August 16, 2007
Mr. Michael L. DeBoy
DeBoy Land Development Services
50 I South cjh Street, Suite 100
Noblesville, IN 46060
]AM:ES BRAINARD, MAYOR
RE: Forestal Estates - Project Review ##1
Dear Mr. DeBoy:
We have reviewed the.siteconstruction plans submitted for review at the lune 20, 2007 Technical Advisory
Committee meeting. We offer the following comments:
GENERAL INFORMATION
1. These comments represent the Department of Engineering's ~ review of the construction plans
for this project.
2. We request that all responses to our comments be provided in writing and be accompanied by a
drawing reflecting the requested revisions. Failure to provide written responses may result in the
delay oftbe review process.
3. It is critical that this office be made aware of all modifications made on the plans being re-
submitted, particularly if any such changes are considered "new" or fall outside of c>urprevious
reviews. Please notify us of any changes and specifically state any changes, including clumges
resu1tingfrom Plan Commission, BZA or other committee meetings.
4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations
submitted to this office for review. !fyou have not already done so. please provide a set of
drainage plans and calculations to their office for review. We will share Crossroad's comments as
they are received.
5. FiDaI drawings will not be approved for construction until:
a. All Engineering Department and Utility Department and Hamilton County Surveyor issues
have been resolved.
b. All bonds and performance guarantees are posted.
c. All Board of Public Works and Safety approvals and any other governing agency approvals (if
required) are obtained.
d. All off-site easements necessary to install utilities to serve.tbe development are secured.
e. Digital tiles have been submitted.
f. Water and Sanitary Sewer availability fees have been paid.
6. The Department reserves tbe right to provide additional comments based upon subsequent
reviews.
7. An approved Storm Water Management Permit is required prior to commencing any earth
disturbing activity.
8. An approved right-of~way penn it is required prior to commencing any work in the public right-of~
way.
9. Ifit will be necessary to relocate existing utilities, the cost for such relocation shall be borne solely
by the Developer. If utility poles must be relocated, they must be relocated to within one foot of
the proposed right-of-way.
10 The Department requires that the construction drnwings be developed in accordance with the City
of Carmel digital submission standards and that aU required submittals for primary plat, secondary
plat, and constnJction drawings be made. The digital files must be submitted to the Department of
DEI'AlITMENT OF ENGINEERrNG
ONE CIVIC SQUAI(E, CARMEl, IN 46032 OFFICE 317.571.2441 FA.\ 317.571.2439
EMAIL engineering@carmdin.gov
Mr. Michael L. DeBoy
August 16, 2007
Forestal Estates - Project Review #1
Page 2 of7
Engineering prior to the approval of the construction plans. Please contact the City GIS
Department for the requirements.
11. Jwisdictions:
a. The project site is located within current City of Carmel Corporate Limits.
b. Streets and Right of Way - City of Carmel (l411t Street, Ditch Road)
c. Water - City of Cannel Utilities
d. Sanitary Sewers - Clay Township Regional Waste District
e. Storm SewerslDrainage - City of Carmel \ Hamilton County Surveyors Office
f. Legal Drains - Hamilton County Surveyor's Office.
12. Drawings submitted for approval:
a. The design engineer must certify all drawings submitted for fmal approval.
b. If dual jurisdiction of the City of Carmel and the Hamilton County Surveyor's Office is
required for this project, a minimum of eight-sets of drawings will be required for approval
after all issues have been resolved. The drawings will be stamped as approved and will be
signed by the City Engineer and Director of Cannel Utilities. The 8-sets are then delivered to
the Hamilton County Surveyor for approval. The Owner will receive three-sets, one of which
is to be maintained on the construction site at all times. The City of Cannel will receive three-
sets and the Hamilton County Surveyor will retain two-sets.
13. Cannel Utilities will provide a separate review ofwatet issues. If you have not already done so,
please provide the construction plans to their office for review:
Paul Pace
Carmel Utilities Water Distribution
3450 West 13151 Street
Westfield, IN 46074
14. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water
main locations.
15. The following items wiD be provided as the approval process advances for this project:
a. Project Approval Checklist
b. PerformancelMaintenance Guarantee Requirements
c. PerfonnancelMaintenance Guarantee Release Procedure
d. Engineering Requirements for Building Permit approval
e. StreetSignage
f. Utility Jurisdiction/Other Miscellaneous
g. Schedule for Board of Public Works and Safety meetings
BOARD OF PUBLIC WORKS AND SAFETY
16. Please use the Engineering Department deadlines for submissions to the Board.
17. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission
and/or the Board of Zoning Appeals (if applicable) and completion of ll'eview by the
Technical Advisory Committee. All written requests to be.,placed on the Board's agenda
must include the appropriate Docket Number and tbe date (or dates) of approval by the Plan
Commission andlor the Board of Zoning Appeals (if applicable).
18. Water Availability approval from the Board is based upon the total number of single family
residential units. Reference item #35-37 below for a more detailed explanation.
19. If a community swimming pool, community clubhouse or community bathhouse is planned for
this development; additional Water and Sanitary Sewer Availability approval from the Board will
be required.
20. If an entryway irrigation system or other community irrigation systems are planned for this
development, additional Water Availability approval from the Board will be required.
21. Commercial Curb Cut Approval - This approval will be required for any residential driveways to
be located on either 14] II Street or on Ditch Road. If a variance is not obtained for a frontage
place, the Department requests a cul-de-sac be constructed to serve the development rather than a
frontage place. If a proper variance for access is obtained, the Department will only support two
,.,
Mr; Michael L. DeBoy
August 16,2007
Forestal Estates - Project Review #1
Page 3 of7
drive cuts. One on Ditch Road at the northern property line and one on 141 It Street at the eastern
property line. One will need to serve two lots, A cut on 141 sl Street may not be provided full
access in the future. Provide a letter to this office requesting BPWS Commercial Curb Cut
approval. Provide an 8 Yz x 11 exWbit or exhibits detailing the requested curb cut(s) with all
appropriate dimensional data including width, radii, auxiliary lane dimensions, existing and
opposing streets or drives, etc..
22. Temporary Construction Entrance approval if the location is at a site other than the location of the
proposed pennanent entrance to the development. Submission requirements are the same as for
commercial curb cut.
23. The installation of any permanent, privately o\Vlled and/or maintained improvement (signs,
decorative street signs, walls, streetlights, etc.) within platted or dedicated right of way or platted
or dedicated easements requires the execution of a Consent to Encroach Agreement between the
Owner and the City of Carmel. The Board of Public Works and Safety executes such agreements.
The City Engineer may approve irrigation system agreements.
24. Secondary Plat approval ifapplicable.
a. All performance guarantees must be posted prior to submission of secondary plats for Board of
Public Works and Safety approval.
25. Dedication of Right of Way if not platted.
26. Are any open pavement cuts of 141 Sf Street or Ditch Road required to provide sanitary, water,
storm, CATV, electric, telephone service to the development or to each lot? Open pavement cuts
must be indicated on the plans and requiTe BPW &S approval.
BONDING REQUIREMENTS
27. There is not enough infonnation on the submitted plans to make an accurate determination of
Performance Guarantee requirements. A typical subdivision would be required to provide
Performance Guarantees for the following:
a. Streets (base, binder and surface must be bonded together)
b. Curb & Gutters
c. Water Mains
d. Street Signs.
e. Storm SewersIDrainage (could be Hamilton COWlty Surveyor jurisdiction)
f. Monuments and Markers (could be Hamilton County Surveyor jurisdiction)
g. Interior Sidewalks (builder's lot right of way sidewalks).
h. Exterior Sidewalks (common area/perimeter road right of way sidewalks/asphalt paths).
i. Right of Way Improvements may be bonded separately. This could include
acceleration/deceleration lanes, passing blister, pavement widening, thennoplastic striping,
stone shoulders, curbs, etc. if applicable.
j. Erosion and Sediment Control and Stonn Water Quality. Please contact Amanda Foley,
Engineering Department Stormwater Administrator, for details regarding engineer's
estimates/performance guarantee requirements for these items.
28. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100%
of the cost of labor and materials to construct the individual improvements, to be provided by the
design engineer. Please provide detailed Engineer's Estimates for each improvement including
quantities; unit costs, pipe sizes and materials, etc.
29. Upon completion and release of individual Perfonnance Guarantees, a three.year Maintenance
Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the
Performance amount for Streets and Curbs and 10% of the Performance amount for all other
improvements.
30. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of
Credit.
