HomeMy WebLinkAbout05050047 Correspondence (2)OF CARMEL / CLAY TOWNSHIP
Permit #-. 05050047
" , vfPROVEMENT LOCATION PERMIT APPLICATION Date:
-•.< Foy°:CommzrdQ],Lldust-ria!, orlAsti mional;NewStmctit res,6dditioPIS, or Acccsso-.Strurntres
PARCEL ID #: 1505251602026000
LOT & SUBDIVISION: 16PT WARREN & PHELPS ADDITION
ADDRESS OF CONSTRUCTION: 30 FIRST ST SW CARMEL, IN 46032
Township?: Zoning: B2 Flood Zone: N Lot Split: N
PROPERTY OWNER INFORMATION:
Name: LEECHCO PROOPERTIES, LLC
Ph. M Fax #:
Street Address! 1344 S. RANGE LINE RD. CARMEL, IN 48032
CONTRACTOR INFORMATION:
Name: SUPERIOR CONTRACTORS, INC.
Ph. #: (317)3n4-0460 Fax #: (317) 354-0461 Email: SUPERIOR&NDYWERNET
Street Address: 2209 E. BEECHER ST. SUITE A INDIANAPOLIS. IN 46203
Plumber's Name: EXEL MECHANICAL - -
Codes for Project: [PC ,
PROJECT NAME:
PERMIT TYPE: COMADON ; COMMERCIAL ADDITION
Water Service by: CARMEL County Well Permit #
Sewer Service by: CARMEL County Septic Permit #:
Foundation Type: CRAWL Estimated Cost at ConstructionAl 1000
Sump Pump: N Manufactured Trusses: N
Usage Class: COM Construction Type:
State Design Release #: 306124 Square Footage: 4752
;SPECIAL CONDITIONS & NOTES:
DR. LAUCK & CONWAY (OR MCCLEAN). REMODEL OF
EXISTING 1 ST FLOOR BUILDING, AND ADDITION OF 2ND
FLOOR. CONST.TYPE: V-B. OCCUP,CLASS: B. ARCH,
FDN, STR ONLY., TWO STORY-NO ELEV SEE NOTEPAD.
State Rel.#: 305124, FIVE CONDITIONS--
SEE COPY OF RELEASE WIAPPLICATION. This
isTonly a,PARTIAL release.
"bccket #'s: 04050006 ADLS "AMEND:
040405021 V - 04040023 V; 04040045 V, and
04040046 V.
BEFORE ISSUANCE:
1. Determine when water and sewer have
to be paid; and for full Engineer OK
2. Get copies of stamped site plans from
Breyer
3. Get copies of stamped elevations from
Dobosiewicz
4. Determine when the rest of Stale
Release and plans may be submitted.
This pe,?nit is valid only if constmedun commences within one (1) yea: of the date of tssuaute of the State Commercial Design Release. All construction
must be completed (CIO issued) wx thin two (2) years of the issuance date.
1, the undzrsi?med, a=tee that any ec•ns?,uctioa, recansrrucnon, eoiargetr en[, zelaca.ior?, ox zkeration of a srrmzture, cr any =hange m tie use of land er s[rucaa^ea
requested by this apishcarior wII comply with. and confcr-n to, all appLc2ble Ikws of the Sure of klm,a, and t}_e'Zoning C)Amancc of Carrrd indana -1993
(7-2S9) and amen3-r,enrs, adeptzc under authority of SC 35-7 e, ste., CeneraI Assembly of the Statc -Nadi ana. and cl4 Acts ameadatoc? thereto. I fcr_her Gerrity'
that Only-,--kchen. bath, and four drains are Connected to the sac-ira_j sewer. I further certify that the mnstrucrion will not be used or occupied until a
Certificate ofOocupa rt has been issued by the Department of Communir; Ser, ces, Carmel, Indiana
APPLICANT NAME: GREG JONES
T
FEES:
CO'M. INC/O 103.00
C.I.I. N'EV ACC. 1277.88
CII ELECTRICAUMETERB. 9625
CII FINAL 96.25
CII FOOTING & UNDRSLB 96.25
21NID REQ'D FDOTAMEDSLAB 9525
CII RCUGWN 9025
CII SITE 96,25
CARMEL FIRE DEPARTMENT
PLAN REVIEW
Project
Address
Received
Released
3(Ise prI d,L&
16
State Permit c-3661 --),q
Reviewer
Position
Reviewed ?C
Type K 4-C
City Permit ?1 -b Sn d ??
