Loading...
HomeMy WebLinkAbout07100040 Plot PlanTHEREFORE SUBJECT TO ANY STATEMENT OF FACTS REVEALED BY EXAMINATION OF SCHEDULE "A" AND SCHEDULE "B" OF A TITLE POLICY. Sm. µ4s //^\\\\ TC - 902.40 5o ?' \ \ r SE' % ?AJ? 7,633 SO. FT. D.U. 6 i \ SOIL PROTECnON i r AREA ?n , WI vi Jj m =10 O N ?I I LOW 2% 12,:58 SO. FT ° w4 G °O' PROPOSED C \ 09 DWELLNG }. \R N ?7 ? F.F.E. - 905.0 BA \ \ ! SE. - 895.0 AGAR. - 901.0 Vol " 10' O.U. k S.E. NOTE: THIS SITE PLAN IS BASED ON CONSTRUCTION PLANS OR RECORD DRAWINGS AND IS NOT BASED UPON A FIELD SURVEY. MILLER SURVEYING, INC. DOES NOT WARRANT THE ACCURACY OR SUFFICIENCY OF THIS INFORMATION. THE CONTRACTOR SHOULD VERIFY EXISTING CONDITIONS PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES FOUND UPON THIS DRAWING SHOULD BE REPORTED TO MILLER SURVEYING, INC IMMEDIATELY; FAILURE TO DO SO WILL RESULT IN THE CONTRACTORS ASSUMPTION OF LIABILITY. NOTE: THE BASEMENT ELEVATION DEPICTED HEREON HAS BEEN DETERMINED AND BASED UPON THE PAD GRADES AND OR CONTOURS TAKEN FROM THE CONSTRUCTION PLANS FOR THE SUBDIVISION. UNLESS STATED.-NO INFORMATION ABOUT FLUCTUATING WATER_ TABLES, SOIL CONDITIONS OR SOIL TYPES WITHIN THE BUILDING AREA HAS BEEN PROVIDED OR STATED ON SAID SITE PLAN. IF DURING THE EXCAVATION PROCESS. ANY GROUNDWATER IS WITNESSED ADDITIONAL CONSTRUCTION TECHNIQUES SHOULD BE INCORPORATED TO ALLEVIATE FUTURE PROBLEMS. -1 00c11 A ACC1?%CO 070CCT \s t . 0+45 TC - 900.30 \lA O ?J z o ° °. 0 p• ?4J \!! t \ \ 9t \ N ° in t Locr as 16.392 SO. F -T. 1 t \ LEGEND 1mfi im-ur l GRAPHIC SCALE 0 20 40 80 SCALE : 1" = 40' SITE PLAN JOB NO. 831986 Q = STABILIZED CONSTRUCTION DRIVE ® = PERMANENT SEED / SOD IMMEDIATELY AFTER CONSTRUCTION B.L. = BUILDING LINE D.U. & S.E. = DRAINAGE UTILITY & SEWER EASEMENT DESCRIPTION LOT NUMBER 25 IN THE VILLAGE OF WEST CLAY, SECTION 9003 AS PER PLAT OF SAID ADDITION RECORDED AS INST. #200600000421 IN PLAT CABINET 3 SLIDE 800 IN THE OFFICE OF THE RECORDER OF HAMILTON COUNTY, INDIANA. PAGE: 1 OF 2 S0083 No. A""'l & STATE OF ^ A WAT [MAI WILL MINIMIZL LHUJIUN. 2. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 4. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 5. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 6. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 7. SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUM- ULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL 8. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND RE- DISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON SITE. (HOMEOWNER SHALL CLEARLY MARK ANY EXISTING TREES OR STRUCTURES THEY INTEND TO KEEP) 11. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY THE ENGINEER. b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. SEASONAL SOIL PROTECTION CHART srAeuuTO! mACna rA. FQ MAR. A[0. MAY A AAY AIw. mT Nw. DEc .ANE,n ® c A • n ///n // r s M 11MIA11 sFmNc n nuwnAm B®INC a A• /^/ ramNC /// /// / A - VN.C cal va 4 Iw Ins/A aQPNC I rf30{ la lB5/APC' rW5 x ltl5 e1Mr MY181/Adr a Am AYaY. n1£LM4 'A l?