31. Please reference the enclosures for more detailed explanation of our procedures.
Mr. Michael L. DeBoy
August 16, 2007
Forestal Estates - Project Review #1
Page 4 of7
RIGHT OF WAY PERMIT AND BONDING
32. Any work in the dedicated right of way of 141 or Street andlor Ditch Road will require an approved
Right of Way Permit and a License & Permit Bond.
33. The bond amountis detennined by the number of instances of work in the right of way at
$2,000.00 per instance. However, if the work is included in the scope of work ofa required and
posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond
requirements of the Right of Way Permit.
34. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way pennitting and
bonding.
AVAILABILITY AND CONNECTION FEES
35. The Availability and Connections Fees are current as of this date but are subjectto future revisions
and are as follows:
a. Water Availability (acreage) Fee = $1,010.00 per acre plus $300.00 Development Application
Review Fee (effective 712/07).
b. Water Connection Fee = $1,310.00/1.0 EDU + $86.00/1.0 EDD Tap Inspection Fee (effective
712/07) totaling $1,396.00/1.0 EDU.
36. Availability (acreage) Fees must be paid after all other Engineering Department requirements have
been satisfied and prior to approval and start of constroction activities. Availability Fees are based
upon total platted acreage or legal description acreage for the development. Based upon the
indicated acreage on Sheet CI.O, the following Availability Fees would apply:
a. Water- 2.328A @ $1,010.00/A = $2,351.28 + $300.00 = $2,651.28
b. Connection Fees are paid when the infrastructure has been completed, satisfactory test results
obtained and the development has been released for building pennits. Connection Fees are
paid on an individual buildingllot basis. Based on the drawings submitted, there appear to be 3-
residential dwellingsllots.
37. If an entryway irrigation system or other community irrigation system is planned for this
development, additional Water Connection Fees will be assessed based upon the size and usage of
the system and upon the recommendations of the Director of Carmel Utilities.
CONSTRUCTION DRAWING REVIEW COMMENTS
38. General Comments
a. If existing off-site easements are being utilized for the installation of various utilities to serve
the site, please confirm that aU utilities that will serve this site are public utilities and not
service laterals..
b. This project is subject to the Stonnwater Management Ordinance, which was adopted February
6,2006.
c. Please contact Amanda Foley to review storm water quality/treatment requirements.
d. Please add a note to all appropriate sheets that no earth disturbing activity may commence
without an approved storm water management permit.
e. Please include the summary drainage information required by Section 100 of the Stormwater
Technical Standards Manual on the appropriate sheet.
f. Please verity that no drainage and utility easements overlap tree preservation or landscaping
easements.
g. The drawings shall reflect all improvements that were included in the City's reconstruction of
Ditch Road and construction of the roundabout including curbs, sidewalks/asphalt paths,
medians, storm sewer manholes, curb inlets and pipes, and any other buried utilities.
h. The City has adopted a new paving policy. Please revise any notes, specifications, and details
to accommodate this policy. The language of this policy must be added to a specification sheet
on the plans.
i. The City has adopted a new curbing policy. Please revise any notes, specifications, and details
to accommodate this policy. The language of this policy must be added to a specification sheet
on the plans.
Mr. Michael L. DeBoy
August 16,2007
Forestal Estates - Project Review #1
Page 5 of?
j. Please indicate why a variance is being sought for the frontage place requirements and why a
cul-de-sac was not considered.
Ie. The Department will not support the subdivision waiver request and will reconunenda cul-de-
sac to the Plan Commission.
39. Sheet CS
a. This name of this project was spelled Forestal on the T.A.C. agenda and on your transmittal
sheet. It is spelled Forstal on the construction plans. Which is correct?
b. The Department assumes Lot 31 is a typographical error on this and all sheets.
c. Sheet List Table. Sheets C4.0 and C5.0 are not included in the list and were not included with
the submittal. Sheet C3.0, Site Grading and Utility Plan was omitted from the plans submitted
to this office for review.
d. Please remove tree symbols from the proposed site plan.
e. Please identify and label141st Street on the proposed site plan.
40. Sheet Cl.O
a. Identify and label 141 st Street on the proposed site plan.
b. There is a demolition legend but none of the symbols in the legend are indicated on the
drawing.
c. The Department assumes the existing drive to lot 31 will be eliminated. If this drive is to be
eliminated., the portion of the drive in the right-of..way shall be removed in accordance with
Carmel City code section 227(h)(1O). The existing depressed curb shall be removed to the
nearest joint and replaced with City standard chairback curb. If this cut wiII continue to be
utilized, it shall be brought to current City standards per Cannel City code section 227(h).
d. This sheet does not seem to serve any useful purpose.
e. Note 13 shall be added that requires connection of any drain tiles encountered during
development to a positive outfall.
41. Sheet C2.0
a. Again, the Existing Legend and Abbreviations and the Site Legend seem to serve no useful
purpose as none of the symbols are utilized on the sheet.
b. Please separate the Landscape Plan from the Site Plan. Do not submit Landscape Plans with
construction plans submitted to the Engineering Department for review and approval. We do
not have approval authority over landscaping.
c. Identify and label 141 sI Street on the plans.
d. Identify, label and dimension right of way lines.
e. Please add the following note: All paving within the existing and proposed City right-of-way
shall conform to the requirements of the Department of Engineering. Contractor shall contact
the Department of Engineering to schedule a pre~construction meeting to review the
Department's construction requirements, staff notification requirements, required inspections
for certain stages of the work and to review the authority of the Department as it relates to
work within the existing and proposed City right~of~way.
f. The Department understands a variance is being sought from the requirement for a frontage
place. The City requests the construction of a cul-de-sac in lieu of a frontage place to serve the
development located such that access is as far east on 14151 Street as possible if a variance is
not obtained. As the Department expects the 141st Street median to extend to the frrst full
access at Cheswick Boulevard in the future, full access to the cul-de-sac cannot be guaranteed
by the City.
g. Curb return radii of public road approach shall be 40-foot.
h. Compliance with the City's Thoroughfare Plan includes construction of half of the
improvements prescribed by the Thoroughfare Plan across the frontage. Typically, developers
provide the money equal to the value of constructing these improvements to the City for
deposit in the City's non-reverting Thoroughfare Plan fund. This applies to the 141st Street
and Ditch Road frontages.
Mr. Michael L. DeBoy
August 16,2007
Forestal Estates - Project Review #1
Page 6 of?
i. The Department will not require auxiliary lanes as right-of-way is not likely available to the
east. A passing blister is required if adequate right-of-way exists on the south side of 141 Gt
Street
j. The Department requests widening of the 141sc Street frontage such that a 24-foot wide
roadway is provided from a point 160 feet west of east property line to a point 100 feet east of
east property line.
k. Within the widening limits, City standard gravel shoulder shall be installed on each side of
roadway from the end of the curbing of the road project to the eastern limit of widening.
1. Please confirm the existing right-of-way to the parcel to the east to ensure requested widening
and 40' curb radii may be constructed.
m. 10-foot alternative transportation path is required across each frontage.
n. City standard ADA ramps are required where path crosses public street.
o. If the existing right-of-way is less than that prescribed by the thoroughfare plan, additional
right-of-way shaUbe dedicated to comply with the thoroughfare plan.
p. A 45 degree angle right-of-way comer cut shall be provided at the southwest comer. The line
of this right-of-way shall be that line perpendicular to a 120' radius from the intersection of the
existing centerlines of 14 I Sf Street and Ditch Road.
q. The City requests curb from end of road project to the entrance return radii on the north side of
the project.
r. 5' sidewalk is required on each side of the cul-de-sac.
s. The cul-de-sac shall comply with all City standards.
t. The City requests full width milling and resurfacing between the limits of the requested
widening.
42. Sheet C6.0
a. Identify and label 14151 Street on the plans.
b. The temporary construction entrance will require BPWS approval. If a cul-de-sac is installed,
the construction entrance, if moved to cul-de-sac location, will not require Board of Public
Works and Safety approval. If a cul-de-sac is not constructed, the entrance should be moved to
141st Street due to the median on Ditch Road.
c. City ordinances related to protection of and restoration of existing street, walk, path, and curb
shall apply to the construction entrance. Please add a note to this affect to this plan.
d. The City's storm water quality standards shall apply to this project. This shall include, but by
no means be limited to, two BMP's.
