Loading...
HomeMy WebLinkAboutCorrespondence TAC CI EL 4A _ ': <6; ) ,". ~ RECEIVED t .. 4IJG 2 f 2007 \:~c lJoes August 16, 2007 Mr. Michael L. DeBoy DeBoy Land Development Services 50 I South cjh Street, Suite 100 Noblesville, IN 46060 ]AM:ES BRAINARD, MAYOR RE: Forestal Estates - Project Review ##1 Dear Mr. DeBoy: We have reviewed the.siteconstruction plans submitted for review at the lune 20, 2007 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION 1. These comments represent the Department of Engineering's ~ review of the construction plans for this project. 2. We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay oftbe review process. 3. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of c>urprevious reviews. Please notify us of any changes and specifically state any changes, including clumges resu1tingfrom Plan Commission, BZA or other committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. !fyou have not already done so. please provide a set of drainage plans and calculations to their office for review. We will share Crossroad's comments as they are received. 5. FiDaI drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off-site easements necessary to install utilities to serve.tbe development are secured. e. Digital tiles have been submitted. f. Water and Sanitary Sewer availability fees have been paid. 6. The Department reserves tbe right to provide additional comments based upon subsequent reviews. 7. An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. 8. An approved right-of~way penn it is required prior to commencing any work in the public right-of~ way. 9. Ifit will be necessary to relocate existing utilities, the cost for such relocation shall be borne solely by the Developer. If utility poles must be relocated, they must be relocated to within one foot of the proposed right-of-way. 10 The Department requires that the construction drnwings be developed in accordance with the City of Carmel digital submission standards and that aU required submittals for primary plat, secondary plat, and constnJction drawings be made. The digital files must be submitted to the Department of DEI'AlITMENT OF ENGINEERrNG ONE CIVIC SQUAI(E, CARMEl, IN 46032 OFFICE 317.571.2441 FA.\ 317.571.2439 EMAIL engineering@carmdin.gov Mr. Michael L. DeBoy August 16, 2007 Forestal Estates - Project Review #1 Page 2 of7 Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 11. Jwisdictions: a. The project site is located within current City of Carmel Corporate Limits. b. Streets and Right of Way - City of Carmel (l411t Street, Ditch Road) c. Water - City of Cannel Utilities d. Sanitary Sewers - Clay Township Regional Waste District e. Storm SewerslDrainage - City of Carmel \ Hamilton County Surveyors Office f. Legal Drains - Hamilton County Surveyor's Office. 12. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for fmal approval. b. If dual jurisdiction of the City of Carmel and the Hamilton County Surveyor's Office is required for this project, a minimum of eight-sets of drawings will be required for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and Director of Cannel Utilities. The 8-sets are then delivered to the Hamilton County Surveyor for approval. The Owner will receive three-sets, one of which is to be maintained on the construction site at all times. The City of Cannel will receive three- sets and the Hamilton County Surveyor will retain two-sets. 13. Cannel Utilities will provide a separate review ofwatet issues. If you have not already done so, please provide the construction plans to their office for review: Paul Pace Carmel Utilities Water Distribution 3450 West 13151 Street Westfield, IN 46074 14. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 15. The following items wiD be provided as the approval process advances for this project: a. Project Approval Checklist b. PerformancelMaintenance Guarantee Requirements c. PerfonnancelMaintenance Guarantee Release Procedure d. Engineering Requirements for Building Permit approval e. StreetSignage f. Utility Jurisdiction/Other Miscellaneous g. Schedule for Board of Public Works and Safety meetings BOARD OF PUBLIC WORKS AND SAFETY 16. Please use the Engineering Department deadlines for submissions to the Board. 17. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals (if applicable) and completion of ll'eview by the Technical Advisory Committee. All written requests to be.,placed on the Board's agenda must include the appropriate Docket Number and tbe date (or dates) of approval by the Plan Commission andlor the Board of Zoning Appeals (if applicable). 18. Water Availability approval from the Board is based upon the total number of single family residential units. Reference item #35-37 below for a more detailed explanation. 19. If a community swimming pool, community clubhouse or community bathhouse is planned for this development; additional Water and Sanitary Sewer Availability approval from the Board will be required. 20. If an entryway irrigation system or other community irrigation systems are planned for this development, additional Water Availability approval from the Board will be required. 21. Commercial Curb Cut Approval - This approval will be required for any residential driveways to be located on either 14] II Street or on Ditch Road. If a variance is not obtained for a frontage place, the Department requests a cul-de-sac be constructed to serve the development rather than a frontage place. If a proper variance for access is obtained, the Department will only support two ,., Mr; Michael L. DeBoy August 16,2007 Forestal Estates - Project Review #1 Page 3 of7 drive cuts. One on Ditch Road at the northern property line and one on 141 It Street at the eastern property line. One will need to serve two lots, A cut on 141 sl Street may not be provided full access in the future. Provide a letter to this office requesting BPWS Commercial Curb Cut approval. Provide an 8 Yz x 11 exWbit or exhibits detailing the requested curb cut(s) with all appropriate dimensional data including width, radii, auxiliary lane dimensions, existing and opposing streets or drives, etc.. 22. Temporary Construction Entrance approval if the location is at a site other than the location of the proposed pennanent entrance to the development. Submission requirements are the same as for commercial curb cut. 23. The installation of any permanent, privately o\Vlled and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc.) within platted or dedicated right of way or platted or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. The Board of Public Works and Safety executes such agreements. The City Engineer may approve irrigation system agreements. 24. Secondary Plat approval ifapplicable. a. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. 25. Dedication of Right of Way if not platted. 