Loading...
HomeMy WebLinkAboutCorrespondence - .,. ........ ~- Date: l.{- 3() -03 ( , ON-SITE ~tLUATION FOR EROSION AND SEDIM( ',r CONTROL Hamilton County Soil and Water Conservation D'i!ii'ict ~ 11 OS South 9~h Street, Noblesville, IN 46060 .::.. Ph:317-773~2]8] Fax: 317-776-1101 bj...) di ~ ~/ Project Name: f~2;~>>~;J:Zht(;e, tl2 H,4YM#- .,r-;JJ.; Present at Site: John South, Hamitton Co SWCD, ft;JJfJ $ulAEFPIZ. t1AIZK ;h;PFHAIV. This RepOlt Provided To: TOOl) 'Se.I'I-4E1=~1Z / H~IL H~HIJI.I""- Ce#reJC /16"es C~JSH4W ClHh&Jl't/IT/Ii~.s ;:A~ 'IS- ~z.ol S13 -B49:)' F4J( TYPE OF EVALUATION: Ii);> /I',~~EL C~~H&,(,. SVJlUUJiL Flu:. o [nitial Routine M' Follow-up o Complaint o This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion and sedimentation. All practices recommended in this report slwuld be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the "Indiana JIandboohfol" Erosion Control in Developing Areas" or similar guidance docl/ments. Current Site Information: We lOfe I ~ q;,WS.s u.ldr"'~1 , I A",JrC61M/j~ce. L= , ~.,G The Following Items Have Been Evaluated and Assigned a Designation of: S "" Satisfactory M = Marginal U = Unsatisfactory NA '=' Not Applicable Construction Site Management for Erosion and Sediment Control S M @. NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment control measures. (2) Appropriate perimeter sediment control measures have been implemented, (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures (4) Erosion & sediment control measures are installed properly. (5) Storm drain inlets have been adequately protected. (6) Outlets have been adequately stabilized. (7) Existing erosion & sediment control measures are being maintained. (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil. (9) Erosion & sediment control measures have been installed and maintained on individual building sites. s @ U NA S (1)U NA @ M U NA S M @ NA S Q U NA S tSJ U NA S @ U NA S <& U NA Sta tus of Sediment Retention On-Site 9f Site conditions present a high potential for off-site sedimentation. o There is evidence of off-site sedimentation Describe: o Please Refer to the Comments Section of this Report Definitions The item is currently in compliance with the Rule A concern has been identified; corrective action is strongly recommended to remain in compliance A violation has been Identitied and the site is not in compliance; corrective action is required Does not apply at th is stage of construction Satisfactory: Marginal: Unsatisfactory: Not Applicable: Reviseil4 / 98 ~ r ON-SI1('" TW ALVA TfON FOR EROSION AND SEDlMFt]T CONTROL -V U COMMENTS PROJECT NAME I-AIa$ tR HdlJ' ~u .R~N , Page 2 The items checked below must be correcte,d prior to ;AS r 1J1JiE.' , unless otherwise noted. o Install an appropriate sediment control practice betweell construction areas and lower lying areas. o Replace/Repair silt fcnce and/or straw bale barriers. o Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales. o Remove accumulated sediment from: 0 sediment traps/basins, 0 behind silt fence/straw bales, 0 around stonn drain inlet protection devices, 0 streets and gutters (Do not flush with water) pc Temporary seed, fCl1ilize, and/or mulch: 4&.'- ~IJrp201!ft.lJ A.IP€.AS ~ Permanent seed, fertilize, and mulch areas that are at final grade: ~jtIlal>3 B.Yt:41 S' , Ae/tv _ AJ~ 64.ML$' . .; o Protect storm drain inlets: 0 curb inlets, 0 drop inlets o Reshape and stabil ize sides lopes of: 0 sediment traps/basins, 0 detention/retention basins o Install/Maintain construction entrance(s): o Reshape and stabilize conveyance channels: f.l Place greater emphasis on erosion and sediment control on building sites; contractors, subcontractors, material vendors, and others should be made aware of erosion and sediment control requirements Appropriate perimeter sediment controls (eg. silt fence) and stable construction entrances shall be utilized on all sites. Sediment tracked into the street shall be removed (do not flush with water) at the end of each work day. o Other Requirements: eh~dVJP / Ed /1t-de. / O/'D.b A~ s / l' if' /; ~ /t{r/'v~V f u;er, ",p""i,? !f'~ ~ s~J7. ~ Nore. -I' #~ tl' .P~ /' / This ;cport sulw,ined bY,/.L il ~ Revised 4! 98 i" R u u Frank O'Bannon, Governor John Goss, Director Indiana Department of Natural Resources , , , , Division of Soil Conservation 402 W. Washington Street Room W-265 Indianapolis, Indiana 46204-2782 Phone: 317/233-3870 FAX: 3]7/233-3882 April 15, 2003 Mr. Tom Kutz Centex Development 6602 E. 71 5t Street Suite lOO Indianapolis, IN 46250 ~ RECfNED ~,?R 11 1~~~ . DOCS \; , ("V d.--::> 9-9) -,,0 ,{r' ", " ..- ~\"/ ".- VIA CERTIFIED MAIL # 7001 0360 0000 6407 8523 RE:~51ie.1i.Rl.itLS..ec.rl, Hamilton County, Indiana ~r? W AWNING OF NONCOMPLIANCE Dear Mr. Kutz: This office has been notified by John B. South, District Engineer for the Hamilton County Soil and Water Conservation District that your project known as Shelborne Park Sec. 1 is out of compliance with the National Pollution Discharge Elimination System (NPDES) GeneralPermit Rule 327 lAC 15-5. It is the intent of the Division to resolve non-compliance issues and avoid referring this project to the Indiana Department of Environmental Management (IDEM) for an enforcement action. The On-Site Evaluations for this project document that an inadequate effort has been made to comply with the conditions and requirements of327 lAC 15-5. A copy of the most recent reports has been enclosed. The reports clearly outline the deficiencies observed at the site and the requirements to bring the project back into compliance. Failure to implement and maintain appropriate erosion and sediment control measures is a serious violation and deserves your immediate attention. It is therefore requested on or before April 30, 2003 that you adequately address the deficiencies as specified in the enclosed on-site evaluation. Once corrective action has been taken to address the deficiencies, please notify John B. South, SWCD Engineer. Page I of3 The Lakes at Hayden Run Sec. 1. Hamilton County, Indiana An Equal OpportunIty Employer Printed on Recycled Paper o o Staff will continue to inspect this site to monitor progress and assess compliance with the Rule. Failure to correct deficiencies will result in a referral to the Indiana Department of Environmental Management and the initiation of an enforcement action. If you have any questions regarding the On-site Evaluation or require clarification on any issue, please contact John B. South immediately at 773-1406. Sin(~ \.::77~{.j~ Randy J. Brau~e1'ESC Chief, Stormwater and Sediment Control Program Enclosures: On-site Evaluation Reports cc: Hamilton County Soil and Water Conservation District (Project File) Doug Wolf, Stormwater Specialist Hamilton County Surveyor Carmel DOCS Page 2 of3 The Lakes at Hayden Run Sec. 1. Hamilton County, Indiana Date: 1};)3 'rAt:- bias . ) (' ON-SITE 'WALUATION FOR EROSION AND SEDIIVi~T CONTROL Hamilton County Soil and Water Conservation District 1108 South 91h Street, NoblesviIle, IN 46060 Ph: 317-773-2181 Fax: 317-776-1101 Project Name: tV ;/4vd;.'