HomeMy WebLinkAboutCorrespondence
''---'
I"'
..-~
( \ \
ON-SIT~V ALUATIONFOR EROSION AND SEDI NT CONTROL
Hamilton County Soil and Water Conservation District
1108 South 9lh Street, Noblesville, IN 46060
Email at iohn-south(ciJ,iaswcd.org Ph: 317-773-2181 Fax: 317-776-110 I
Date: November 13, 2003
Project Name: Sedgwick
Present at Site: John South, Hamilton Co. SWCD
~ 7b 0 @J1,(9, ~rdJ
This Report Provided To:
GWZ Development
9011 N. Merdian Street
Suite 202
Indianapolis, IN 46260
TYPE OF EVALUATION: 0 lnitial X Routine 0 FolJow-up 0 Complaint
This evaluation is intended to assess the level of compliance with 327 lAC /5-5 (Rule 5). It is also intended to identifjJ areas where
additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be
evaluated as to their feasibility by a qualified individual WIth structural practices designed by a qualified engineer.
All erosion and seditnent control measures shall meet the design criteria, standards, and specifications outlined in the ''Indiana
Handbook jar Erosion Control in Developing Areas H or similar guidance documents.
Carmel DOCS
Surveyor
File
Current Site Information: Land development is completed. All disturbed areas are protected. The first home is
being constructed.
The Following Items Have Been Evaluated and Assigned a Designation of:
S = Satisfactory M = Marginal U == Unsatisfactory NA == Not Applicable
Construction Site Management for Erosion and Sediment Control
M (1) Disturbed areas have been adequately protected through sceding or other appropriate erosion and
sediment control measures.
S
S
S
S
S
S
S
M
(2) Appropriate perimeter sediment control measures have been implemented.
(3) Conveyance channels havc been stabilized or protectcd with appropriate sediment control measures.
(4) Erosion & sediment control measures are installed properly.
(5) Storm drain inlets have been adequately protected.
(6) Outlets have been adequately stabilized.
(7) Existing erosion & sediment control measurcs are being maintained.
(8) Public & privatc roadways are being kept clear of accumulated sediment or tracked soil.
(9) Erosion & sediment control measures have been installed and maintained on individual building sites
Status of Sediment Retention On-Site
Site conditions present a high potential for off-site sedimentation.
There is evidence of off-site sedimcntation.
Describe:
Satisfactory:
Marginal:
Unsatisfactory:
Not Applicable:
X Please Refer to the Comments Section of this Report
Definitions
The item is currently in compliance with the Rule
A concern has been idcntified; corrective action is strongly recommended to remain in compliance
A violation has been identified and the site is not in compliance; corrective action is required
Does not apply at this stage of construction
Revised 4/98
-
,,,
( ) ( )
ON-SI1-EVALUATlON FOR EROSrON AND SEDI~T CONTROL
q
COMMENTS
PROJECT NAME:
Sedgwick
Page 2
The items checked below must be corrected prior to _11-26-03
, unless otherwise noted.
Install an appropriate sediment control practice between construction areas and lower lying areas.
Replace/Repair silt fence and/or straw bale barriers.
Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales.
Remove accumulated sediment from:
o sediment trapslbasins,
o behind silt fence/straw bales,
o around storm drain 111let protection devices,
o streets and gutters (Do not flush with water)
Temporary seed, fertilize, and/or mulch:
Permanent seed, fertilize, and mulch areas that are at final grade
Protect storm drain inlets:
o curb inlets,
o drop inlets
Reshape and stabilize sideslopes of:
o sediment trapslbasins,
o detention/retention basins
InstalllMaintain construction entrance( s):
Reshape and stabilize conveyance channels:
Place greater emphasis on erosion and sediment control on building sites; contractors,
subcontractors, material vendors, and others should be made aware of erosion and sediment control
X requirements. Appropriate perimeter sediment controls (e.g. silt fence) and stable construction
entrances shall be utilized on all sites. Sediment tracked into the street shall be removed (do not
flush with water) at the end of each work day.
Other Requirements:
This report submitted by: John B. South r.E. CPESC
R el'i.~ed 4/98
~~/D3
Project Name: SELJ6 1../; c:.,('
Present at Site: John South, Hamilton Co, SWCD,
This Report Provided To: C kl2 ntE()E:LCPfEl2
q tlll /J. 11 EIZ I OnuJ $1:
$;,h7C z:.Oz:..
:IblO lA-jl/APt;LI.s J s:.I
'-/lrzto
~
"'~r.
.~
Date:
TYPE OF EVALUATION:
.-':-.
ON-SnIt. j"ALUATION FOR EROSION AND SEDH/H CONTROL
"'1'Iamilton County Soil and \Vater Conservation~trict
1108 South 9th Street, Noblesville, IN 46060 "
Ph: 317-773-2181 Fax: 317-776-1101
(~~~A))W
C.AeHEL.