26. Are any open pavement cuts of 141 Sf Street or Ditch Road required to provide sanitary, water, storm, CATV, electric, telephone service to the development or to each lot? Open pavement cuts must be indicated on the plans and requiTe BPW &S approval. BONDING REQUIREMENTS 27. There is not enough infonnation on the submitted plans to make an accurate determination of Performance Guarantee requirements. A typical subdivision would be required to provide Performance Guarantees for the following: a. Streets (base, binder and surface must be bonded together) b. Curb & Gutters c. Water Mains d. Street Signs. e. Storm SewersIDrainage (could be Hamilton COWlty Surveyor jurisdiction) f. Monuments and Markers (could be Hamilton County Surveyor jurisdiction) g. Interior Sidewalks (builder's lot right of way sidewalks). h. Exterior Sidewalks (common area/perimeter road right of way sidewalks/asphalt paths). i. Right of Way Improvements may be bonded separately. This could include acceleration/deceleration lanes, passing blister, pavement widening, thennoplastic striping, stone shoulders, curbs, etc. if applicable. j. Erosion and Sediment Control and Stonn Water Quality. Please contact Amanda Foley, Engineering Department Stormwater Administrator, for details regarding engineer's estimates/performance guarantee requirements for these items. 28. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities; unit costs, pipe sizes and materials, etc. 29. Upon completion and release of individual Perfonnance Guarantees, a three.year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. 30. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. 31. Please reference the enclosures for more detailed explanation of our procedures. Mr. Michael L. DeBoy August 16, 2007 Forestal Estates - Project Review #1 Page 4 of7 RIGHT OF WAY PERMIT AND BONDING 32. Any work in the dedicated right of way of 141 or Street andlor Ditch Road will require an approved Right of Way Permit and a License & Permit Bond. 33. The bond amountis detennined by the number of instances of work in the right of way at $2,000.00 per instance. However, if the work is included in the scope of work ofa required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of Way Permit. 34. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way pennitting and bonding. AVAILABILITY AND CONNECTION FEES 35. The Availability and Connections Fees are current as of this date but are subjectto future revisions and are as follows: a. Water Availability (acreage) Fee = $1,010.00 per acre plus $300.00 Development Application Review Fee (effective 712/07). b. Water Connection Fee = $1,310.00/1.0 EDU + $86.00/1.0 EDD Tap Inspection Fee (effective 712/07) totaling $1,396.00/1.0 EDU. 36. Availability (acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to approval and start of constroction activities. Availability Fees are based upon total platted acreage or legal description acreage for the development. Based upon the indicated acreage on Sheet CI.O, the following Availability Fees would apply: a. Water- 2.328A @ $1,010.00/A = $2,351.28 + $300.00 = $2,651.28 b. Connection Fees are paid when the infrastructure has been completed, satisfactory test results obtained and the development has been released for building pennits. Connection Fees are paid on an individual buildingllot basis. Based on the drawings submitted, there appear to be 3- residential dwellingsllots. 37. If an entryway irrigation system or other community irrigation system is planned for this development, additional Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. CONSTRUCTION DRAWING REVIEW COMMENTS 38. General Comments a. If existing off-site easements are being utilized for the installation of various utilities to serve the site, please confirm that aU utilities that will serve this site are public utilities and not service laterals.. b. This project is subject to the Stonnwater Management Ordinance, which was adopted February 6,2006. c. Please contact Amanda Foley to review storm water quality/treatment requirements. d. Please add a note to all appropriate sheets that no earth disturbing activity may commence without an approved storm water management permit. e. Please include the summary drainage information required by Section 100 of the Stormwater Technical Standards Manual on the appropriate sheet. f. Please verity that no drainage and utility easements overlap tree preservation or landscaping easements. g. The drawings shall reflect all improvements that were included in the City's reconstruction of Ditch Road and construction of the roundabout including curbs, sidewalks/asphalt paths, medians, storm sewer manholes, curb inlets and pipes, and any other buried utilities. h. The City has adopted a new paving policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. i. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. Mr. Michael L. DeBoy August 16,2007 Forestal Estates - Project Review #1 Page 5 of? j. Please indicate why a variance is being sought for the frontage place requirements and why a cul-de-sac was not considered. Ie. The Department will not support the subdivision waiver request and will reconunenda cul-de- sac to the Plan Commission. 39. Sheet CS a. This name of this project was spelled Forestal on the T.A.C. agenda and on your transmittal sheet. It is spelled Forstal on the construction plans. Which is correct? b. The Department assumes Lot 31 is a typographical error on this and all sheets. c. Sheet List Table. Sheets C4.0 and C5.0 are not included in the list and were not included with the submittal. Sheet C3.0, Site Grading and Utility Plan was omitted from the plans submitted to this office for review. d. Please remove tree symbols from the proposed site plan. e. Please identify and label141st Street on the proposed site plan. 40. Sheet Cl.O a. Identify and label 141 st Street on the proposed site plan. b. There is a demolition legend but none of the symbols in the legend are indicated on the drawing. c. The Department assumes the existing drive to lot 31 will be eliminated. If this drive is to be eliminated., the portion of the drive in the right-of..way shall be removed in accordance with Carmel City code section 227(h)(1O). The existing depressed curb shall be removed to the nearest joint and replaced with City standard chairback curb. If this cut wiII continue to be utilized, it shall be brought to current City standards per Cannel City code section 227(h). d. This sheet does not seem to serve any useful purpose. e. Note 13 shall be added that requires connection of any drain tiles encountered during development to a positive outfall. 41. Sheet C2.0 a. Again, the Existing Legend and Abbreviations and the Site Legend seem to serve no useful purpose as none of the symbols are utilized on the sheet. b. Please separate the Landscape Plan from the Site Plan. Do not submit Landscape Plans with construction plans submitted to the Engineering Department for review and approval. We do not have approval authority over landscaping. c. Identify and label 141 sI Street on the plans. d. Identify, label and dimension right of way lines. e. Please add the following note: All paving within the existing and proposed City right-of-way shall conform to the requirements of the Department of Engineering. Contractor shall contact the Department of Engineering to schedule a pre~construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right~of~way. f. The Department understands a variance is being sought from the requirement for a frontage place. The City requests the construction of a cul-de-sac in lieu of a frontage place to serve the development located such that access is as far east on 14151 Street as possible if a variance is not obtained. As the Department expects the 141st Street median to