( Run / Present at Site: John South, Hamilton Co. SWCD, This Report Provided To: 70111 1<:~/z: C en It. 1: 0t'1/.; /;t:.6Z. E. 15f<. sf. S:.u rl! /00 r....Ji.4.Ui;OO k-s. TIA 4& 1:3-0 C. If -- /If €/ 00 l. 5 5v/ VC'YOr ( P,' I e.. TYPE OF EVALUATION: o Initial ~. Routine o Follow-up o Complaint This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. All erosion and sediment conlrol nieasures ~'hilll meet the design criteria, standard.v, and specifications outlined in the "Indiana Handbook/or Erosion Control in Developing Areas" or similar guidance documeiits. Current Site Information: j" Li~p{ b ".u The Following Items Have Been Ev.aluated and Assigned a Designation of:- S == Satisfactory M = Marginal U == Unsatisfactory NA == Not Applicable Construction Site Management for Erosion and Sediment Control S M .0.NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment control measures. (2) Appropriate perimeter sediment control measures have been implemented. (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures. (4) Erosion & sediment control measures are installed properly_ (5) Storm drain inlets have been adequately protected, (6) Outlets have been adequately stabilized. (7) Existing erosion & sediment control measures are being maintained. (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil. NA (9) Erosion & sediment control measures have been installed and maintained on individual building sites, ,'~ @ M U NA S M @ NA S M @ NA S M (Q) NA @ M U NA "'- ~ @ ~ ~~ s 8 U Status of Sediment Retention On-Site }\' Site conditions present a high potential for off-site sedimentation. o There is evidence of off-site sedimentation. Describe: Satisfactory: 1vlarginal Unsatisfactory: Not Applicable: fl( Please Refer to the Com ments Section of this Report Definitions The item is currently in compliance with the Rule A concern has been identified; corrective action is strongly recommended to remain in compliance A violation has been identified and the site is not in compliance; corrective action is required Does not apply at this stage of construction Revised 4/98 ON-sr~UA TIO]\! fOR EROSION AND SEDr(~T CONTROL COMMENTS PROJECT NAME: 71u_ L Q j~:; tZD l/dl//r.N --eu/i I Page 2 The items checked below must be corrected prior to -'-I /~8103 , unless otherwise noted. f ' o Install an appropriate sediment control practice between construction areas and lower lying areas. o Replace/Repair silt fence and/or straw bale barriers. o Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales. o Remove accumulated sediment from: 0 sediment traps/basins, 0 behind silt fence/straw bales, 0 around storm drain inlet protection devices, 0 streets and gutters (Do not flush with water). ~ Temporary seed, fertilize, and/or mulch: A I//'.ls lurb.t'J dn"O'S' o Permanent seed, fertilize, and mulch areas: that are at final. grade: t. ~/77/?'J"-;' RFt"CS: /~4kl' b-i;ii. s '" SUM.Ie.f, fitPihU!s , f'" ~' o Protect storm drain inlets )('curb inlets, 0 drop inletsL4'c6/'I'c" (,JH r!1' ~4j"I;~;' ;$ .lit -/ "JPF&/..ld", Res1wpe and stabi lize sideslopes of: 0 sediment traps/basins,)fdetention/retention basins o I nstalllMaintain construction entranee(s): Reshape and stabilize conveyance channels: tl /1';:itl./J/ ks ft.. .~ o Place greater emphasis on erosion and sediment control on building sites; contractors, subcontractors, material vendors, and others should be made aware of erosion and sediment control requirements. Appropriate perimeter sediment controls (e,g. silt fence) and stable construction entrances shall be utilized on all sites. Sediment tracked into the street shall be removed (do not flush with \vater) at the end of each work day. Other Requirements: This report submitted by: all}. ~~ / Revised 4/98 ,- \ ~ ON-SlTE ALUATION FOr~ EROSION AND SEDIJ\.__.;r~ CONTROL Ham i1ton Countv Sod and Water Conservation DIstrict II 08 South~ 9'11 Street. Noblesville, IN 46060 Ph 317-773-2181 Fax: 317-776-] ]01 l I I Date: IHq.o~ f>roject Narne: /...- A K E: 5 .4 r H,. Yo IE N re tJ AI Present at Site: .John South, Hami lton Co. SWCD, This Repol1 Provided To TOft I::u"z. CEfo/-rBJ< D~V. H AlluEtiC>.AI.Jrf2.Vc. -nDli / Sr.J~f.)t!.roR CA/lHEL- f fl. e. TYPE OF EVALUATION: o Initial ~ Routine o Follow-up o Complaint This evaluation is intended to assess the level of compliance IVitlt 327 fA C 15-5 (Rule 5). It is also intended to identify areas where additional measures may be required 10 control ems/on and .~edimentation. All practices recommended in this report SllOlIld he evaluated as to theirfeasibility by a qualified individual witlr structural practices designed by a qualified engineer. All erosion and sediment control measures shall meet the des'ign criteria, standard~', and specifications outlined in the "Indiana Hi/nt/booli Fu Erosioll Co/1trol in Developing A rcas " Of similar guida/lce dOCUfllents. Current" Sire Inform ation: BDic DF "}lTE GR.-A.D/Nt:, CbHPt..t:.TF--b S-r6JUt SEWeR. S I #ST4L.1.