HomeMy WebLinkAbout07100070 Site PlanREVEALED BY EXAMINATION OF SCHEDULE °A" AND
SCHEDULE "B" OF A TITLE POLICY.
NOTE: THIS SITE PLAN IS BASED ON CONSTRUCTION PLANS OR RECORD
DRAWING5 AND IS NOT BASED UPON A FIELD SURVEY. MILLER
SURVEYING, INC. DOES NOT-WARRANT THE ACCURACY OR-SUFFICIENCY
OF THIS INFORMATION. THE CCNTRACTOR SHOULD VERIFY EXISTING
CONDITIONS PRIOR TO AN',' CONSTRUCTION. ANY DISCREPANCIES FOUND
UPON THIS DRAWING SHOULD BE REPORTED TO MILLER SURVEYING. INC
IMMEDIATELY: FAILURE TO DO SO WILL RESULT IN THE CONTRACTORS
ASSUMPTION OF LIABILITY.
NOTE: THE BASEMENT ELEVATION DEPICTED tEREON HAS HELN
DETERMINED AND BASED JPON THE PAD GRADES AND.OR CONTOURS
TAKEN FROM THE CONSTRUCTION PLANS FOR THE SUBDIVISION. UNLESS
STATED, NO INFORMATION ABOUT FLUCTUATING WATER TABLES, SOIL
CONDITIONS OR SOIL TYPES WITHIN THE BUILDING AREA HAS BEEN
PROVIDED OR STATED ON SAID SITE PLAN. IF DURING THE EXCAVATION
PROCESS, ANY GROUNDWATER IS WITNESSED ADDITIONAL
CON:ST-RUCTION TECHNIQUES SHOULD BE INCORPORATED TO ALLEV+ATE
FUTURE PROBLEMS.
? O O
?`p,+roo'S 060
O??OVO?? no
n
\, n
STR. #25
TC = 905.00
3274 LET T LANE WFS T
fLLER SURVEYING 948 CONNER ST. NOBLFSVTLI..E, IN. Ph. 773-2644
c -11 - nu 11 unT 11I'm'1T n"n/ne UAI In WTIJni IT RnTA DArrC
NOTE: THIS DRAWING IS NOT INTENDED TO BE REPRESENTED AS A RETRACEMENT OR
ORIGINAL BOUNDARY SURVEY, A ROUTE SURVEY OR A SURVEYOR LOCATION REPORT.
STIR. #736
STORM INLET W/ APPROVED
SEDIMENT CONTROL DEVICE
TC = 898.21
'STR. #26
TO = 900.00
0 15 30
SCALE : 1" = 30'
SITE PLAN
JOB NO. 03'1949-
LEGEND
sc = STABILIZED CONSTRUCTION DRIVE
-Z = PERMANENT SEED / SOD IMMEDIATELY
AFTER CONSTRUCTION
B,S.L. = BUILDING SETBACK LINE
L.E. = LANDSCAPE EASEMENT
D. & U.F. = DRAINAGE & UTILITY EASFMFNT
DESGF?!MN
LOT NUMBER 21 IN GLEN OAKS AS PER PLAT OF
SAID ADUTION RECORDED AS INST. #200500038530
IN PLAT CABINET 3 SLIDE 649 IN THE OFFICE OF
-
THE RECORDER OF HAMILTON COUNTY, INDIANA
Ao_'t o 2
R. L.S. 50083
DATE: SEPT. 26, 20071
FOR: GOLLNER HOMES
PAGE: 1 OF 2
}`\y 1+? 111 I I I I IIll ???'''
saoe3
STATIC OF
-q4;Q n IT'
rgnnru
LAND ALTERATION WHICH STRIPS THE LAND OF
VEGETATION, INCLUDING RECRADING, SHALL BE DONE IN
A WAY THAT WILL MINIMIZE EROSION.
,ONTRACTOR SHALL COMPLY WITH All STATE AND LOCAL
ORDIRANCI-S THAT APPLY.
THIS PLAN SHALL NOT BE CONSIDERED ALI. INCLUSIVE
AS THE CON7RAGFORSHALL TAKE ALL-NECESSARY-
PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING
THE SITE
ADDITIONAL ERUSIUN AND SEDIMENT CONTROL MEASURES
WILL BE INSTALLED IE DEEMED NECESSARY BY ON SITE
INSPECTION.