/AUi B - I "N ' HWOUS' IA INS/AEI: UrIIAIa l? fEAUC 12C IHi/AaF- PWS x 1015 am* W101/A a Aw Ag1uK M. .fO M/A C - IiA1F1C aTS ] MIMEIE/AdE D - TACT a RIE t SISFEl9/AIDE E - AMIIN. RRFRASS b Iffi/Aaf ( 1 wp. SD. FT.) Ea F :9M B smw Y T lU5/A •A/• - Val" w H 0MaN0 Alva, Am/a mm?Mrn » - iWanw Na FOR f ro ] Y S ARR M VMB SOD 1STU11HFMf SEEWR SEFOBEO NEPARARON FOR I.RR BIa TI B[loeRE W AAO NaaR11R IE1ns (fY,NLT IYANfT nw a mvaAmc Cnmaol ara ran Assswa Ao su ArTwAT1oA FaIBNw AvAAAas m1HA Mawm) s r 90l pN a M A9[ ra wr ? TO E s®m. IMIr UZ AOOnwt m mT RaRBIDDATIMR 1 FE1IiAla A HF2CYOO6 h M Ha 161. r mlAO W HAT NINE W®D1 Anne m-eoo Y./AOC a la-It-n AHArse. a ronvAUrr. rvrnum. F. WL 1SIP NL TO WU` A IAiBIM B®. rAlaO M FTNaIIIn ue U( Mm M SAR E-A R E® 1NM A M OR A BAR PPAm AIMIS M n W! B nmaaa Al amaRIFa MrAS IAOlr ro BE 6G ra 15 Mn 11L IIAw SRAM srAaaAVpl AFMIm. Brol 1rA1HG1 m61IOr5 Aaron AW a1Bw1AOI v aAs mI n/AC MAa 4 R I® m OrRR M6rD srAaYAmI RSMmOFn AR YET. I wR wwcx eras roan w+ ATIXaIE r WInrACI1AYV F iARMC Mmnr15AIM5 Ra No D FILM RABIC Y®,ml YNWY IEXCIY K VIAL I s SA BUCI x 04 NL1 CdM1I POer /L JO K MATERIAL RYS FLOW ME auu a woaD. mm a eMNFM. AMI RIALL sm>, TR R1561 BAMAa M o<sAr . aAmc .V.. D NP ro swal AA'lAn Lam rur e a A Aonl aanxnc FA ' - m5snne v BIAaa noT AFSSANI, ,,,,I . 7 YA1mAAS n?rwT TP ¢Tww,na, rncY I I LL1MN4£f AIO MGi [ASBIRE I 1 moo rAeea j E Mr roralw SILT FENCE CONSTRUCTION NTS YANTENANa: INSPECT WE SILT FENCE PEWOWI Y AND AFTER EACH STONY EVENT. If FENCE FABRIC TEA STARTS TO OEWIFPL OR N ANY WAY FIE ES INEFFECTIVE. REPLACE THE AFFECTED PORTION IMMEDIATELY. REMOVE DEPOSITED SWUM MEN IT REACHES HIALE THE HOWT M THE FENCE AT ITS LOWEST PONT OR IS CAUSING WE FABRIC M WAGE . TARE CARE TO A%00 NOEIIINNO DIE FETICE DURING CIEARO1T. AFTER WE C WIWIINO DRAINAE AREA HAS BEEN STAIIIIID REMOVE THE TERM AND SEDYE]RT OEPOSITS, WINO THE aSNINFD AEA M ORAc. AI) STABium. DasnM awlo-? STABILIZED CONSTRUCTION, ENTRANCE]. NTS MAINTENANCE: INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER EACH STORM EVENT OR HEAVY USE. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. TOP DRESS WITH CLEAN STONE AS NEEDED. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC/PRIVATE ROADS BY BRUSHING OR SWEEPING. RUSHING SHOULD ONLY BE USED IF WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. REPAIR ANY BROKEN ROAD PAVEMENT SECTION 102.07 NOTES 1) BUILDER TO INSTALL TEMPORARY CONSTRUCTION ENTRANCE PRIOR TO ANY EARTH DISTURBING ACTIVITY. 11) BUILDER TO INSTALL SILT FENCE OR APPROVED EQUAL. BUILDER TO INSTALL AND/OR MAINTAIN INLET SEDIMENT PROTECTION. 111) BUILDER TO CLEAN MUD FROM STREETS AND ALLEYS DAILY. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED ON IN A MANNER COMPLIANT WITH ALL STATUTES AND REGULATIONS. IV)BUILDER MUST COMPLY WITH ALL ORDINANCES GOVERNING SITE EROSION AND SEDIMENT CONTROL AND THE APPROVED EROSION CONTROL PLAN FOR THE DEVELOPMENT. V) BUILDER SHALL NOT ALTER ELEVATIONS OF ADJOINERS LOT. BUILDER TO ENSURE SEDIMENT / EROSION DOES NOT LEAVE THE LOT. VI) THE OVERALL SELF MONITORING PLAN AND PROCEDURES AS APPROVED FOR THE DEVELOPMENT SHALL BE USED IN CONJUNCTION WITH THIS PROPOSED SITE PLAN. VII) BUILDER TO OBTAIN A REFERRAL FROM THE DEVELOPER FOR THE QUALIFIED INDIVIDUAL" IN CHARGE OF THE MANDATORY STORM WATER POLLUTION PREVENTION SELF MONITORING PROGRAM FOR THIS PROJECT SITE. BUILDER TO ENSURE THE NECESSARY DOCUMENTS PLANS AND PROCEDURES ARE IN PLACE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. VIII) BUILDER IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SITE IS STABILIZED. SITE PLAN PAGE: 2 OF 2 JOB NO. 831986 AAMVTVUUIINR4p,AAA No. o •:?9 ; S0083 = STATE OF I HEREBY CERTIFY THAT THE DRAINAGE WAYS, PAD ELEVATIONS, AND EROSION AND SEDIMENT CONTROL MEASURES ARE CONSISTENT WITH THE OVERALL DEVELOPMENT PLANS A _