Loading...
HomeMy WebLinkAboutCorrespondence STEWART ANDERSON, LLC Angie Conn FROM Darlene Lorenz t.t RECENED C ..."I~ OCf - \'1 DOCS LETTER OF TRANSMITTAL TO: COMPANY: n.~TE: Citv of Carmel , 10/8/2007 COpy RE: Village on the Manon WE ARE SENDING YOU: o iITTi\CHED o SI';Pi\I{ATELY VIA COPIES: DESCRIPTION: 3 Secondary Plat - 1 mylar and 2 paper copies o FOR YOUR USE 0 AS REQUESTED o REJECTED 0 REVISE & RESlJlJMIT o FOR YOUR SIGNATURE 0 FOR REVII',W & COMMENT o 1:011 YOUR i\PPROV l\L DorllER For approval and placement on the next Board of Public Works agenda. I'OST OFFTCE BOX 374. C'\Ri\JEL, TN 460ll2. 317.867.2880 Page 10f2 Conn, Angelina V From: Darlene Lorenz [dlorenz@theandersoncorporation,com] Sent: Monday, October 08, 2007 1 :53 PM To: Conn, Angelina V Subject: RE: Village on the Manon Hi Angie, Jason from our office ,viII be dropping off the revised Secondary Plat in tile next ha If hour." thiU1ks for your help on this, Darlene Lorenz THE ANDERSON CORPORATION 301 S, Union Street I Westfield, IN 46074 Phone 317,867.2880 I Fax 317.867.2888 y.lww. ThfAJLd~lsonCQ[Qoratjgl1..\';.Qm From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Tuesday, September 25, 2007 9:42 AM To: Darlene Lorenz Cc: Stacey A. Fouts; Jim Anderson Subject: RE: Village on the Manon Yes, if you can get the mylar and two paper copies to Lise with the changes that Matt Griffin asked for a while ago, we can probably get this signed tomorrow (Wednesday).and then we can run it down to the engineering office (dick hill) to be placed on the bpw agenda. Please make sure the owner has signed the plat before submitting it to our office. Angie Conn, Planning Administrator Dept. of Community Services - Planning & Zoning 1 Civic Square. 3rd Floor City of Carmel, IN 46032 p.317-571-2417 f.317-571-2426 aconn@carmel.in,gov From: Darlene Lorenz [mailto:dlorenz@theandersoncorporation.com] Sent: Tuesday, September 25, 2007 8:54 AM To: Conn, Angelina V Cc: 'Stacey A. Fouts'; 'Jim Anderson' Subject: Village on the Manon Hi Angie, I understand that the Secondary Plat for Village on the Monon has not yet been submitted to the Department of Community Services. Is it still possible to get tbis to you in time to be on the October 3 BPWS agenda? I appreciate your input. - Darlene Lorenz From: Hill, Dick B [mailto:DHill@carmel.in.gov] Sent: Tuesday, September 25, 20078:31 AM To: Darlene Lorenz 10/812007 Page 2 of2 Subject: RE: Village on the Manon Believe you need to send the mylar and 3~paper copies to Angie Conn of OUT Department of Community Services. Suggest you call Angie to confiml (571-2417). After their review, approval and signature, the mylar comes to om Department and we place it on the BPWS for approval. After Board approval you w~iJ] be able to record the plat. 1 will need a 1etterrequesting Board approval of the plat The Board meets on the 1 st and 3rd Wednesdays of each month. 'I'here is a meeting scheduled for October 3 but the deadline [or submissions is tomorrow at 4:00. The next available meeting is October 17 and the submission deadline is October 10. Need to provide DOCS witb the plat to gi ve them sufficient rime to review and approve before the submission deadHne, From: Darlene Lorenz [mailto:dlorenz@theandersancarporation.com] Sent: Tuesday, September 2.5, 2007 7:43 AM To: Hill, Dick B Cc: 'Jim Anderson' Subject: RE: Village on the Manon Hi Dick, Thanks for the update ... can you please tell me \'\'hat I call do on OUI end to help obtain DPWS approval? Darlene Lorenz THE Ar~DERSON CORPORATION 301 S. Union Street I Westfield, IN 46074 Phone 317,867,2880 I Fax 317.867.2888 '!:!.,!!W. TheA nde rSQnC:;9J:Qora1iQ~CQm -'''''''''''''''''='~~~~~'''''~~~.''''_'''-'''_~~~''''~M'~~~,__"O",''''''=.~'~=n""...." From: Hill, Dick B [mailto:DHill@carmel.in.gav] Sent: Monday, September 2.4, 2.007 2:57 PM To: dJorenz@theandersoncorporation.com Subject: Village on the Monon Darlene, I don't know where you are in the building process but just a reminder that according to my records, the secondary plat hasn't received BPWS approval and that will be required for building permits. Thanks. 10/812007 )lr EL l;s R'tCH\lEU -....... ~~'i\ 'r: '. .