extend to the frrst full access at Cheswick Boulevard in the future, full access to the cul-de-sac cannot be guaranteed by the City. g. Curb return radii of public road approach shall be 40-foot. h. Compliance with the City's Thoroughfare Plan includes construction of half of the improvements prescribed by the Thoroughfare Plan across the frontage. Typically, developers provide the money equal to the value of constructing these improvements to the City for deposit in the City's non-reverting Thoroughfare Plan fund. This applies to the 141st Street and Ditch Road frontages. Mr. Michael L. DeBoy August 16,2007 Forestal Estates - Project Review #1 Page 6 of? i. The Department will not require auxiliary lanes as right-of-way is not likely available to the east. A passing blister is required if adequate right-of-way exists on the south side of 141 Gt Street j. The Department requests widening of the 141sc Street frontage such that a 24-foot wide roadway is provided from a point 160 feet west of east property line to a point 100 feet east of east property line. k. Within the widening limits, City standard gravel shoulder shall be installed on each side of roadway from the end of the curbing of the road project to the eastern limit of widening. 1. Please confirm the existing right-of-way to the parcel to the east to ensure requested widening and 40' curb radii may be constructed. m. 10-foot alternative transportation path is required across each frontage. n. City standard ADA ramps are required where path crosses public street. o. If the existing right-of-way is less than that prescribed by the thoroughfare plan, additional right-of-way shaUbe dedicated to comply with the thoroughfare plan. p. A 45 degree angle right-of-way comer cut shall be provided at the southwest comer. The line of this right-of-way shall be that line perpendicular to a 120' radius from the intersection of the existing centerlines of 14 I Sf Street and Ditch Road. q. The City requests curb from end of road project to the entrance return radii on the north side of the project. r. 5' sidewalk is required on each side of the cul-de-sac. s. The cul-de-sac shall comply with all City standards. t. The City requests full width milling and resurfacing between the limits of the requested widening. 42. Sheet C6.0 a. Identify and label 14151 Street on the plans. b. The temporary construction entrance will require BPWS approval. If a cul-de-sac is installed, the construction entrance, if moved to cul-de-sac location, will not require Board of Public Works and Safety approval. If a cul-de-sac is not constructed, the entrance should be moved to 141st Street due to the median on Ditch Road. c. City ordinances related to protection of and restoration of existing street, walk, path, and curb shall apply to the construction entrance. Please add a note to this affect to this plan. d. The City's storm water quality standards shall apply to this project. This shall include, but by no means be limited to, two BMP's. 43. Grading and Drainage a. A proper grading and drainage plan shall be provided. b. Drainage calculations shall be provided. c. How is the apparent 898 low area at the northeast comer being drained? d. Where does swale at northeast comer go? What is outfa]l? e. The Department will evaluate the need for a piped outfall in lieu of the proposed ditch/surface discharge. f. Are their any direct runoff areas? g. Please indicate how perimeter and offsite drainage is being addressed. h. Rear yard swales require subsurface drains. i. If a regulated subdivision, is access to pond per standards? j. All existing road drainage, culverts, and bridges need to be indicated on the plans. The City may require reconstruction or extension of any existing drainage piping or structures in right- of-way adjacent to development. k. How is roadside drainage maintained? 1. Right-of-way drainage and detention of fully developed right-of-way across each frontage must be provided. Stub piping shall be extended to right-of-way for future connection. m. Please indicate flood route on and off~site to ultimate receiving system. n. Please indicate spillway on pond. Mr. Michael L. DeBoy August 16, 2007 Forestal Estates - Project Review #1 Page 7 of7 o. What is the ultimate drainage outlet? Did downstream system anticipate this concentrated flow? Is there an adequate outfall? 44. Utility plan a. Please indicate existing utilities. b. Please indicate the utility connections and service laterals. c. Is their adequate fire protection? 45. Sheet C7.0 a Please include County standard swale detail in liew of the DeBoy Land Development Services swale section detail. 46. Sheets 9.0, 10.0, and 10. I a. The Department has comments related to this sheet but will issue as a part of the next review. b. Based on if the cul-de-sac is constructed or not, there are numerous details that will need to be added. 47. If a variance is, obtained from the requirements fora frontage place and drive cuts are pursued, the following standards shall apply: a. Access shall be indicated on the plans. b. Per previous comment, the Department will only support two cuts to the BPWS; one on Ditch as far north as possible and one on 14 I st Street,.as Jar ~ast as .possible. One drive will need to serve two lots. It must be acknowledged that a full cut will not be provided off of Ditch and it is not likely that full access will be maintained to 14] st Street cut long term. c. Each cut will require BPWS approval. d. The portion of each drive in the right-or.-way shall be constructed of concrete. e. Existing curb shall be removed to nearest joint for each cut and shall be replaced with City standard depressed curb. Such work shall be indicated on the drawings. f. All existing improvements shall be protected and repaired or restored in accordance with City ordinance. g. Each apron shall conform to all current City standards (dimensions, thickness, etc.). h. Drainage shall be maintained in accordance with City standards. If you have questions, please contact me at 571-2441. Sincerely, Gary R. Assistant ity Engineer Department of Engineering Cc: Angelina Conn, Department of Community Services John Duffy, Director Carmel Utilities Paul Pace, Carmel Utilities Distribution Greg Illm, Crossroad Engineers Greg Hoyes, Hamilton County Surveyor's Office Tim Atkinson, M One Construction Engineering Department Review/File Copy \\Apps2\user data\eng\shared\DHiII\PROJREV07\FORESI ALESI A TESMlNORSUB# I ,doc Page 1 of 1 Conn, Angelina V From: Foley, Amanda J Sent: Wednesday, June 27, 200712:17 PM To: 'Brent A. White' Cc: Duncan, Gary R; Conn, Angelina V; Redden, Nick Subject: Forestal Estates Attachments: SWPPP Plan Requirements.doc Brent, In reviewing the plans for this project which were submitted to me on June 16, I found that the SWPPP is incomplete. Please see the attached SWPPP guidelines and resubmit the plans according to these guidelines. Let me know if you have any questions. Thank you, Amanda Foley Storm Water Administrator City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 (317) 571-2314 (317) 571-2439 (fa.x:) (Thl.r?Y@9.