43. Grading and Drainage
a. A proper grading and drainage plan shall be provided.
b. Drainage calculations shall be provided.
c. How is the apparent 898 low area at the northeast comer being drained?
d. Where does swale at northeast comer go? What is outfa]l?
e. The Department will evaluate the need for a piped outfall in lieu of the proposed ditch/surface
discharge.
f. Are their any direct runoff areas?
g. Please indicate how perimeter and offsite drainage is being addressed.
h. Rear yard swales require subsurface drains.
i. If a regulated subdivision, is access to pond per standards?
j. All existing road drainage, culverts, and bridges need to be indicated on the plans. The City
may require reconstruction or extension of any existing drainage piping or structures in right-
of-way adjacent to development.
k. How is roadside drainage maintained?
1. Right-of-way drainage and detention of fully developed right-of-way across each frontage
must be provided. Stub piping shall be extended to right-of-way for future connection.
m. Please indicate flood route on and off~site to ultimate receiving system.
n. Please indicate spillway on pond.
Mr. Michael L. DeBoy
August 16, 2007
Forestal Estates - Project Review #1
Page 7 of7
o. What is the ultimate drainage outlet? Did downstream system anticipate this concentrated
flow? Is there an adequate outfall?
44. Utility plan
a. Please indicate existing utilities.
b. Please indicate the utility connections and service laterals.
c. Is their adequate fire protection?
45. Sheet C7.0
a Please include County standard swale detail in liew of the DeBoy Land Development Services
swale section detail.
46. Sheets 9.0, 10.0, and 10. I
a. The Department has comments related to this sheet but will issue as a part of the next review.
b. Based on if the cul-de-sac is constructed or not, there are numerous details that will need to be
added.
47. If a variance is, obtained from the requirements fora frontage place and drive cuts are pursued, the
following standards shall apply:
a. Access shall be indicated on the plans.
b. Per previous comment, the Department will only support two cuts to the BPWS; one on Ditch
as far north as possible and one on 14 I st Street,.as Jar ~ast as .possible. One drive will need to
serve two lots. It must be acknowledged that a full cut will not be provided off of Ditch and it
is not likely that full access will be maintained to 14] st Street cut long term.
c. Each cut will require BPWS approval.
d. The portion of each drive in the right-or.-way shall be constructed of concrete.
e. Existing curb shall be removed to nearest joint for each cut and shall be replaced with City
standard depressed curb. Such work shall be indicated on the drawings.
f. All existing improvements shall be protected and repaired or restored in accordance with City
ordinance.
g. Each apron shall conform to all current City standards (dimensions, thickness, etc.).
h. Drainage shall be maintained in accordance with City standards.
If you have questions, please contact me at 571-2441.
Sincerely,
Gary R.
Assistant ity Engineer
Department of Engineering
Cc: Angelina Conn, Department of Community Services
John Duffy, Director Carmel Utilities
Paul Pace, Carmel Utilities Distribution
Greg Illm, Crossroad Engineers
Greg Hoyes, Hamilton County Surveyor's Office
Tim Atkinson, M One Construction
Engineering Department Review/File Copy
\\Apps2\user data\eng\shared\DHiII\PROJREV07\FORESI ALESI A TESMlNORSUB# I ,doc
Page 1 of 1
Conn, Angelina V
From: Foley, Amanda J
Sent: Wednesday, June 27, 200712:17 PM
To: 'Brent A. White'
Cc: Duncan, Gary R; Conn, Angelina V; Redden, Nick
Subject: Forestal Estates
Attachments: SWPPP Plan Requirements.doc
Brent,
In reviewing the plans for this project which were submitted to me on June 16, I found that the SWPPP is incomplete.
Please see the attached SWPPP guidelines and resubmit the plans according to these guidelines.
Let me know if you have any questions.
Thank you,
Amanda Foley
Storm Water Administrator
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
(317) 571-2314
(317) 571-2439 (fa.x:)
(Thl.r?Y@9.(U:}}1cl.jn,gQY
6/27/2007
, cCJ\JrlC]]]{[:';ltlllC
June 18, 2007
1~
RECEIVED
JUN 1 9 ,,!,'Yi?
DOCS
Michael L. DeBoy
DeBoy Land Development Services, Inc,
501 South 9th Street, Suite 100
Noblesville, IN 46060
RE: Forestal Estates
Project No,: 2007-0043
Dear Mr. DeBoy:
The above mentioned project has been received and reviewed.
In reviewing the project, it appears that the Vicinity and Location maps are
incorrect. I see nothing in the plans that would hamper law enforcement
efforts,
If we can be of any further assistance to you, please contact us.
Respectfully,
lJu;c,ACltJ2 JJ . -?:~
Michael D. Fog~~ - J
Chief of Police
MDF:vb
IOept of Community Services
cc:
(317) 5n-2500
A Nationally Accredit "'k?;;'" v.,^~forcement Agency
~.~i>>;};?<ft'~1~~.,*
Faxl3!?) fi71-2512
06/19/2007 15:00
317775%28
H~MILTON CO SURVEYOR
PtlGE Ell/02
:-r"~
.Xmtal1 C 'lOard, C'FJv{
SUrJJlj'OI' Of c'l-(clTlriltDll County
'l'(,Olle (:3J7) 7715.$495
'TO.L' (; ~7) 77G"'96~S
$11111: h'{lf
Oll~ ;Hamiltoll CmlrT~' Sql/ore
;i'..."MC.~lIiUc, Tndla"o 46060-:>.:1.30
June 19, 2007
1\
oW.
DeBoy Land Development Services, Inc.
ATTN: Mike DeBoy
501 South 91" Street, Suite 100
Noblesville, IN 46060
VIA FACSIMILE: 770-1821
RECEIVED
.:1. I 'I ,~'-\~7
DOCS
RE: Fontal Estates
Dear Mr. DeBoy:
We ha.ve reviewed the oonstruction plans submitted to the Hamilton County Surveyor's
Office on June 14,2007, for this project and have the following comments:
I. The proposed project falls in the incorporated area and MS4 jurisdiction of the
City of Carmel.
2. The proposed prOje<:t DOES NOT fall in a Cannel Wellhead Protection Zone.
3. The proposed project falls in the Osborn & Collins Regulated Drain Watershed
and drain through the Kingsborough Regulated Drain Watershed.
4. Please submit the following procedural items with the revised oonstruction plans
to this oflice,Petition for Regulated Drain. Subdivision, outlet permit to the
Kingsborough Drain, subdivision. non-enforcement agreement, engineer's
estimatt:, and allassoeiated bonds (storm sewers, SSD, and monumentation) for
120% of construction cost. The applications are available on our website at
htt~J:!!www.co.hamilt.)n_in.us. go to Departments~ Surveyor, and Forms.
So It appears that the off-site sanitary sewer work will cross or run parallel to parts of
the Saddle Creek Regulated Drain. Insufficientinformati.on is given in the plans
to make the actual determination, which is why the regulated drain5 should be
shown in the construction plans. Once this is done, either a crossing permit
and/or utility non-enforcement agreement may be required.
06/19/2007 15:00
317775%28
HAMILTON CO SURVEYOR
PAGE 02/02
'"
....~\.
6. Hamilton County Ordinance 4-26-99-C(7)a requires each lot to have access to an
adequate outlet for sump pump disc:l:1Jrges. Since this subdivision does not have
curbline SSDthat laterals can be install on. then other options need to be explored
to come up with adequate approval outlet points.
7. Hamilton County Ordinance 4-2(i~99-C(7)e does not allow dry detention basins to
be located on residential lots, which is currently what the construction plans show.
The same section of the ordinance also requires SSD under the dry detention
basin. Based.OD the current design, as variance from this ordinance will be
requinld from the Hamilton County Drainagr; Board.
8. Please label the WSE for the dry dE:tention basin on the construction plans.
9. Please provide a P & P sheet for the storm sewer run.. Please fill ill or correct the
data for the storm pipe data table.
10. The as-built drawings for Kingsborough Section 4, on file with HCSO, show the
invert of the existing structw"e that this site will connect into as 892.38. This
appears. to be slightly higher then design assumptions made for this project.
1 L The developer will be responsible for contacting the Property Owner of Lot 89 in
Kingsoorough to negotiate access to the regulated drain. While easement is in
place per the secondary plat, HCSO can not "grant" access permission to the
property.
12. This site does have a private tile across the site, but it is believed the tile does not
extend beyond the limits of the parcel. If1hat is the case, the tile should be
crushed across the site so it does not cause future issues for the property owners.
13. The detention pond outlet will need to be constructed out ofRCP, with a concrete
end section and trash guard. Also, please mo'Ve the tree at least IS' away from the
centerline of the pipe. Please include an appropriate HCSO Standard Details in
the construction plans.