-El) S'AJ;Jt TfJeY SEWE/ZS BE'IN6 /NSiA/..l..elJ PONOS bN /34.sr 1-4t.K. Ov-rJ.ET5 - CASf i'OIJf) {$ #c~/l' rop Cf IJANK 5ef3p1N6 HDt .srA~Ie.D The Following Items Have Been Evaluated and Assigned a Designation of: S = Satisfactory M = Marginal LJ = Unsatisfactory NA = Not Applicable Constl-uction Site Management for Erosion and Sediment Control S M @ NA (I) Disturbed areas have been adequately protected through seeding or other apPlOpriate erosion and sed iment control measures. S M @ NA (2) Appropriate perimeter sediment control measures have been implemented S M ~NA (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures. S M NA (4) Erosion & sediment control measures are installed properly. SM. NA (5) Storm drain inlets have been adequately protected. cr> 1\1 U NA (6) Outlets have been adequately stabilized. S ~ UNA (7) Existing erosion & sediment control measures are being maintained. <]) M U NA (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil. S M U ~(9) Erosion & sedimenr comrol measures have been installed and maintained on individual building ,ites. Status of Sediment Retention On-Site 'fii Site cond itions present a high potential for uff-site sedimentallon. o There is evidence of off-site sedimentation. Describe: Sati s factory: Marginal: UllsCltisfilctory: Not Applicable: ~ Please Refer to the Comments Section of this Report Definitions The item is currently in compliance with the Ru Ie A concern has been identified; correctkve action is strongly recommended to remain in compliance A violation has been identified and the sit" is not in cOl1lpliance~ corrective action is required Does not apply at th is stage of construction R(;\,iser! 4/98 ON-SIOV ALUA nON FOR EROSTON AND SEDlOr CONTROL COMMENTS PROJECT NAME: l..AkcS AI _liAr'C>eJJ K'LlrJ Page :2 The items checked below must be corrected prior to JI' 3tJ-o ~ , unless otherwise no.ted. IlJ Install ah appropt'iate sediment control practice between construction areas and lower lying areas. POHDS IYE:EiJ WiLlErS ro co#r2bl- wa,ee. t-EtJU. o Replace/Repaii' silt fence and/or straw bale barriers. o Entrench silt fence (6-8 in.) andfor straw bale barriers (4 -6 in,) and stake straw bales. o Remove accumulated sediment from: 0 sedimennraps/basins, 0 behind silt fence/straw bales, 0 around stonn drain inlet protection devices, 0 streets and gutters (Do .not flush with water). 'i1 Temporary seed. felii lize, and/or mulch PADS 0( c (J1fI{{)}/ A12E/J$ o Permanent seed. fertilize, and mu!eh areas that are a.t final grade: S W4.J..e S fOND I3AflK.S . . ~ Protect storm drain inlets: 0 curb inlets. ~ drop inlets (ABEle ViVOfER 'l'JUl./) JJ1/J..E.Y'S DO /llDr HEET sPEcS. ~ Reshape and stabilize sicteslopes of: 0 sediment traps/basins. 'f1 detention/retention basins o ] IlstalllMaintain construction entrance(s): ~ Reshape and stabilize conveyance channels: Sw AL.€.S o Place greater emphasis on erosion and sediment control on building sites; contractors. subcontractors, material vendors, and others should be made aware of erosion and sediment control requirements, Appropriate perimetenediment controls (e.g. silt fence) and stable construction entrances shall be utilized on all sites. Sediment tracked into the street shall be rem oved (do not flush with water) at the end of each work d3Y_ o Other Requirements: OI${o~8Ej) 4e CAS /f/eetJ m lSE.. srA,81l-1l::E.lJ wlr'H 1.5.eELJ/Ai Is, ANn/I)/!" ceJP-(PfSD 5TKA l.t)~ This report submitted by: ~/Jh I Re>i.\'ed 4 19~ .It;/Z!-Clk___ i'li~'YCll'-lalllc_____~4 kES~f!( __L4.tI2.e-tL_~R[);./ __ ON-SITE( '\~LUATIONFOR EROSION AND SEDIMFNT CONTROL ~11l ilton Countv Soil and Water Conservation ( }ict II OR South l)'11 Street. Noblesville. IN 46061'r'" Ph 317.773-2IXI Filx:317-776-IIOI I , I I ! ; I I I I I -CtJ;r;'C 1_120C 5 I I 51,)"1.)t.'f--P-~~_~ I Ft' l e... .___ i I -----~.~--~~------ ! I );!I c': l'rc,"L'l1t <II Site: .Iohl1 SOllth. Hamiltoll Co, SWCD. JIAI?v,er &pS~.~~~"~'i':--i:lf: __.u_C tit b 11~.s fll is R '.::!)(II'i Pro\' Ided To: TYPE OF EVALUATION: t} r nitial A'" Routine o Follow-up o Complaint This evaluation is intended to assess tile leJlel of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where additional measures may he required tu cuntrol erosion and sedimentation. All pmctices recommended in thi,,; report should 1Jt' evalulTted (!,~ to theirfeasibility hy II qualified individual with strucfllraf practice,., designed by II qualified engineer. ,tit i'!'(/sion and sl!dil11ent control measures shall meet the desir;h criteria, standards, and ,~pec!fication,'i olltlined in the "Indiana ffant/booA .1(1/" L'rosio/1 Control in Devefopinr:; Areas ,. or similar guidI/lice documents. H.4~ GfJ;/JL))/fIIC> CflHPtereD, r;J[r4J.J..A~)'/ 61# S~_ w~ree /5 ~L~SlAf'6 ('llITenl Site lnformatiun: The following Items H;'l\'e Been Evaluated and Assigned a Designation of: S = Satisfactory M= Marginal V = Vnslltisfactory NA = Not Applicable Construction Site Management for Erosion and Scdiment COll'trol (3) 1',,1 U NA (I) Disturbed areas have been ildequately protected through seeding or other appropnate erosion and sed imcnt control measures A ppropriate perimeter sed iment control measures have been implemented. Conveyancc channels have been stabilized or protected with appropriate sedimem control measures. Erosion & sediment controlll1e<lsLlres are mstalled properly. Storm drain inlets have becn adequately protected. Outlets have been adequately stabilized. Existing erosion & sediment control measures are being maintained, Public & private roaclwilYs arc bcing. kept clear ofaccumulaled sediment or tracked soiL Erosion & sediment control mC<1S11reS have been installed and maintained on individual building sites, ([) 1\-1 LJ NA (2) ~M U NA (.3) .' rv1 U NA (4) S a[)U NA (5) ~M U NA (6) QM U NA (7) @M U NA (8) S M U ~(9) '';tatus of Sediment Retention Oil-Site () Sile CDllditiollS present a 11Igh potential for ()n~'ii\c sedimeJ1l21!ton. '-' l'l1nc is c''-ldcllce of Oft~SItt' sccJilllcntalinn. Descrihe. ~jl(\r~inal l} Il~,m i sfClctory: ~'i')t Applicable: () Pkase ReJer to the Com m ents Section of this Report Definilions The item is currently in compliance with the Rule A concern ha.s been identified: corrective action is strongly recommended to remain in compliance A violation has been identified and the sile j's not ill compliance: corrective action is required Does not apply at this stage OfcOllstruction Rr~I'i.l'{!d " / 9g 1 I ~;~li IS l-dClol-~~' Nf;1"E- Ol5WE !::;/Ef} I1R€A5 W JI.J- BE- pj::t) fEC T'EJ) /.