Loading...
HomeMy WebLinkAboutMinutes TAC 04-17-02 CARMEL/CLAY TECHNICAL ADVISORY COMMITTEE MINUTES April 17 , 2002 Laurence Lillig - DOCS Brian Hanson -DOCS Gary Hoyt ~ Carmel Fire Dept. Chuck Shupperd - Vectren Energy Phil Bennett - Carmel Parks Bill Akers - Communications Mike McBride - Carmel Engineer. Jim Blanchard - Carmel Bldg. Dept. Jon Dobosiewicz - Camlel DOCS Tom Skolak - Carmel Postmaster Steve Broermann - Ham.Co.Highway Sharon Prater - Panhandle Eastern Dean Groves - CinergyIPSI Dick Hill ~ Carmel Engineering John South - Ham. Co. Soil & Water Steve Cash - Ham. Co. Surveyor's s : T eclmi calAd visoryCommi ttee \Minutes \tac2 002apr 1 ~ ~~eR--- Tipton Road, LLC Office Complex (ADLS) (Construction Plails) The site is located at 1220 AAA Way. The site is zoned B-8 / Business. Filed by Paul G. Reis of The Reis Law Firm, LLC for Tipton Road, LLC. Paul Reis presented the case. He introduced John Mosele, John Mose1e Architect, and Dave Sexton, Schneider Engineering. Construction will be for a 3,600 square foot medical office. Mr. Reis has received comments from utilities. Dick Hill and Mike McBride will write comment a letter. Board of Public Works approval will be needed. Dick Hill understands the building will 40' X 90' feet and classified as a storage facility. However, it is designed and parking is planned as if it was an office. The connection fees will run between $6,000 to $7,000. The cost is based on use not fixtures. The only bonding requirements regard a right of way pernlit. Pavement will be removed. The AAA Way right of way line is needed. The City usually asks for a connection rather than a "y"drainage pattern in the parking area with spot elevations and flow arrows. A drainage swale exists. It is important to keep landscaping out ofthe flow in the swale. Jim Blanchard inquired about the use ofthe building. It will be used for stored medical records, some medical equipment, and a vehicle. There wiU be an oil separator. A pre- submittal meeting will be required. Gary Hoyt will write a letter. The building will not be sprinkled. It will be a storage building. The vehicle stored will be a personal car. The height will be single story with a 25-foot maximum. There will be storage in the truss portion of the roof. No basement is planned. Mr. Hoyt requested a Knox box be used. Steve Cash stated no County drains are affected. Bill Akers will need to assign an address for the building. John South sent a fax this morning. The erosion control plan looks fine. No NOl of required. Dean Groves asked the petitioner to call Cinergy for a new service request. They will discuss location of service and power needs. Jon Dobosiewicz gave infonnation from Vectren. Scott Brewer was unable to attend the meeting. He will write comments for the petitioner. Additional shrubs might be needed along AAA Way. The setback is in conformance. The request for the proposed signs is included in the ADLS. A variance is needed to have both signs for each business. There will be one tenant in the northern building and potentially two in the south building. Mr. Dobosiewicz suggested getting Scott Brewer's comments on landscaping before the ADLS is heard in May. The Board of Zoning Appeals must hear additional signage s:T echni calAdvisoryCo mmi ttee \Minutes\tac2002a pr 28 requests. The Department might support one sign for each entrance, but not for two buildings. s: T echnicalAd visoryCommi ttee \Minutes \ tac2 002apr 29