Comments:
Pale 1 of 2
Subj: FW: 30 First Street SW
Date: 5/2612005 12:11:19 P.M.
From: JimS@nf-law.com
To: sl ctaclesincl@aol_.com
Brad - See below. jim
James E. Shinaver
Nelson & Frankenberger
3105 E. 98th Street, Suite 170
Indianapolis, In. 46280
ph. 3171844-0106
fax 3171846-8782
US Eastern Standard Time
----Original Message----
From: Jim Shinaver
Sent: Thursday, May 26, 2005 1209 PM
To: 'Duncan, Gary R'
Cc: 'specatlesinc!@aol.com'
Subject: RE: 30 First Street SW
Gary - Thanks. I'll advise my contact, Brad Subrin (848-9081
James E. Shinaver
Nelson & Frankenberger
3105 E. 98th Street, Suite 170
Indianapolis, In. 46280
ph. 317/844-0106
fax 317/846-8782
---Original Message----
From: Duncan, Gary R [mailto:gduncan@ci.carmel.in.usj
Sent: Thursday, May 26, 2005 10:57 AM
To: Jim Shinaver
Subject: 30 First Street SW
Jim,
Thanks so much,
Gary
Gary R Duncan Jr., P.E.
Assistant City Engineer
City of Carmel
Department of Engineering
One Civic Square
Carmel, Indiana 46032
OK-, 9)
Thursday, Mays 26, 2005 America Online: Spectaclesincl
Page 2 of 2
(317) 571-2441
(317) 571-2439 (fax)
gduncan@ci.carmel. in. us
Thursday, May 26, 2005 America Online: Spectaclesincl
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Monday, April 25, 2005 4:58 PM
To: Kendall, Jeff A; Dobosiewicz, Jon C; Conn, Angelina V; Brewer, Scott I; Hill, Dick B; Duncan;
Gary R; Akers, William P; Hoyt, Gary A; Blanchard, Jim E; Dolan, Veronica A; Duffy, John M;
Lillard, Sarah N
Cc: 'superior@indyweb.net'
Subject: Pre-Submittal for Lauck & Conway Optometry Office
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit.
Project:
Lauck & Conway Optometry Office
30 First St. S.W.
Meeting Date: PENDING
Time: PENDING
Related Planning & Zoning docket numbers:
0404000221 V; 04040022 V; 04040023 V; 04040045 V; 04040046 V; 04050006
ADLS/AMEND
Representative:
Greg Jones
Superior Contractors, Inc.
superior@indyweb.net
(317) 223-7638
If there are concerns that might affect the issuance of this permit, please
REPLY TO ALL on this e-mail.
i
Lillard, Sarah N I
From: Brewer, Scott I
Sent: Monday, April 25, 2005 8:02 PM
To: Lillard, Sarah N; Kendall, Jeff A; Dobosiewicz, Jon C; Conn, Angelina V; Hill, Dick B; Duncan.
Gary R; Akers, William P; Hoyt, Gary A; Blanchard, Jim E; Dolan, Veronica A; Duffy, John M!
Cc: superior@indyweb.net'
Subject: RE: Pre-Submittal for Lauck & Conway Optometry Office
Please submit 4 copies of the approved landscape plans to Environmental Planner Scott Brewer, DOCS - Town Hall, One
Civic Square, Carmel, IN, 46032. You will be notified by phone or email when your copies are available for pick-up from
the DOCS "will-call" box.
Scott Brewer, City Forester
Environmental Planner - DOCS
One Civic Square
Carmel, IN 46032
PH (317) 571-2478
-----Original Message- ---
From: Lillard, Sarah N
Sent: Monday, April 25, 2005 4:56 PM
To: Kendall, Jeff A; Dobosiewicz, Jon C; Conn, Angelina V; Breyer, Scott I; Hill, Dick B; Duncan, Gary R; Akers, William P; Hoyt, Gary A;
Blanchard, Jim E; Dolan, Veronica A; Duty, John M; Lillard, Sarah N
Cc: 'supedorC indyweb.net'
Subject: Pre-Submittal for Lauck & Conway Optometry Office
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit.
