HomeMy WebLinkAboutDrainage Report0-g ". %"*do
Surveying Site Design Civil Engineering Urban Planning Water Quality
Designs
241 5 Directors Row 5te.E
Indianapolis, In 46241
31 7-244-1 968
FAX-244--1 969
DRAINAGE REPORT
FOR
WESTON POINTE RETAIL CENTER
OUTLOT #3
1 1 145 NORTH MICHIGAN ROAD
CARMEL, INDIANA
June 22, 2007
Dmitlage Repo~t
Weston Pointe Retd Center - Lot nF 3
Table of Contents
S ullunay. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . 2
Appendix A Maps
Appendix B Existing Conditions
Appendix C Proposed Conditions
Appendix D Inlet Capacity \Vorksheets
Appendix E Water Qudty
Weston Pointe Retail Center - Lot # 3
U.S. 42 1 & Weston Pointe Di-ive
Introduction:
11e existing 1.22 +/- xre site is located on the east side of U.S. 42 1 in the City of Cwn~el, H&dton
Count): Indiana. C~~rrentl~ the site is v~cant with only rough grading and a row of curbing along the
west side. This lot is located at the North West comer of the oveld development known as K'eston
Pointe Retd Center. Utdities including stornlwater and saitaiy have been stubbed to the site for
coru~ection. The proposed constniction wdl include a 7,900 sf retd building its associated parlung
and utilities. Water qualtty wdl be provided by an Aqua-swirl AS-2 for the proposed conditions prior
to the release into the existing underground pipe network
Existing Conditions: (Appendix B)
The existing site curre~ltlydrins through sheet flow from two basins. Basin A flow.; to the west and
into an existing endsection located on the site. Stormwater entering the endsection flows south and
eventually drains into the overall site pond. Basin B flons east and south to an existing pavement
inlet. Flow entering the inlet will flow slightly east and south through an existing underground pipe
network, and wdl eventually drain into the overall site pond. Both basins are prima-ily gms and bxe
earth with a five foot concrete sidewalk running along the north edge of the site. This walk is the
only impervious we'l in the two basins. The 10-Yew total lunoff from the site is 1.34 cfs.
Existinz Soil Types:
Brooks ton (Br) Silty Clay Loam.. .................... .Type B
G-osby (G-A) Silty Clay Loam.. .......................Type .. C
07- 170 - Drainage Report
Proposed Conditions: (Appendix C)
Ile proposed const~~lction calls for a 7,965 sf retail building its ,~sociated p,uking 'lnd ut~lities, see
Proposed Basins Map C1. Run-off from the site will drain through the proposed underground pipe
network to the existing inlet located at the southeast corner of the lot. Fronl the inlet stormnvrater
n~n-off ud flow south to the existing oved site pond, Lake 1. Please see the attached drainage
repolt for Weston Pointe Section 1, prep,u-ed by Ch~isto~her M Figueroa at Stoeppelwerth and
Associates on December 15, 2003 and revised March 17, 2004. Also see the included Post
Developed ICPR Basins. This site is part of the 10.20 Acre Basin 608. This basin WCE developed
expecting a fudy developed co~mnercial site. A curve number of 90 wa used for the entire site and a
composite C value of 0.85. Composite C values for this site are calculated as 0.63, 0.61, 0.64, 0.82
and 0.63 with an overed value of 0.70. Time of concentration values are the mini~nuu~l allowable at
5.0 minutes. These values meet the design st.mdards assuuned while designing the site pond.
Ple'lse refer to the attached Proposed Drainage Basins ehbit on page CI that oultlules the proposed
watersheds for each proposed and existing inlet. Interconnected pipes were designed with the
Rational Method, dnd sized for the IO-year frequency rainfall event. Total site nm-off in the
proposed condition is 5.33 cfs.
Analysis Method:
Storm Sewer Conlpu~tations: Computations for stornl sewers to be constructed for the proposed site
during this phase of the development have been completed. ?he interconnected pipes were designed
with the Rationd Method, and sized for the IO-year frequency raitdall event. 11ese conlputations
xe shown on in Appe~idix C The following sun~rnarizes the results of the analysis:
Ket~un Interval = 10 years
Contributing Basins = see page C1
Rational Runoff Coefficient, C = see page C2
Time of Concentration, Tc = assumed 5 I~.
Rainfall Intensity, i = see page C3
Total Runoff, Q = CIA
Pipe Fill1 Capacity = (1.49/n)(pdJ/4)(( pdJ/4)/( pd))'j(s)G5
n = Manning's Roughness Coefficient = 0.013 for RCP Pipes
d = Diameter of Pipe (feet)
s = Slope of Pipe
Water Ouality: (Appendix E)
VIrater qiiahty n7as determined using the w-ater q~~ality volunle methodology. A corresponding CLIIT~
Number (CNwq) is compi~ted utilizing the following equation:
CNwq = 1000 / (10 + 5P + 10Qa- 10 (Qa- 1.25QaP) )
Rv = 0.05 + 0.009 (I)
CNwq = curve number for water quality storm event
P = 1" (rainfall for water quality storm event)
Qa = runoff volume, in i~lches = 1" x Rv = Rv (inches)
Rv = volumetric runoff coefficient
I is the percent impervious cover
A CNwq WE computed to be 97 (see Appendix E). A depth of 1" and duration of 24 holm mras
used in the SCS Tpe I1 stonn event. The resudts gave a peak flow of 0.46 cfs. See VIrinTR-20 input
and results in Appendix E. An Aqua-snlrl AS-2 capable of treating a peak flow of l.Ocfs was chosen
to treat the flow.