() I '/1/ oRa $>,. H/)A ell oR CRII1PEf} StRAw TII/?oo611 w/tVT'ER f 5ee/) Seep i 5t:e.D I " I ON-SITE EV ~\.TION FOR EROSION AND SEDp''!",ENT CONTROL Hamilton County Soil and Water Conservati~bistrict 1108 South 9th Street, Noblesville, IN 46060 Telephone: 317-773-2181 Fax: 317-776-1101 Project Name: a~ A1 /If ,eb~C.)' , Date: Present at Site: John South, Hamilton Co. SWCD, This report was Provided To: Type OF EVALUATION: Initial 0 Routine 0 Follow-up 0 Complaint This evaluation is intended to assess the level of compliance with 327 IAC 15.5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the "Indiana Handbook for Erosion Control in Developing Areas" or similar guidance documents. CUlTen' Si.eInfonnation: If tJff h pr.,/.,. -A,( s .r ,(..-/d ..../ Pnnc/ t~ S.L!: C,or#1cr i7~.tt'",.~ e6N./J/cA- / The Following Items Have Been Evaluated and Assigned a Designation of: S = Satisfactory M = Marginal U == Unsatisfactory NA = Not Applicable Construction Site Management for Erosion and Sediment Control ([) M U NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment control measures. U NA (2) Appropriate perimeter sediment conti"ol measures have been implemented. U t@(3)Conveyancechannelshavebeenstabilizedorprotected with. appropriate sediment .control measures. . U m. (4) Erosion & sediment control measures are installed properly. U ('fVV (5) Storm drain inlets have been adequately protected. U ]::V; (6) Outlets have been.adequately stabilized. U NA (7) Existing erosion & sediment control measures are being maintained. U NA (8) Public & private roadways are beingkept clear of accumulated sediment or tracked soil. U ~ (9) Erosion & sediment control measures have been installed and maintained on individual building sites. Status of Sediment Retention On-Site o Site conditions present a high potential for off-site sedimentation. o There is evidence of off site sedimentatif.m. o Description provided: @M S M {[;)M S M QM <:pM 'F~ o Please Refer to the Comments Section of this Report Compiled By: Defmitions Satisfactory: The item is currently in compliance with the rule Marginal: A concern has been identified; corrective action is strongly recommended to remain in compliance Unsatisfal;.:tory: A violation has been identified and the site is not in compliance; corrective action is required Not Applicable: Does not apply at this stage of construction Revised 4 / 98 0- o ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL COMMENTS PROJECT NAME: L or 1:~s fZJ. /l,t ~n' ;RuM The items checked hdow must be corrected pdor to, W Z. , ' unl.., otherwise note,d. o Install an appropnatesedlment control practice betvveen constructlOn areas and lower Iymg areas. o o o Replace/Repair silt fence and/or straw bale barriers. Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales. Remove accumulated sediment from: 0 sediment trapslbasins, 0 behind silt fence/straw bales, 0 around storm drain inlet protection devices, 0 streets and gutters (Do no.. t flush w~r) Temporary seed, fertilize, andlor mulch: 7"4/$ /'. ~ ~ Permanent seed, fertilize, and mulch areas that are at final grade: ;.I, $ o o Protec't stonn drain inlets: 0 curb inlets, 0 drop inlets Reshape and stabilize sideslopes of: 0 sediment trapsfbasins, 0 detenti"onlretention basins o o Install!tv1aintain construction entrance(s): Reshape and stabilize conveyance channels: o Place greater"emphasis on erosion and sediment control on building sites; contractors, subcontractors, material vendors, and others should be made aware of erosion and sediment control requirements. Appropriate perimeter sediment .controls (e.g. silt fence) and stable construction entrances shall be utilized on all sites. Sediment tracked into the street shall be removed (do not flush with water) at the end of each work day. Other Requirements: ~ o I ~ ~".,,,., ,,,d a f,i.J(sf J,tJrJ~ S~() ed~M . r f!"M Ivel'-': SII f to! c. e.. . . = I~r ~ rOlld J /" 0 cJc. .s~~k ol'D i e c..,..f. / .J Rt y/~,(" I Po~pv' J / ~/ For questions regarding this report contact: John South w U I:ENTEX HDMES October 21, 2002 Corporate Office 6602 East 75th Street Jon Dobosiewicz Planning Administrator City of Cannel One Civic Square Cannel, Indiana 46032 Suite 100 Indianapolis, IN 46250 Phone: 317-915-2200 Dear Jon: RE: Lakes at Hayden Run Section I Attached is one mylar copy and 3 blackline copies of the Lakes at Hayden Run Section I recorded plat. Please call with any questions and thank you for your assistance in this matter, Sincerely, CENTEX HOMES ~4- T:as L. Kutz, -P.E. Land Development Manager TLK/tlk 10/22/2002 14:43 317-775-1101 HAMILTON CO USD~ PAGE 05 Date: 1f;/~~L. ON.$;JTE tV ALU A TlON FOR EROS Hamilton County Soil and W 11 OS South 9'" Street, N bles iHe, TN 460 0 'P11: 317-773-2181 F, ~ 31 .776-1101 J$ ,01 S~ Project Name: /.. .dill&$" pre~ent at,Si~e:')olm South, Hamilton Co. $WCD, .' This Rep01i Pn,lvided To: !lJJln)/!/I ,~...,' s ./ TyPE OF EYALUATION: II Initial .J( RQU One o Follow-l,Ip o Complaint Current Site Information: u;'R This ellalJwtlon is inteMdttd (0 a~st$S the level of compliance with wh.~re addiliofifJi measures may be requifed tr) control I!rllsio/1 an ,~houid be I!valil-ated as tn their feasibility by a qualified individu(1 AU uos{Orl and setUlneni control measures shall meet thl! de:.tign Hal7.db(lOkfor Erosioll Con fro I in Developing Areas" or simU(Jl' g The following Hems Have lldn Eval ted nd Assigne a Designation of: S == Satisfactory M 0= Margln~1 U ,. Un atist: ctory N == Not Applkable Construction S;(e Man~l!mf!.nt for Ero.siOJI and Sediment Co Tol cj) M U NA (l) Disrurbed areas have been adeqll<J.te1y Jrote ted through seeding or other <'Ippropriate erosion and sediment control measures, f M U NA (:2) Appropriate perimeter sediment cont \ me sures have een implemented. S M U NA (3) Conv"",," c~",",I, ~'" be.. <lab '>ed r protected 'irhap"",p,'at,,,dimont 00'''01 m'"","" . M uNA (4) Erosion & sediment control l'neastlre are i stalled prop Tly, S a[)U NA (5) Storm drain inlets have been adequat ly pr teeted. ~ M U NA (6) Outlets have been adequately stabiliz d. o.:? M U NA (7) Existing erosion & sediment control easu es aTe beln @ MU NA (8) Public & private roadways are being ept ear of acc;u ulllted sediment or tracked soll. s M U ~ (9) Erosion & sediment control measure nave been install d and maintained. on individual building sites. St<l.lusof Sediment Retention On-Site r.