Project:
Lauck & Conway Optometry Office
30 First St. S.W.
Meeting Date: PENDING
Time: PENDING
Related Planning & Zoning docket numbers:
0404000221 V; 04040022 V; 04040023 V; 04040045 V; 04040046 V; 04050006
ADLS/AMEND
Representative:
Greg Jones
Superior Contractors, Inc.
superior@indyweb.net
(317) 223-7638
If there are concerns that might affect the issuance of this permit, please
L
Lillard, Sarah N
From: Hoyt, Gary A
Sent: Thursday, April 28, 2005 1:03 PM
To: Lillard, Sarah N; Kendall, Jeff A; Dobosiewicz, Jon C; Conn, Angelina V; Brewer, Scott I; Hill,
Dick B; Duncan, Gary R; Akers, William P; Blanchard, Jim E; Dolan, Veronica A; Duffy, John
M
Cc: 'superior@indyweb.net'
Subject: RE: Pre-Submittal for Lauck & Conway Optometry Office
In the TAC meeting of May 19, 2004 the fire department requested a Knox box for emergency access. Knox products may
be ordered on line at <,Nvjw.knoxbox.com>
Gary
CFD
-----Original Message-----
From: Ullard, Sarah N
Sent: Monday, April 25, 2005 4:58 PM
To: Kendall, Jeff A; Dobosiewia, Jon C; Conn, Angelina V; Brewer, Scott I; Hill, Dick B; Duncan, Gary R; Akers, William P; Hoyt, Gary A;
Blanchard, Jim E; Dolan, Veronica A; Duffy, John M; Lillard, Sarah N
Cc: 'superior@indyweb.net'
Subject: Pre-Submittal for t.auck & Conway Optometry Office
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit.
Project:
Lauck & Conway Optometry Office
30 First St. S.W.
Meeting Date: PENDING
Time: PENDING
Related Planning & Zoning docket numbers:
0404000221 V; 04040022 V; 04040023 V; 04040045 V; 04040046 V; 04050006
ADLS/AMEND
Representative:
Greg Jones
Superior Contractors, Inc.
superior@indyweb.net
(317) 223-7638
If there are concerns that might affect the issuance of this permit, please
REPLY TO ALL on this e-mail.
I
Lillard, Sarah N
From: Kendall, Jeff A
Sent: Friday, April 29, 2005 11:04 AM
To: Lillard, Sarah N
Subject: FW: Pre-Submittal for Lauck & Conway Optometry Office
Does this mean they will not be cleared for water and sewer fees?
----Original Message-----
From: Hill, Dick B
Sent: Thursday, April 28, 2005 10:49 AM
To: Lillard, Sarah N; Kendall, Jeff A; Dobosiewicz, Jon C; Conn, Angelina V; Brewer, Scott I; Duncan, Gary R; Akers, William P; Hoyt,
Gary A; Blanchard, Jim E; Dolan, Veronica A; Duffy, John M
Cc: 'superior@indyweb.net
Subject: RE: Pre-Submittal for Lauck & Conway Optometry Office
Engineering has no problem with scheduling the pre-submittal meeting. Remaining issues required for drawing/plan
approval will be resolved with the Developer.
---Original Message-----
From: Lillard, Sarah N
Sent: Monday, April 25, 2005 4:58 PM
To: Kendall, Jeff A; Dobosiewicz, Jon C; Conn, Angelina V; Brewer, Scott I; Hill, Dick B; Duncan, Gary R; Akers, William P; Hoyt, Gary A;
Blanchard, Jim E; Dolan, Veronica A; Duffy, John M; Lillard, Sarah N
Cc: 'superior@inchweb. net'
Subject: Pre-Submittal for Laudc & Conway Optometry Office
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit.
Project:
Lauck & Conway Optometry Office
30 First St. S.W.
Meeting Date: PENDING
Time: PENDING
Related Planning & Zoning docket numbers:
0404000221 V; 04040022 V; 04040023 V; 04040045 V; 04040046 V; 04050006
ADLSlAMEND
Representative:
Greg Jones
Superior Contractors, Inc.
superior@indyweb.net
(317) 223-7638
05050047. 30 First Avenue SW
Superior Contractors
From: Ochs, James A [JOchs@carmel.in.govj
Sent: Thursday, August 25, 2005 8:48 AM
To: superior@jndyweb.net
Cc: Hollibaugh, Mike P, Blanchard. Jim E
Subject: 05050047, 30 First Avenue SW
ENCOMPASS NOTEPAD - 08/25/05
NOTES 703: 05650047 04 2 - PI
DATE TIME NOTE TEXT
---------- -------- -------------------------------------
2D05-08-25 08:44:51 STOP WOR% ISSUED:
I A DESIGN PROFESSIONAL MUST PROVIDE
PLANS FCR THE REDESIGNED STRUCTURAL
CHANGES.