(U:}}1cl.jn,gQY 6/27/2007 , cCJ\JrlC]]]{[:';ltlllC June 18, 2007 1~ RECEIVED JUN 1 9 ,,!,'Yi? DOCS Michael L. DeBoy DeBoy Land Development Services, Inc, 501 South 9th Street, Suite 100 Noblesville, IN 46060 RE: Forestal Estates Project No,: 2007-0043 Dear Mr. DeBoy: The above mentioned project has been received and reviewed. In reviewing the project, it appears that the Vicinity and Location maps are incorrect. I see nothing in the plans that would hamper law enforcement efforts, If we can be of any further assistance to you, please contact us. Respectfully, lJu;c,ACltJ2 JJ . -?:~ Michael D. Fog~~ - J Chief of Police MDF:vb IOept of Community Services cc: (317) 5n-2500 A Nationally Accredit "'k?;;'" v.,^~forcement Agency ~.~i>>;};?<ft'~1~~.,* Faxl3!?) fi71-2512 06/19/2007 15:00 317775%28 H~MILTON CO SURVEYOR PtlGE Ell/02 :-r"~ .Xmtal1 C 'lOard, C'FJv{ SUrJJlj'OI' Of c'l-(clTlriltDll County 'l'(,Olle (:3J7) 7715.$495 'TO.L' (; ~7) 77G"'96~S $11111: h'{lf Oll~ ;Hamiltoll CmlrT~' Sql/ore ;i'..."MC.~lIiUc, Tndla"o 46060-:>.:1.30 June 19, 2007 1\ oW. DeBoy Land Development Services, Inc. ATTN: Mike DeBoy 501 South 91" Street, Suite 100 Noblesville, IN 46060 VIA FACSIMILE: 770-1821 RECEIVED .:1. I 'I ,~'-\~7 DOCS RE: Fontal Estates Dear Mr. DeBoy: We ha.ve reviewed the oonstruction plans submitted to the Hamilton County Surveyor's Office on June 14,2007, for this project and have the following comments: I. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of Carmel. 2. The proposed prOje<:t DOES NOT fall in a Cannel Wellhead Protection Zone. 3. The proposed project falls in the Osborn & Collins Regulated Drain Watershed and drain through the Kingsborough Regulated Drain Watershed. 4. Please submit the following procedural items with the revised oonstruction plans to this oflice,Petition for Regulated Drain. Subdivision, outlet permit to the Kingsborough Drain, subdivision. non-enforcement agreement, engineer's estimatt:, and allassoeiated bonds (storm sewers, SSD, and monumentation) for 120% of construction cost. The applications are available on our website at htt~J:!!www.co.hamilt.)n_in.us. go to Departments~ Surveyor, and Forms. So It appears that the off-site sanitary sewer work will cross or run parallel to parts of the Saddle Creek Regulated Drain. Insufficientinformati.on is given in the plans to make the actual determination, which is why the regulated drain5 should be shown in the construction plans. Once this is done, either a crossing permit and/or utility non-enforcement agreement may be required. 06/19/2007 15:00 317775%28 HAMILTON CO SURVEYOR PAGE 02/02 '" ....~\. 6. Hamilton County Ordinance 4-26-99-C(7)a requires each lot to have access to an adequate outlet for sump pump disc:l:1Jrges. Since this subdivision does not have curbline SSDthat laterals can be install on. then other options need to be explored to come up with adequate approval outlet points. 7. Hamilton County Ordinance 4-2(i~99-C(7)e does not allow dry detention basins to be located on residential lots, which is currently what the construction plans show. The same section of the ordinance also requires SSD under the dry detention basin. Based.OD the current design, as variance from this ordinance will be requinld from the Hamilton County Drainagr; Board. 8. Please label the WSE for the dry dE:tention basin on the construction plans. 9. Please provide a P & P sheet for the storm sewer run.. Please fill ill or correct the data for the storm pipe data table. 10. The as-built drawings for Kingsborough Section 4, on file with HCSO, show the invert of the existing structw"e that this site will connect into as 892.38. This appears. to be slightly higher then design assumptions made for this project. 1 L The developer will be responsible for contacting the Property Owner of Lot 89 in Kingsoorough to negotiate access to the regulated drain. While easement is in place per the secondary plat, HCSO can not "grant" access permission to the property. 12. This site does have a private tile across the site, but it is believed the tile does not extend beyond the limits of the parcel. If1hat is the case, the tile should be crushed across the site so it does not cause future issues for the property owners. 13. The detention pond outlet will need to be constructed out ofRCP, with a concrete end section and trash guard. Also, please mo'Ve the tree at least IS' away from the centerline of the pipe. Please include an appropriate HCSO Standard Details in the construction plans. 14. Please provide a C(lPY of the secondary plat for review by HCSO. 15. Please note that further comments may be necessary a.t a. later date. Should you have any questions, I can be reached at 317.776-8495. cc: Christine BartQn~Holmes - Carmel DOCD, Amanda Poley - Cannel Engineering Dick Hill - Carmel El\gi.neering, Greg Dko - Crossroad Engineers M One Construction - 218.0315 HAMILTON COUNTY HIGHWA Y DEPARTMENT CARMEL T.A.C. AGENDA Date: June 20,2007 From: David Lucas ~ HCHD 9:00 a.m. Docket No~ 07040024 SP: Westmont, Section 1. This project is located outside HCHD jurisdiction. 9:15 a.m. Docket No. 07050005 SU: Pet Angel Memorial Center Crematorium. This project is located outside HCHD jurisdiction. 9:25 a.m. Docket No. 07050012 DP/ADLS: House Investments Office. This project is located outside HCHD jurisdiction. 9:35 a.m. Docket No. 07050012 PP: Forestal Estates Mirior Subdivision. This project is Io"cated outside HCHD jurisdiction. Docket No. 07050019 SW: Access to Collector Roads. This project is located outside HCHD jurisdiction. Docket No. 07050014 SP: Forestal Estates Minor Subdivision. This project is located outside HCHD jurisdiction. 9:50 a.m. Docket No. 07050016 Z: 116th Street Crossing PUD This project is located outside HCHD jurisdiction. 10:05 a.m. Docket No. 07050017 Z: 96th Street Crossing PUD. This department does not have any objections to the rezone. We will proceed with plan review until a decision is reached in the pending annexation. Comments letter attached. 10:20 a.m. Docket No. 07060003 TAC: Opus Landmark at Meridian-Generator. This project is located outside HCHD jurisdiction. 10:30 a.m. Docket No. 07060004 TAC: Midwest 180-701 Building. This project is located outside HCHD jurisdiction. Docket No. 07060005 TAC: Midwest 180-720 Building. This project is located outside HCHD jurisdiction. 10:40 a.m. Docket No. 07060006 TAC: Village of West Clay. This project .is located outside HCHD jurisdiction. G\USERSldeIITACICarmel TAClJune 2007 1700 South 10'h Street Noblesville, In. 46060 www.co.hamilton.in.us Office (317) 773-7770 Fax (317) 776-9814 Conn. Angelina V From: Sent: To: Cc: Subject: Brewer, Scott I Friday, June 15, 200710:52 AM Michael L. DeBoy Conn, Angelina V FW: June 20 TAC agenda - forestal estates. Dear Michael: I received construction "plans" for this submittal yesterday. They combine the site and landscaping plans, and the existing conditions and Demo plans. This does not seem to be acceptable because the information I need does not appear to make it on to the plans when they are combined. 