14. Please provide a C(lPY of the secondary plat for review by HCSO.
15. Please note that further comments may be necessary a.t a. later date.
Should you have any questions, I can be reached at 317.776-8495.
cc: Christine BartQn~Holmes - Carmel DOCD, Amanda Poley - Cannel Engineering
Dick Hill - Carmel El\gi.neering, Greg Dko - Crossroad Engineers
M One Construction - 218.0315
HAMILTON COUNTY
HIGHWA Y DEPARTMENT
CARMEL T.A.C. AGENDA
Date: June 20,2007
From: David Lucas ~ HCHD
9:00 a.m. Docket No~ 07040024 SP: Westmont, Section 1.
This project is located outside HCHD jurisdiction.
9:15 a.m. Docket No. 07050005 SU: Pet Angel Memorial Center Crematorium.
This project is located outside HCHD jurisdiction.
9:25 a.m. Docket No. 07050012 DP/ADLS: House Investments Office.
This project is located outside HCHD jurisdiction.
9:35 a.m. Docket No. 07050012 PP: Forestal Estates Mirior Subdivision.
This project is Io"cated outside HCHD jurisdiction.
Docket No. 07050019 SW: Access to Collector Roads.
This project is located outside HCHD jurisdiction.
Docket No. 07050014 SP: Forestal Estates Minor Subdivision.
This project is located outside HCHD jurisdiction.
9:50 a.m. Docket No. 07050016 Z: 116th Street Crossing PUD
This project is located outside HCHD jurisdiction.
10:05 a.m. Docket No. 07050017 Z: 96th Street Crossing PUD.
This department does not have any objections to the rezone.
We will proceed with plan review until a decision is reached in the
pending annexation. Comments letter attached.
10:20 a.m. Docket No. 07060003 TAC: Opus Landmark at Meridian-Generator.
This project is located outside HCHD jurisdiction.
10:30 a.m. Docket No. 07060004 TAC: Midwest 180-701 Building.
This project is located outside HCHD jurisdiction.
Docket No. 07060005 TAC: Midwest 180-720 Building.
This project is located outside HCHD jurisdiction.
10:40 a.m. Docket No. 07060006 TAC: Village of West Clay.
This project .is located outside HCHD jurisdiction.
G\USERSldeIITACICarmel TAClJune 2007
1700 South 10'h Street
Noblesville, In. 46060
www.co.hamilton.in.us
Office (317) 773-7770
Fax (317) 776-9814
Conn. Angelina V
From:
Sent:
To:
Cc:
Subject:
Brewer, Scott I
Friday, June 15, 200710:52 AM
Michael L. DeBoy
Conn, Angelina V
FW: June 20 TAC agenda - forestal estates.
Dear Michael:
I received construction "plans" for this submittal yesterday.
They combine the site and landscaping plans, and the existing conditions and Demo plans.
This does not seem to be acceptable because the information I need does not appear to make
it on to the plans when they are combined.
1. The plan shows a tree (one species) planted about every sixty feet on two sides. This
does not meet the Section 25.04 Perimeter Bufferyards requirement of the ordinance.
Please submit a landscape plan that meets the Section 26.04 requirements, including a
plant schedule, planting notes, a graphic planting details, all easements, and utility
lines, and anything normally required or included in those plans.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One civic Square
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
-----Original Message-----
From: Conn, Angelina V
Sent: Friday, June 15, 2007 9:49 AM
To: 'Greg Hayes', Foley, Amanda J; Holmes, Christine B; Hill, Dick B; Littlejohn, David Wi
Duncan, Gary R; Hoyt, Gary Ai Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1; Greg
llkoi Ryan Hartman; Shirley Hunter; Chuck Shupperd; Akers, William Pi Blanchard, Jim E;
Brewer, Scott 1; 'Brook Gajownik'; Carter, Ronald E; 'Chuck Shupperd'; 'Dale Sparks';
'David Lucas'; 'David Malone' i Duffy, John M; Duncan, Gary R; Fogarty, Michael D; Foley,
Amanda J; Foster, Jim P; 'Greg Hayes'; 'Greg llko'; Hill, Dick B; Hohlt, William G;
Holmes, Christine B; Hoyt, Gary A; 'Jason Kirkman'; 'Jason LeMaster'; 'Jennifer Marlett';
'Joel Thurman'; Keeling, Adrienne M; Klingensmith, David W; Krueskamp, Theresa Ai 'Larry
Castetter'i 'Mark wood'; McBride, Mike T; Pace, Paul V; Redden, Nick; 'Ron Farrand'; 'Ron
Morris'i 'Ryan Hartman' i Schmiesing, Rebecca; 'Shirley Hunter'; Snyder, M Todd;
Westermeier, Mark
Subject: RE: June 20 TAC agenda - forestal estates.
Hello, TAC members!
Does everyone NOW have paper copies of the prlmary plat and secondary plat for forestal
estates? They were delivered on june 14.
This item will remain on the tac agenda if everyone received plans yesterday.
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
p. 317-571-2417 f. 317-571-2426
aconn@carmel.in.gov
-----Original Message-----
From: Greg Hayes [mailto:grh@co.hamilton.in.us]
Sent: Wednesday, June 13, 2007 2:07 PM
To: Conn, Angelina Vi Foley, Amanda Ji Holmes, Christine B; Hill, Dick Bi Littlejohn,
David W; Duncan, Gary R; Hoyt, Gary Ai Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1;
Greg llko; Ryan Hartman; Shirley Hunter; Chuck Shupperd
Conn. Angelina V
Subject:
Greg Ilko [gilko@crossroadengineers.com]
Friday, June 15, 200710:19 AM
Conn, Angelina V; 'Greg Hayes'; Foley, Amanda J; Holmes, Christine B; Hill, Dick B; Littlejohn,
David W; Duncan, Gary R; Hoyt, Gary A; Hollibaugh, Mike P; Redden, Nick; Brewer, Scott I;
'Ryan Hartman'; 'Shirley Hunter'; 'Chuck Shupperd'; Akers, William P; Blanchard, Jim E;
Brewer, Scott I; 'Brook Gajownik'; Carter, Ronald E; 'Chuck Shupperd'; 'Dale Sparks'; 'David
Lucas'; 'David Malone'; Duffy, John M; Duncan, Gary R; Fogarty, Michael D; Foley, Amanda J;
Foster, Jim P; 'Greg Hayes'; Hill, Dick B; Hohlt, William G; Holmes, Christine B; Hoyt, Gary A:
'Jason Kirkman'; 'Jason LeMaster'; 'Jennifer Marlett'; 'Joel Thurman'; Keeling, Adrienne M;
Klingensmith, David W; Krueskamp, Theresa A; 'Larry Castetter'; 'Mark Wood'; McBride, Mike
T; Pace, Paul V; Redden, Nick; 'Ron Farrand'; 'Ron Morris'; 'Ryan Hartman'; Schmiesing,
Rebecca; 'Shirley Hunter'; Snyder, M Todd; Westermeier, Mark
RE: June 20 TAC agenda - forestal estates.
From:
Sent:
To:
Just got the plans today, but no drainage calculations were included. We will have no
comments until that information is provided.
Gregory J. llko
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
office: 317.780.1555 ext. 112
fax: 317.780.6525
web: www.crossroadengineers.com
-----Original Message-----
From: Conn, Angelina V [mailto:Aconn@carmel.in.govJ
Sent: Friday, June 15, 2007 9:49 AM
To: Greg Hoyesi Foley, Amanda Ji Holmes, Christine B; Hill, Dick Bi Littlejohn, David Wi
Duncan, Gary Ri Hoyt, Gary A; Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1; Greg
llko; Ryan Hartman; Shirley Hunter; Chuck Shupperd; Akers, William P; Blanchard, Jim E;
Brewer, Scott 1; Brook Gajownik; Carter, Ronald E; Chuck Shupperd; Dale Sparksi David
Lucas; David Malone; Duffy, John Mi Duncan, Gary R; Fogarty, Michael D; Foley, Amanda J;
Foster, Jim Pi Greg Hoyesi Greg llko; Hill, Dick B; Hohlt, William G; Holmes, Christine B;
Hoyt, Gary A; Jason Kirkman; Jason LeMaster; Jennifer Marlett; Joel Thurman; Keeling,
Adrienne M; Klingensmith, David W; Krueskamp, Theresa A; Larry Castetteri Mark WOOdi
McBride, Mike T; Pace, Paul Vi Redden, Nick; Ron Farrand; Ron Morris; Ryan Hartman;
Schmiesing, Rebecca; Shirley Hunter; Snyder, M Todd; Westermeier, Mark
Subject: RE: June 20 TAC agenda - forestal estates.