Suit iJ EYd 12
HLE..
o Initial
K Routine
o Follow-up
o Complaint
This evaluation is intended (0 assess tlte level of compliance with 32i lAC 15-5 (Rule 5). It is also intended to identify areas
where additional measures may be required to control erosion and sedimentation. All practices recommended in this report
should be evaluated as t.o their feasibility by a qualified individual with structural practices designed by a qualified engineer.
All erosion and sedimelltcontrol measures shall meet tire design criteria, standards, and specifications outlined in the "Indiana
Handbookfor Erosion Control in Developing Areas" or similar guidance documents.
r~
Current Site Information:
The Following Items Have Been Evaluated and Assigned a Designation of:
S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable
Construction Site Management for Erosion and Sediment Control
S 6) U NA (1) Dishlrbed areas have been adequately protected through seeding or other appropriate erosion and
sediment control measures.
(2) Appropriate perimeter sediment control measures have been implemented.
(3) Conveyance channels have been stabilized ot protected with appropriate sediment control measures.
(4) Erosion & sediment control measures are installed properly.
(5) Stann drain inlets have been adequately protected.
(6) Outlets have been adequately stabilized,
(7) Existing erosion & sediment control measures are being maintained.
(8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
(9) Erosion & sediment control measures have been installed and maintained on individual building sites.
CD M U NA
C[)M U NA
C2:) M U NA
c:J1,> M U NA
c2)M U NA
a M U NA
S @U NA
S M @ NA
Status of Sediment Retention On-Site
o Site conditions present a high potential for off-site sedimentation.
o There is evidence of off-site sedimentation.
Describe:
~ Please Refer to the Comments Section of this Report
Definitions
The item is currently in compliance with the Rule
A concem has been identified; corrective action is strongly recommended to remain in compliance
A violation has been identified and the' site is not in compliance; corrective action is required
Does not apply at this stage of construction
Satisfactory:
Marginal:
Unsatisfactory:
Not Applicable:
Revised" / 98
V..
\ .
ON-SJTP r-:V ALUATION FOR EROSION AND SEDIMFNT CONTROL
-u U
COMMENTS
PROJECT NAME:
SEIJ6tUICK
Page 2
The items checked below must be corrected prior to t-1z:.t!>/03 , unless otherwise noted.
, ,
o Inslall an appropriate sediment control practice between construction areas and lower lying areas.
(J' Replace/Repail" silt fence and/or straw bale barrins.
o Entrench silt fence (6-8 in.) andlor straw bale barriers (4-6 in.) and stake straw bales
o Remove accumulated sediment from' 0 sediment traps/basins. 0 behind silt fence/slraw bales, 0 around storm drain inlet
plotection devices, 0 streets and gutters (Do not flush with water)
Y Temporary seed, fel1iJize, andlor mu ch:
Or ;'5 v-r - 4~~
/Ii' Permanent seed, fertilizy, and mulch arer tbat are ali~nal
grade: .s/.r/;,-f,~e DtJ/1.d /; .:t11~5
/
o
Protect storm drain inlets: 0 curb inlets, 0 drop inlets
Reshape and stabllize sides lopes of: 0 sediment tI'aps/basms, 0 detention/retention basins
o
o
o
Install/Maintain construction entnmce(s):
Reshape and stabJiize conveyance. channels:
;I
Place greater emphasis on erosion and sediment control on building sites~ contractors, subcontractors, material vendors, and
others should be made aware of erosion and sediment control requirements. Appropriate perimeter sediment controls
(e.g silt fence) and stable construction entrances shall be utilized on all sites. ediment tracked int the street shall be
removed (do not tlush with water) at the end of eacl1 work day. 5, Ii 't'JICe . ~ 41h
Other Requirements:
o
Thi, "po" "ubm;tted by prL-13. ..J2.;#t
Revised ~ / 9~
OS/21/02 14:19 FAX
HAMILTON CO HWY. ~~~ Carmel DOCD
@ 0011001
u
u
May 21,2002
HAMILTON COUNlY
HIGHWAY DEPARTMENT
, ~--,r---,,-
- J / :~~ I;.....
I . , 1''''....
~. I . '\.
"\ .~,
. .\
\ -,),
\_- \
- \
/--
~tI ~
111; Cbh
;7 CO
/J. .f?4z
VCS ??
, i
Mr. Lance G. Ferrell
Banning Engineering
698 Tower Road, Suite 100
Plainfield, Indiana 46168
\ ,
" ,
RE:
Sedgwick SUbdivis,ion,
Revised Primary Plat
N of 131s\ Street / W of Towne Road
Clay Township
, I
Dear Mr. Ferrell:
This letter serves to acknowledge receipt of atransmitlal received 5/02102 containing the revised
plans for the above-mentioned project. After reviewing the plans the Highway Department has the
following comments:
1. The Application for Project Review has not been received. Approval for this project will not
be issued untH the fees have been received.