2 DESIGN PROFESSIONAL MUST MAKE A SITE
VISIT AND SPECIFY ALL MATERIALS AND
INSTALLATION METHCDS.
Page 1 of 2
AUG 2 5 ?005
PAGE 1
OPERATOR
jocks
3 DETAILED INSTRUCTIONS OF INSTALLATION
AND FASTENING OF STEEL WALL STUDS TO
PLATES AND FASTENING OF PLATES TO
WOOD TRUSS ROOF FRAMING AND CONCRETE
BLOCK WALLS.
4 Provide desian professional truss .J
-prints. ..._..?? - -
5 Exterior walls, interior walls and
ceilings covered with insulation and/or
gypsum board.
6 Remove 4 foot wide section of sheet
rock from east to west along the entire
ceiling on the first floor and at the
bottom cord of roof trusses.
7 Support pluming _stack at each floor
level and stub out vents from walls to
above the drop ceiling fine.
8 Complete bending of junction boxes
and use HCF grade wiring methods to
all receetacles used for electrical
equipment in contact with patients.
This was a general over view inspection
and does not contain all items need to
be corrected. Additional corrections
will follow during further inseections.
8/25/2005
I AUG 2 5 2005
ENGINEER'S FIELD REPORT
PROJECT NAME:
PROJECT NUMBER:
DATE: August 9, 2005
EST. •k OF COMPLETION:
WORK IN PROGRESS
Installing drywall ceiling and insulation
installing ductwork
Installing Brick along west wall
ARGO Consulting Engineers, Inc.
618 North Davidson Street
Indianapolis, Indiana 46202-3508
Tel. (317) 639-9244
Fax. (317) 639-9249
Email argo@argoce.oom
10 4
REPORT NO: S2
TIME: 11 AM WEATHER: Sunny 850F
PRESENT AT SITE
Brian Warner, superintendent with Superior
6 Masons
2 HVAC
4 Carpenters
OBSERVATIONS:
• The masons were installing appropriate 3/16" brick des and anchors.
• The bolts requested in FR S-1 were partially installed; two beams to be bolted.
ITEMS TO VERIFY:
• Brian reported that A-1 installed two push piers at the NW and two push piers at the NE
building comers to stabilize the walls. Documentation should be provided for the owners file
(warranty information etc.)
INFORMATION OR ACTION REQUIRED:
• Finish bolting the beam to the blocking plate
Install (4) #12 screws each side of second floor window cripple into 6" steel 18 gage jamb
stud.
• Suggested that the roof vents be Installed before the second floor ceiling drywall Is
completed.
• Requested that the contractor forward documentation on the joist and trusses for the owners
file. The documents should Include the design loads certification and recommendations from
the supplier for installation and bracing.
• Requested that blocking be installed between joist where non-bearing walls sit parallel to
supporting Joist.
• Need to install 3/16" dia Kid Kwlck Bolt II through track Into masonry wall at 32" cc.
ATTACHMENTS: None
REPORT BY: Bob Homburg
CC: Brad Subrin and Jeff Slpe
Drs. Lauck and McLean
Optometry Office Addition
30 151 Street
Carmel, Indiana
Page 1
TC rcn= AXL am CST
1- 2. -4739. 0.19 0.40 0.59
2- 3 6,435 0:36 OAS q.62
3- 4 46425 0.36J, 0.17 0}44
4- 5 -6828 0.42,-0.29.0:72
5- 6 -6936 0.,42,'0:30,0.77
6- 7 -5595 0J22 0.16 0.38
,,7- 8 -5591, 0.23 0.52'0.75
8- 9 -3389 0.12.0.67.0.79
BI.e ' FORCE AXL mm? CST'
1x117: 0 0.00 0.09 0.09=
17-16 4613 0.40 0.1j. ;0".51
Urlls 4613 0.40 031 0.51
L5-14 6563 0:56 0:52 0.65P
L4-13 5741 0.49,0.12.0.61
L3-12 3630 0.31 0?08 0.39
L2-11 3630 0.31 OAS 0.39
L1-10 0 0.00 0.00.. q.03
ry,
mm PORCR mm FCRm
1-18 -1622 6-14 1174
1-17 4425 6-13 -813
2-17 -124a R-13 2157
2-15 1916 8-11 -1563
4-15 -532 9-11 3759
4-14 271 9-10 -1943
5-14 -429
RNB a 1.00
9GG'
\ s,
`O
S
3X5 [6X121 [MO] SX12 TL16-3X10 [6X101 3X5
BY20-6X14.4 [5X10]
CHOMS: 2X4 SP 240OP-2.09
.