Hello, TAC members!
Does everyone NOW have paper copies of the primary plat and secondary plat for forestal
estates? They were delivered on June 14.
This item will remain on the tac agenda if everyone received plans yesterday.
Angie Conn, Planning Administrator
Dept. of Community services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
p_ 317-571-2417 f. 317-571-2426
aconn@carmel.in.gov
-----Original Message-----
From: Greg Hoyes [mailto:grh@co.hamilton.in.usJ
Sent: Wednesday, June 13, 2007 2:07 PM
To: Conn, Angelina V; Foley, Amanda J; Holmes, Christine B; Hill, Dick B; Littlejohn,
David Wi Duncan, Gary R; Hoyt, Gary A; Hollibaugh, Mike P; Redden, Nick; Brewer, Scott 1;
Greg llko; Ryan Hartman; Shirley Hunter; Chuck Shupperd
Cc: Kenton Ward; miked@deboyland.com; staceyf@deboyland.com
1
06/15/2007 FRI 10.
_ .12 FAX 317
"_ " 770 1821 DEBOY LAND
.. DEV. SERVICES
:
I
I
!
i /
I 1 (i'
i n61I' -[I C Oll tl
i iJ-
I \
: ~
- ~
(
'1
I
!
I sll ;;}~(llo
!
: !
: !
. !
I {) 0 f~ L1A ~2td1J
I ~JA-/
"
~ i D~\'
~, WlR...M-
1dI~01/026
/
A) .- iJ
/f4tCf,f ~
Jtl/'" /1I!;'!'l
It I t;,~ .... d'
I) '...Or.:
[I,n(l
'Jr ~~
06/15/2001 FRI 10: 12 FAX 317 170 1821 DEBOY LAND DEV. SERVICES
1dI002/026
r:"'..~';I:'
"I
l t,~
TRANSMITTAL SHEET
TO:
FROM:
Michael L. DeBoy
(lATE;
JUNE 14, 2007
Cannel Engineering Department
ADDRESS:
One Civic Square, Rrst Floor
Carmel, IN 46032
ATTENTION:
Gal)' DuncanlNick Redden
PROJECT NAME;
Forestal Estates
f'IlOJEel AOOfif$S:
PROJECT NUMBER:
2oo7..()()43
141$1 Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached are two copies of the drawings as submitted to planning for the June TAC Meeting.
If you have any Questions or comments, please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH 9"' STREET, NOBLESVlLLE, IN 46060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888. 801-8555 TOU FREE
: !
. I
I
I
i
!
I.
i
!
,
!
t
j
I
I
'1
I
!
I
, I
, !
;.1
. l
'j
06/15/2007 FRI 10: 13 FAX 317 770 1821 DEBOY LAND DEV. SERVICES
IdJ003/026
TRANSMITTAL SHEET
TO:
FROM:
Michael L DeBoy
Carmel Dept. of Community Services
(DOCS)
ADDRESS:
One Civic Square
Carmel. IN 46032
DATE:
JUNE 14.2007
ATIEHTlON:
Scott Brewer
PROJECT NAME:
Forestal Estates
PROJE~ ADOflESS:
14131 Street& Ditch Road
PROJECT NUMBER:
2007-0043
o URGENT
o FOR REVIEW
o PLEASE REPLY
o PLEASE RECYCLE
o PLEAS!: COMMENT
NOTES/COMMENTS:
Attached is one set of drawings as submrtted to planning for the June TAC Meeting
If you have any questions or comments, please contact our office.
Thank You.
Bringing Your World into Focus
50t SOUTH ~ STREET. NOBLESVILLE, IN 4606Q
PHONE: 317.770.1801 FAX: 317.770.1821
1.888.801-8555 TOLL FREE
i
,
,... ~
- j
. i
, l
. i
, !
i
t
I
i
. .
!
i
I
!
l
. ,
i
I
,
d
:1
:1
'I
I
06/15/2007 FRI 10: 13 FAX 317 770 1821 DEBOY LAND DEV.SERVICES
.~004/026
TRANSMITTAL SHEET
TO:
FROM:
Michael L. DeBoy
Carmel Dept of Community Services
(DOCS)
ADDRESS:
One Civic Square
Cannel, IN 46032
ATTENTlON:
Angie Conn/Christine Barton-Holmes
PROJECT HAIlE:
Forestal Estates
PROJECT AIlORESS:
141s1Street& Ditch Road
DATE:
JUNE 14,2007
PROJECT NUMBER:
2007.()()43
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY 0 PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June T AC Meeting
If you have any questions or comments, please contact our offICe.
Thank You.
Bringing Your World into Focus
SOl SOUTH ri" STREET, NOBLESVlLLE, IN 48060
PHONE:317.nO.1801 FAX: 317.770.1821
1.888. 801-8555 TOLL FREE
.<'1
. i,
i
, [.
i
. !
!
!
i
, ~
j
)
!
I
i
I
. ,
I
. !
I
i
I
,
I
1
I
I
.1
:!
,I
if
'j
'.
i' ........._
06/15/2007 FRI 10: 13 FAX 317 710 1621 DEBOY LAND DEV. SERVICES
[;lJ005/026
TRANSMITTAL SHEET
TO:
Carmel Clay Communications
ADDRESS:
31 First Avenue NW
Carmel, IN 46032
FROM:
Michael L. DeBoy
DATE:
JUNE 14,2007
ATTENTION:
Bill AkelE
PROJECT NAI:lE:
Forestal Estates
PROJECT ADDRESS:
PROJECT NUMBER:
2007-0043
141 $I Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTESICOMMENTS:
J;.~
Attached is one set of drawings as submitted to planning for the ~ 18 TAC Meeting,
If you have any questions or comments, please contact our office.
Thank YOU.
Bringing Your World into Focus
5D1 SOUTH 9'" STREET. N08LESVlLLE. IN 46060
~HONE: 311.770.1801 FAX: 311.nO.1821
1.888. 801-8555 TOLL FREE
, i
i
I
I
!
l
!
f
i
'/
, 1
: t
'.
J
~
!
I
!
\
f
!
!
I
!
r
!
, t
,I
I
06/15/2007 FRI 10: 14 FAX 317 770 1821 DE,BOY LAND DEV. SERVICES
121006/026
TRANSMITTAL SHEET
TO:
Office of Police Chief
ADORllSS:
Three Cillie Square
Cannel, IN 46032
FRO"':
Michael L. DeBoy
DATE:
JUNE 14, 2007
ATTENTION:
Michael Forgarty
PROJECT HP.IilE:
Forestal Estates
PROJECT AOORE55:
PROJECT NlIMBER:
2007..0Q43
14151 Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY 0 PLEASE RECYCLE
NOTESJCOMMENTS:
Attached is one set of drawings as submitted to planning for the June T AC Meeting.
If you have any questions or comments; please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH glh STREET, N08LESV1LLE, IN 46060
PHONE: 317.770.1801 FAX; 317.770.1 B21
1.888.801.8555 TOll FREE
i
,
. ,
,
,
,
. !
I
. . ~
!
. i
. i
I
I
!
I
j
. (
: 1
I
I
!
!
: ,
!
I
i
1
!
!
. !
: !
I
06/15/2007 F~ 10: 14 FAX 317 770 1821 DEBOY LAND DEV. SERVICBS
G;!J007/026
i
..1
I
I
eBdY
. ..' I
DEVELOPMENT SEiIVICES
De8I' .,_...._~"...,-,...-~..- "'-'--'~-"-"-~.cr. ~y;~
6'11I1 S. 9trr Stnttllt. Suit. 100 Nobhts"n'N'4GOf(J
"'_: :J17.770.1f1Ot Fexr SI7.77il,,,.:l:tt
Toll Frwe: f.B8IUJtJI.8S5 ,!
TRANSMITTAL SHEET
TO:
FROM:
Michael L DeBoy
Office of Fire Chief, Fire Station #1
ADDRESS;
Two Civic Square
Carmel, IN 46032
DATE;
JUNE 14. 2007
ATTENTION:
Gary Hoyt
PROJECT NAME;
Forestal Estates
PROJECT ADDRESS:
PROJECT NUMBER:
2007:.0043
14151 Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPL '(
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June T AC Meeting.
If you have any questions or comments, please contact our offICe.
Thank You.