2. A variance will be needed from the Hamil!on County Board of Commissioners for the reduced
centerline radius. Notice will need to be sent to the Board of Commissioners asking for the
variance. please copy the Highway Department on the request. You will need to contact the
Hamilton County Auditor's Office to request your placement on the agenda for the next Board
of Commissioners meeting.
1f you have any questions or comments concerning this letter, please feel free to contact me at
anytime.
Sincerely,
/!;I!!~
Staff Engineer
cc: Jon Dobosiewicz
1700 South 10th Street
Noblesville, In. 46060
www.co.hamilton.in.us
Office (317) 773-7170
Fax (317) 176-9814
=
f(62-
U u
City of Carmel
DEPARTMENT OF COMMUNITY SERVICES
May 14, 2002
David Warshauer
Barnes & Thornburg
11 South Meridian Street
I ndianapolis, IN 46204
RE: Sedgewick Subdivision, Primary Plat Landscape Plans
Dear Mr. Warshauer:
After our phone conversation today, I reviewed the entrance and common area
landscape plans for Plan Commission submission. My comments on the
subdivision are as follows:
1. An engineered site plan showing all required and proposed landscaping
needs to be submitted. This plan must include perimeter bufferyard
requirements found in Chapter 26.4 of the Carmel/Clay Zoning Ordinance.
A table should be included that shows required plant totals and totals
provided on the proposed plan. A designated landscaping easement
should be established for these plantings to avoid conflict with drainage
and utility easements.
2. These plans must include a plant schedule with totals, and planting notes
and graphic planting details.
3. Landscaping in the medians on Lincolnshire Boulevard should include
shade trees, low-growing shrubs and plants and ground covers. Turf
should be eliminated if possible to avoid the need to mow weekly.
4. Species comments: Two-needle pines such as Austrian Pine (Pinus
nigra) should be avoided because of long-term health and pest concerns.
Spruce (Picea) species, deciduous evergreens such as Dawn Redwood
(Metasequoia glyptostroboides), or Fir (Abies) Species are much better
alternatives.
Crabapple species should be chosen from the Indiana Urban Forest
Council's recommended list (see attached). 'floribunda' variety is
acceptable; 'Profusion' and 'Snowdrift' are not.
ONE CIVIC SQUARE CARMEL, INDIANA 46032. 317/571-2417
u
u
..~
~
Cross-pollination between ornamental pear species of the "callery" family
is becoming an invasive problem. Please choose an alternative
ornamental tree species. Such species could include Yellowwood
(C/adrastis kentukea), Hornbeam (Carpinus), Hop Hornbeam (Ostrya
virginiana), Tri-color Beech (Fagus sylvatica 'Purpurea Tri-color't Pagoda
Dogwood (Camus a/temifo/ia), or Redbud (Cercis canadensis).
Please reply to these comments in writing and by amended plan. If you have any
questions or comments, please contact me be phone at 317-571-2478 or by
email atSbrewer@cLcarmel.in.us.
Sincerely,
S~~
Scott Brewer
Urban Forester, City of Carmel
cc: Jon Dobosiewicz, DOCS
Lance Ferrell, Banning Engineering
t May ~ooo
u
u
An IUpe Education Committee Report...
Selecting Crabapples'
Tre~'ofthe Malus species. CrabapplcS. You love them or you hate them. To some they are a priceless landscape specimen with
. ou~slanding flower display. To others they are a maintenance headache with constant base sprouting; Some crabapples can be :
plagued with diseases like apple scab and also be defoliated by Japanese beetles. But by choosing your crabapple cultivars wisely,
you can be assured of healthy trees.
A 1997 pubHcation of Purdue Cooperative Extension by CIi ff Sadof, Department of Entomology and Paul peckno ld, Department
of Botany and Plant Pathology outlined crabapptes resistant to apple scab and Japanese beetles in fndiana a.nd also those species
not recommended. Note that some of the popular street tree species like Snowdrift crabapple are on the latter list.
Keep in mind, also. that cfOlbapples come in all shapes and sizes. They are ideal under power lines and in narrow grow spaces.
'When choosing a crabapple species, use the list below to assure plant health and note the eventual width of the tree you plant. If
you keep in mind "quireD"nts for sidewalk and s,,,,et clearances, a proper s.lee'ion call minimize pruning needs. And don" .
forget to request "tree fonn" "vhen ordering if)'cu want a single stem tree that is ~lready pruned.
Recommended Crabapple Cultivars~
cu1tivar
Adirondack
Baccata "Jacki i"
Bechtel
Centurion
David
Harvest Gold
Japanese Flowering
touis'a,
M~tton Lava
pink Spires
Prnrieflfc
Red Baron
Red Jewel
Sinai Fire
Tea
Van Eseltine
Winter Gold
Zumi Calocarpa
Height
18'l-!
