Loading...
HomeMy WebLinkAbout07100099 Sewer/Water Permit/sNovember 22, 2004 Board of Public Works and Safety One Civic Square Carmel, IN 46032 RE: Sanitary Sewer Availability RequestlAlexandria of Carmel Dear Board Members: I recommend the Board approve Sanitary Sewer Availability.for this development, which will be located at the southeast comer of the intersection of Pennsylvania. Street and West 131" (Main) Street: ALEXANDRIA OF CARMEL SanitarySewer: 89.3 E.D.U.s per Sanitary Sewer Ordinance S58. Not to exceed an average daily flow of 26,790.0. gallons per day. This development is in the service area of the Indianapolis Water Company. EDU Calculation/Fees 324 total apartment units @ 82.7 gallons/day/unit + 300 gallons/day/E.D.U. = 89.3 E.D.U.S Sanitary Sewer Availability (acreage) Fees 18.969 Acres @ $1,365.001Acre Current Availability Fee = $25,893.00 Sanitary Sewer Connection Fees 89.3 E.D.U.s @ $795.001E.D.U. Current Connection Fee = 570,994.00 NOTE: Should any of the data provided regarding total number of apartment units or total acreage be revised or increased, we reserve the right to require additional Board of Public Works and Safety availability approval and the right to recalculate Sanitary Sewer Availability (acreage) and Connection Fees. Construction or development of this project must begin within twelve (12) months or said approval expires and the developer or builder must reapply to the Board. Sincerely, Michael T. McBride, P.E. City Engineer Enclosure cc: John Duffy, Carmel Utilities SAA VAILMALEXANDRIAOFCARMEL DEPAM ENT OF ENGINEERING ONE Cme 3QuARE, CAR.uEL, IN 46032 OFFICE 317.57L2441 FAx 317.571.2439 E"L engineering@ci.rarmeldn.us JAMES $RALNARD, MAYOR 7172 Graham Road Indianapolis, IN 46250 317.842-6777 FAX: 317-841.4798 em-.acnpe.biz • Architecture • Construction Administration • Engineering • Geographic Information services • Landscape Architecture • Land Fanning • Land Surveying • Real Estate Consulting • Transportation Engineering ISO `9001 QUal?a CF. a55GR.. February 21, 2005 Mr. Dick Hill City of Carmel - Department of Engineering Carmel City Hall, First Floor One Civic Square Carmel, IN 46032 REQUEST FOR APPROVAL FROM THE BOARD OF PUBLIC WORKS S. SAFETY FOR ALEXANDRIA OF CARMEL. ADDITIONAL SANITARY SEWER APPROVAL, SANITARY SEWER EASEMENTS, GRANT OF RIGHTS-OF-WAY, AND CURB CUT APPROVALS. Dear Mr. Hill, Please allow this letter to serve as our request for Edward Rose Development Company, LLC and their proposed apartment project, Alexandria of Carmel, to be placed on the agenda for the Board of Public Works & Safety meeting on March 2, 2005. The 324 apartment units of this project received approval for sanitary sewer availability on December 1, 2004. This request is for sanitary sewer approval for the other elements of this project that will require sanitary sewer service. These include a maintenance building, a swimming pool and a clubhouse for the swimming pool. The swimming pool will be 1,500 square feet and has an estimated sewer usage of 2.4 EDU. This estimate is based The City of Carmel's average user factor which is 1.6 EDU/ 1000 square feet for a swimming pool. We have estimated usage for the clubhouse and the maintenance building to be 310 gallons per day for each facility or 1 EDU for each facility. The total request amount for sewer availability for the pool and the clubhouse and the maintenance building is 4.4 EDU. Additionally, the attached Dedication & Deed of Public Rights-Of-Way with associated exhibits is being submitted as well. We have attempted to include all'of the planned areas for Public Right-Of-Way dedication. We understand that the City of Carmel has plans for a traffic roundabout at the intersection