SEDIMENT LADEN WATER SHALL BE DETAINED BY
ROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE
;EDIMENTATION IN THE RECEIVING STREAM. NO STORM
DATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER
HAT CAUSES EROSION AT THE POINT OF DISCHARGE.
WASTES AND UNUSED BUILDING MATERIALS SHALL
NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY
STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES
AND UNUSED BUILDING MATERIALS IS REQUIRED.
SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE.
ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUM-
ULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH
WATER. CLEARED SEDIMENT 5HALL BE RETURNED TO THE
SITE FOR DISPOSAL
SOIL WHICH HAS ACCUMULATED NEXT TO EROSION
CONTROL DEVICES SHALT. BE COLLECTED AND RE-
DISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND
AT LEAST ONCE A WEEK.
IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE
NTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS
SHALL BE COVERED WITH FILTER FABRIC.
ALL EXISTING STRUCTURES, FENCING, TREES AND ETC.,
WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND
DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON
SFIE. (HOMEOWNER SHALL CLEARLY MARK ANY EXISTING
TREES OR STRUCTURES THEY INTEND TO KEEP)
SCHEDULE OF EARTHWORK ACTIVITIES'
THE DURATION CF TIME WHICH AN AREA REMAINS
EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE
AREA SHALL BE STABILIZED AS SOON AS POSSIBLE.
TEMPORARY VEGETATION OR MULCHING SHALL BE USED
TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY
CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY
THE ENGINEER.
TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM
MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL
OTHER TIMES OF THE YEAR. PERMANENT AND FINAL
VEGETATION ANU STRUCTURAL EROSION CONTROL DEVICES
SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
KACANAI SO PROTE(: MN CHART
9T 4NLA?SN
PlucnfE _ AHY. Nxv u.NC JV.Y um `Znr. CDC
_ NO. DEC.
eNr
SEFA'HG _
owuul t
ffmino
_
o.
ANC ? D
5[[gxF /// //? ///y
NAa HG
A - rxxruam NIu w%'..i> W AWNi 11 1- l m'T'/.
n HENw 2V1CN5 muw uu Wl/?A I FNI IIKI)ttFF N!E 120 -11,%
c - 91AY 'An 3 MI9HW M K
D = 1 Ir, me x WNdS/AwR
E _ INIDN NYDiI 4 b Iffi/HRL / 1 i8/Cm 50. EI.
F_gm
•/I/• _ ren.nml NCF#N uuwo An:E :TAT. AVP15F AND/[n spNWO-x
r _ px . xfII`F9 FOR E rn a tfltS IFIEF fGIR:'N"+ S9
5lEf50 PREPMtATgX FtA PFAMMRPT iEIDIN[k
1.}Ri Sa R, xTATNH[ t1I mm wneNF LLVRS
L?9 iIELR?inAnw?rntltu ?Anvnt.® tza?l l?N¢?uR?ilC[ .Im .?nrfc tin
i s ?. Ix m ultllR/AE FR 1I[ !F'EY9 TO OE NIDII .IKr YE AI` F'
W TWT mmxomn,a,m
xmiZ[ W maces 9l,HE SOL ,LSZ N lu1Nti 11A6 NOT O«R. ?
T ARL1Nf mO-eW M/A?]C OF 1YIY13 AVKY9£ Nt [anvuui. FWR16?4
x.I? ? ?+ bwr0°.cTN?EmxA rlx?i N?T? :'x.nE?oann?m?vrd' s NEE ?aE.xro
1¢lE D 16GMR4 YL ntiRA6Fil M[AS VISIT TO m: RtR IM 10 NYS 9WI rtnK SWACL
xiwuznYWN AFPIrtY. vF01 cA»NN maNOS vnwN PAPG tAFUAm, ff wAK
ra n/nc raw rNt a ? ro MTmrE cBIAFr sT.a1 WaN mmMNlwFlrs AIE WT.
1L1_/ l 411 1T \ LI EU-. x l "I Ti
Yllhn ,
NOTE
mL FS uLL NnYE T uA1W IFN4M [!
,N
? !5 nu5 Bwlk mrnL PosT NW
FLUB
E,
_ R Y ll. SIFk'4 (W SvxINETf,
?AIL
o`N'Wf 1
A fC G- 1LIxI 51P01 lO N!