30'H
30'H
ZO'H
12'1-{
25'H
Width
IO'W
20'W
lS'W
IS'W
12'W
20'W
25'W
15'W
Comments:
white flowers
white flowers, glossy leaves
rose red flowers, vase upright
white flowers, glossy leaves
gold fruit
weeping, true pink flowers, glossy leaves
semi-weeping
pink flowers, purple leaves
pinkish red flowerS, purple green leaves
dark red flowers, purple leaves
white flQwers, bright red fruit
white flowers, glossy leaves~ red fruit
unique spread
upright vase
15'H
20'H
18'H
IS'H
lS'H
12'W
20'W
g'W
12'W
15'W
25'W'
12'W
20'W
24'W
"Red Bud" Crab, wide; white flowers
25'H
20'H
Crabapple Cultivars Not Recommended~
T~e following should not be used because of insect and disease susceptibility
Adams
Baskatong
Brandywine
Candied Apple
Donald Wyman
Doubloons
Page 4
L.
Indian Magic
Indian Summer
Liset
Madonna
Mary potter
prarie Maid
Profusion
Robinson
Selkirk
Sentinel
Snowdri ft
Sugar TYlUe
Velvet Pillar
While Cascade
White Candle'
BARNES & THOR~hURG
u
11 South Meridian Street
Indianapolis, Indiana 46204.3S35 U.s.A.
(3 17l 236.1313
Fax (317) Z3L.74H
David R. Warshauer
(317) 231.7346
Email: dwarshau@btlaw.com
www.brlaw.com
VIA FIRST CHOICE COUJUER
Ramona Hancock, Secretary
Cannel-Clay Plan Commission
Carolel City Hall
One Civic Square
Carmel, In 46032
1:
~~~~~~[Ql
HAY 8 ,.:
DOCS
May 8, 2002
RE: Sedgwick Subdivision, Primary Plat and Subdivision Waiver, 42-02PP,
43-02A and SW
Dear Ramona:
Enclosed please find twenty (20) informational paekets with respect to the above-
referenced matter. Tfyo11 need anything further, plea~e do not he~itate to contact me.
r
DRW/rlj
Enclosures
ec: Jon Dobosicwicz (v.do enc.)
Mark Zukemlan (w/o euc.)
Glenda Garrison (w/o enc.)
lNDS[J! DR\." 507256\'l.
Indianapolis
Fort Wayne
Suuth Bend
Elkhart
Chicago
Washington, D.C.
-u
Banning Engineering, P,C. .. 698 Tower Road, Suite 100 . Plainfield, IN 46168
Phone: (317) 839-2581 . Fax: (317) 838~9171 . E-mail: banning@banning-eng.com
, .
'",
".
May 6, 2002
I -. _ --
4-
fFJ~((';a'#~!Q)
MAY 8 2002
DOCS
',. ...
'\. \
, \
\ \
'.-\
c/.
.....1
,.: I
1. ,
/ -""""'J
Mr. Jon Dobosiewicz
Planning Administrator
City of Carmel
One Civic Square
Cannel, IN. 46032
,'.j
. I
I '
I_I
\ -:\
\\
/~
,,' .
" ,'....
........./ : . ..
-....:..... '
,(~J/
. \,/
RE: SEDGWICK SUBDIVISION - PRIMARY PLAT
Dear Jon:
We have received and reviewed your comment letter date May 3, 2002 and would like to respond at this
time.
1. I have forward a copy of you letter to David Warshaure of Batnes & Thornburg and he will be
handling the Road Improvement cost.
2. I have discussed this issue with the developer and his landscaper will be forwarding you a
response and revised plans.
3. I have copied the developer on this issue.
4. We will finalize the common area with the plat at recordation
5. We will finalize with the plat recordation.
6. We have revised the sidewalks to be 5' wide and added the 10' wide asphalt path along the
frontage and a 6' wide asphalt path within our subdivision.
Please find enclosed two full size sets of revised plans and 2 reduced copies for your use. David
Warshaure will be forwarding you the packet infortnation you requested.
If you have any questions or need any additional information please calL..
Cc: David Warshaure - Barnes & Thornburg
Mark Zukerman - GWZ Development, LLC
s: \Proj ects\02022\docs\j ondcarmel. doc
517102
v
u
Banning Engineering, P.C. . 698 Tower Road, Suite 100 · Plainfield, IN 46168
Phone: (317) 839-2581 . Fax: (317) 838-9171 . E-mail: banning@banning-eng.com
DELIVERY TRANSMITTAL
DATE:
May 3, 2002
JOB NO.:
02022
TO:
.Jon Dobosiewicz
Dep;utmcnt of Community Services
City of Carmel
One Civic Square
Cannel, IN 460~~2
, ~ '
~:/' ~~~X~~~~~~1 ,.'