} Sit~ conditions present a high potential for ofhite sedirn mati o There is evidence of off-site sedimentation, Describe: Satisfactory: Marginal: Uns!lti~factory: Not ApplicabllO o PlcnS.e Ref1!r to the Comments Section of thi~ Report Deji 'lion The item is currently m compl1anee WIth the R e l A concern has been identified: corre<:tive actio \s str ngly reCQm ended to rernain in compliance A violation has been identlfled and the site is n t in cbmphance: Does not apply at th is stag~ of construction Re_tvJ:d'11J8 ;lorE- 'O/Jrvea/?IJ II1l00S wlt.J- BE- wl71/DRQS~ H/JJC/f oR C~I!IJ 711'/)a# tlJ/tV7'ER . ( 5eE~ Seep i ~t:i!JJ) \ t' I u (J City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2600 - - -- - - - - -- - - - -- - - - - - - -- -.. -- -- ~ ~-- ~ - - - - - - -- - - - - - - - - - - - - - - - - ~- - -- Edward Fleming '" /l/~ Stoeppelwerth & Associates .1 0... ' 0 9940 Alllsonville Rd. ~!J. Fishers, IN 46038-2005 =- RE: Lakes of Hayden Run, Section 2 LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Lakes of Hayden Run, Section 2 and has approved the plans subject to the following: 11 1!.2~ 0\ .~ ~ ~ /-1' - -DP~[Cl[8'VfQ - - ~~" - U I 2002 DOCS (() .......; 1. Our office is requesting that a temporary cul-de-sac be placed at the east end of Milano Dr. if the street does not connect with an existing street. 2. 3_ 4. 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: October 3, 2002 By: Gary Hoyt, Fire Marshal Carmel Fire Department Fire Prevention Saves Lives and Property -; ( \ ( \ ERDmON AND SEDIMENT CONT L PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south@iaswcd.org PROJECT NAME: The Lakes '1t Hayden RUB Sec. 2 SUBMITTED BY: Mr. Tom Kutz Centex Development 6602 E. 75th Street. Suite 100 Indianapolis, IN 46250 Ph- 317 -915-2200 Mr. Ed Fleming Stoeppelwerth & Associates 9940 AUisonville Road Fishers, IN 46038 REVIEWED BY: .John B. South P.E. Certified Professional in Erosion and Sediment Control PLAN REVlEW PROCEDURE: Plan Review Date: 10-10-02 Acreage- 38 LOCATION: north side of I 3l street 3/4 mile east ofShelbome Road LEGAL DESCRIPTION: Sec. 29 TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay SOIL SURVEY MAP SHEET: On the Plans The technical review and comments are intended to evaluate the completeness of the erosion and sediment control planjor the project The erosion and sediment control plan submitted was not reviewedfor the adequacy of/he engineering design All practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has no/ been reviewedfor local, state, or federal permits that may be required to proceed with this project Additional information, including design calculations may he requested to further evaluate the erosion and sediment ('on/rol plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: X Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwardcd to the Indiana Department of Environmental Management. X I{cfer to the comments section for additional information. Proper implementation of the erosion and sediment control plan and inspections o/the construction site by the developer or a representative are necessGlJ! to minimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions may effect the pelformance ofa practice or the erosion and sediment control plan. The plan mus/ be aflexible document, with provisions to modifY or substitute practices as necessary. Revised 4 /97 .' PROJECT: Hayden Run Sec. 2 U u Page 2 of 3 Yes No x IA x IE x Ie x lD x IE Yes x No 2A 2B 2C 2D x x x x x 2E 2F In Drainage Report2G x x Yes No x x Yes No 2H 21 ARE THE FOLLOWING ITEMS AIlEQUA TEL Y ADDRESSED ON THE PLANS? (All Plans Must Include Appropriate Legends, Scales, and North Arrow) (Items tllat are Not Applicable to tllis Project are designated by NA) PROJECT INFORMATION Project Location Map (Show proiect in relatioll to other areas afthe county) Narrative Describing tbe Nature and Purpose oftbe Project Location of Planned and/or Existing Roads, Utilities, Structures, Highways, etc. Lot and/or Building Locations Landuse of Adjacent Areas (Show the Entire Upstream Watershed and Adjacent Areas Within 500 Feet of the Property Lines) TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES Existing Vegctation (Identify ondDelineate ) Locatiun and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site 100 Year Floodplains, Floodway Fringes, and Floodways (Note if None) Soils Information (if hydric soils are present, it is the responsibility of the owner/developer to invesligate the existence 0./ wetlands and to obtain permits ji-om the appropriate government agencies.) Existing and Planned Contours at an Interval Appropriate to Indicate Drainage Patterns Locations of Specific Points Wbere Storm water Discharge Will Leave tbc Site Identify All Receiving Waters (fjDischarge is to a Separate Municipal Storm Sewer, ldentifY the Name of the ~M1inicipal Operator (lnd the U1linwte Receiving Water) Potential Areas Where Storm water May Enter Groundwater (Note if None) Location of Stormwatcr System (Include Culverts, Storm Sewers, Channels, and Swales) LAND DISTURBING ACTIVITIES 3A Location and Approximate Dimensions of All Disturbed Areas [i.e., Construction Limits] (Areas Where Vegetative Cover Will Be Preserved Should be Clearly Designated) 3B Soil Stockpiles and or Borrow Areas (Show Locations or ,Vote if None) x 4A x 48 x Comment 4C x 4D X Comment 4E x 4F x 4G x 4H x 41 x 4J x 4K EROSION AND SEDIMENT CONTROL MEASURES Sequence of When Eacb Measure Will He Implemented (Relative to Earth Disturbing Aclivli!es) Monitoring and Maintenance Guidelines for Each Measure Perimeter Sediment Control Measures (Location, Constrtlclion Detail. Dimensions. and Specifications) Temporary Seeding (SpecificaliolJS; Including Seed Mix, Fertilizer, Lune, and Mulch Rates) Temporary Erosion and Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Permanent Erosion and Sediment Control Measures (Locatioll, Construction Detail, Dimensions, and Specifications) Storm Drain Inlet Protection (Location, Constrtlction Detail, Dimensions, (lnd Specifications) Stormwater Outlet Protection (Location, Construction Detail. Dimensions, and Specifications) Stable Construction Entrance (Location, Construction Detail, Dimensions, and Specifications) Erosion and Sediment Control on Individual Building Lots (Specifications) Permanent Seeding (Specifications: Including Seed lvlix, Fertilizer, Lime, and .i\.111Ich Rates) Rcvi.,ed 4 ! 