Summary:
The proposed design wdl ensure proper dr&unage by co~lvejin~ storm water at an adequate velocity
through the proposed pipe network toward the dry detention. As a result, the storm water design
effectively manages the runoff from the site without bul-dering downstre;un property owners.
07- 170 - Drainage Report
Appendix A
Maps
07- 170 - Drainage Report
WESTON POINTE - LOT 3
U.S. 42 1 & WESTOIV POINTE DRIVE
CARMEL, INDIANA
"..
f 31 7-244-1 969
U.S. 42 1 & WESTOIV POINTE DRIVE
CARMEL, INDIANA
f 31 7-244-1 969
Appendix B
Existing Conditions
07- 170 - Llrainage Report
Exising Conditions
CIVII Designs Project No 07-1 70
Project Weston Polnte Retall Center - Lot 3
Location U S 421 & Westor) Polnte Dr~ve
Descr~pt~on Exisltng Cornposlte C Cornputatlons
Runoff
Coefficient
lrnperv~ous Area = 0 90
Greenspace = 0 20
Gravel~Stone = 0 80
BASINS
By MAT
Date 611 112007
Checked JMP
Date 611 112007
Total Site
lrnpervlous Area Stone
(ftA2)
0
Time of ConcentrationlTravel Time Worksheet
Civil Designs Project No. 07-1 70
Project Weston Pointe Retail Center - Lot 3
Location U.S. 421 & Weston Pointe Drive
Description Existing Time of Concentration - Basin A
Basin A
SHEET FLOW (Applicable to T, only) Segment ID
1. Surface description ..............................
2. Manning's roughness coefficient, n ..........
3. Flow length, L (total L 5 300 ft) ............... fi
4. two-year, 24-hour rainfall, P2 .............................. in
5. Land slope, s ................................... fWft
6. T, = [0.007(n~)~~~]l[~,~~~s~.Compute "] T, .......... hr
n source:
P2 source:
SHALLOW CONCENTRATED FLOW Segment ID
7. Surface description (paved or unpaved) ..........
8. Flow length, L ................................... fi
9. Watercourse slope, s .............................. ft/fi
10. Average velocity, v .............................. ft/s
11. TI = (Llv)l3600 Compute T, .......... hr
v = 20.3282(s)'.~ for paved surfaces
v = 16.1345(s)~.for ~ unpaved surfaces
CHANNEL FLOW
12. Cross sectional flow area, a
13. Wetted perimeter, P,,
14. Hydraulic radius, r = alp,(,
15. Channel slope, s ....
16. Manning's roughness coefficient, n
17. v = (1 .49r2'3s"2)ln
18. Flow length, L
19. TI = (Uv)13600
n source:
20. Total Time of Concentrationflravel Time
Segment ID
......................... ft '
................... ... .......... ft
Compute r .......... fi
................... ........... ft/ft
...............
Compute v .......... fWs
......................... ft
Compute T, .......... hr
By MAT
Date 0611 112007
Checked JMP
Date 0611 112007
...................................... hours = 0.19
minutes = 11.54
B - C
Unpaved
8 1
0.012
2.25
0.010
Basin A
07-170 - Tc Worksheet.xls
Total
0.010
Time of ConcentrationlTravel Time Worksheet
Civil Designs Project No. 07-1 70
Project Weston Pointe Retail Center - Lot 3
Location U.S. 421 & Weston Pointe Drive
Description Existing Time of Concentration - Basin B
Basin B
SHEET FLOW (Applicable to T, only) Segment ID
1. Surface description ..............................
2. Manning's roughness coefficient, n ..........
3. Flow length, L (total L 5 300 ft) ............... ft
4. two-year, 24-hour rainfall, P, .............................. in
5. Land slope, s ................................... ftfft
6. T, = [o.oo~(~L)@~~]/[P~~s~~] Compute T, .......... hr
n source:
PS source:
SHALLOW CONCENTRATED FLOW Segment ID
7. Surface description (paved or unpaved) ..........
8. Flow length, L ........................ ........... ft
9. Watercourse slope, s .............................. ftfft
10. Average velocity, v .............................. ft/s
11. T, = (Uv)l3600 Compute T, .......... hr
v = 20.3282(s)' for paved surfaces
v = 16.1 345(s)05 for unpaved surfaces
CHANNEL FLOW
12. Cross sectional flow area. a
13. Wetted perimeter, P,
14. Hydraulic radius, r = alp,.,
15. Channel slope, s .......
16. Manning's roughness coefficient, n
17, v = (1 .49rz3~"2)ln
18. Flow length, L
19. T, = (Llv)/3600
n source:
20. Total Time of Concentration/Travel Time
Segment ID
......................... ft2
........................ ... ..... ft
Compute r .......... ft
...................................... ftfft
...............