~. - uOCS _ ; ~;:~ /' >~! :;- -:-: _ .;.::2 :'('" _ April 23, 2007 JAMES BRAINARD, .MAYOR Mr. Brent White DeBoy Land Development Services 501 South 91h Street, Suite 100 Noblesville, IN 46060 o~ a ~ 60\ e ~ p RE: Village on the Monon construction plans-Project Review #5 Dear Mr. White: The City has received your comment letter and drawings dated April 6, 2007 based upon the City review of April 2, 2007. The comments from the previous City reviews have been satisfactorily addressed with the following exceptions : 12. Please provide a typical cross.section for Rohrer Road and a separate typical cross-section for the interior streets. Each cross-section should show features such as the pavement centerline, edge of pavement, curbs, widening, auxiliary lanes, sidewalks, subsurface drains, and right-of-way lines. All features must be dimensioned. Tbank you for making tbe revisions on the drawings submitted for approval. Please revise typo "varies 1.4' - 4.2' widening" to read! "varies 3.4' - 4.2' widening." Please delete the "Oscar Lane & Jeffery Court typical cross.sedions" detail and replace with tbe attached PDF. 20. Sheet C2.1/Note 2 should be added next to the right-of-way pavement text in the legend and a different hatch should be used from the local street hatching. Should also reference Rohrer Road pavement section on Sheet CIO.O. Tbank you for revising this note. However, this note is still on Sheet Cl.t. The City requests, again to please revise to read as on Sheet C2.0. These comments represent the Department of Engineerlng's fifth review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. If you have questions, please call me at 571-2441. DEPARTMENT OF ENGINEERING ONE Crvlc SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 E~"'IL engineering@carmelingov .. cc: Matt Griffin, Department of Community Services John Duffy, Cannel Utilities Paul Pace, Cannel Utilities Paul Arnone, Cannel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers Jim Anderson Project File Engineering Department Review S:\DHILL\PROJREV07\VILLAGEONTHEMONONPRIMARYPLA T#5 Ii. 000200 I ~ 5;P January 19,2007 JAMES BRAINARD, MAYOR '-'--:1 i :-~._ \ \J~:"'U'J ' ;: ~y -...~ / ;, ",' A. . . / 4\' ~..)11 :--1 I?tCtI/lP/) \(.:,. JjJ. cJ.; \ W<22flOl /JOes I J,-. (. ).' Mr. Brent White DeBoy Land Development Services 501 South 9th Street, Suite 100 Noblesville, IN 46060 ~'oo..: Q'" / , . . Il>~ ;{, '" ~. .'7f , :. ~~__ \ I '_ RE: Village on the Monon construction plans-Project Review#:2 Dear Mr. White: The City has received your revised drawings dated December 15,2006 based upon the City review of May 26,2006. The City did not receive written responses to our previous comments. The comments from the previous City reviews have been satisfactorily addressed with the following exceptions: 1. There is not enough information to tell whether or not the geometry at the entrance is correct. Needed dimensions include the width of the existing Rohrer Road pavement, the distance from the existing pavement centerline to the existing edge of pavement, the width of the proposed widening, and the widths of the auxiliary lanes. Please indicate and label the length of the median island. 2. Please add an Asphalt Path Detail that requires 1 inch HMA # 11 surface on 2 inches HMA #8 binder on 5 inches #53 stone if the proposed multi-use paths will not be concrete. You previously stated that five-root wide sidewalks would be provided. Six-foot walk is now indicated along Rohrer Road. Please confirm that DOCS is acceptable to a 6-root walk. 3. The Department will expect mounding or a guardrail adjacent to the pond where the minimum pond setback from the right-of-way is not provided. Please refer to the Stormwater Technical Standards Manual. 4. Please formalize any commitments for the thoroughfare plan or other improvements to the Rohrer Road right-of-way with the Department of Community Servi.ces. 5. Please provide a maintenance of traffic plan. 6. If off-site easements will be necessary to install the utilities, these easements must be secured prior to the Department ofEngine~ing approving the drawings. 7. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made prior to approval of the construction plans. 8. The City has adopted a new curbing policy. Please revise any notes, specification, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. 9. This development will be subject to the drainage ordinance adopted February 6, 2006 by the City of Cannel. 