HomeMy WebLinkAboutCorrespondence
r:.. IY'.
Cr EL
~
RECEIVED
ocr 2 1 2005
DOCS
]ArvIES BRAiNARD, .MAYOR
October 19, 2005
!vIr. Roger A. Kilmer
Land Use Consultant
Baker and Daniels
600 East 96th Street
Suite 600
Indianapolis, IN 46240
RE: Clarian North Hospital-Landscape and Regrading Review #1
Dear Mr. Kilmer:
We have revie..ved the drawings submitted for this project for the October 19,2004 Technical
Advisory Committee meeting. We offer the following comments:
GEI\'ERAL INFOR1\1:A TION
1. The project site is located within current City of Carmel Corporate Limits. The following
jurisdictions will apply.
2. Jurisdictions:
. Streetand Right of Way - City of Carmel
D Water-Indianapolis Water Company Service Area (!We)
· Sanitary Sewer-Clay Township Regional Waste District (CTRWD)
o . Storm Sewer - Hamilton County (primary), City of Carmel (Secondary).
3. Board of Public Works and Safety Approval Requirements:
e Commercial Curb Cut. When appropriate, Board approval for the curb cuts should be
requested. Please pro'0~e 811.2 x 11 exhibits of the.curb cuts and include all dimensional
. . data including throat width, overall width at the 'street, radii, etc. '..Show all existing and
opposing curb cuts and the alignment between existing and proposed.
· Consent to Encroach Agreements for any permanent improvement to be installed within
dedicated right of way and/or dedicated easements.
o Dedication of right of way if applicable.
Any submissioll to the Board requires prior final approval by the Carmel Clay Plan
Commission and/or the Board of Zoning Appeals and completion of review by the
Technical Advisory Committee. All written requests to be place 011 the Board's agenda
mllst include tlie appropriate Docket Numbers and the date (or dates) of approval by the
Plan Commission and/or BZA.
4. Water and Sanitary Sewer Availability (acreage) and Connection Fees
· Current Water and Sanitary Sewer Availability Fees
Not required by the City but may be required by the CTRWD or the IWe.
o Current Water and Sanitary Sewer Connection Fees
Not required by the City but may be required by the CTRWD or the fWe.
5. T AC Review/Drawings submitted for approval:
DEPARTMENT OF ENGINEERING
ONE CrvlC SQUARE, CARMEL, IN 46032 OFFICE 317-571.2441 FAX 317-571,2439
E"WL engineering@ci.carmel.in,us
~.
Mr. Roger A. Kilmer
May 18, 2004
Page 2 of3
We request that all comments and comment letters generated by this oftke be answered in
writing and be accompanied by a drawing reflecting requested revisions. Final drawings will
not be approved for construction until all issues have been resolved. The design engineer
must certify all drawings submitted for final approval. This office will require a minimum of
three sets of approved drawings after all issues have been resolved and the construction
drawings have been approved. The drawings will be stamped approved and signed by the
City Engineer. The Developer/Owner will receive one set which is to be maintained on the
construction site at all times. Our Construction Manager will recei ve one set and one set will
be maintained in the Department of Engineering. Ifmore than the minimum three sets are
requested to be approved; the additional sets (maximum total of two additional) must be
submitted with the three required sets.
6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
right of way and/or dedicated easements will require a Consent to Encroach Agreement
between the Owner/Developer and the City of Carmel. This Agreement requires Board of
Public Works and Safety approval.
7. I am including copies of the following with this correspondence:
· Commercial Project Approval Procedures.
· Permit Data, Contacts, etc.
· Commercial Permitting Procedures.
I will send a copy of our Commercial Irrigation System Requirements upon request.
BONDING REQUIREMENTS
8. The following bonding requirements may apply to this project:
Performance Guarantees
It does not appear Performance and Maintenance Guarantees will be required.
PROJECT COMMENTS
9. Sheet L3.0 1 Grading and Drainage Details
o Where is detail 6 referenced?
· For details 4, 5, and 6 will the riprap impede flow and cause water to pond in the areas of
these installations during peak flow condition (since capacity of outlet is restricted) and
. cause water to spill over in other places on the site during the longer rain events? (mainly
to the southern end of the paved ditch to the south).
D Why is there no riprap in detail 3?
10. Sheet 14.01 Layout and Materials Plan
· Please show construction limits on this sheet and all appropriate sheets. Or, is the bubble
the construction limits?
II. Sheet L4.03 Layout and Materials Plan
· The proposed pipe has to stay within the legal drain easement, or the easement has to be
redescribed.
III Please shade back all existing items; it all looks proposed.
· Why is the whole area north of the proposed pipe clouded? \Vhat is being done in this
area? Does this have any impact on the detention? Is the area clouded utilized for
detention volume?
12. Please provide plans on 24" x 36" sheets.
13. Please remove the. landscape plan (sheets L6.00 and L6.03) from plan submitted to the
Department of Engineering for approval. The Department of Engineering does not approve
the landscape plan.
.-..