Bringing Your World into Focus
501 SOUTH 'if' STREET, NOBLESVlIJ.E, IN 46060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888.801.8555 TOLL FREE
I
. !
: I
I
,
,
. ,
; ~
: ~
.,
, I
)
!
f
I
!
.1
f
I
!
I
i
I
.1
f
::
!l
"
06/15/2001 FRI 10: 15 FAX 317 170 1621 DEBOY LAND DEV. SERVICES
~OOB/026
TRANSMITTAL SHEET
TO:
Carmel Engineering Department
AllOIlESS:
One Civic Square, First'Floor
Cannel, IN 46032
FROM:
Michaell. DeBoy
DATE:
JUNE 14,2007
ATTENTION:
Amanda Foley
PROJECT NAME:
Forestal Estates
PROJECT ADDRESS:
PROJECT NtI iii BER:
2007-0043
141& Street & [)jtch Road
o URGENT
o PLEASE COMMENT
o PLEASE REPLY 0 PLEASE RECYCLE
o FOR REVIEW
NOTESrCOMME NTS:
Attached are two copies of the drawings as submitted to planning for the June TAC Meeting.
If you have any questions orcomments. please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH gill STREET, NOBLESVlLLE, IN 48060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888 801-8555 TOLL FREE
,i
..l
, i
i
i
, I
. ,
i
I
i
i
!
i
. i
: I
!
I
~
!
!
i!
i '~
, ,
, ~
, ~
i
I
, i
!
I
, f
I
I
]1
06/15/2007 FRI 10:15 FAX 317 770 1821 DEBOY LAND DEV. SERVICES
,IdJ009/026
TRANSMITTAL SHEET
TO:
Cannel City Utilities
ADDRESS:
760 Third Avenue SW
Carmel, IN 46032
FROIII:
Michael L. DeBoy
DATE~
JUNE 14, 2007
ATTENTION:
John Duffy
PROJECT NAME:
Forestal Estates
PROJECT A.OORESS:
141 sI Street & Ditch Road
PROJECT NUMBER:
2007-0043
o URGENr
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTESICOMMENTS~
Attached is one set of drawings as submitted to planning for the June TAC Meeting.
If you have any questions or comments. please contact our office.
Thank You.
Bringing Your World into Focus
5Q1 SOUTH 9'" STREET. NOBLESVILLE. IN 40060
PHONE: 317.770.1801 FAX 317.770.1821
1.888.801-8555 TOll FREE
.-1
i
, t
f
: ~
~
. ~
t
, !
, I
,
;
f
, ,
. ~
: ~
'[
j
i
I
!
i
I
I
I
:j
i
I
'I
:1
'I
,
I
06/15/2007 FRI 10: 15 FAX 317 770 1821 DEBOY LAND DEV. SERVICES
121010/026
"
TRANSMITTAL SHEET
TO:
FROM:
Michaell. DeBoy
Deputy Building Comm!ssioner
ADDRESS:
One Civic Square
Carmel, IN 46032
DATE:
JUNE 14, 2007
ATTENTION;
Bill Hohlt
PROJECT MAlliE:
Foresta! Estates
PRO.W AOORESS:
PROJECT NUMBEIt:
2007-0043
141st Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/CO~MENTS:
Attached is one set pf drawings as submitted to planning for the T AC Meeting.
If you have any Questions or comments, please con1act our office.
Thank You.
Bringing Your World into Focus
501 SOUTH 9"' STRge:T, NOBLESVlLLE, IN 46000
PHONE: 317.770.1801 FAX: 317.770:1821
1.888.801-8555 TOLL FREE
I
"
ii
'f
I
06/15/2007 FRI 10:16 FAX 317 170 1821 DEBOY LAND DEV.SERVICES
~Ol~/026
TRANSMITTAL SHEET
TO:
Cannel Street Department
ADDllES$:
3400 W. 131m Street
Westfield, IN 46074
FROM:
Michael L. DeBoy
DATE;
JUNE 14, 2007
ATTENTIOl/:
Dave Klingensmith
PROJECT,NAflIIE;
Forestal Estates
PROJECT ADllftESS:
PROJECT NUIIIBER:
2007..Q043
14181 Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting.
If you have any questions or commenis, please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH gm STREET. NOBLESVlLLE. IN 46060
PHONE:317.770.1801 FAX: 317.nO.1821
1.888. 801-8555 TOLL FREE
.1
,
!
. I'
i
i
. i
I
.1
d
: I
I
I
d
I
06/15/2007 FR! 10: 16 FAX 317 770 1821 DEBOY LAND DEV. SERVICES
1ZI012/026
TRANSMITTAL SHEET
TO:
FROM:
Michael L. DeBoy
DATE:
JUNE 14, 2007
Cannel Post Office
.ADDRESS:
United State Postal Service
275 Medical Drive
Carmel, IN 46032
ATTENTION:
Dale Sparks
PROJECT tu.ME:
Forestal Estates
PROJECT ADDRESS:
PROJECT NUMBER:
2006-0120
141 sl Street & Ditch Road
o URGENT
o fOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached Is one set of drawings as submitted to planning for the June TAC Meeting.
If you have any questions or comments, please contact our offJce.
Thank You.
Bringing Your World into Focus
501 SOUTH"" STReeT. NOSLE8VlI.LE, IN MlO6O
PHONE: 317.770.1801 ':AX: 317.770.1821
1.888.801.8555 TOLL FREE
,
i
, i
f
: 1
I
I
: 1
: r
~
!
I
I
'J
f
: I
i
:t
J
I
<
j
f
!
i
I
,1
:1
I
I
I
06/15/2007 FRI 10: 16 FAX 317 770 1821 DEBOY LAND DEV. SBRVICES
121013/026
TRANSMITTAL SHEET
TO:
Clay Township Regio,nal Waste District
1WDRfSS:
10701 North College Avenue, Suite A
Indianapolis, IN 46280
ATTENTION;
Ryan Hartman
PROJECT NA~E:
Forestal Estates
PROJECT AOORfSS:
FRO"':
Michael L. DeBoy
DATE:
JUNE 14, 2007
PROJEi;T !lUMBER:
2007-0043
14131 Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTE 5/COMMENTS:
Attached is one set of drawings as submitted to planning for the June T AC Meeting.
If you have any questions or comments, please contact our office,
Thank You.
Bringing Your World into Focus
!;O1 SOUTH 9/to STREET. NOBLESVILLE, IN 46060
PHONE: 317.770. '801 FAX: 311.770,1821
1.888.,801-8555 TOU FREE
,
!
:1
I
I
,I
"I
06/15/2007 FRI 10:11 FAX 3177701821 DEBOY LAND DEV.5ERVICES
Idl014/026
TRANSMITTAL SHEET
TO:
FROM:
Michael L. DeBoy
Cannel Clay Parks Department
AlXlRESS:
760 Third Avenue SW, Su~e100
Cannel, IN 46032
ATTENTK)N:
Mark Westermeier
DATE:
JUNE 14, 2007
PROJECT NAME:
Forestal Estates
PROJl:CT ADDRESS:
141st Street & Ditch Road
PROJECT HUMBER:
2007-0043
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE Rf:PL Y
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting,
If you have any questions or comments, please contact our offICe.
Thank You.
~~----'---Brfnging Your World into Focus
501 SOUTH ff' STREET, NOBLESVlll.E, IN 46060
PHONE: 317.170.1801 FAX: 317.170.1821
1.888.601-8555 TOll FREE
i
. i
. j
, ~
I
I
. I
f
~
(,
.1
l
, I
. ,
..I
; I
!
I
. !
!
,
.~
. ~
; 1
: I
l t
06/15/2007 FRI 10:17 FAX 317 770 1821 DEBOY LAND DEV.SERVICES
1lI015/026
TRANSMITTAL SHEET
TO:
Cannel Clay Schools
ADDRES$;
5201 East 131& Street
Cannel. IN 46033
ATTENTION:
Ron Farrand
FROM:
Michaell. DeBoy
DATE:
JUNE 14, 2007
PROJECT NAME:
Forestal Estates
PROJECT ADllRfSS:
PROJECT NUMBER:
2007.0043
14151 Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting
If you have any questions or comments, please con1act our offICe.
Thank You.