1. The plan shows a tree (one species) planted about every sixty feet on two sides. This does not meet the Section 25.04 Perimeter Bufferyards requirement of the ordinance. Please submit a landscape plan that meets the Section 26.04 requirements, including a plant schedule, planting notes, a graphic planting details, all easements, and utility lines, and anything normally required or included in those plans. Scott Brewer, City Forester Environmental Planner, DOCS City of Carmel, One civic Square Carmel, IN 46032 PH: 317-571-2478 FAX: 317-571-2426 -----Original Message----- From: Conn, Angelina V Sent: Friday, June 15, 2007 9:49 AM To: 'Greg Hayes', Foley, Amanda J; Holmes, Christine B; Hill, Dick B; Littlejohn, David Wi Duncan, Gary R; Hoyt, Gary Ai Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1; Greg llkoi Ryan Hartman; Shirley Hunter; Chuck Shupperd; Akers, William Pi Blanchard, Jim E; Brewer, Scott 1; 'Brook Gajownik'; Carter, Ronald E; 'Chuck Shupperd'; 'Dale Sparks'; 'David Lucas'; 'David Malone' i Duffy, John M; Duncan, Gary R; Fogarty, Michael D; Foley, Amanda J; Foster, Jim P; 'Greg Hayes'; 'Greg llko'; Hill, Dick B; Hohlt, William G; Holmes, Christine B; Hoyt, Gary A; 'Jason Kirkman'; 'Jason LeMaster'; 'Jennifer Marlett'; 'Joel Thurman'; Keeling, Adrienne M; Klingensmith, David W; Krueskamp, Theresa Ai 'Larry Castetter'i 'Mark wood'; McBride, Mike T; Pace, Paul V; Redden, Nick; 'Ron Farrand'; 'Ron Morris'i 'Ryan Hartman' i Schmiesing, Rebecca; 'Shirley Hunter'; Snyder, M Todd; Westermeier, Mark Subject: RE: June 20 TAC agenda - forestal estates. Hello, TAC members! Does everyone NOW have paper copies of the prlmary plat and secondary plat for forestal estates? They were delivered on june 14. This item will remain on the tac agenda if everyone received plans yesterday. Angie Conn, Planning Administrator Dept. of Community Services - Planning & Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317-571-2417 f. 317-571-2426 aconn@carmel.in.gov -----Original Message----- From: Greg Hayes [mailto:grh@co.hamilton.in.us] Sent: Wednesday, June 13, 2007 2:07 PM To: Conn, Angelina Vi Foley, Amanda Ji Holmes, Christine B; Hill, Dick Bi Littlejohn, David W; Duncan, Gary R; Hoyt, Gary Ai Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1; Greg llko; Ryan Hartman; Shirley Hunter; Chuck Shupperd Conn. Angelina V Subject: Greg Ilko [gilko@crossroadengineers.com] Friday, June 15, 200710:19 AM Conn, Angelina V; 'Greg Hayes'; Foley, Amanda J; Holmes, Christine B; Hill, Dick B; Littlejohn, David W; Duncan, Gary R; Hoyt, Gary A; Hollibaugh, Mike P; Redden, Nick; Brewer, Scott I; 'Ryan Hartman'; 'Shirley Hunter'; 'Chuck Shupperd'; Akers, William P; Blanchard, Jim E; Brewer, Scott I; 'Brook Gajownik'; Carter, Ronald E; 'Chuck Shupperd'; 'Dale Sparks'; 'David Lucas'; 'David Malone'; Duffy, John M; Duncan, Gary R; Fogarty, Michael D; Foley, Amanda J; Foster, Jim P; 'Greg Hayes'; Hill, Dick B; Hohlt, William G; Holmes, Christine B; Hoyt, Gary A: 'Jason Kirkman'; 'Jason LeMaster'; 'Jennifer Marlett'; 'Joel Thurman'; Keeling, Adrienne M; Klingensmith, David W; Krueskamp, Theresa A; 'Larry Castetter'; 'Mark Wood'; McBride, Mike T; Pace, Paul V; Redden, Nick; 'Ron Farrand'; 'Ron Morris'; 'Ryan Hartman'; Schmiesing, Rebecca; 'Shirley Hunter'; Snyder, M Todd; Westermeier, Mark RE: June 20 TAC agenda - forestal estates. From: Sent: To: Just got the plans today, but no drainage calculations were included. We will have no comments until that information is provided. Gregory J. llko CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 office: 317.780.1555 ext. 112 fax: 317.780.6525 web: www.crossroadengineers.com -----Original Message----- From: Conn, Angelina V [mailto:Aconn@carmel.in.govJ Sent: Friday, June 15, 2007 9:49 AM To: Greg Hoyesi Foley, Amanda Ji Holmes, Christine B; Hill, Dick Bi Littlejohn, David Wi Duncan, Gary Ri Hoyt, Gary A; Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1; Greg llko; Ryan Hartman; Shirley Hunter; Chuck Shupperd; Akers, William P; Blanchard, Jim E; Brewer, Scott 1; Brook Gajownik; Carter, Ronald E; Chuck Shupperd; Dale Sparksi David Lucas; David Malone; Duffy, John Mi Duncan, Gary R; Fogarty, Michael D; Foley, Amanda J; Foster, Jim Pi Greg Hoyesi Greg llko; Hill, Dick B; Hohlt, William G; Holmes, Christine B; Hoyt, Gary A; Jason Kirkman; Jason LeMaster; Jennifer Marlett; Joel Thurman; Keeling, Adrienne M; Klingensmith, David W; Krueskamp, Theresa A; Larry Castetteri Mark WOOdi McBride, Mike T; Pace, Paul Vi Redden, Nick; Ron Farrand; Ron Morris; Ryan Hartman; Schmiesing, Rebecca; Shirley Hunter; Snyder, M Todd; Westermeier, Mark Subject: RE: June 20 TAC agenda - forestal estates. Hello, TAC members! Does everyone NOW have paper copies of the primary plat and secondary plat for forestal estates? They were delivered on June 14. This item will remain on the tac agenda if everyone received plans yesterday. Angie Conn, Planning Administrator Dept. of Community services - Planning & Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p_ 317-571-2417 f. 317-571-2426 aconn@carmel.in.gov -----Original Message----- From: Greg Hoyes [mailto:grh@co.hamilton.in.usJ Sent: Wednesday, June 13, 2007 2:07 PM To: Conn, Angelina V; Foley, Amanda J; Holmes, Christine B; Hill, Dick B; Littlejohn, David Wi Duncan, Gary R; Hoyt, Gary A; Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1; Greg llko; Ryan Hartman; Shirley Hunter; Chuck Shupperd Cc: Kenton Ward; miked@deboyland.com; staceyf@deboyland.com 1 06/15/2007 FRI 10. _ .12 FAX 317 "_ " 770 1821 DEBOY LAND .. DEV. SERVICES : I I ! i / I 1 (i' i n61I' -[I C Oll tl i iJ- I \ : ~ - ~ ( '1 I ! I sll ;;}~(llo ! : ! : ! . ! I {) 0 f~ L1A ~2td1J I ~JA-/ " ~ i D~\' ~, WlR...M- 1dI~01/026 / A) .- iJ /f4tCf,f ~ Jtl/'" /1I!;'!'l It I t;,~ .... d' I) '...Or.: [I,n(l 'Jr ~~ 06/15/2001 FRI 10: 12 FAX 317 170 1821 DEBOY LAND DEV. SERVICES 1dI002/026 r:"'..~';I:' "I l t,~ TRANSMITTAL SHEET TO: FROM: Michael L. DeBoy (lATE; JUNE 14, 2007 Cannel Engineering Department ADDRESS: One Civic Square, Rrst Floor Carmel, IN 46032 ATTENTION: Gal)' DuncanlNick Redden PROJECT NAME; Forestal Estates f'IlOJEel AOOfif$S: PROJECT NUMBER: 2oo7..()()43 141$1 Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached are two copies of the drawings as submitted to planning for the June TAC Meeting. If you have any Questions or comments, please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH 9"' STREET, NOBLESVlLLE, IN 46060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888. 801-8555 TOU FREE : ! . I I I i ! I. i ! , ! t j I I '1 I ! I , I , ! ;.1 . l 'j 06/15/2007 FRI 10: 13 FAX 317 770 1821 DEBOY LAND DEV. SERVICES IdJ003/026 TRANSMITTAL SHEET TO: FROM: Michael L DeBoy Carmel Dept. of Community Services (DOCS) ADDRESS: One Civic Square Carmel. IN 46032 DATE: JUNE 14.2007 ATIEHTlON: Scott Brewer PROJECT NAME: Forestal Estates PROJE~ ADOflESS: 14131 Street& Ditch Road PROJECT NUMBER: 2007-0043 o URGENT o FOR REVIEW o PLEASE REPLY o PLEASE RECYCLE o PLEAS!: COMMENT NOTES/COMMENTS: Attached is one set of drawings as submrtted to planning for the June TAC Meeting If you have any questions or comments, please contact our office. Thank You. Bringing Your World into Focus 50t SOUTH ~ STREET. NOBLESVILLE, IN 4606Q PHONE: 317.770.1801 FAX: 317.770.1821 1.888.801-8555 TOLL FREE i , ,... ~ - j . i , l . i , ! i t I i . . ! i I ! l . , i I , d :1 :1 'I I 06/15/2007 FRI 10: 13 FAX 317 770 1821 DEBOY LAND DEV.SERVICES .~004/026 TRANSMITTAL SHEET TO: FROM: Michael L. DeBoy Carmel Dept of Community Services (DOCS) ADDRESS: One Civic Square Cannel, IN 46032 ATTENTlON: Angie Conn/Christine Barton-Holmes PROJECT HAIlE: Forestal Estates PROJECT AIlORESS: 141s1Street& Ditch Road DATE: JUNE 14,2007 PROJECT NUMBER: 2007.