Compute v .......... ft/s
......................... ft
Compute T, .......... hr
By MAT
Date 0611 112007
Checked JMP
Date 0611 112007
...................... .. ............................. hours = 0.31
minutes = 18.42
Unpaved
Basin B
07-170 - TG Worksheet.xls
Total
0.000
Storm Drain Flow Tabulation Form
Civil Designs Project No.
Project
Location
Description
07-1 70
Weston Pointe Retail Center - Lot 3
U.S. 421 & Weston Pointe Drive
Rational Flow Worksheet
By MAT
Date 611 112007
Checked JMP
Date 611 112007
Design Storm Frequency = 10-Year
COEFFICIENT
Rational Runoff - 10-Year
07-170 - Storm Sewer Design Worksheet.xls
Appendix C
Proposed Conditions
07- 170 - Drainage Report
Proposed Conditions
(1 CIVII Project Deslgns Project No Weston 07-1 70 Polnte Retall Center - Lot 3 Date By 61812007 MAT
Locat~on U S 421 & Weston Polnte Dr~ve
Descrrpt~on Proposed Cornpos~te C Computations
Checked .IMP
Date 61812007
Runoff
Coefflclent
0.90
0 20
0 80
Greenspace Stone Total Total Cornpos~te
lrnperv~ous Area Greenspace
(ftA2)
Storm Drain Flow Tabulation Form
Civil Dosigns Pro)oct No 07-1 70
Project Woston Poirrlu Rul.lll Conlel- Lot 3
Lncation U.S. 421 8 Wosloo Paint" Olive
Descrlj,tiul~ Slornl Sowor Slrlng Cornpuln:~a!ls
By MAT
Dalo iilO/ZOC/
Clieckod JMP
Dalo blB12007
Storm Sower - 10-Yoar
07-170 -Storm Sewer Design Workshootxls
Appendix D
Inlet Capacity Worksheets
07- 170 - Dr'ainage Report
Discharge vs Depth On Grate
Discharge vs Depth On Grate
Discharge vs Depth Grate
Appendix E
Water Quality
07- 170 - Drainage Report
Civil Design Porject No. 07-1 70
Project Name Weston Pointe Retail Center - Lot 3
Location U.S. 421 & Weston Pointe Drive
Description Proposed Water Quality Curve Number
By: MAT
Date: 6/8/2007
Checked: JMP
rm! IMPERVIOUS Date: 6/8/2007
WQV = (P) (Rv) (A)
12
CNwq = 1000
10+5~+10Qa-0(1 Qa2+1 .25QaP)"0.5
Total Site
Pervious Building Impervious Total Total Curve Number
)'tf ((ft') (ft") (f t') (Acres) CN
15389 0 37770 53159 1.22 87.29
Rv WQV CNwq
Water Quality
Name of printed page f~ile:
C:\Program Files\USDA\WinTR20\07-170 - Water Quality.out
Area or Drainage Rain Gage ~~~~ff ------------ peak ~l~~
Reach Area ID 01- Amount %levation Time Rate Rate
Identifier (sq mi) Location (in) ( ft ) (nr) (cfs) (cs~)
Site 0.002
OUTLET 0.002
WinTR-20 Version 1.0
Area or Dralnage ----------- Peak Flow by Storm -----------
Reach Area Alternate 1.0" 24Hr
identifier (sq rnli (cfs) (cfs) (cf s) (cfs! icf s)
Site 0.190E-02
OUTLET 0.190E-02
WinTR-20 Version 1.0
WinTR-20: Version 1.0
Water Quality
SUB -AREA :
Site Outlet
STORM ANALYSIS :
1.0" 24Hr
RAINFALL DISTRIBUTION:
24. OHr
0.
,064
,181
.856
,953
GLOBAL OUTPUT:
1 .05
1. 24. OHr 2
.05 YNNhW NNNNNN
(1) As recommended by the Center for Watershed Protection and most municipalities, the
Aqua-SwirlTN provides full treatment of the "first flush," while the peak design storm is
diverted and channeled through the main conveyance pipe. Connections to larger pipe
diameters are available at an additional cost, please refer to your local representative for
more information.
(2) Many regulatory agencies are establishing "water quality treatment flow rates" for their
areas based on the initial movement of pollutants into the storm drainage system. The
treatment flow rate of the Aqua-SwirlTN system is engineered to meet or exceed the local
water quality treatment criteria. This "water quality treatment flow rate" typically
represents approximately 90% to 95% of the total annual runoff volume.
'The design and orientation of the qua-swirl'" Concentrator generally enta~ls some degree of
custornization. For assistance in design and specific sizing using historical rainfall data, please
refer to Joe O'Brien, ENTEL, Inc. at (734) 657-3839 or go to our web site for more
information at www.AguaSh~eldInc~c~om~ CAD details and specifications are available upon
request.