HomeMy WebLinkAbout07120064 MiscellaneousEROSION AND SEDIMENT CONTROL PLAN
TECHNICAL REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9ht Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at john-south@iaswed.org
PROJECT NAME: CMC Business Park Phase 1
St TBMiTTED BY: CMC Properties Mr. Robert Doster
10925 Reed Hartman Highway, Suite 200 Schneider Corporation
Cincinnati. OH 45242 8901 Otis Avenue
Ph: 513-984-3030 Indianapolis, IN 46216-1037
REVIEWED BY: John B. South P.E.
Certified Professional in Erosion and Sediment Control
PLAN REVIEW PROCEDURE: Plan Review Date: 2-7-03 Acreage: 10 ac
LOCATION: NW corner of 131' and US 31
LEGAL DESCRIPTION: See. 26
TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay
SOIL SURVEY MAP SHEET: sheet 50
The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan jor the
project. The erosion and sediment control plan submitted was not revieuvd jor the adequacy of the engineering design. All
practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibiiity by a
qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewed for local, state,
or f derul permits that may be required to proceed with this project. Additional information, including design calculations may
he requested to further evaluate the erosion and sediment control plan.
The erosion and sediment control plan has been reviewed and it has been determined that the plan:
X Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the
Indiana Department of Environmental Management.
Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a
representative are necessarv to minimize off-site sedimentation. The developer should be mvure that unforeseen construction
activities and uvather conditions might affect the performance of a practice or the erosion and sediment control plan. The plan
must he a flexible document, with provisions to modify or substitute practices as necessary.
Revised 4 i 9?
Cc: Carmel DOCS
Ha. Co. Surveyor
IDEM
File