Bringing Your World into Focus
501 SOUTH if' STREET, NOBLESVlLlE, IN 4&160
PHONE: 317.770.1801 FAX: 317.770.1821
1.888,801-8555 TOLL FREE
'I
f
I
06/15/2007 PRI 10:18 FAX 317 770 1621 DEBOY LAND DEV.SERVICES
~016/026
TRANSMITTAL SHEIET
TO:
CrossRoads Engineering
AOORESS:
3417 South Shennan Drive
Indianapolis, IN 46268
ATTENTION:
GregO/)' lIko, PE
PROJECT NAME:
Forestal Estates
AAOJECT /IOORESS;
fROM:
Michael L. DeBoy
DATE:
JUNE 14, 2007
PftOJECT 1'I11M8ER:
2OO7..Q043
141st Street & Dltch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting.
If you have any questions or comments, please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH 9'" STREET. NOBLESVlLLE, IN 46060
PHONE: 317.770,1801 FPJI.: 317.770.1821
1.888.801-8555 TOLL FREE
. (
i
i
I
. ~
I
I
I
1
: I
, ,
1
:!
if
I
!
I
I
06/15/2007 FRI 10: 18 FAX 317 770 1621 DEBOY LAND DEV. SERVICES
141017/026
TRANSMJTT Al SHEET
TO:
Hamilton County Highway Department
AllOllfS$;
1700 South 1()lh Street
Noblesville. IN 46060
ATTENTION:
David Lucas
FROM:
Michael L. DeBoy
DAlE:
JUNE 14. 2007
PROJECT NAIIIE:
Forestal Estates
PROJECT AIlDRESS:
PROJECT NLlMBER:
2007-0043
141st Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY 0 PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawfngs as submitted planning for the TAC Meeting.
If you have any questions or comments, please contact our offICe.
Thank You.
Bringing Your World into Focus
501 $OUTH fin STREET, NOBLESVIUE, IN 4eoeo
PHONE; 317.770.1801 FAX: 317.770.1821
1.888.801-8555 TOLL FREE
!
. i
.,
;
,
I
I
.1
. ,
,.
i
I'
f
f
i
!
,
: i
. !
i
!
.1
. t-
~
f
I
I
i
: f
!
J
.1
,j
.1
06/15/2007 FRI .10: 18 FAX 317 770 1821 DEBOY LAND DEV. SERVICES
121018/026
TRANSMITTAL SHEET
TO:
FROM:
Michael L. DeBoy
DATE;
JUNE 14,2007
Duke Energy
ADDRESS:
16475 Southpar1< Drive
Westfield, IN 46074
ATTENTION:
Shirley Hunter
PROJECT ItAME:
Forestal Estates
PROJECT AllllRESS:
PROJECT NUIlBER:
2007-0043
141$1 Street & Ditch Road
o URGENT
o FOR RE....IEW
o PLEASE: REPLY
o PLEASE RECYCLE
o PLEASE COMMENT
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning tor the June TAC MeetIng.
If you have any questions or comments, please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH 9'~ STREET, NOSLESVlLlE. IN 40060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888.801-8555 TOll FREE
06/15/2007 FRI 10:19 FAX 311 710 1821 DEBOY LAND DEV.SERVICES
1dI019/026
TRANSMITTAL SHEET
TO:
FROM:
Michael L. DeBoy
DATE:
JUNE 14, 2007
Hamilton County Sheriffs Office
ADDRESS:
18100 Cumberland Road
Nobtesville, IN 46060
ATTENTION:
Brooke Gajownik
PROJECT HAllIE:
Forestal Estates
PROJECT AIlIlRESS:
PROJECT HUMBER:
2007..Q043
14151 Street & Ditch Road
. r
:1
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the JuneT AC Meeting.
If you have any questions or comments, please contact our office,
Thank You.
Srr nging Your World into Focus
501 SOUTH ~ STREET, NOBLESVIUe, IN 4I'i060
PHONE: 317.nO.1801 FAX: 317.770.1821
1.886. 601.6~55 TOLL FREE.
06/15/2001 PRl 10: 19 FAZ 311 170 1821 DEBOY LAND DEV.SERVICES
!;.?I020/026
. !
1
. ~
,
. i
f
.1
,
; I
: I
; i
i
i
I
\
!
I
!
!
!
i
, ~
TRANSMITTAL SHEET
TO:
fROIM:
Michael L. DeBoy
DATE:
JUNE 14, 2007
Hamilton County Health Department
ADDRESS:
One Hamilton County Square
Su~e 30
Noblesvllle, IN 46060
ATTENTION:
Jason Lemaster
PROJECT NAME:
Forestal Estates
I'ROJECT ADDRESS:
PROJECT NUMBER:
2OQ7.{J(J43
141 st Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June T AC Meeting.
If you have any questions or comments, please con1act our office.
I
Thank You,
.
Bringing Your World into Focus
501 SOUTH 'if' STREET, NOBLESVlLLE, IN 46060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888. 801-8555 TOLL FREE
06/15/2007 FRI 10= 20 FAX 317 770 1821 DEBOY LAND DEV.SERVICES
G1l021/026
,
'j
,
. ,
TRANSMITTAL SHEET
, l
!
/
,
I
,
l
I
!
~
,
~
I,
f-
I
'I
, I
r
l
I
TO:
Hammon County Surveyor's Office
ADDRESS;
One Hamilton Square, Suite 188
NobIesville, IN 46060
ATTENTION:
Greg Hayes
PROJECT HAllIE:
Forestal Estates
PROJECT ADDRESS:
FROM:
Michael L DeBoy
DATE:
JUNE 14,2007
!'ROJECT NUMBER:
2007-0043
14151 Street & Dnch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY 0 PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting.
If you have any questions or comments, please contact our offJCe.
Thank You.
Bringing Your World into Focus
501 SOUTH 9" STREET. NOBLESVlLLE. IN 46060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888. 801-8555 TOLL FREE
. !
. f
: ;
. i
i
i
t
i
I
1
j
i
I
i
,
'I
1
.1
!
I
.,
!
.j
i
I
:I
:/
~ I
I
I
06/15/2007 FRI 10: 20 FAX 317 770 1821 DEBOY LAND DEV. SERVICES
,,111022/026
TRANSMITTAL SHEET
TO:
Panhandle Eastern Pipeline Co.
ADllRESS:
9371 Zionsville Road
Indianapolis, IN 46268
ATTENTION:
David Malone
FROM:
Michael L. DeBoy
OATE:
JUNE 14,2007
PROJECT NAME:
Forestal Bates
PRllJECT A!lllRESS:
PROJECT NUMBER:
2007-0043
141 SI Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting.
If you have any questions or comments, please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH rJl' STREET, NOBLESVlLLE, IN 46000
PHONE: 317.770,1801 F/J;)(: 317.770.1821
1.8S8. 801-8555 TOLL FREE
06/15/2007 FRI 10: 20 FAX 317 770 L821 DEBOY LAND DEV. SERVICES
, ,
. i
~i
,
. I
I
: I
,I
,
I
, .
I
I
, I
I
. I
, I
I
!
,1
!
I
, I
\
, I
, ,
I
!
j I
, t
!
'I
&:D023/026
TRANSMITTAL SHEET
TO:
FROM;
Michael L. DeBoy
Brighthouse Networks
l\DORfSS:
3030 Roosevelt Avenue
Indianapolis, IN 46218
ATTEIlTlOtl:
Jason Kirkman
DATE:
JUNE 14.2007
PROJECT NAIllE;
Forestal Estates
PROJECr AOORfSS:
14181 Street & Ditch Road
PROJECT NUMBER:
2007-0043
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting.
Thank You.
If you have any questions or comments. please contact our office.
Bringing Your World into Focus
501 SOUTH 'i" STREET. NOE3\..ESVlLLE, IN 46060
PHONE: 317.nO.1SQ1 FAX: 317.770,1821
1.888.801+8555 TOLL FREE
:1
06/15/2007 FR! 10: 21 F.AX 317 770 1821 DEBOY LAND DEV. SERVICES
~024/026
TRANSMITTAL SHEET
TO:
FROI'iII:
Michael L. DeBoy
OA TE:
JUNE 14, 2007
Indianapolis Water Company
AOllRESS:
1220 Waterway Blvd.
Indianapolis, IN 46206
ATTENTION.:
Jennifer Mar1ett
""'"
PROJECl NAME:
Forestal Estates
PROJECT ADDRESS:
PROJECT HlJMBER:
2007-0043
141stStreet & Ditch Road
o URGENT
o PLEASE COMMENT
o PLEASE REPLY
o FOR RI:VIEW
o PLEASE RECYCLE
NOTES/COMMENTS:
Attached Is one set of drawirl9s as submitted to planning for lheJune TAC Meeting.
If you have any quesUons or comments, please contact our office,
Thank Yau.