97 ERWION AND SEDIMENT CONTR~ PLAN TECHNICAL REVIEW COMMENTS ~ PROJECT: Hayden Run Sec. 1 Page 3 of 3 Note: All erosion and ~'ediment control measures shown on the plans am} referenced ill this review must meet the design criteria, standards, and specifications outlined in the" Indiana Handbook for Erosion Control ill Developing Areas" from the Jm/ialUl Department of Natural Resources, Division of Soil Conservation or similar Guidallce Documellts. Item 4C. The installation of the swale along the east P.L. would prevent offsite sedimentation. Please include this in your notes prior to rough grading. Item 4E. A height is needed for the rock horse shoe dam. Cc: Carmel DOCS Ha. Co. Surveyor Ha. Co. Highway File ON-SITE EV AT :UA TION FOR EROSION AND SEp:--\1.ENT CONTROL HamWn County Soil and Water ConservaU District " 1108 South 9tb Street, Noblesville, IN 46060 Telephone: 317-773-2181 Fax: 317-776-1101 Date: BPi} z. ilt: J4leS ; , "",-_ I Project Name: Present at Site: John South, Hamilton Co. SWCD, This report was Provided To: Type OF EVALUATION: Initial 0 Routine 0 Follow-up 0 Complaint This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. All erosion and sediment control measures shaJI meet the desig!l criteria, standards, and specifications outlined in the "Indiana Handbook for Erosion Control in Developing Areas" or similar guidance documents. Current Site Info,m,tion: !?O'f j 1''-44 'iu s . or tCr(c/ /~ . ~ /:Jond ," S' .f, Corl-t er .., ~ tG/ ~ (' "~Oh The Following Items Have Been Eval~ated and Assigned a Designation of: S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable Construction Site Management for Erosion and Sediment Control ([) M U NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment control measures. U NA (2) Appropriate perimeter sediment control measures have been implemented. U ~ (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures. U 1\rA (4) Erosion & sediment control measures are installed properly. U ~ (5) Storm drain inlets have been adequately protected. U "lfA" (6) Outlets have been adequately stabilized. U NA (7) Existing erosion & sediment control measures are being maintained. U NA (8) Public & private roadways are being'kept clear of accumulated sediment or tracked soil. U @:) (9) Erosion & sediment control measures have been installed and maintained on individual building sites. @M, S M OM S M ~M ~M c.f~ Status of Sediment Retention On-Site o Site conditions present a high potential for off-site sedimentation. o There is evidence of off site sedimentatipn. o Description provided: o Please Refer to the Comments Section of this Report Compiled By: Defmitions I Satisfactory: The item is currently in compliance with the rule Marginal: A concern has been identified; corrective action is strongly recommended to remain in compliance Unsatisfactory: A violation has been Identified and tbesite is not in compliance; corrective action is required Not Applicable: Does not apply at this stage of construction Revised 4/98 u u ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL COMMENTS PROJECT NAMK L" i~$ @ ;/'t dr".,. .RUM '':'l:f':;~ , / ' <?,'vC/J The items checked below must be corrected prior to ~/bZ. unless otherwise nog:d. 0 ";1'{'J o Install an appropriate sediment control practice between constrUction areas and lower lying areas. UCJ' -, ./ , (-~/ ~., \ -- o o o ReplacelRepair silt fence and/or straw bale barriers. Entrench silt fence (6-S in.) and/or straw bale barriers (4-6 in,) and stake straw bales. Remove accumulated sediment from: 0 sediment trapslbasins, 0 behind silt fence/straw bales, 0 around storm drain inlet protection devices, 0 streets and gutters (Do not flush w~r) Temporary seed, fertilize, and/or mulch: rJ/s f; -L _,__::..:.-.--' l( 15 Pennanent seed, fertilize, and mulch areas that are at final grade: ;I, 'J o o Protect storm drain inlets: 0 curb inlets, 0 drop inlets Reshape and stabilize sideslopes of: 0 sediment trapslbasins, 0 detention/retention basins o InstalVMaintain construction entrance(s): o Reshape and stabilize conveyance chaJUlels: o Place greater emphasis on erosion and sediment control on building sites; contractors, subcontractors, material vendQrs, and others should be made aware of erosion and sediment control requirements. Appropriate perimeter sediment controls (e.g. silt fence) and stable co'nstruction entrances shall be utilized on all sites. Sediment tracked into the street shall be removed (do not flush with water) at the end of each work day, o Other Requirements: I J ~et:.;}~.w1/ud /'ocJ~ a f /41($1 s.;/e.. J,()r.fe sto e & I' J)I'~ ,. e !'-f. f ..J c1a~ I"r rot2c/ M4/ve"...f .Rt RIGU' / RrPtPv' sl"ll f!cMC,e.-. f , - For questions regarding this report contact: John South j\ 06/12/02 08:44 FAX u HAMILTON CO HWY. ~ Carmel DDeD H~ 0021002. HAMILTON COUNTY RE: Lakes at HaydenRur Revised Secondary Plat and Construction Plans - received 5/29/02 S of 131$\ Street J W of Towne Road Clay Township HIGHWAY DE~ARTME7JSFiI]1:q\ b~ Sf 1(';';/ f?[j ~\;\ ~ g . ~ JIJIt it/lit/) '~~ \ ~~ IJoes loop I ~! c'~>-- , (' )/ '~-----\\'. " ""-, / I ,I ;:;; \ \ June 12,2002 Mr. Edward E. Fleming Stoeppelwerth & Associates 9940 AllisonviUe Road Fishers, Indiana 46038-2005 Dear Mr. Fleming: This letter serves to acknowledge receipt of a transmittal containing the revised plans for the Hayden Run Subdivisfon. After reviewing the plans, the Highway Department has the following comments: Construction Plans 1. Has the additional right of way needed for the installation of the passing blister lane acquired? Construction plans will not be approved until the necessary right of way is acquired and the dedication forms forwarded to the Highway Department. 2. The following note needs lo be added to the Entrance Plan sheet: A sawcut is needed to remove the edge Hne along the north side of 13151 Street before the widening Is completed_ This will allow for the new edge line to be place on the widening. The new edge line will need to be installed by the developer. 3. A 24w preformed tape stop bar is needed at the entrance. 