of Pennsylvania. Street and Main Street. If additional public Right-Of-Way is required in the future, then a separate request will be made at that time. through the City engineering department. Three separate easement exhibits are included for sanitary sewers that are proposed for this project. These easements cover the proposed sanitary sewers that have been shown on the Construction Plans that have been submitted previously with the incorporated comments received from TAC reviews. Curb Cuts are being requested as shown on the attached exhibits for curb cut locations. We are currently revising many of the curb cuts with respect to the specific geometry; however the locations of the curb cuts are not proposed to change substantially. The revisions that are being made are being worked out If there Is any additional information that you require for this project, please do not hesitate to contact me at 842-6777. Sincerely, I PAUL t. CRIPE, INC. C'471JMH Aaron M. Reynolds; PE Senior Project Manager 01200=203WX IX%d=V 0-WNS-DO, inCZ-?0-05DCC i ISO49001 I? * • r l t}c ?. I I I I I 1r-?-r-- l I ? ?'-ter+Ji ? •? z E j - ? _^ ?I_LI UILLIU il[I. rIII IF:It CIS-iI? i II - I _ ?c. r,e.in?Li!nnl! III It LIh!IIII-IIII !IIIIIIII II oI i(?11111-?!LLilllTlll I llII( II' ? ? ? -?I15 c ? ? " ° IIl UI-IN 9 aulnl lul I fI Tu Irll I` irk C CIII 1•??1 L c (?P r- lol 11?_I? L - I C? J ? ? I ' a IIIIInnllliilli'Inlllll!uI IIII ?t+ -- j II = _.? I I I CUZD \ 1 ?' ` I _ I ? III I = ? ` `? ? I III I I I ? I = Q SUMMERTRACE ( _ o I z ! 11--- HIM 08 I I P, ILI, _ MIEIJER ALEXANDRIA OF CARMEL February 23, 2005 Board of Public Works and Safety One Civic Square Carmel. IN 46032 Dear Board Members: I recommend the Board approve sewer availability for a proposed pool, clubhouse and maintenance building, located within the Alexandria of Carmel multi-family development located at the southeast comer of the intersection of Pennsvlvania Street and West 131" Street as follows: ALEXANDRIA OF CARMEL POOL, CLUBHOUSE AND MAINTENANCE BUILDING Sewer: 4.4 E.D.U.'s as per Sewer Ordinance S-58, not to exceed an average daily flow of 1320_,0, gallons. This project is located in the Indianapolis Water Company service area. Pool Pools are covered in our Sewer and Water Ordinance Equivalent User Tables. The usage is calculated at 1.6 E.D.U.'s per 1,000 square feet of total surface water area. The Alexandria pool will have a total of 1,500 square feet of water surface area. Thus: 1.5 x 1.6 E.D.U.'s per 1,000 square feet = 2.4 E.D.U.'s. Clubhouse and Maintenance Buildine Paul 1. Cripe, the engineer for this project, has estimated usage for the clubhouse and the maintenance building at 310 gallons per day for each or a total of 2.0 additional E.D.U.'s. Additional Sanitarv Server Connection Fees: , . Sanitary Sewer: 4.4 E.D.U.'s @ S 795.00/E.D.U. = S 3,498.00 These usages and calculations have been reviewed and approved by John Duffy, Carmel Utilities Manager. Construction or development of this project must begin within twelve (12) months or said approval expires and the developer or builder must reapply to the Board. Sincerely, ? ,' X,6 Michael T. McBride, P.E. City Engineer MTM/rbh cc: John Duffy, Carmel Utilities S:1DH ILUAVAIL05?kLEXANDRIAPOOL&CLUBHOL'SE DFPARTLEXT OF E.