" ;', \\~~, 1~
\~..\ ~OCS . . I
\'>, "" /
~. >>''-- -. (', ,;'
~I~
X Mail
Fed Ex
Customer Pick-up
Delivered By:
PROJECT:
SEDGEWICK
SUBMITTED:
1) Resubmittal Packet for Primary Plat
2)
3)
4)
COMMENTS: Jon, David Warshauer asked that I send the revised plans directly to you.
FIe will forward all the remaining information to you next weekl
IF THERE ARE ANY QUESTIONS REGARDING THIS TRANSMITTAL, PLEASE GIVE ME A
CALL AT 839-2581. THANK YOU.
Lance Ferrell
I
f
III
/ /
/ /
u
~,j
City of Carmel
VIA FAX: 838-9171
Original by Mail
May 3,2002
Mr. Lance G. Ferrell
Banning Engineering
698 Tower Road, Suite 100
Plainfield, mdiana 46168
L1 COpy
RE: Sedgwick Subdivision, Primary Plat Application
Dear Mr. Ferrell:
This letter is in response to your Primary Plat filing for Sedgwick Subdivision. The following conunents
need to be addressed and plans updated accordingly:
1. Provide Commitment concerning required road improvements and an estimate of
construction cost of Road Improvements per the Commitment. We will evaluate the estimate
and determine the appropriate action in receiving the improvements per the commitment.
2. Landscape Plan:
a. Provide analysis of frontage & required plantings per that frontage for review and
approval by Scott Brewer, DOCS Urban Forester.
b. Please provide landscaping in median on Lincolnshire Boulevard.
c. What is proposed for all of the evergreens on the east and west perimeter of the site?
3. Be advised of the requirements of Chapter 26.2.7 (existing and proposed) of the Zoning
Ordinance regarding setbacks.
4. The landscaped area within Sedgwick Lane needs to be a cornmon area.
5. Identify other common areas as variable drainage and utility easements.
6. Alternative transportation plan: sidewalks required at 5', asphalt path along West 13151
Street required at 10', and asphalt paths within subdivision required at 6'.
Please submit a revised Primary Plat with the above-mentioned changes for further consideration.
Sincerely,
~c~
Planning Administrator
Sedgwick-PP2
Page 1
ONE CMC SQUARE
CARivIEL, INDIANA 46032
317/571-2417
.- .'. - .
~.~
'rf!~
w
j,11 U
11, 5t_:~6W\~~_
xjl ~,,\~ ~,,-...IA'1f.:
m .
i~ '?Of!..... C- "
(, ,
~ '
V
\
'1/'t Ilo""t.
f'.}OI--\'E-
~Jl.~ ~ "'Tt> Gb~",,~~ . Oft.. ttU~v€.. ~A'V€' a.~)
i
i
~
"j (2..0~." ~~c- --mI tIt? ZfPfPO\ c-,~ ~
Ij!~~: €~ "'" ~E L-I~~
II .' ..-' ~s' ."'S'I'fo.,r..Eb
l'
,~l ""~& L.. y~ '. L' 6)...(if)
;'1' -
iil
~VS_~~ ~~ 'bI illk8 ~ot.J - ;
,
r
'\M~_f5.~~t...=-rb vr-
! . ,
~I I
L !-'--~
;1 ~.~
I
~c - 0 5~~_~ I
, 'I
"
::~~~rV1~ L~~ :
\ 'I'l
\,.'Il 'v~" .......~,,-
\r-- '1\ 1 ,.., ,,~ . VV'.,.,V~
\.._~, II
\---.:1
\
\r...........-
\
'I ....
c- \
\
\
I
\
,
\
\
\
I
6,e>'\1-t ~ n~S
~r -
1 r/> ~ ~ ~t~~
I ~.... f2 Nep..~
,i'
'Ti
{
ill
I
\
j
I
:
I
APR 16 '02 10:01PM
P.1/1
.'l<elltmi C. 'lfiard, SUffil.jlOI'
"/'Ijl1"~ () 17) 776-84~5
'Fa.\ ().17) 77~;-.'H;;!.$
.' ~
/--- ./
I' ,
\~\
,. _1
\; ,
.. ....
/
~...;.~. "
r-__
Apdl 16, 2002
'~-\~. >- /'/
Lance Ferrell
Banning Engineering
Re: Sedgwick Subdivision - Primary Plat
I have reviewed the primary plat for this project and have the following comments.
1. The storm sewers for this project will be petitioned to become Regulated Drain.
2. This project is located within watershed ofthc: JW Brendle R<::gulated Drain. The
allowable discharge rate for this watershed is 0.24 cfs per acre.
3. The plat shows a combined detention area \'lith SheLboume Park. Both the fmal
drainage reports for Sedgwick and Shelboume Park will need to reflect the combined
pond.
4, What offsite drainage al,*el\ flows onto this site and how will it be handled?
5. Will this be developed in phases or as one single phase?
6. The Hamilton COU11ty Surveyorls Office standard details will be required on the
construction plans. 111ese may now be downloaded from our website
www.co.hamilton.in.us ,
If you have any questions or comments, please feel free to contact this office at (317)776.