10. As we have discussed and as indicated on the preliminary plat, the drainage system will discharge to the manhole at the northeast comer of Rohrer Meadows. As we have discussed, the construction drawings will need to indicate an overland flow route of the pond overflow. This overflow may go eaStto the Monon provided that the existing culvert under Rohrer is appropriately sized and reconstructed ifit is not. If the overland flow path will go to the south, the ~ DEPARTMENT OF ENGINEERING ONE CIVIC SQUAHE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@caflTlel.in.gov ~<t; entire path must be indicated to an adequate outfall. The flow path must be adequate to convey the water. 11. Please replace the CONCRETE STRAIGHT CURB DETAIL on Sheet C I 0 with the City of Carmel standard. Where does this apply? Not indicated in legend on C2.0. 12. Please provide a typical cross-section for Rohrer Road and a separate typical cross-section for the interior streets. Each cross-section should show features such as the pavement centerline, edge of pavement, curbs, widening, auxiliary lanes, sidewalks, subsurface drains, and right-of-way lines. All features must be dimensioned. 13. Sheets C4.I, C4.2, C4.3, and C4.4/ Please add a general note that states "WHERE REFERENCED, GRANULAR BACKFILL SHALL CONFORM TO CITY BACKFILL MATERIAL AND PLACEMENT REQUIREMENTS." 14. Where does integral walk and curb detail on Sheet CI0.0 apply? 15. Delete 24" curb and gutter detail on Sheet CIO.O. 16. 5'-0" concrete walk shall be City standard detail. 17. Delete subsurface drain detail from Sheet CIO.L 18. Please indicate separate ADA ramps at the intersection of Jeffrey Court and Oscar Lane. The ramps shall be set back from the intersection and shall direct people perpendicularly to the street. There shall be a total of six ramps. 19. All ADA ramps shall include 1" ribbing on the ramps. 20. Sheet C2 . I /Note 2 should be added next to the right-of-way pavement text in the legend and a different hatch should be used from the local street hatching. Should also reference Rohrer Road pavement section on Sheet CIO.O. 21. Revise sanitary sewer trench and bedding details and plastic pipe trench details to conform to City backfill policy for the portions of these installations within the right-of-way. 22. Replace RCP trench details with City standard details. 23. Site notes on Sheets C2.2 and C2.3 reference Noblesville. 24. Grading Note 6: "Engineered granular material" shall read ..Engineered granular material meeting the material and placement requirements of the City." 25. Delete Utility Note 6. 26. Utility Note 12 needs to be revised to require material and placement to conform with City backfill specifications. 27. Will structures 15 and 16 conflict with future driveways since they are at the property lines? Sheet C9.0 28. General Note 4: Revise to require backfill materials and placement to conform to City backfill policy within the right-of-way. 29. Add City backfill and cover policies. 30. Delete "curb" from "concrete curb and walks." Curb must meet curbing policy. 31. Utilities Note 3. Revise to require backfill materials and placement to conform to City backfill policy. 32. Utilities Note I. Revise Indianapolis Water Company to City of Cannel. 33. Sanitary Sewer Specifications Note 7. Revise to require backfill materials and placement to conform to City backfill policy. 34. Parking Lot Striping - There are no parking areas on site. Is this necessary? 35. Storm Sewer Specifications Note 2 - ensure this language meets City standards. 36. Storm Sewer Specifications Note 3 - Revise to require backfill materials and placement to conform to City backfill policy. 37. Storm Sewer Specification Note 4 - ensure these notes agree with details and City standards. 38. Storm Sewer Specification Note 6 - ensure that this meets City cover standards. These comments represent the Department of Engineering's second review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. .r i It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. If you have questions, please call me at 571-244]. cc: Matt Griffin, Department of Community Services John Duffy, Cannel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers Phillip & David Stewart Project File Engineering Department Review S:\DHILL\PROJREV06\VILLAGEONTHEMONONPRIMARYPLA T#4 10/27/2005 Sg:47 317775%28 HAMILTON CD SURVEYOR PAGE 01/03 " :Kentart C. 'u"ara, Sunrry.rnr "r/imH' (31.7) 77L".'\4~1S '7=11;:; (517! 