Bringing Your World into Focus
501 SOUTH gin STREET, NOBLESVlLLE, IN 46060
PHONE: 317.770,1801 FAX: 317.770.1821
1.888. 801.8555 TOLL FREE
. t
f
; I
I
i
I
.
~
i
. ~
!
!
(
l
I
j
!
I
, f
'I
,I
!
j
06/15/2001 FRI 10:21 FAX 317 77Q 1821 DEBOY LAND DEV.SERVICES
1dI025/026
TRANSMITTAL SHEET
TO:
FROM:
Michael L. DeBoy
DATE:
JUNE 14, 2007
Indianapolis Power & Ught Co.
ADORES&:
3600 North Arliogton Avenue
Indianapolis, IN 46218
ATTENTION:
Ron Monis
PROJECT IlAYE:
Forestal Estates
I'ROJEtT AOORESS:
PROJECT NUMBER:
2007 ~0043
141 $I Street& Ditch Road
o URGENT
o FOR REVIEW
o PLEASE REPLY
o PLEASE RECYCLE
o PLEASE COMMENT
NOTESICOMMEIoITS:
Attached is one set of drawings as submitled to planning for the June TAC Meeting.
If you have any questions or comments, please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH aU. STREET, NOBLESVlUE, IN 46060
PHONE: 317.770.1801 FAX: 317.nO.1821
1.686,801-8555 TOLL r:REE
r
~ f
, :
I
r
,
: f
~
i
.t
f
'1
t
I
!
,
,I
i
1
I
!
I
!
!
!
[
: !
: I
!
j
i I
; !
if
i
: I
I
q
, !
!
l
06/15/2007 FRI 10: 22, FAX 317 770 1821 DEBOY LAND DEV. SERVICES
fdJ026/026
/~
....,i' 'C'.'
,f(c-.ry'~, "
'..,' .~': ~ ;t ~I:,) ;11
J~~/"
I, II ~,
t -~'(i} _:~ .~'
TRANSMITTAL SHEET
TO:
FROM:
Michael L DeBoy
DATE:
JUNE 14, 2007
Vectren Energy
ADIlRESS:
P.O. Box 1700
Noblesville, IN 46061-1700
ATTENTION:
Chuck Shupperd
PROJECT NAIIE:
Forestal Estates
PROJECT AOORESS:
PROJECT NUMSER:
2007-0043
141$1 Street & Ditch Road
o URGENT
o PLEASE REPLY
o PLEASE RECYCLE
o FOR REVIEW
o PLEASE COMMENT
NOTES/COMMENTS:
Attached is one set of drawings as submitted to planning for the June TAC Meeting.
If you have any questions or comments, please contact our offICe.
Thank You.
Bringing Your World into Focus
501 SOUTH rj' STREET. N06LESVlI.LE. IN 46060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888.801-8555 TOLL FREE
I
/
I
~
DEVELOPMENT SEiNICES
. _...'.M._.........,................. . . ". ":....;..,.......""......
De ers-EngineerS-S411'l(eyo,s
501 s. 9th Str..et. Suite 100 Noblesville IN 46060
Phone: 317.770.1801 Fax, 317.770J1821
To" Free: 1.888.801.8555 1
{~
RECEIVED
I .
DOCS
TRANSMITTAL SH EET
Carmel Dept. of Community Services
(DOCS)
ADDRESS:
One Civic Square
Carmel, IN 46032
FROM:
Michael L. DeBoy
TO:
DATE:
JUNE 14,2007
ATTENTION:
Angie Conn/Christine Barton..Holmes
PROJECT NAME:
Forestal Estates
PROJECT ADDRESS:
PROJECT NUMBER:
2007 -0043
1415t Street & Ditch Road
o URGENT
o FOR REVIEW
o PLEASE COMMENT
o P lEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS
Attached is one set of drawings as submitted to planning for the June T AC Meeting
If you have any questions or comments, please contact our office.
Thank You.
Bringing Your World into Focus
501 SOUTH g'h STREET, NOBLESVlllE, IN 46060
PHONE: 317.770.1801 FAX: 317.770.1821
1.888.801-8555 TOLL FREE
City of Carmel
nd Development Services, Inc.
9[h St. ste 100
Noblesville, IN 46060
RE: Forestal Estates
Dear Ms. Fouts:
The following letter represents comments for this project specifically addressing the area of alternative
transpOJiation. I have reviewed the drawings submitted for the May 16, 2007 Technical Advisory Conmrittee
meeting and offer the following comments:
ALTERNATIVE TRANSPORTATION REVIEW COMMENTS
1) The Carmel Clay Alternative Transportation Plan requires the construction of 10' asphalt path along
141't St and Ditch Rd. These paths should be located I' from the edge of the right-of-way and should
include ADA compliant ramps at all sidepath and sidewalk crossings.
We request that all responses to our comments be provided in ""Titing. Failure to provide written responses may
result in delay of the review process.
II is critical that this office be made aware of all modification made on the plans being re-submitted, paliicularly if
any such changes are considered "new" or fall outsidc of our previous reviews. Please provide revised plans
indicating all revisions. Please notify us of any changes and specifically state any changes, including changes
resulting from Plan Commission, Special Studies or other committee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent
reVIews.
If you have questions, please contact me at 571-2417.
Sincerely,
;?~~
David Littlejohn
Alternative Transportation Coordinator
Depaliment of CommtUlity Services
ec: Angie Conn, Department of Community Services
Engineering Department Review
Project File
ONE CIVIC SQUARE
CARIvffiL, INDIANA 46032
317/571-2417
Page I of I
Conn, Angelina V
From: Wood, Mark A. [MarkWood@SUG.com]
Sent: Monday, June 11,20078:12 AM
To: Conn, Angelina V
Cc: Malone, David G.
Subject: RE: June 20 TAC agenda
Panhandle Eastern Pipe Line Company has no conflicts with the items listed on this month's agenda. Thank You.
-----Original Messagen-n
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Friday, June 08,2007 11:54 AM
To: Akers, William P; Blanchard, Jim E; Boone, Rachel M.; Brewer, Scott I; Brook Gajownik; Carter,
Ronald E; Chuck Shupperd; Dale Sparks; David Lucas; Malone, David G.; DeVore, Laura B; Donahue-
Wold, Alexia K; Duffy, John M; Duncan, Gary R; Fogarty, Michael D; Foley, Amanda J; Foster, Jim P; Greg
Hayes; Greg IIko; Hancock, Ramona B; Hill, Dick B; Hohlt, William G; Hollibaugh, Mike P; Holmes,
Christine B; Hoyt, Gary A; Jason Kirkman; Jason LeMaster; Jennifer Bruner; Jennifer Marlett; Joel
Thurman; Keeling, Adrienne M; Klingensmith, David W; Krueskamp, Theresa A; Larry Castetter; Lillard,
Sarah N; Littlejohn, David W; Marilyn Anderson; Wood, Mark A.; McBride, Mike T; Pace, Paul V; Redden,
Nick; Richard Heck; Ron Farrand; Ron Morris; Ryan Hartman; Schmiesing, Rebecca; Shirley Hunter;
Snyder, M Todd; Stewart, Lisa M; Tingley, Connie S; Westermeier, Mark
Cc: Steve Broermann; coleen_ellis@petangelmemorialcenter.com; Mike Hoff; staceyf@deboyland.com;
miked@deboyland.com; Jennifer.Burk@Dukerealty.com; Laystrom, Chris; Fred Simmons; Brandon Burke;
Keeling, Adrienne M; Richard Heck (E-mail)
Subject: June 20 TAC agenda
Good morning,
Please see attached agenda for the June 20 Technical Advisory Committee meeting.
Let me know if you did not receive plans for an item. (Petitioners, please distribute necessary plans to all
T AC members (list attached) if you have not already done so.) If you have any questions, please don't
hesitate to email me.
Thanks,
An 9 ie Co n n, Pia nning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Cannel, IN 46032
p. 317~571-2417 f.317-571-2426
aconn@c;)rmel,ingov
The information in this e-mail, and any tiles transmitted with it, is intended for the exclusive use oflhe
recipient(s) to which it is addressed and may contain confidential, proprietary or privileged information
If you are not an intended recipient, YOLl have received this transmission in error and any lise, review,
dissemination, distribution, printing or copying of this information is strictly prohibited. [fyoLl have
received this e-mail. in error, please notify the sender immediately ofthe erroneous transmission by reply
e-mail, immediately delete this e-mail and all electronic copies of it from your system and destroy any
hard copies of it that you may have made. Thank you.
611112007