8495.
s.~'nce '. ____.
_..--~'~'/' d
-~/ _/ - II'
':..A',A/'~ - c.---"'-'-~-...
-,:;/
~> Steven T. Cash
Plan Reviewer
Cc: Carmel Eng.
Cannel DOCS
Co. Hwy.
SCS
u
u
,
.,
Johnson, Sue E
From:
Sent:
To:
Subject:
Dobosiewicz, Jon C
Friday, April 12, 2002 3:40 PM
Johnson, Sue E
FW: April 17 Carmel/Clay T AC Agenda
Sue Ellen,
Hope you had a good vacation day (weekend). Please forward the following comments you
received from the District to petitioners.
Thanks I
Jon
see you Wednesday
-----Original Message-----
From: Jay Alley [mailto:Jay@ctrwd.org]
Sent: Friday, April 12, 2002 2:08 PM
To: rfarrand@ccs.k12.in.us; AKeeling@ci.carmel.in.us;
CTingley@ci.carmel.in.us; DHill@ci.carmel,in.us;
DPattyn@ci.carmel.in.us; Ghoyt@ci.carmel.in.us; GStahl@ci.carmel.in.us;
JDobosiewicz@ci.carmel.in.us; JKendall@ci.carmel,in.us;
JPFoster@ci.carmel.in.us; KHahn@ci.carmel,in.us;
LLillig@ci.carmel.in.us; MFogarty@ci.carmel.in.us;
MHollibaugh@ci.carmel.in.usiMMcBride@ci,carmel,in.us;
MSnyder@ci.carmel.in.us; PMorrissey@ci.carmel.in.us;
PPace@ci.carmel.in.us; RAuler@ci.carmel.in.us; RRancock@ci.carmel.in.us;
SBrewer@ci.carmel.in.us; SJohnson@ci.carmel.in.us;
slillard@ci.carmel.in.usi WAkers@ci.carmel.in.us; sprater@cmsenergy.com;
sjb@co.hamilton.in.us; stc@co.hamilton.in.us; john-south@iaswcd.org;
heck@iquest.net; jeffry.farmer@timewarnercable.com; tskolak@usps.gov;
cshupperd@vectren.com
Cc: Candy Feltner; tstevens@mann-properties.com; preis@reislaw.com;
rlauritsen@SLMACO.com
Subject: Re: April 17 Carmel/Clay TAC Agenda
Hello everyone:
Following are CTRWD comments on the agenda items effecting our sanitary sewers or service
area for the April 17 TAC meeting. Please feel free to copy and distribute this email or
attach it to your meeting minutes. We have also created a new page on our website linked
to the "Construction" page where we have posted all CTRWD TAC comments from 2001 and 2002
meetings held to date. We will continue to add to this page every month so please let
everyone know they can view our comments online now too.
West Carmel Center Block B
The plans received by the District only showed a sewer connection for one building; each
building needs to have its own individual connection to the District's sewer so the plans
will need to be revised to show how the whol~ site will be served.
West Carmel Center Block D
The District has no comments on the re-plat unless it effects the sanitary sewers in
development.
of Sedgwick Subdivision
The District has no comments on the plat but will need to review and approve construction
plans when they are completed. The petitioner should contact the District's engineering
1
u
u
consultant relative to plans for this development and several others in a revised
submission to IDEM.
Key West subdivision
The District has no comments on the plat but will need to review and approve construction
plans when they are completed. The petitioner should contact the District's engineering
consultant relative to plans for this development and several others in a revised
submission to IDEM.
New 126th Street Middle School
plans have been received by the District and reviewed by the District's engineering
consultant and will be ready for submittal to IDEM for state construction permits once the
District's construction specifications are added to the plans. The School Corporation also
needs to consider dedicating the sewers to the District for maintenance once they are
completed. The District is also negotiating with the School Corporation for easement
rights for a future force main. through the property; if they remain private, no other
users besides the School Corporation will be allowed to connect. Building permits should
NOT be issued unless the District has issued connection permits.
Saddle Creek Sections 10 & 11
A comment letter was sent by the District's engineering consultant to Cripe in July 2001
but the District has not received any revised plans for review since that time. Please
have the petitioner provide plans for review. Building permits should NOT be issued unless
the District has issued connection permits.
Cox Hall Park Maintenance Facility
The plans received by the District do not indicate how the facility proposes to receive
sanitary sewer service. District specifications need to be added to the plans. Building
permits should NOT be issued unless the District has issued connection permits.
Little Farms Lot 46 (Primary plat Amendment)
The petitioner will need to contact the District to discuss the proposed sanitary sewer
connection; for an existing active line, connection via a manhole core drill is preferred.
Other requirements may also apply at the time the District issues its connection permit.
Building permits should NOT be issued unless the District has issued connection permits.