()()43 o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY 0 PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June T AC Meeting If you have any questions or comments, please contact our offICe. Thank You. Bringing Your World into Focus SOl SOUTH ri" STREET, NOBLESVlLLE, IN 48060 PHONE:317.nO.1801 FAX: 317.770.1821 1.888. 801-8555 TOLL FREE .<'1 . i, i , [. i . ! ! ! i , ~ j ) ! I i I . , I . ! I i I , I 1 I I .1 :! ,I if 'j '. i' ........._ 06/15/2007 FRI 10: 13 FAX 317 710 1621 DEBOY LAND DEV. SERVICES [;lJ005/026 TRANSMITTAL SHEET TO: Carmel Clay Communications ADDRESS: 31 First Avenue NW Carmel, IN 46032 FROM: Michael L. DeBoy DATE: JUNE 14,2007 ATTENTION: Bill AkelE PROJECT NAI:lE: Forestal Estates PROJECT ADDRESS: PROJECT NUMBER: 2007-0043 141 $I Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTESICOMMENTS: J;.~ Attached is one set of drawings as submitted to planning for the ~ 18 TAC Meeting, If you have any questions or comments, please contact our office. Thank YOU. Bringing Your World into Focus 5D1 SOUTH 9'" STREET. N08LESVlLLE. IN 46060 ~HONE: 311.770.1801 FAX: 311.nO.1821 1.888. 801-8555 TOLL FREE , i i I I ! l ! f i '/ , 1 : t '. J ~ ! I ! \ f ! ! I ! r ! , t ,I I 06/15/2007 FRI 10: 14 FAX 317 770 1821 DE,BOY LAND DEV. SERVICES 121006/026 TRANSMITTAL SHEET TO: Office of Police Chief ADORllSS: Three Cillie Square Cannel, IN 46032 FRO"': Michael L. DeBoy DATE: JUNE 14, 2007 ATTENTION: Michael Forgarty PROJECT HP.IilE: Forestal Estates PROJECT AOORE55: PROJECT NlIMBER: 2007..0Q43 14151 Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY 0 PLEASE RECYCLE NOTESJCOMMENTS: Attached is one set of drawings as submitted to planning for the June T AC Meeting. If you have any questions or comments; please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH glh STREET, N08LESV1LLE, IN 46060 PHONE: 317.770.1801 FAX; 317.770.1 B21 1.888.801.8555 TOll FREE i , . , , , , . ! I . . ~ ! . i . i I I ! I j . ( : 1 I I ! ! : , ! I i 1 ! ! . ! : ! I 06/15/2007 F~ 10: 14 FAX 317 770 1821 DEBOY LAND DEV. SERVICBS G;!J007/026 i ..1 I I eBdY . ..' I DEVELOPMENT SEiIVICES De8I' .,_...._~"...,-,...-~..- "'-'--'~-"-"-~.cr. ~y;~ 6'11I1 S. 9trr Stnttllt. Suit. 100 Nobhts"n'N'4GOf(J "'_: :J17.770.1f1Ot Fexr SI7.77il,,,.:l:tt Toll Frwe: f.B8IUJtJI.8S5 ,! TRANSMITTAL SHEET TO: FROM: Michael L DeBoy Office of Fire Chief, Fire Station #1 ADDRESS; Two Civic Square Carmel, IN 46032 DATE; JUNE 14. 2007 ATTENTION: Gary Hoyt PROJECT NAME; Forestal Estates PROJECT ADDRESS: PROJECT NUMBER: 2007:.0043 14151 Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPL '( o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June T AC Meeting. If you have any questions or comments, please contact our offICe. Thank You. Bringing Your World into Focus 501 SOUTH 'if' STREET, NOBLESVlIJ.E, IN 46060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888.801.8555 TOLL FREE I . ! : I I , , . , ; ~ : ~ ., , I ) ! f I ! .1 f I ! I i I .1 f :: !l " 06/15/2001 FRI 10: 15 FAX 317 170 1621 DEBOY LAND DEV. SERVICES ~OOB/026 TRANSMITTAL SHEET TO: Carmel Engineering Department AllOIlESS: One Civic Square, First'Floor Cannel, IN 46032 FROM: Michaell. DeBoy DATE: JUNE 14,2007 ATTENTION: Amanda Foley PROJECT NAME: Forestal Estates PROJECT ADDRESS: PROJECT NtI iii BER: 2007-0043 141& Street & [)jtch Road o URGENT o PLEASE COMMENT o PLEASE REPLY 0 PLEASE RECYCLE o FOR REVIEW NOTESrCOMME NTS: Attached are two copies of the drawings as submitted to planning for the June TAC Meeting. If you have any questions orcomments. please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH gill STREET, NOBLESVlLLE, IN 48060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888 801-8555 TOLL FREE ,i ..l , i i i , I . , i I i i ! i . i : I ! I ~ ! ! i! i '~ , , , ~ , ~ i I , i ! I , f I I ]1 06/15/2007 FRI 10:15 FAX 317 770 1821 DEBOY LAND DEV. SERVICES ,IdJ009/026 TRANSMITTAL SHEET TO: Cannel City Utilities ADDRESS: 760 Third Avenue SW Carmel, IN 46032 FROIII: Michael L. DeBoy DATE~ JUNE 14, 2007 ATTENTION: John Duffy PROJECT NAME: Forestal Estates PROJECT A.OORESS: 141 sI Street & Ditch Road PROJECT NUMBER: 2007-0043 o URGENr o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTESICOMMENTS~ Attached is one set of drawings as submitted to planning for the June TAC Meeting. If you have any questions or comments. please contact our office. Thank You. Bringing Your World into Focus 5Q1 SOUTH 9'" STREET. NOBLESVILLE. IN 40060 PHONE: 317.770.1801 FAX 317.770.1821 1.888.801-8555 TOll FREE .-1 i , t f : ~ ~ . ~ t , ! , I , ; f , , . ~ : ~ '[ j i I ! i I I I :j i I 'I :1 'I , I 06/15/2007 FRI 10: 15 FAX 317 770 1821 DEBOY LAND DEV. SERVICES 121010/026 " TRANSMITTAL SHEET TO: FROM: Michaell. DeBoy Deputy Building Comm!ssioner ADDRESS: One Civic Square Carmel, IN 46032 DATE: JUNE 14, 2007 ATTENTION; Bill Hohlt PROJECT MAlliE: Foresta! Estates PRO.W AOORESS: PROJECT NUMBEIt: 2007-0043 141st Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/CO~MENTS: Attached is one set pf drawings as submitted to planning for the T AC Meeting. If you have any Questions or comments, please con1act our office. Thank You. Bringing Your World into Focus 501 SOUTH 9"' STRge:T, NOBLESVlLLE, IN 46000 PHONE: 317.770.1801 FAX: 317.770:1821 1.888.801-8555 TOLL FREE I " ii 'f I 06/15/2007 FRI 10:16 FAX 317 170 1821 DEBOY LAND DEV.SERVICES ~Ol~/026 TRANSMITTAL SHEET TO: Cannel Street Department ADDllES$: 3400 W. 131m Street Westfield, IN 46074 FROM: Michael L. DeBoy DATE; JUNE 14, 2007 ATTENTIOl/: Dave Klingensmith PROJECT,NAflIIE; Forestal Estates PROJECT ADllftESS: PROJECT NUIIIBER: 2007..Q043 14181 Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting. If you have any questions or commenis, please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH gm STREET. NOBLESVlLLE. IN 46060 PHONE:317.770.1801 FAX: 317.nO.1821 1.888. 801-8555 TOLL FREE .1 , ! . I' i i . i I .1 d : I I I d I 06/15/2007 FR! 10: 16 FAX 317 770 1821 DEBOY LAND DEV. SERVICES 1ZI012/026 TRANSMITTAL SHEET TO: FROM: Michael L. DeBoy DATE: JUNE 14, 2007 Cannel Post Office .ADDRESS: United State Postal Service 275 Medical Drive Carmel, IN 46032 ATTENTION: Dale Sparks PROJECT tu.ME: Forestal Estates PROJECT ADDRESS: PROJECT NUMBER: 2006-0120 141 sl Street & Ditch Road o URGENT o fOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached Is one set of drawings as submitted to planning for the June TAC Meeting. If you have any questions or comments, please contact our offJce. Thank You. Bringing Your World into Focus 501 SOUTH"" STReeT. NOSLE8VlI.LE, IN MlO6O PHONE: 317.770.1801 ':AX: 317.770.1821 1.888.801.8555 TOLL FREE , i , i f : 1 I I : 1 : r ~ ! I I 'J f : I i :t J I < j f ! i I ,1 :1 I I I 06/15/2007 FRI 10: 16 FAX 317 770 1821 DEBOY LAND DEV. SBRVICES 121013/026 TRANSMITTAL SHEET TO: Clay Township Regio,nal Waste District 1WDRfSS: 10701 North College Avenue, Suite A Indianapolis, IN 46280 ATTENTION; Ryan Hartman PROJECT NA~E: Forestal Estates PROJECT AOORfSS: FRO"': Michael L. DeBoy DATE: JUNE 14, 2007 PROJEi;T !lUMBER: 2007-0043 14131 Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTE 5/COMMENTS: Attached is one set of drawings as submitted to planning for the June T AC Meeting. If you have any questions or comments, please contact our office, Thank You. Bringing Your World into Focus !;O1 SOUTH 9/to STREET. NOBLESVILLE, IN 46060 PHONE: 317.770. '801 FAX: 311.770,1821 1.888.,801-8555 TOU FREE , ! :1 I I ,I "I 06/15/2007 FRI 10:11 FAX 3177701821 DEBOY LAND DEV.5ERVICES Idl014/026 TRANSMITTAL SHEET TO: FROM: Michael L. DeBoy Cannel Clay Parks Department AlXlRESS: 760 Third Avenue SW, Su~e100 Cannel, IN 46032 ATTENTK)N: Mark Westermeier DATE: JUNE 14, 2007 PROJECT NAME: Forestal Estates PROJl:CT ADDRESS: 141st Street & Ditch Road PROJECT HUMBER: 2007-0043 o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE Rf:PL Y o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting, If you have any questions or comments, please contact our offICe. Thank You. ~~----'---Brfnging Your World into Focus 501 SOUTH ff' STREET, NOBLESVlll.E, IN 46060 PHONE: 317.170.1801 FAX: 317.170.1821 1.888.601-8555 TOll FREE i . i . j , ~ I I . I f ~ (, .1 l , I . , ..I ; I ! I . ! ! , .