4. It appears that all other comments have been satisfactorily addressed. Therefore, the Highway Department requests seven sets of plans for final approval. The plans should not be submitted until all comments from the Hamilton County Surveyor's Office have been proper1yaddressed. If you have any comments or questions regarding this letter or project, please feel free to contact me at any time. Thank you for your attention and cooperation. Sincerely, ~/g~' 4::0 !e/oermann Staff Engineer cc: Jon Dobosiewicz Steve Cash G:\USERS\SB\02T AC\06-12-02Ial<es@haydenrun.doc 1700 South 10'. Street Noblesville, In. 46060 www.co.hamilton.in.us Office (JI 7) 773-7770 Fax (31.7) 776-9814 u u (0 NS U.lTI.N G EN GI.NE' E R.S .L".A N D SUR V E Y. 0, R '5 R'-M. Stoeppelwerth, PE; PlS . David J. Stoeppelwerth, PE,'PlS .. Curtis C. Hull, PlS 0 Dennis D. Olmstelld, PLS · Jellory W.Oorling, PLS May 28, 2002 Department of CQmmuillty Services 1 Civic.,Square Carmel,. Ih,j:i.a.l14 46032 .i\ttn: .ion Dobc.siewicz Re: The Lakes at Hayden Run, Section 1 Dear Mr.,Dbbosiewicz: Please find enclosed Ollie set i)f O;mstru~Jion Plans with Plat, w:b.ich weretevlsed in accordanc'e .~ith the comments listed in your letter dated May 2, 2002 Those C,mlmerits' were addressed~s follows: I. Tqe b.ew landscape plan has been enclosed shown onthe grading plan:. 2. . SOlirceoftitlc is,shown. 3. The final review letters will be for-varded to youupon receipt. 4. .The IIlstrument Number for the survey haB been included. .5. C~ntexwil1 prov:i'dc the ietterJor mad improvements. If you ha7e'any q uestions 'conc~min;g these revisions, .please contact me at (317) '8'4' 9 "19.3..5. . t ?') '. :-_.", ex . ._"'" y ety truly yours, STOEPPELWERTH & ASSGCI..i-\.T:ES, INC. '~';t . ,l C; rj)/ ' , x:..~ t, 1'-..-1:.- . ) Edward E. Fleming .c,.,. l~ ,,;j~,,~,c l\iTT,qpj< ............ ,I, ...,,,,,1...+"'....,,,...' .' ....-Lf-.I.-l'...... . 3:\d, r848S 1 \p.,. g~f",":Y 9940 Allrsonville Road.. Fisners Indiana 46038-2005 0 (317) 849-5935 It ):800-728-6917 It FAX: (317) 849.5942 " @ reCYlled paper CENTEX HOlfES ~002 0( ., 95/21/2002 14; 50 FAX 317 915??Ql W J:l-,r.? -'0-:.-<<-''(/ ~ ~.. . w I:ENTEX HOMES May 21,2002 1~ RECEIVED !l 'i V 21 ~ . l'i M I i002 C.or-por.::lite OHic~ 6602 Eelll r:iln ~lreel s~ Ita 100 IndlenapQlh;, IN 46250 Scott Brewer Urban Forester City of Carmel ODe Civic Squate Carmel, fN 46032 DOCS Phone: 3t 7.915-2200 RE: Lakes at Hayden Run Landscape Plan Dear Scott, Centex Homes is requesting to l'emove the street trees on OUI J...a:o.dscaplng plan on the non-collector roads in OUI Lakes at Hayden Run Section 1 neighborhood. per the Hamilton County Highway Department request. This will remove 70 su:eet trees. Centex Homes will be bull ding on Y:. of the. lots (55 lots), Each of our homes will inc1ud~ a landscaping package with a minimum of the below material. Lakes at Hayden Run Home Landscaping: 12 Shrubs (4 trees) 1 Tl"CC 5 Total Trees x 55 total lots .= 275 Trees Centex. will be installing a minimum of me 275 trees, which is still 205 trees more tban the current landscapiug plan IndlC<ltes. This does not include landscaping material pro'iided by the other home bui1d~r on the remaining 5610ts aIld is ouly a mininw.m of275 trees. Please: take Lhis into comideration when reviewing '\he Lu.ca at Hayden Run Landscaping Plan. Call me with any quc~tions or concCIIUl. Sincerely, CENTEX HOMES ~>>:a~-~ lan.d Development Project Manager '" 4/. ," ;.' w u City of Carmel DEPARTMENT OF COMMUNITY SERVlCES May 23,2002 Rodney Muller Centex Homes 5602 East 75th Street, Suite 100 Indianapolis, IN 46250 RE: Lakes at Hayden Run Landscape Plan Dear Rodney: I received your additional commitment letter for the Lakes at Hayden Run Subdivision on May 21, 2002. The request for Centex Homes to commit to trees as part aflandscape packages on individual lots (in lieu of the street trees requested to be removed from the plan by the Hamilton Highway Department) is acceptable under certain conditions. 1. At least 1 large maturing tree is planted in the front of each these 56 lots, but outside the right-of-way. 2. These trees should be native hardwood species, or chosen from the enclosed list of recommended street tree species. If you have any further questions, please contact me at 317-571-2478, or be email at Sbrewer(@,ci.carmel.in.us. Sincerely, Sc;;rp~ Scott Brewer Urban Forester, City of Carmel cc: Jon Dobosiewicz, DOCS ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2417 to\. ( '1 FROmON AND SEDIMENT CONTR1"'JL PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south@iaswcd.org a ~ ~O cr- .. ;; PROJECT NAME: The Lakes at Hayden Run Sec. 1 SUBMITTED BY: Mr. Tom Kutz Centex Development 6602 E. 75th Street. Suite 100 Indianapolis, IN 46250 Ph- 317 -915-2200 John B. South P.E. CCltitied Professional in Erosion and Sediment Control Mr. Ed Fleming Stoeppelwerth & Associates 9940 Allisonville Road Fishers, IN 46038 t RECEIVED tUY 24 20G2 DOCS REVIEWED BY: PLAN REVIEW PROCEDURE: Site Visit Datc: Plan Review Date: 5-8-02 LOCA TION: north side of 131 street 3/4 mile east of Shelborne Road LEGAL DESCRIPTfON: Sec. 29 To\VNSHIP: 18N RANGE: 3E CIVIL TO\VNSHIP: Clay SOIL SURVEY MAP SHEET: On the Plans The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plantar the project The erosion and sediment control plan suhmilled was not revie,vedfor the adequacy of the engineering design. All practices included in the plan, as well as those recommended in the comments should be evaluated as to theirjeasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewed/or local, state, or federal permits that may be required to proceed with this project Additional in/ormation, including design culculations may be requested lofitrther evaluate .the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: Satisfies the minimum requirements and intent of 327IAC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Envimnmental Management. Refer to the comments section for additional information. X Does not satisfy the minimum requirements and intent of 3271AC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violations of the rule and must be adequately addressed for compliance. The information necessary to satisfy the deficicncics must be submitted: Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a represenialive are necesswy to minimize offsite sedimentation. The