77t':;.,~'~2& Suilr 7$8 Oill' .:Hllmi/lml Comllf' 5q1llJl'/: .'I'(Ib1c::I'fllc.l1rdir/"'1 4(;(10(1.12)1' '" October 26~ 2006 DeBoy Land Development Services, Inc. ATTN: Brent White 501 South 9th Street, Suite 100 NoblesviHe, IN 46060 VIA FACSIMILE: 770-1821 RE: Village on the Monon Dear Mr, Robrns: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Offil;:e on October 4, 2006, for this proje<:t and have the following comments: 1. The proposed project falls in the incorporated area. and MS4 jurisdiction of the City ofCwmel 2. The proposed project DOES NOT fall in a Cannel Wellhead Protection Zone, 3. The proposed project is surrounded by the Hunters Creek South Drain and the Hunters Creek Village Drain. 4. The proposed project will be a Hamilton County Regulated Drain Subdivision. 5. Please submit the following procedural items to this office, petition for regulated drain subdivision, non-enforcement request, outlet permi~ and en.gineer'S estimate for the reconstruction. Bonds for 120% ofreconstlUction cost will need to be posted before :final approval on the plans. The applications are available on our website at httD:llwww.co.hamilton..in.us. go to Departments, Surveyor, and Drainage Permits. 18/27/2885 89:47 3177759528 HAMILTON CO SURVEYOR PAGE 82/83 6. In review the as-built drawings (or Rohrer Meadows Section 1B, it appears your discruu-ge point has an invert elevation of 852.47. I hope that you have a field verified invert. elevation and that oW" as-built drawings are WI'Qng, or this site will require some redesign. Some options appear to exist that a site outlet point of approximately 849.60 could be achieved but it would require some off-site reconstruction of a regulated drain. 7. Please label pipe: sizes, lengths, and materials on the site utility plan. 8. The HCSTSM requires 50' of separation between the ROWand the TOB of a detention basin. Since this is not po&sible at this stage of the project design, please look into one of the other acceptable alternatives like a berm orbol1ards of some type. 9. The HCSTSM requires IS' easement from the TOB of a detention basin or the conunon area be d.edicated as easement. If you draw an easement 15' from the 854 contour line. it appears some:: side yard and rear yard easements will be required on lots 1,2, and maybe 3. 10. The existing culvert under Rohrer Road will need to be addressed because of the accelJdecaI lanes. I would recommend extending the culvert and utilizing it as the emergency overflow routing, but it may conflict with the SSD along the road should~r, 1 J. Please show an emergency spillway from the detention basin. including eross- section i1.11d spot elevation. Also show the emergency flood routing for the pond overflow to a loe.ation of positive off-site discharge. 12. The location ofthe Mechanical BMP structure (St!. #2) does not conform to the requirements. Any mechanical BMP should be located upstream oithe detention pond, as they are more effective treating the runoff before it get to the pond. rather then the entire discharge from the pond. A good location for this ap:Pe~ to be Stt. #11. but HCSOwill require it to be within 15' of the back ofeurb for maintenance access. 13. HCSO will require 2' sumps in the following Structures: 6, 14, 17, and 20. These will need to be a minimwn off48" manhole with steps all the way to the bottom of the sump structure. Note, if the mechanical BMP is moved to Str. 11, the sump will not be required in St(. 14, 17, and 20, but will still be required in Str. 6. 14. Th.e site has areas of direct discharge or areas that no drainage improvements are being installed. ] am assuming this is because of tree preservation areas. FOT tbe record. these areas could. and probably will, have poor drainage and standing water issues in the future. 15. Please ineIude all applicable HCSO Standard Details in the construction plans. 10/27/2006 09:47 3177759628 HAMILTON CO SURVEYOR PAGE 03/03 16. Please provide a wpy of the landscape plans and secondary plans for review by HCSO. 17. Please note that further comments may be necessary at a later date. Should you have any questions; I can be reached at 317-776-8495. Sincerely, ,~~ Greg Hoye$, AC, eFM Plan Reviewer cc: Matt Griffin - Cannel DOeD Amanda Foley - Cannel Engineering Dick Hill - Cannel Engineering Joel Thurman - HeHD Greg Ilko . Crossroads Engineering John Edwards - Langston Development Jim Anderson - Anderson Corp. u U.;rril~Ol(jt5T~$P ;3. . ,~..