~ . ~ ; 1 : I l t 06/15/2007 FRI 10:17 FAX 317 770 1821 DEBOY LAND DEV.SERVICES 1lI015/026 TRANSMITTAL SHEET TO: Cannel Clay Schools ADDRES$; 5201 East 131& Street Cannel. IN 46033 ATTENTION: Ron Farrand FROM: Michaell. DeBoy DATE: JUNE 14, 2007 PROJECT NAME: Forestal Estates PROJECT ADllRfSS: PROJECT NUMBER: 2007.0043 14151 Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting If you have any questions or comments, please con1act our offICe. Thank You. Bringing Your World into Focus 501 SOUTH if' STREET, NOBLESVlLlE, IN 4&160 PHONE: 317.770.1801 FAX: 317.770.1821 1.888,801-8555 TOLL FREE 'I f I 06/15/2007 PRI 10:18 FAX 317 770 1621 DEBOY LAND DEV.SERVICES ~016/026 TRANSMITTAL SHEIET TO: CrossRoads Engineering AOORESS: 3417 South Shennan Drive Indianapolis, IN 46268 ATTENTION: GregO/)' lIko, PE PROJECT NAME: Forestal Estates AAOJECT /IOORESS; fROM: Michael L. DeBoy DATE: JUNE 14, 2007 PftOJECT 1'I11M8ER: 2OO7..Q043 141st Street & Dltch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting. If you have any questions or comments, please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH 9'" STREET. NOBLESVlLLE, IN 46060 PHONE: 317.770,1801 FPJI.: 317.770.1821 1.888.801-8555 TOLL FREE . ( i i I . ~ I I I 1 : I , , 1 :! if I ! I I 06/15/2007 FRI 10: 18 FAX 317 770 1621 DEBOY LAND DEV. SERVICES 141017/026 TRANSMJTT Al SHEET TO: Hamilton County Highway Department AllOllfS$; 1700 South 1()lh Street Noblesville. IN 46060 ATTENTION: David Lucas FROM: Michael L. DeBoy DAlE: JUNE 14. 2007 PROJECT NAIIIE: Forestal Estates PROJECT AIlDRESS: PROJECT NLlMBER: 2007-0043 141st Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY 0 PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawfngs as submitted planning for the TAC Meeting. If you have any questions or comments, please contact our offICe. Thank You. Bringing Your World into Focus 501 $OUTH fin STREET, NOBLESVIUE, IN 4eoeo PHONE; 317.770.1801 FAX: 317.770.1821 1.888.801-8555 TOLL FREE ! . i ., ; , I I .1 . , ,. i I' f f i ! , : i . ! i ! .1 . t- ~ f I I i : f ! J .1 ,j .1 06/15/2007 FRI .10: 18 FAX 317 770 1821 DEBOY LAND DEV. SERVICES 121018/026 TRANSMITTAL SHEET TO: FROM: Michael L. DeBoy DATE; JUNE 14,2007 Duke Energy ADDRESS: 16475 Southpar1< Drive Westfield, IN 46074 ATTENTION: Shirley Hunter PROJECT ItAME: Forestal Estates PROJECT AllllRESS: PROJECT NUIlBER: 2007-0043 141$1 Street & Ditch Road o URGENT o FOR RE....IEW o PLEASE: REPLY o PLEASE RECYCLE o PLEASE COMMENT NOTES/COMMENTS: Attached is one set of drawings as submitted to planning tor the June TAC MeetIng. If you have any questions or comments, please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH 9'~ STREET, NOSLESVlLlE. IN 40060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888.801-8555 TOll FREE 06/15/2007 FRI 10:19 FAX 311 710 1821 DEBOY LAND DEV.SERVICES 1dI019/026 TRANSMITTAL SHEET TO: FROM: Michael L. DeBoy DATE: JUNE 14, 2007 Hamilton County Sheriffs Office ADDRESS: 18100 Cumberland Road Nobtesville, IN 46060 ATTENTION: Brooke Gajownik PROJECT HAllIE: Forestal Estates PROJECT AIlIlRESS: PROJECT HUMBER: 2007..Q043 14151 Street & Ditch Road . r :1 o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the JuneT AC Meeting. If you have any questions or comments, please contact our office, Thank You. Srr nging Your World into Focus 501 SOUTH ~ STREET, NOBLESVIUe, IN 4I'i060 PHONE: 317.nO.1801 FAX: 317.770.1821 1.886. 601.6~55 TOLL FREE. 06/15/2001 PRl 10: 19 FAZ 311 170 1821 DEBOY LAND DEV.SERVICES !;.?I020/026 . ! 1 . ~ , . i f .1 , ; I : I ; i i i I \ ! I ! ! ! i , ~ TRANSMITTAL SHEET TO: fROIM: Michael L. DeBoy DATE: JUNE 14, 2007 Hamilton County Health Department ADDRESS: One Hamilton County Square Su~e 30 Noblesvllle, IN 46060 ATTENTION: Jason Lemaster PROJECT NAME: Forestal Estates I'ROJECT ADDRESS: PROJECT NUMBER: 2OQ7.{J(J43 141 st Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June T AC Meeting. If you have any questions or comments, please con1act our office. I Thank You, . Bringing Your World into Focus 501 SOUTH 'if' STREET, NOBLESVlLLE, IN 46060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888. 801-8555 TOLL FREE 06/15/2007 FRI 10= 20 FAX 317 770 1821 DEBOY LAND DEV.SERVICES G1l021/026 , 'j , . , TRANSMITTAL SHEET , l ! / , I , l I ! ~ , ~ I, f- I 'I , I r l I TO: Hammon County Surveyor's Office ADDRESS; One Hamilton Square, Suite 188 NobIesville, IN 46060 ATTENTION: Greg Hayes PROJECT HAllIE: Forestal Estates PROJECT ADDRESS: FROM: Michael L DeBoy DATE: JUNE 14,2007 !'ROJECT NUMBER: 2007-0043 14151 Street & Dnch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY 0 PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting. If you have any questions or comments, please contact our offJCe. Thank You. Bringing Your World into Focus 501 SOUTH 9" STREET. NOBLESVlLLE. IN 46060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888. 801-8555 TOLL FREE . ! . f : ; . i i i t i I 1 j i I i , 'I 1 .1 ! I ., ! .j i I :I :/ ~ I I I 06/15/2007 FRI 10: 20 FAX 317 770 1821 DEBOY LAND DEV. SERVICES ,,111022/026 TRANSMITTAL SHEET TO: Panhandle Eastern Pipeline Co. ADllRESS: 9371 Zionsville Road Indianapolis, IN 46268 ATTENTION: David Malone FROM: Michael L. DeBoy OATE: JUNE 14,2007 PROJECT NAME: Forestal Bates PRllJECT A!lllRESS: PROJECT NUMBER: 2007-0043 141 SI Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting. If you have any questions or comments, please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH rJl' STREET, NOBLESVlLLE, IN 46000 PHONE: 317.770,1801 F/J;)(: 317.770.1821 1.8S8. 801-8555 TOLL FREE 06/15/2007 FRI 10: 20 FAX 317 770 L821 DEBOY LAND DEV. SERVICES , , . i ~i , . I I : I ,I , I , . I I , I I . I , I I ! ,1 ! I , I \ , I , , I ! j I , t ! 'I &:D023/026 TRANSMITTAL SHEET TO: FROM; Michael L. DeBoy Brighthouse Networks l\DORfSS: 3030 Roosevelt Avenue Indianapolis, IN 46218 ATTEIlTlOtl: Jason Kirkman DATE: JUNE 14.2007 PROJECT NAIllE; Forestal Estates PROJECr AOORfSS: 14181 Street & Ditch Road PROJECT NUMBER: 2007-0043 o URGENT o FOR REVIEW o PLEASE COMMENT o PLEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting. Thank You. If you have any questions or comments. please contact our office. Bringing Your World into Focus 501 SOUTH 'i" STREET. NOE3\..ESVlLLE, IN 46060 PHONE: 317.nO.1SQ1 FAX: 317.770,1821 1.888.801+8555 TOLL FREE :1 06/15/2007 FR! 10: 21 F.AX 317 770 1821 DEBOY LAND DEV. SERVICES ~024/026 TRANSMITTAL SHEET TO: FROI'iII: Michael L. DeBoy OA TE: JUNE 14, 2007 Indianapolis Water Company AOllRESS: 1220 Waterway Blvd. Indianapolis, IN 46206 ATTENTION.: Jennifer Mar1ett ""'" PROJECl NAME: Forestal Estates PROJECT ADDRESS: PROJECT HlJMBER: 2007-0043 141stStreet & Ditch Road o URGENT o PLEASE COMMENT o PLEASE REPLY o FOR RI:VIEW o PLEASE RECYCLE NOTES/COMMENTS: Attached Is one set of drawirl9s as submitted to planning for lheJune TAC Meeting. If you have any quesUons or comments, please contact our office, Thank Yau. Bringing Your World into Focus 501 SOUTH gin STREET, NOBLESVlLLE, IN 46060 PHONE: 317.770,1801 FAX: 317.770.1821 1.888. 