Little Farms Lot 26 (Primary Plat Amendment)
The District has not received any plans for this proposal. Building permits should NOT be
issued unless the District has issued connection permits.
Village of West Clay Commercial Building 2
District specifications should be added to the plans. The plans are not clear as to the
location of the sewer connection. Building permits should NOT be issued unless the
District has issued connection permits.
103rd Street Office Building Addition
All work on relocating the existing sanitary lateral will need to be inspected. Additional
permit and inspection fees will be due the District. Building permits should NOT be issued
unless the District has issued connection permits.
please remind all TAC applicants to provide plans directly to the District at our main
office address at:
10701 N. College Avenue, Suite A, Indianapolis, IN 46280-1098.
If there are questions about the District's requirements, then please refer to our websLte
for current information on the District's construction specification and permit standards.
2
u
u
One Civio Square
Carmel, IN 4E032
(31 T) 571-2417
Fax: (317) 571-2426
To:
.~~, C ~ ~&-~~~~ From:
Ot~ \ _, ~~ Pages:
~ 'i~~_
~
Fax:
Phcme:
Date:
-r~-C C-
Re~
cc:
o Urgent
o For Review 0 Please Comment 0 Please Reply
o Please Recycle
a~'
~~~..~
c:::=:-
~ ~ C e ..,,) \ ",,-. ~ .....:s
,r
- - -:-"-;'
,-'
APR. 12.2002 10:05AM
8~ES THORNBURG 317-231-7433
U
11 South Meridian Street
Indianapolis, Indiana 46204
(317) 236.1313
Telecopier (Fax) Number: (317) 231-7433
NO, 130
p, 1
,..
'~.
BARNES & THORNBURG
Attorneys at Law
Call before sending
Telephone Number:
'~I~~
/ \ \ - 'J. ,"';-"
/V< ,/' ......- - "" ;~A
;,." ..J '\: /~,
L,~' . ~~ ~ \~\
(.-:, 4fJ; .l.~~ 0
"..\ ~ 1l/1,,~ r
\(\. DOCa 'V{/.! /...-/
,'\ Ii ;/
'/, ,<"/'
" ~ ...'~~ -..,\. ...
"<~ I i T--n'\ '-,'/
~J._(_'~~--~
FAX COVER SHEET
TO: Sue Ellen Johnson
COMPANY NAME: Cannel DOCS
FROM: David Warshauer
TELECOPY NO.: 571-2426
DATE: April 12, 2002
TIME SE"NTIING:
NUMBER OF P AGES (INCLUDING THIS COVER SHEET): 2
(f you have difficulty receiving- tlili F~ pr~:ISO call Bllme$ & Thornburg at (JI7) 2~ and~~"
Sue Ellen,
I would appreciate if you would look over the attached form of legal notice and make sure I have
included the correct docket numbers, and if the notice otherwise conforms to Cannel's requirements.
I've always COunted on Jose to do this before!
Thanks.
David
CLIENT #
MATTER #
32062
1
x
Original to follow by mail
Orighlal will not follow by mail
lk
CONFIDENTIALITY NOTICE: This message is fliT the exclusive use of me individual or entity to which it is
addressed and j& confidential. rfyou are not the addressee or an employee or agent of the addressee responsible for
delivering it to the addressee, please do not read, use, disclose, copy or distciwte this message and do not take lUly action
in reliance upon it [fyou have received mis message in error, pleas\:l IlotifY us immediately by telephone (collect) to
arrange for its return. We do :l1ot intend to waive any attorney-client or work produot privilege by the transmi$sion of
this mess~e.
Indianapolfs
Fort Wayne
South Bend
Elkhan
Chicago
Washington, D.C.
Route to: Warshauer
LJ
One Civic Square
Carmel, IN 4e032
(317) 571-2417
Fax: (317) 571.2428
u
To: ~,~ ~~~~~ From: ~~~Q~
Fax: O? 2?\ -,l.f 2:, ~ Page$: 4 .
Phone:
Re:
'Lf~~TA~
4. ~~ cc:
Date:
.'l2J -0;2.. .
o Urgent 0 For" Review 0 P.[ease Comment 0 Please Reply
o Please Recyele
~......
"'"
~~
~.
.
C{, . ~D ~.<<\
c:::::::::2 ~
~.. ~~, ~V-. ~:::::'c l!> C::lf ~, ~, Q) .)
~~ 04/02/02 11:37 FAX
HAMILTON CO HWY. 7~~ Carmel DOCD
----..,.--, -. . U
~ 0011002
u.
HAMILTON COUNTY
HIGHWAY DEPARTMENT
Apri12,2002
Mr. Lance G. Ferrell
Banning r::nglneerlng
698 Tower Road, Suite 100
Plainfield, Il'ldiana 46168
,/
")
~
mIfEtr~91if~D
APR 4 2{)O2
DOCS
RE: Sedgwick Subdivision
Primary Plat
N of 131~t Street/ W of Towne Road
Clay Township
Dear Mr. Ferrell:
!