%GINEERING OBE CtvIC SQe.kRE, CAR%IEL, IN 46032 OFFIce 317.571.2441 Fat 317.5712439 EMAIL ena.ineerin1-@ci.carmel.in.us JAMES Bp-u,;ARD, MAYOR 7172 Graham Road IrOWMpodIS, IN 46M 317-842-6777 FAX: 317-641-4798 w .Crlpebiz • Archdacfv . Curas7reiCdon AdmelrSlraOOn • Egfnamng • GaograplNc Nrfurtnaliwr Servn:ea Lerrd9caye ArchReehue • Lend Prannrng • Land slrrvepfng • Rear Eatate CorrWftg • 7ransri0r'ati0n £rrgarearing May S, 2006 Board of Public Works City of Carmel One Civic Square Carmel, Indiana 46032 Dear Board Members: On behalf of Edward Rose Development Company, LLC, we are requesting re-approval bf'Sanitary SewerAv-ailability for the Alexandria of Carmel project Alexandria of Carmel was previously approved for Sanitary Sewer Availability as follows: Santary SeinrerAvailability approved by the Board an DeoemberI, 2004 for3Y4 total apartment units and 89.3 EDUs. Sanitary Sewer Availability approved by the Board on March 2, 2005 for a Pool, Clubhouse and Maintenance Building and 4.4 These were contingent upon constructionldevelopment commencing within twelve months of your approval._ Since development has; not commenced'ori'the`'Ti» ect erid bn behielf of'Alexandria-of Cannel, we P l are requesting re-approval of these two items and we certify that the basis for the calculation of the EDUs for Math items has not changed. Sincerely, Thank you for your consideration. in this matter. PAUL I. CR1PE, INC. Mitch Hansel, PE Project Manager cc: Steve Hormann, Edward Rose Development File May 10, 2006 Board of Public Works and Safety One Civic Square Carmel, IN 46032 RE: Alexandria of Carmel, Re-approval of Sanitary Sewer Availability Dear Board Members: I recommend the Board re-approve Sanitary Sewer Availability for the Alexandria of Carmel apmu ent development at West 131" Street and Pennsylvania Street. The Engineer, Paul I Cripe, has certified that the basis for the original request and calculations has not changed The previous approvals were contingent upon construction or development commencing within twelve months. The construction/development of the project has not commenced as of this date, Alexandria of Carmel o Apartments - Sanitary Sewer Availability approved by the Board on December 1, 2004. The Availability of 89.3 EDUs was based upon a total of 324 apartment units. o Swimming Pool/Clubhouse/Maintenance Building - Sanitary Sewer Availability approved by the Board on March 2, 2005. The Availability of 4.4 EDUs was based upon our Ordinance for pools and on calculations provided by Paul I Cripe for the Clubhouse and Maintenance Building. These usages and calculations were previously reviewed and approved by John Duffy, Carmel Utilities. Construction or development of this project must begin within twelve (12) months or said approval expires and the developer or builder must reapply to the Board. Sincerely, 2K ? 7 Michael T. McBride, P.E. City Engineer Enclosures MTM/rbh cc: John Duffy, Carmel Utilities S:IDFIILL1AVAllA6U1LE3CANDRIASANIrARYREAPPROV AL DEPARTMENT OF ENGINEERING ONE CIVIC SQUkFE, CARMEL, IN 46032 OFFICE 317.571.2441 Fnx 317, 571.2439 EMAIL engineenng®ca? e[.in,grn JAMES BRAINARD, MAYOR Form ED-! Revised 10-20-82 i{.{4Jp?? Name of Project: Location: E??rzt}r? i31`I.SC_??t?sLJ1 5 Name of Applicant: ?p? 2G??s? 111_7 e;1?I«y_ _.1 LLC------ Address: 7gGl_G H?gr_7ZSrit?? t? C1??lezL - Phone: 5L?S--A ---- Date Figured: _Zj231o$ __ By: _ Applicable Ordinance(s) J[ R---------- CONNECTION SEWER TOTALS (a) Total user units: (b) User Multiplier: AftCii?{? `'i (°) Connection Charge per -- I E. D. U. V E 7 ____ w. :c _ ZQ? C? (c) Total E.D.U.'s (a x b) S.L (e) Total Connection Charge -'----- (c x d) OTPVL I; lc S WATER I (f) Total User Units: _t?, (g) User Multiplier: A_S_ ?Lt7 (i) Connection Charge per -- ------ I E.D.U. (h) Total E•D.U.'s (f x g) (j) Total Connection Charge (h x 1) N.ri AVAILABILITY SEWER (k) Number of Acres -__- (1) Cost per Acre s__1 aj ?.?_ (m) Availability Charaes(k x I)_ _} WATER (nJ NUTter of Acres (o) Cost per Acre _Cs5t4?