801.8555 TOLL FREE . t f ; I I i I . ~ i . ~ ! ! ( l I j ! I , f 'I ,I ! j 06/15/2001 FRI 10:21 FAX 317 77Q 1821 DEBOY LAND DEV.SERVICES 1dI025/026 TRANSMITTAL SHEET TO: FROM: Michael L. DeBoy DATE: JUNE 14, 2007 Indianapolis Power & Ught Co. ADORES&: 3600 North Arliogton Avenue Indianapolis, IN 46218 ATTENTION: Ron Monis PROJECT IlAYE: Forestal Estates I'ROJEtT AOORESS: PROJECT NUMBER: 2007 ~0043 141 $I Street& Ditch Road o URGENT o FOR REVIEW o PLEASE REPLY o PLEASE RECYCLE o PLEASE COMMENT NOTESICOMMEIoITS: Attached is one set of drawings as submitled to planning for the June TAC Meeting. If you have any questions or comments, please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH aU. STREET, NOBLESVlUE, IN 46060 PHONE: 317.770.1801 FAX: 317.nO.1821 1.686,801-8555 TOLL r:REE r ~ f , : I r , : f ~ i .t f '1 t I ! , ,I i 1 I ! I ! ! ! [ : ! : I ! j i I ; ! if i : I I q , ! ! l 06/15/2007 FRI 10: 22, FAX 317 770 1821 DEBOY LAND DEV. SERVICES fdJ026/026 /~ ....,i' 'C'.' ,f(c-.ry'~, " '..,' .~': ~ ;t ~I:,) ;11 J~~/" I, II ~, t -~'(i} _:~ .~' TRANSMITTAL SHEET TO: FROM: Michael L DeBoy DATE: JUNE 14, 2007 Vectren Energy ADIlRESS: P.O. Box 1700 Noblesville, IN 46061-1700 ATTENTION: Chuck Shupperd PROJECT NAIIE: Forestal Estates PROJECT AOORESS: PROJECT NUMSER: 2007-0043 141$1 Street & Ditch Road o URGENT o PLEASE REPLY o PLEASE RECYCLE o FOR REVIEW o PLEASE COMMENT NOTES/COMMENTS: Attached is one set of drawings as submitted to planning for the June TAC Meeting. If you have any questions or comments, please contact our offICe. Thank You. Bringing Your World into Focus 501 SOUTH rj' STREET. N06LESVlI.LE. IN 46060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888.801-8555 TOLL FREE I / I ~ DEVELOPMENT SEiNICES . _...'.M._.........,................. . . ". ":....;..,.......""...... De ers-EngineerS-S411'l(eyo,s 501 s. 9th Str..et. Suite 100 Noblesville IN 46060 Phone: 317.770.1801 Fax, 317.770J1821 To" Free: 1.888.801.8555 1 {~ RECEIVED I . DOCS TRANSMITTAL SH EET Carmel Dept. of Community Services (DOCS) ADDRESS: One Civic Square Carmel, IN 46032 FROM: Michael L. DeBoy TO: DATE: JUNE 14,2007 ATTENTION: Angie Conn/Christine Barton..Holmes PROJECT NAME: Forestal Estates PROJECT ADDRESS: PROJECT NUMBER: 2007 -0043 1415t Street & Ditch Road o URGENT o FOR REVIEW o PLEASE COMMENT o P lEASE REPLY o PLEASE RECYCLE NOTES/COMMENTS Attached is one set of drawings as submitted to planning for the June T AC Meeting If you have any questions or comments, please contact our office. Thank You. Bringing Your World into Focus 501 SOUTH g'h STREET, NOBLESVlllE, IN 46060 PHONE: 317.770.1801 FAX: 317.770.1821 1.888.801-8555 TOLL FREE City of Carmel nd Development Services, Inc. 9[h St. ste 100 Noblesville, IN 46060 RE: Forestal Estates Dear Ms. Fouts: The following letter represents comments for this project specifically addressing the area of alternative transpOJiation. I have reviewed the drawings submitted for the May 16, 2007 Technical Advisory Conmrittee meeting and offer the following comments: ALTERNATIVE TRANSPORTATION REVIEW COMMENTS 1) The Carmel Clay Alternative Transportation Plan requires the construction of 10' asphalt path along 141't St and Ditch Rd. These paths should be located I' from the edge of the right-of-way and should include ADA compliant ramps at all sidepath and sidewalk crossings. We request that all responses to our comments be provided in ""Titing. Failure to provide written responses may result in delay of the review process. II is critical that this office be made aware of all modification made on the plans being re-submitted, paliicularly if any such changes are considered "new" or fall outsidc of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department of Community Services reserves the right to provide additional comments based on subsequent reVIews. If you have questions, please contact me at 571-2417. Sincerely, ;?~~ David Littlejohn Alternative Transportation Coordinator Depaliment of CommtUlity Services ec: Angie Conn, Department of Community Services Engineering Department Review Project File ONE CIVIC SQUARE CARIvffiL, INDIANA 46032 317/571-2417 Page I of I Conn, Angelina V From: Wood, Mark A. [MarkWood@SUG.com] Sent: Monday, June 11,20078:12 AM To: Conn, Angelina V Cc: Malone, David G. Subject: RE: June 20 TAC agenda Panhandle Eastern Pipe Line Company has no conflicts with the items listed on this month's agenda. Thank You. -----Original Messagen-n From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Friday, June 08,2007 11:54 AM To: Akers, William P; Blanchard, Jim E; Boone, Rachel M.; Brewer, Scott I; Brook Gajownik; Carter, Ronald E; Chuck Shupperd; Dale Sparks; David Lucas; Malone, David G.; DeVore, Laura B; Donahue- Wold, Alexia K; Duffy, John M; Duncan, Gary R; Fogarty, Michael D; Foley, Amanda J; Foster, Jim P; Greg Hayes; Greg IIko; Hancock, Ramona B; Hill, Dick B; Hohlt, William G; Hollibaugh, Mike P; Holmes, Christine B; Hoyt, Gary A; Jason Kirkman; Jason LeMaster; Jennifer Bruner; Jennifer Marlett; Joel Thurman; Keeling, Adrienne M; Klingensmith, David W; Krueskamp, Theresa A; Larry Castetter; Lillard, Sarah N; Littlejohn, David W; Marilyn Anderson; Wood, Mark A.; McBride, Mike T; Pace, Paul V; Redden, Nick; Richard Heck; Ron Farrand; Ron Morris; Ryan Hartman; Schmiesing, Rebecca; Shirley Hunter; Snyder, M Todd; Stewart, Lisa M; Tingley, Connie S; Westermeier, Mark Cc: Steve Broermann; coleen_ellis@petangelmemorialcenter.com; Mike Hoff; staceyf@deboyland.com; miked@deboyland.com; Jennifer.Burk@Dukerealty.com; Laystrom, Chris; Fred Simmons; Brandon Burke; Keeling, Adrienne M; Richard Heck (E-mail) Subject: June 20 TAC agenda Good morning, Please see attached agenda for the June 20 Technical Advisory Committee meeting. Let me know if you did not receive plans for an item. (Petitioners, please distribute necessary plans to all T AC members (list attached) if you have not already done so.) If you have any questions, please don't hesitate to email me. Thanks, An 9 ie Co n n, Pia nning Administrator Dept. of Community Services - Planning & Zoning 1 Civic Square, 3rd Floor City of Cannel, IN 46032 p. 317~571-2417 f.317-571-2426 aconn@c;)rmel,ingov The information in this e-mail, and any tiles transmitted with it, is intended for the exclusive use oflhe recipient(s) to which it is addressed and may contain confidential, proprietary or privileged information If you are not an intended recipient, YOLl have received this transmission in error and any lise, review, dissemination, distribution, printing or copying of this information is strictly prohibited. [fyoLl have received this e-mail. in error, please notify the sender immediately ofthe erroneous transmission by reply e-mail, immediately delete this e-mail and all electronic copies of it from your system and destroy any hard copies of it that you may have made. Thank you. 611112007