-=-- ~ .------ ~_.>--~-- October 10,2006 Mr. Brent White, E.I.,S.I.T. Michael DeBoy Land Development Services, Inc. 501 South 9tl] Street, Suite 100 Noblesville, Indiana 46060 RE: Village on the Monon Dear Mr. White: The Engineering Department has received your commenlletter and drawings dated October 2, 2006 based upon the stormwater quality review comments of September 27,2006. These comments have been satisfactorily addressed. Please submit a City ofCarmcl Stormwater Mangement Permit application and an owner acknowledgement agreement to our office for final approval along with the following bond requirement: BONDING REQUIREMENTS 1. The following bonding requirements apply to this project: Performance Guarantees An Erosion and Sediment Control Performance Guarantee is needed for this project. It is critical that this office be made aware of all modifications made on these plans, particularly if any such changes are considered "new" or fall outside of om previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval. Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. Approval from the Engineering Department is required before a City of Carmel Storm water Management Permit can be issued. \Vork on site shall not conm1ence until a City of Carmel Stormwater Management Permit is isslIed. If you have questions, please contact the Engineering Department at 571-2441. Sincerely, Amanda Foley Storm Water Administrator Department of Engineering cc: Matt Griffin Project File ; \ ; \ . ~-.{~D~~~/'/' City of Carmel via email: mld@deboyland.com Original by mail October 10, 2006 Mike DeBoy 501 S. 9th Street Suite 100 Noblesville, IN 46060 COpy RE: Village on the Monon (06080018 SP) Dear Mr. DeBoy: This letter is in response to your secondary plat application for Village on the Monon. Please make the tollowing revisions to the submitted plat: 1. Add the Source of Title Instrument Number. 2. Add the Primary Plat Docket Number (06030005 PP) and the Secondary Plat Docket Number (06080018 SP). 3. Add the phone number of the Subdivider. 4. Identify and label all easements (tree preservation, landscape, drainage, utility, etc.). There should be easements within the identified common areas as well - to provide access to the pond perimeter, and also identify the tree preservation/landscape easements. 5. Please label or remove the series of dashed lines on the south west comer of the plat. 6. Please add concrete monuments at the NE and SE subdivision corners (at the right of way). Once all required changes have been made and comments addressed, please produce a Mylar copy (with owner's signature) tor signature by this Department. Two paper copies of the plat must be filed with the Mylar prior to recording. A digital version, three paper copies, and a Mylar of the recorded plat must be submitted following recordation. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. If you have any questions regarding these comments please feel free to call. ~\,\/j , l~kl~i~ Planning Administrator 06080018 sr Village on the Manon Page 1 ONE crV1C SQUARE CAR1.vlEL, INDIANA 46032 317/571-2417 C1QoStrJIQ Sf CI EL August 10, 2006 JAMES BRAINARD, MAYOR \,'"'1\ . ..' .~ ., 't\:~. .' ~, . , . Mr. Mike DeBoy DeBoy Land Development Services 50 I South 91h Street, Suite 100 Noblesville, IN 46060 ... ....... ... ~ U'\J\"<.! RE: Village on the Monon Construction Drawings-Project Review #1 Dear Mr. DeBoy: The City has received your comment letter and drawings dated August 4. 2006, which were submitted for the August 16,2006 TAC meeting. The Department previously reviewed drawings that were submitted on June 26, 2006 and then received this revised set prior to issuance ofthe letter. We assume that the August 4, 2006 submittal was Secondary Plat/Construction Drawings for review; although the title sheet is labeled "Primary Plat." The submittal plans are of poor quality and are difficult to read and review. Also, the improvements are not indicated consistently throughout the differing sheets in the plan set. We request an updated set of plans for review and comment. If you have questions, please call me at 571-2441. cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers Phillip & David Stewart Project.File Engineering Department Review S:\DHILL\PROJREY06\VILLAGEONTIIEMONONCONSTRUCTIONORA WINOS# I DEPARTMENT OF ENGINEElUNG ONE CiVIC SQUARE, CARMEL, IN 46032 OFfiCE 317.571.2441 FAX 317.571.2439 EMAIL engineering@carmel.ingov :~:_,6[Qo~~~oo'"~-~{ 511/ August 9, 2006 Kevin Roberts DeBoy Land Development Services, Inc. 501 South 9th Street, Suite 100 Noblesville, IN 46060 RE: Project Review IT AC Village on the Manon Dear Mr. Roberts: The information for the above-referenced project has been reviewed. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully. ~ D.-I~ Michael D. Fogarty Chief of Police MDF:vb -" Y', \pl"" . '.. '~''';{.:r}I-~.~~'~~/c~ ) "/',I""(""'il,,"': , -{' . , 'r' ,'-' j cr.o'\ " l-W 5 1_, ::::::;:. <", "ro ':rJ 1:W :::'< c..~ ~S l...w r. r-...;..." cc: I'Dept. of Community Services \317) S71~2500 ~,? .~:t~ ._, A Nationally AccreditE1,O ,.filtorcement Agency ~,~;.'t::t:tihS,1~f~,:\'o Fn (3~ 7~ 571-2512 u u 1'(\-'I'r;{)17 1)6 1 't~''P:~). U"~.:-Vi-~:':"--~-'-=-- -- .'-. - _ 'J6!. ..; September 27,2006 Mr. Kevin Roberts Michael DeBoy Land Development Services, Inc. 501 South 9th Street, Suite 100 Noblesville, Indiana 46060 RE: Village on the Monon Dear Mr. Roberts: The Engineering Department has received your comment letter and drawings dated September 13,2006 based upon the stormwater quality review comments of August 11, 2006. These conmlents have been satisfactorily addressed with the following exceptions: BONDING REQUIREMENTS 1. The following bonding requirements apply to this project: Performance Guarantees An Erosion and Sedinient Control Perfonnance GuaTantee is needed f01 this project. STORMW A TER QUALITY REVIEW COMMENTS-CONSTRUCTION PLANS The following items of the storm water pollution prevention plan have not been satisfied: B2. Sequence describing storm water quality measure implementation relative to land disturbing activities Include a regular street sweeping schedule. Rear-yard swales and the pond should be stabilized with erosion control blankets and seeded as soon as they are built. Silt fence should be installed around all of the rear-yard swales before home constmction begins. lnclude information regarding handling the tree preservation areas. BIS. Erosion and sediment control specifications for individual lots Refer to the City ofCarIllel Stormwater Teclmical Standards Manual Chapter GOO. Specify that streets along lot frontage shall be cleaned at the end of every work day. Perimeter protection should be installed before excavation of basement/foundation has begun. Perimeter protection on lots shall remain in place until the lot is stabilized with at least 70% cover. All trash and construction debris shall be disposed properly into an enclosed Waste receptacle. C4. Location, dimensions, specifications, and construction details of each storm water quality measure. Include the calculations for the selection of the Aquaswirl unit. Change the note in the plans from sheet 7.0 to 10.0. If the pond is to be lIsed as one of the two required water quality BMPs, refer to the City of Carmel Stormwater Techncial Standards Manual Chapter 700 for design requirements. Items to consider include short-circuiting iil the pond, pond depth, and pond plantings. CS. Description of maintenance guidelines for post construction storm water quality measures ,,' ,~ u u An O&M manual specifying information regarding maintenance of both of the water quality BMPs is needed. An owner acknowledgement agreement for the BMPs has been included and sholdd be completed and submitted with the O&M manual. We request that all responses to oOr comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. All bonds and performance guarantees (if required) must be posted priorto Engineering Department approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Deparmlent ofEnglneering reserves the right to provide additional eonmlents based on subsequent revIews. If you have questions, please contact the Engineering Department at 571-2441. S incerel y , Amanda Foley Storm Water Administrator Department of Engineering ee: Matt Griffin Project File :-~ u unWD~c-eGi8b---CS~)f2 J d- September 15, 2006 Mr. Ed Fleming Stoeppelwelth & Associates, Inc. 9940 Allisonville Road Fishers, IN 46038-20OS RE: Lakeside Park Subdivision, Section 6 Dear Mr. Fleming: The following lctter represents comments from the Engineering Department for this project specifically addressing the