-/
i _~\
\;-\
\
,"\.
\ '
"
This letter sel'Ves to i!lcknowle<:lge receipt of a transmittal received 3/25/02 containing the plans
for the above-mentioned project After reviewing the plans the Highway Department has the
following comments:
1. An Application fer Project Review needs to I)e completed ancl the appropriate review fees
for a Primary Plat paid, before any approvals will be granted from this office, I have enclosed
a blank form for your use.
2. The westbound lane of 131 It Street will need to be widened 3 feet across the frontage of the
property. This includes acquiring additional rrght of way from the Goold property to install the
widenlng across thai!' frontage. The widening will consist of a 14" stone base, 5" HAC blndel'
i!!lI'ld 1" HAC surface, plus a 3' stone shoulder.
3. The center medIans on Lincolnshire Boulevard Will need to match the medians instafled at the
east and west ends. r have [neluded a copy of the median layout.
4. Please verify that the centerline radii of Sedgwick Court and Sedgw'Ck Circle meet the
required minimum of 150', Include all of thra curb information in table form on tile Primary
Plat.
5. Please note that decorative signs, sprinkler systems, trees, landscaping mounds, light poles
or other such amenities are not permitted in the right of way.
6. A 15'.DU&E is needed along the north and south side of Lincolnshire Boulevard.
7. Additional comments may be necessary after the revisions have been made.
If you have any questions or comments conceming this letter, please feel free to contact me at
anytime.
Sincerely,
/413~
Steven J. Broermann
Staff Engineer
cc: Jon Dobosiewicz
Steve Cash
1700 South 10'~ Street
NoblesvJlJe, In. 46060
www.co.hamUton.in.us
Ofl'lce (317) 773.7770
Fax (317) 776-9814
- ,
. .:"
"
.,
,
,
"
TO BE
DETER INED
tI
()
Location of island Must allow
for turning radius of bus
'..._ ... ~ ,........ ;.0-
, ~
No trees would be perMhted between
the walk and the bock of the curb
unless the watk were Moved closer" to 1;he curb
3010'
1
~ tf.S COV~D C:tD- \.... ~1tlZ.t
'Ii! If' ~;.o~ fr\IN r~ f\"'Jr~-rAitJEP
......1 C 1tt3 <. vJ1>tl.~
"BErW~f>J" 11 I
\ '5' o-j
-36'-0"-
........
'" I
0
oJ;>
'-...
0
N
'-...
0
N
....
....
..
(.-
-I
~
C
~
....
t3
o
z
n
o
:~
.t<
I.
e'.
'1
n
ll:l
'1
I!I
It>
....
t:l
o
n
t:l
~
o
;0
.N
''-...
.0
o
N
u
u
CarmeR
March 29, 2002
Lance G. Ferrell
Banning Engineering
698 Tower Road, Suite 100
Plainfield, IN 46168
RE: Sedgwick Subdivision - 3030 W. 1318t Street
Hamiton County
Dear Mr. Ferrell:
I have received and reviewed the information for the above-mentioned
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully
/fudutd ])./~
MichaelD. Fogarty
Chief of Police
MDF:vb
cc: ioept. of Community Services
A Nationally Accredit
(317) 571-2500
rcement Agency
FAX (317) 571-2512
Banning Engineering, P.C. . 698 Tower Road, Suite 100 . Plainfield, IN 46168
Phone: (317) 839-2581 . Fax: (317) 838c9171 . E-mail: banning@banning-eng.com
March 18, 2002
Cannel Department of Community Services
One Civic Square
Carmel, IN 46032
~
[BJ IE: f'. ;::; 11'(' n rc; '15'
U-\l~~~":"")=':J \!.! I~!!:-l'
25 r r ,
;,1,< ,.
.1....
DOCS
Re: Sedgwick Subdivision - 3030 W. 131 sl Street
Hamilton County
Dear Service Provider & T AC Member:
We are proposing a 27 lot residential subdivision located on 33 acres more or less. The proposed tract
lies west of The villages of West Clay and is on the north side of 13151 Street The main entrance into us
will be through the Shellboume Park Subdivision entry on 1315t Street This approved residential
subdivision is just now being constructed in the field. With the proposed Sedgwick we are plmming on
connecting up all our utilities through them and the approved The Lakes @ Hayden Run.
Enclosed please find a preliminary layout of our site for your review. Weare scheduled to go to the April
17th T AC meeting and would like to get a letter prior, or at that meeting with any concems or comments
that you might have. We look forward to working together to make this subdivision a very nice addition
to the Cannel! Hamilton County area.
If you have any questions or need any additional infomlation please call. . -
s~~ Cg'11 ,
Lance >t;j~e])
Proj eet Manager
Cc: David Warshauer ~ Barns & Thornburg
Mark ZUkel111an - Sedgwick Development LLC