T
wnx xsPLARw µo l0 9pP[Nr FPPllfn
mw
I xvu ac . wnw a?nrrc? rna,r
?rw4.0
n
SILT FENCE CONSTRUCTION
NTS
MAFrENANfE' LVENT IF
F?[YC EABRICaLTFARS ?SIM W03510Y. M IH MY AYMKCO M
NFF,IFCrW. REPLACE THE AFFECTn PCR IMMEDIATELY. ~W MP M
°..CEIMFNT MHN II.FAAcwS 1 THE HEIGHT OF 11 FLNCE AT In Lt)Wi51'
PGNT CR 5 CAUSING THE FABRIC TD RVLGE. TATFE CARE TO A"
IIMFPNNNG fi,E EFNCE WRING ¢ mr.. II ILR WE WIImwU
??Ts, BWWG T p5w uY V m rn?Dr,A D SSTEAM nIM SEDNl
PROFILE
STABILIZED CONSTRUCTION ENTRANCES
NS
MAINTENANCE'.
INSPECT ENTRANCE PAD AND SEDIMENT DIGPOSAL AREA WEEKLY AND
AFTER EACH STORM EVENT OR HEAVY USE. RESHAPE PAD AS NEEDED
FOR DRAINAGE AND RUNOFF CONTROL. TOP DRESS WTH CLEAN STONE
AS NF.F,DED. IMMEDIATELY REMOVE MOD AND SEDIMENT TRACKED OG
WASHED ONTO PUBUC/PRWATE ROADS BY BRUSHING OR SWEEPING.
FLUSHING SHOULD ONLY BE USED IF WATER IS CONVEYED INTO A
SEDIMENT TRAP OR BASIN. REPAIR ANY BROKEN ROAD PAVEMENT
IMMEDIATELY.
- NRC
SEQTION 102.07 NOTE
ON IN A MANNER COMPLIANT Wk7H ALL STATUTES AND
IV) BUILDER MUST COMPLY WITH ALL ORDINANCES GOVERNING
V) BUILDER SHALL NOT ALTER ELEVATIONS OF ADJOINERS LOT.
MONITORING PROGRAM FOR THIS PROJECT SITE. BUILDER
MEASURES UNTIL SITE IS STABILIZED.
I) BUILDER TO INSTALL TEMPORARY CONSTRUCTION ENTRANCE
PRIOR TO ANY EARTH DISTURBING AC{IVITY.
II) BUILDER TO INSTALL SILT FENCE OR APPROVED EQUAL
BUILDER TO INSTALL AND/OR MAINTAIN INLET SEDIMENT
PROTECTION.
III) BUILDER TO CLEAN MUD FROM STREETS AND ALLEYS DAILY.
CLEARED SEDIMENT MUST' BE REDISIRIHUTED OR DISPOSED
REGULATIONS.
SITE EROSION AND SEDIMENT CONTROL AND THE APPROVED
EROSION CONTROL PLAN FOR THE DEVELOPMENT.
BUILDER TO ENSURE SEDIMENT /EROSION DOES NOT LEAVE
THE LOT.
Vl)THE OVERALL SELF MONITORING PLAN AND PROCEDURES AS
APPROVED FOR THE DEVELOPMENT SHALL BE USED IN
CONJUNCTION W171-1 'IBIS PROPOSED SITE PLAN.
VII) BUILDER TO OBTAIN A REFERRAL FROM THE DEVELOPER FOR
THE "QUALIFIED INDIVIDUAL" IN CHARGE OF THE
MANDATORY STORM WATER POLLUTION PREVENTION SELF
70 ENSURE THE NECESSARY DOCUMEN'f5 FLANS AND
PROCEDURES ARE IN PLACE PRIOR 70 THE
COMMENCEMENT OF CONSTRUCTION.
VIII) BUILDER IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL
SITE PLAN
PAGE: 2 OF 2
JOB NO. 831949
\\T\rll lil klHryHq?
yr ND. ''':? '=
50OM `-
?. STATE OF
V HEREBY CERTIFY THAT THE DRAINAGE WAYS, PAD ELEVATIONS,
AND EROSION AND SEDIMENT CONTROL MEASURES ARE CONSISTEN
WITH THE OVERALL DEVELOPMENT PLANS
SEP 2 0 2007