Loading...
HomeMy WebLinkAbout07120064 MiscellaneousEROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9ht Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south@iaswed.org PROJECT NAME: CMC Business Park Phase 1 St TBMiTTED BY: CMC Properties Mr. Robert Doster 10925 Reed Hartman Highway, Suite 200 Schneider Corporation Cincinnati. OH 45242 8901 Otis Avenue Ph: 513-984-3030 Indianapolis, IN 46216-1037 REVIEWED BY: John B. South P.E. Certified Professional in Erosion and Sediment Control PLAN REVIEW PROCEDURE: Plan Review Date: 2-7-03 Acreage: 10 ac LOCATION: NW corner of 131' and US 31 LEGAL DESCRIPTION: See. 26 TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay SOIL SURVEY MAP SHEET: sheet 50 The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan jor the project. The erosion and sediment control plan submitted was not revieuvd jor the adequacy of the engineering design. All practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibiiity by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewed for local, state, or f derul permits that may be required to proceed with this project. Additional information, including design calculations may he requested to further evaluate the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: X Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Environmental Management. Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessarv to minimize off-site sedimentation. The developer should be mvure that unforeseen construction activities and uvather conditions might affect the performance of a practice or the erosion and sediment control plan. The plan must he a flexible document, with provisions to modify or substitute practices as necessary. Revised 4 i 9? Cc: Carmel DOCS Ha. Co. Surveyor IDEM File