Mr. Roger A. Kilmer
May 18,2004
Page 3 of3
14. If you have not already done so, please provide a set of plans and drainage calculations to
Greg I1ko at Crossroad Engineers, PC for the drainage review.
These comments represent the Department of Engineering's initial review of the construction
plans for this project. We request that all responses to our conunents be provided iri writing.
Failure to provide \vritten responses may result in the delay of the review process.
It is critical that our office be made aware of all modifications made on the plans being
resubmitted, particularly if any such changes are considered "new" or fall outside of our previous
reviews. Please provide revised.plans including all revisions. Please notify us of any changes
and specifically state arty changes, including changes resulting from Plan Commission, BZA or
other committee meetings.
All bonds and performance guarantees must be posted prior to Engineering Department approval
of construction plans. Also, Board of Public Works and Safety approvals and any other
governing agency approvals (if required) must be obtained prior to Engineering Department
approvaL
The Department reserves the right to provide additional comments based on subsequent reviews
and on the grading and drainage system upon receipt of drainage calculations and more detailed
construction drawings that provide grading elevations, pipe sizing and invert elevations. These
comments may affect the drainage system and lot and street layout presented on the primary plat.
If you have questions, please contact me at 57] -2441.
cc: Matt Griffin, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Carmel Utilities
Greg Hayes, Hamilton County Surveyor's Office
Project File
Engineering Department Review
Z:lsharedlDHilllPROJREV04ICLAR1ANNOR THHOSPIT AL#I.doc
.....
."'\
Page 1 of2
Conn, Angelina V
From: Brewer, Scott I
Sent: Thursday, October 13, 20054:51 PM
To: Conn, Angelina V
Cc: Griffin, Matt L; 'Brent Longwell'
Subject: RE: Clarian North Grading Revision
Angie:
Thanks, I received them. My comments are as follows:
1. Please change the species of crabapple (Melus) to a native tall growing shade tree such as Bur oak
(Quercus macrocarpa) or swamp white oak (Quercus bicofor) and place them around the foot of the slope rather
than across the top of the mound (same number of trees).
2. The native grass mix should be specified, and planted according to specific recommendations for that
seed mix. If a native prairie grass mix is chosen, then it would lower maintenance costs because of reduced
mowing. It would also provide far better storm water infiltration.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
From: Conn, Angelina V
Sent: Thursday, October 13, 2005 3:59 PM
To: Brewer, Scott I
Subject: FW: Clarian North Grading Revision
Here it is again. 9
Angie Conn, Planning Administrator
Division of Planning & Zoning
Dept. of Community Services
City of Carmel
p.317-571-2417 f.317-571-2426
aconn@carmeJ.in.gov
From: Conn, Angelina V
Sent: Thursday, September 22, 200510:07 AM
To: Griffin, Matt L
Cc: Brewer, Scott I
Subject: FW: C1arian North Grading Revision
Matt (and Scott):
Please view the attached ernaiJ and pdfs.
I think they should go to TAC only, since they are changing the grade of the land and channeling water to a new
location. Please advise.
Angie Conn, Planning Administrator
Division of Planning & Zoning
10/1412005
.-
.~~
Page 2 of2
Dept. of Community Services
City of Carmel
p.317-571-2417 f.317-571-2426
aconn@carmel.in.gov
"'-"~"~-C'~""~~"""~""""~"'cC'''''""''''''''''''''''"''"~-'C~''~~_~'_'''''''''''_'''''''^'''-''-C~__~~"...~
From: Brent Longwell (mailto:blongwell@SWAGroup.com]
Sent: Thursday, September 22, 2005 9:43 AM
To: Conn, Angelina V
Cc: David Bickel; Heather Siemers (E-mail); Gary Baker (E-mail); Penny Busch (E-mail);
Adam. Keyzers@jacobs.com
Subject: Clarian North Grading Revision
Angie:
Attached are the sketches showing the proposed changes for the area between ambulatory road and Meridian
ROW that we discussed earlier this morning. Currently the overflow water is pooling in the right of way area
creating a swamp like condition. The intent of the revised grading is to create a rip rap swale to channel the lake
overflow water into the meridian inlet structure eliminating the standingwater in- the area, and to create a berm
similar to the berms on other properties along meridian. Please advise if we need to submit these drawings for
technical review.
Thanks:
Brent Longwell
SWA Group
214-954-0016
pIQ!J_g'!{~!l@?W<:lgr.9JjQ.c:.9QJ_
10/14/2005
16/13/2005 16:20
3177769528
U
HAMILTON CO SURVEYOR PAGE 01/02
r~ O'O~f,{iJ~Q9]
..
Xel1ton C. 'Ward, Surv!'l'or
"rfi,m( (J17) 776-84:15
'Frt,I' (p 7 J 7i':;'~1I.;;:'~
SlIlte 1 ,~$
Ol!~ .'}(ttmil/{)!l Cmllt')' Sqlillrc
.:YoM~.~I!itIl', Indiana 46('\~o-.z.zJ')
October 13, 2005
Baker and. Daniels
ATTN; Roger Kilmer
600 But 961h Street
Suite 600
Indianapolis. IN 460240
VIA FACSIMILE: 569-4800
~
NtCllfl[lJ
OCr 1
J 2005
/JOes
Re: Clarian North Hospital RevisioBs
Dear Mr. Kilmer:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's
Office on October 6, 200S(or this project and have the following <:omments:
. 1. The proposed project falls in the incorporated area of the City of Cannel.
