, Sarah N Cc: John Turek; Kristy Rexing; Michelle Nuckols; John Tierney; Mark Obergfell Subject: Re: FW: LA Fitness approval Sarah My approval e-mail goes along with Bob's e-mail at 12:11 today and releases both of our outstanding issues. If you have any questions, please let me know. Greg Hoyes HCSO Plan Reviewer >>> "Mark Oberufell" <mobergfell@tlf-engineers.com> 2:12 PM Monday, >>> September 24, 2007 >>> Greg- I am under the impression that your approval message to Sarah this afternoon included- Robert's approval also since you said the HCSO had no problem with the submittal meeting and building permit_ moving forward. It appears that Sarah is not sure about this. Could you please confirm to her? Thanks, Mark Oberafell From: John Turek [mailto:johnrturek@aol.com] Sent: Monday, September 24, 2007 2:07 PM To: Mark Obergfell Subject: FW: Lk Fitness John R. :`urek Director of Development_ LA Fitness International, LLC 13570 Marjac Way McCordsville, IN 46055 C 317.416.8322 F 317.536.3132 From: Lillard, Sarah N [mailto:SLillardgcarmel.in.gov] Sent: Monday, September 24, 2007 2:04 PM