CRp1MS, 2X4 SP 24DOP-2.06
224 SPF sm w
2x4 SP 02 2
.2X4 SPF 03 DA 4,6,8,10
2X4 SPY 01/02 04) 12
IDLE 14ADCAM -- This design in the
e>poeits result of matipla loadeasoo.
CNWMM Cborde am aeoemed to be
f.nuossly braced unless noted otherwise.
L/782 at JODrf 0 5
La-0.50• D:,-0.58• T.-I.08.
NM EERIZIONIRL TDT711. LOAD EMOUTIC11:
T. 0.14•
MAX H I=NFAL'U IAeD DBVEJX=ON:
T. 0.06e
s?
+ 2m
eS
Hold m clone,
d att--h to
nails.
as shown.
It cannot be tamed upside-doanl
L1 or ()- Plate (a) CIFFM from joint center
The Joint Detail Report must be included
with auY submittal, ioopaction, mWor
fabrication documentation.
VhmdLod per BSCH 7-98, mw, V. 90mpb,
Ha 15.0 ft, 1- 0.00, SW.Cat. C, Kate 1.0
Hid 1ypew Earl 1e 33.0 ft lie 33.0 ft Tress
in SM 2®c, TCDLw12.0 pat, BCDIc 6.0 put
- mint Location s a
1) 0- 0- 0 7) 23- 3- 0 13) 22- 0- 0
2) 5- 6- 0, 8) 27- 6- 0 14) 16- 6- 0
3) 9- 9- 1 9) 33- 0- 0 15) 11- 0- 0
4) 11- 0- 0 10) 33- 0- 0 •16) 8- 6- 0
5) 16- 6- 0 11) 27- 6- 0 17) 5- 6- 0
6) 22- 0- 0 12) 24- 6- 0 18) 0- 0- 0
------------ TOTAL DSB1O1 1AODS ------------
uniform Pip Pty PLP Tb
TC Vert L+D -80 0- 0- 0 -80 25- 9- 0
TC Vert L+D -82 25- 9- 0 -180 33- 0- 0
DC Vert L+D -20 0- 0- 0 -20 33- 0- 0
----MAX. RB=CNS PER B84RING LOCATION-
----X-L00 Vert Hartz Uplift Y-Loc Type
0- 1-12 1676 0 0' HOT PIN
32-10- 4 1993 0 0 BOA' H-ROLL
?1 -2 3 4 35 6 7
?36
3X6
-f-
1-10.0
.4._
3X6 [SAID].. 3X6 [5X10 ISX10 15X10
[6X12 5X10
2-110-0
S G' ' 3'1.0-0
15yg2 f.?.S 17 16 15 14 13 12-11
'ATE OF 1676# 3.50" 1990 3.SOe
33x0
D NA
EXCM AS SHOWN rLATFS ARF, 77,20 GA scale = 0.1875
ss10M ftt?`?? ?+ C
H VVAKIV I lsl V: READ A1.L NOTES ON THIS SHEET. Eng. Job:
Dw
SPSCO
-
A C
W W U: 73145
Trum ID: A
"?•+ g
.
OPY OF THIS DRA
ING TO BE GIVEN TO ERECTING
in4ut!?,•.A
-
-
u JR11 CW-
CONTRACTOR. Dsgr.
Date: 7-07-05
, [
f-'v
" TRUSS MANUFACTURING TC Live 20.0 let
BRACING WARNIlVG: DurFae - Lbr: 1.15
(j'
7 2 $
JVL Q COMPANY ING
PO BO TC Dead 20.0 psr Durrac-Pk: 1.15
X 418
WESTFIELD IND 46074
worse OVni.rPY CpvMS mre"ueya6+wek, P,?,;??m Lei: Live 0.0 psi
nasmrm?.s ie?emieeeIIR.ed nsmem J'rep. BC lkad 10.0 psi
(r?Pee ten, manonaes®nosr,:wne ?namw?m:»
TOTAL 50.0 psf O.C. Spacing: 24.0e
Cd1eri&-TP1
Desw
Cede Dm: TPI1-1995
,,a,N n'. ?y.. JOB PAIN: V:ITEII-60RU089URDER617J10 Ilrr mm.m