2. The proposed projeetDOES NOT fall in $ Carmel Wellhead Protection Zone,
3. The proposed project falls in the W.R. Fertig Regulated Drain Watershed.
_ 4. The swale area between the pond outlet and the U.S. 31 culvert is a Hamilton
COWlty Regulated Drain. Approval will need to be granted by Hamilton County
Surveyor's Office prior to any' work commencing within the Regulated Drain
Easement.
5. HCSO will require an approved permit fromlNDOT,for work in the Right of
Way, be provided to us before we will approve any work on this regulated drain.
6. HCSO will not approve the design as presented because it moves the channel
outside of the ,granted regulated drain easement, The channel must be realigned
back to the center oCthe easement. If this channellooation is preferred. it will
require a Regulated Drain Reconstruction and an additional grant of easement.
18/13/2005 16:28
3177769628
U
HAMILTON CO SURVEYOR
U
PAGE 02/02
..
7. The HCSO has concerns the proposed "rip rap cobble" may be sized too small
and it could move under heavy velocities. If this rip rap moves, it will end up in
the culvert, which oould:further back up the water of the hospital site. The HCSO
typically required rip rap sized in the 7" to 9.' range, If a non rip rap alternative
'WQl,Ild be iX)nsidered~ I would suggest using North Amerioan Green's C3S0 -
Pe:tmanent TurfRejnforcing Mat or similar. Thi5 would provide the needed
erosion and stabilization protectfon, while allowing the grass to fill in and hide the
channel. The concrete swaIe 'Would still be ne.eded to move the water on the
flatter slope but ifit was llsed in conjWlction with the C-350, the overall
appearance ma.y be :more appealing.
8. It appears there is some discrepancy in the details on sheet L3.01. DetailS shows.
6" of rip-rap ove.r the conerete swale. Details 4 and 6 show the invert: of the
concrete. swale matching the invert of the pipe. It could be assumed that the rip-
rap is 6" above the invert of the pipe, which we will not approve. Please modify
which ever detail is incorrect.
9. No landscape planting will be permitted Dr allowed within the existing regulated
drainage easements pCI' Ind.iana Code 36-9-27-33(d). Tbe proposed landscape
plans DO NOT :aneet these reqnirements.
10. Please note that tUrther comments maybe nECessary at a later date.
ShouLd you have any questions. I can be reached at 317.776-8495.
Sih~~: 0fimp;2
~~
Plan Reviewer
cc: Matt Griffin- Cann~l DOCD
Dick Hill- Cannel Engineering
John South - HCSWCD
Crossroads Engineering
Dwane Myers - INDOT
Jamie Poczekay - ACE
C<61JI"meR
l 05IbOCfC5-5- tJ
.,U
.U
<61Ir(llliTl e Jl11 t
. \ ' "
f j /
/ ~
I frtCfll/fO
>
Ocr I
1 2005
Docs
October 7, 2005
Roger A. Kilmer
Baker & Daniels
600 E. 96th Street, Suite 600
Indianapolis, IN 46240
RE: Clarian North Hospital Campus - Drainage Grading & Landscaping
Revisions
Dear Mr. Kilmer:
I have received and reviewed the information for the above-mentioned
project.
At the present time, I see nothing in the plans that would hamper Jaw
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully
~D'.=1~
Michael D. Fog:l;---'
Chief of Police
MDF:vb
cc: Dept. of Community Services
liB 7) 571-2500
A Nationally Accredit
'forcement Agency
$
.Eu I;)]]) 571-2512
u
u
Page 1 of 1
Conn, Angelina V
From: Conn, Angelina V
Sent: Wednesday, October 05,2005 11 :02 AM
To: 1oseph.scimia@bakerd.com'
Cc: 'JPoczekay@amercons.com'; Griffin, Matt L
Subject: Clarian North Hospital (#05100005 TAC)
Mr. Scimia:
This letter is in response to your TAC Application for Clarian North Hospital. Members at the TAC
Meeting will make additional comments on October 19. Please complete the following items after the
TAC meeting:
1.) Please place the docket no. on the site pia n.
2.) Please coordinate with the Urban Forester, Scott Brewer, regarding the landscape plan
(species, location, etc.)
3.) Please provide copies of correspondence/permits from the StatellNDOT regarding grade work
in the US 31 road right of way.
Additional comments may be voiced by DOCS at the meeting. Please feel free to call/e-mail me with
any questions/concerns.
Angie Conn, Planning Administrator
Division of Planning & Zoning
Dept. of Community Services
City of Carmel
p.317-571-2417 f.317-571-2426
aconn@carmel.in.gov
10/512005