areas of storm water quality. We have reviewed the construction drawings submitted for this project for the September 20, 2006 Technical Advisory Committee meeting and offer the following conm1ents: BONDING REQUIREMENTS 1. The following bonding requirements apply to this project: Performance Guarantees An Erosion and Sediment Control Perfonnallce Guarantee is needed for this project. STORMW ATER QUALITY REVIEW COMMENTS-CONSTRUCtIoN PLANS The following items of the storm water pollution prevention plan have not been satisfied: AIS. Soils map including soil descriptions and limitations Need better deseriptiQl)s and limitations. H2. Sequence describing storm watcr quality measure implementation relative to land disturbing activities A drawing demonstrating measmes needed during grading and a drawing demonstrating measures needed after streets and utilities are in and homes are being constructed would be preferable to "Temporary" and "Permanent" sheets cunently included. The sequences on C300 and C3Q2 should match. Change all references of the Hamilton County Soil and Water Conservation District to the City of Carmel. The referenced filters and traps are not shown in the plans. Include building and home construction. Rear-yard swales and the pond should be stabllized with erosion control blankets and seeded as soon as they are built. Silt fence should be installed around all of the rear-yard swales before home construction begins. All permanent BMPs should be cleaned at the end of construction of homes in the subdivision. B6. Sediment control measures for storm sewer inlet protection The City of Carmel prefers inlet protection to be either a catch basin insert or a lllat fastened to the grate, but allowing an overflow. BI0. Location, dimensions, specifications, and construction details of each stormwater quality measure Include a detail for the construction entrance. u u B14. Monitoring and maintenance guidelincs for each proposed stormwater quality measure Locations for the referenced sediment trap and sediment basin are not shown in the plans. Include a regular street sweeping schedule. HIS. Erosion and sediment control specifications for individual building lots Specify that streets along lot frontage shall be cleaned at the end of every work day. Perimeter protection should be installed before excavation of basement/foundation has begun. Perimeter protection on lots shall remain in place until the lot is stabilized with at least 70% cover. All trash and constmction debris shall be disposed properly into an enclosed waste receptacle. The following items addressing post construction water quality have not been addressed. These items should be specific to this project. C2. Sequence describing stormwater quality me.lsure implementation C3. Description of proposed post construction stormwater quality measures All stormwatcr leaving a site, post construction, shall be treated by at least two BMPs. Refer to Chapter 700 of the City of Cam1el Stormwater Technical Standards Manual for details. There are guidelines for certain BMPs to be considered for water quality purposes. If the landscaping is to serve as a water quality BMF for this project, a detailed explanation of how the plants and design selected are in excess of that required by Scott Brewer and how these plants and landscape plan will reduce runoff and enhance post constmction stormwater quality. C4. Location dimensions, specifications, and construction details of each stormwater quality Ineasure C5. Description of maintenance guidelines for post construction storm water quality measurcs An O&M manual specifying information regarding maintenance of ALL of the water quality BMPs is needed. An owner acknowledgement agreement for the BMPs has been included and should be completed and submitted with the O&M manual. We request that all responses to our eormnents be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. All bonds and performance guarantees (if required) must be posted prior to Engineering Department approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department of Engineering reserves the right to provide additional cormnents based on subsequent reVIews. If you have questions, please contact the Engineering Department at 571-2441. Sincerely, Amanda Foley Storm Water Administrator Depanment of Engineering cc: Matt Griffin Project File