___ (p) Availability Charges(n x o)-- N.? (q) Meter Installation Fee Total Charaes (e + j + m + P + Date paid: By: ---___ Received by: * Renarks: ----_ -?E tt a_La Z ,_ ----------- (Over for further remarks) CITY OF CARMEL Item 1 of 1 FERMIT RECEIPT Sec:26 Twp:18 Rng:03 Sub: Blk: Lot: PARCEL ID ........: 1609260000015001 DATE ISSUED.......: 10/16/2007 RECEIPT 4.........: 26553 REFERENCE ID # ... 07100098 SITE ADDRESS ...... 1411 FAIRFAX MANOR DR SUBDIVISION ...... CITY .............: CARMEL IMPACT AREA ...... OPERATOR: slill COPY 4 : 1 OWNER ............: EDWARD ROSE DEVELOPMENT CO. ADDRESS ..........: 7901 CRAWFORDSVILLE RD CITY/STATE/ZIP ...: INDIANAPOLIS, IN 46214 RECEIVED FROM ....: EDWARD ROSE DEVELOP. CONTRACTOR .......: LIC 4 XSITE&P COMPANY ..........: SITE & PIPE, LLC ADDRESS ..........: 6825 EAST 34TH ST. CITY/STATE/ZIP ...: INDIANAPOLIS, IN 46226 TELEPHONE ........: FEE ID UNIT QUANTITY AMOUNT PD-TO -DT THIS REC ------ - NEW BAL ---------- ---------- ------------- ---------- USEWERCONN FLAT RATE 1.00 ---------- ------ 775.00 ---- 0.00 -- - 775.00 0.00 USEWERINSP FLAT RATE 1.00 20.00 0.00 20.00 0.00 TOTAL PERMIT ---------- ------ 795.00 ---- 0.00 ---------- 795.00 ---------- 0.00 METHOD OF PAYMENT AMOUNT NUMBER ------------ - --- -- --- -- CHECK 795.00 ----- 257446 TOTAL RECEIPT 795.00 CITY OF CARMEL / CLAY TOWNSHIP Permit #: 07100098 WATER / SEWER PERMIT / RECEIPT Date: 10/16/2007 Ji01X0.: rPARCEL ID #: 1609260000015001 LOT & SUBDIVISION: ADDRESS OF CONSTRUCTION: 1411 FAIRFAX MANOR DR CARMEL, IN 46032 PAYMENT RECEIVED FROM: Name: EDWARD ROSE DEVELOP. CHECK #: 257446 EXCAVATOR INFORMATION: Name: SITE & PIPE, LLC Ph. #: Fax #: Email: Street Address: 6825 EAST 34TH ST. INDIANAPOLIS, IN 46226 Bond Expiration: PERMIT TYPE: USEWRWATR ; SEWERIWATER PERMIT tat tvuresn,unutnuna: ALEXANDRIA APARTMENTS MAINTENANCE BLDG. (BEHIND CLUBHOUSE) SEWER CONNECTION FEE. APPROVED BY BPWS ON 2/2/05, AND RE-APPROVED ON 5/17106. State CDR #328128 is released for ARCH, ELEC, FDN, MECH, PLUM, & STR. There are two conditions listed, RE: 1. Size and spacing of grab bars shall be per code requirements. 2. Buildings shall be designed and constructed to sustain all dead load, live load, and environmental loads, per code requirements. --This area of development within the project was released for receiving nermit annlications by the City The building & Sewer Shall be pvc sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified day pipe, meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are hereby permitted in writing. The sewer shall be installed in accordance with ASTM 2321 for pvc pipe and the Uniform plumbing Code for the State of Indiana. All installations shall be in strict compliance with pertinent City of Carmel ordinances. Back Water check valves shall he installed in accordance with City Code Section 9-122(a). and sections p3008.1 and .2 of the International Residential Code. All building sewers shall be 6" diameter. All installations shall be "open trench" inspected and approved by the Carmel Sewer Department before any backiilling is done. Non- compliance may result in digging up the sewer installation and.tor denial of future sewer permits and/or denial of water connections. No footing or foundation drains or other sources of ground water or storm water shall be permitted to enter the public sewer. Sewer inspection- should he requested at (317)'71-2648 one to four hours in advance. No inspections or installations will he made on Saturday or Sunday or holidays unless arrangements arc made at (cast 24 hours in advance. All plumbers or contractors installing sewer (or water) lines shall have a plumbers bond pasted with the CITY ENGINEER'S OFI7ICE. If any street must he cut a sennrate street. cur nemit. shall he obtained. APPLICANT NAME: STEVE ORMANN PAYMENT RECEIVED BY: FEES: $795.00