deve/oper should be aware that unforeseen construction activities and weather conditions may e:fJect the performance of a practice or the erosion and sediment control plan. The plan must he aflexible document, }\lith provisions to modifY or suhstitute practices as neCeSSalJl, Revised 4 i 97 .. PROJECT: Hayden Run Sec, 1 U u Page 2 of3 Yes No x IA x 18 x IC x lD x IE Yes No x 2A x 2B x 2C x 2D x x 2E 2F In Drainage Repnrt2G x x 21-1 21 Yes x No 3A x 3B Yes No x 4A x 4B x 4C x 4D x 4E x 4F x 4G x 4H x 41 x 4J x 4K ARE THE FOLLOWING ITEMS ADEQUATELY ADDRESSED ON THE PLANS? (All Plans Mus/Illclude Appropriate Legends, Scales, and North Arrow) (Items that are Not Applicahle to this Project are designated by NA) PROJECT INFORMATION Project Location Map (SholV project in relation to other areas of the county) Narrative Describing the Nature and Purpose of the ]>roject Location of Planned and/or Existing Roads, Utilities, Structures, Highways, etc. Lot and/or Building Locations Landuse of Adjacent Areas (Show the Entire Upstream Watershed and A^yacent Areas Within 500 Feet of the Property Lines) TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES Existing Vegetation (identify and Delineate) Locati.on and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site 100 Year Floodplains, Floodway Fringes, and Floodways (Note if None) Soils r nfm"m ation (1f hydric soils are present, it is the responsibility of the owner/developer to investigate the existence of wetlandl' and to obtain permits from the approprime government agenCies) Existing and Planned Contours at an Interval Appropriate to Indicate Drainage Patterns Locations of Specific Points Whel-e Stormwater Discharge Will Leave the Site Identify All Receiving Waters (If Discharge i.l' to a Separate Municipal Storm Sewer, 1denti[v the Name of the .Municipal Operator and the Ultimate Receiving Water) Potential Areas Where Storm water May Enter Groundwater (Note if None) Location of Stormwater Syslem (Include Clllvel'tS, Storm Sewers, Channels, and Swales) LAND DISTURBING ACTIVITIES Location and Approximate Dimensions of All Disturbed Areas [Le., Construction Limits] (Areas Where Vegetative Cover Will Be Presel"ved Should be Clearly Designated) Soil Stockpiles and or Borrow Areas (Show Locations or NOle If None) EROSION AND SEDIMENT CONTROL MEASURES Sequence of When Each Measure Will Be Implemented (Relative to Earth Disturbing Activities) Monitodng and Maintenance Guidelines for Each Measure Perimeter Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Temporary Seeding (Specifications: lncludmg Seed lvlix, Fertilizer, Lime, and Mulch Rate~) Temporary Erosion and Sediment ConlrolMeasures (Locatioll, Construction Detai!, Dimensions, and Specifications) Permanent Erosion and Sediment Control Measures (Locol/O!?, Construction Detail, Dimensions, and Specificarions) Storm Drain Inlet Protection (Location, Construction Detai!, Dimensions, and Specifications) Stormwater Outlet Protection (Location, Construction Detail, DImensions, and Specifications) Stable Construction Entrance (Location, Construction Detail, Dimensions, and Specifications) Erosion and Sediment Control on Individual Building Lots (Specificati()l1.\~ Permanent Seeding (Specifications, Including Seed lvlix, Fertilizer, Lime, Clnd Mulch Rates) Revised 4 I 97 , ) ( ) ER~ION AND SEDIMENT CONTROC PLAN TECHNICAL REVIEW COMJ\1ENTS PROJECT: Hayden Run Sec. 1 Page 3 of 3 IVote: All erosion and Jediment control meaSlIreJ shown on the pllrns alUI referenced in thi,,; review must meet the design criteria, standt'''!s, {{nd specifications outlined ill the "indiana Ham/hook for Erosion Control ill Developing Areas" from 'be Indialla Department ()f Natura/Resources, Divi,\'ion of Soil COllservation or simiLar Guidance Documents. Item 4A. The lack of a site specific installation schedule of each measure in relation to earth disturbing and construction activities is a concern of our office and is a requirement of Rule 5. The sequence on the plans is generic in nature. The sequence needs to addrcss specific items on this site such as: 1. Install construction entrance. 2. Install rock horseshoe at existing road culveli. 3. Install temporary swale around the north side of pond #3 and seed it. 4. InstalI swale along east property line to a sediment trap in the southeast corner. The sediment trap will consist of a berm built to elev. 896 with a pipe discharge with slottcd riser. The berm \vill be located where the berm is to be installed for pond #]. 5. Construct the swale along the east property line going n01ih and install a sediment basin at pond #3 and use the existing field tile connected to a slotted riser as the outlet. 6. Start stripping topsoil from the site and installing pond #2. Provide a temporary outlet pipe for pond #2. These items should get the project off on the right start. Additional instructions are needed to address storm sewer installation, inlet protection, check dams, seeding and critical area planting. Item 4C. Some of the items mentioned in 4A above need construction details. Pipe sizes, dimensions, elevations, grades and practice details are needed. Cc: Carmel DOCS Ha. Co. Surveyor Ha. Co. Highway File u\. u City of Carmel VIA FAX: 849-5942 Original by Mail May 2, 2002 Edward Fleming Stoeppelwerth & Associates, Inc. 9940 Allisonville Road Fishers, IN 46038 RE: Lakes at Hayden Run Subdivision, Section 1, Secondary Plat Application (Review letter #2) Dear Mr. Fleming: This letter is in response to your Secondary Plat filing for Lakes at Hayden Run, Section 1. The following issues must be resolved prior to signature of the plat by the director: 1. Transfer landscape plan to construction grade (verify no conflict with easements.) Provide typical planting plan per lot. This plan will require approval by Scott Brewer, Carmel Urban Forester, prior to approval of the secondary plat. 2. Add source of title instrument number to page one. 3. Fonvard a copy of the final review letters from the following agencies: a. County Highway, County Surveyor, Hamilton County Soil and Water b. Scott Brewer, DOCS Urban Forester 4. Have Mylar signed by property owner and surveyor (with R.L.S. seal) prior to signature by director. 5. Add instrument number for survey plat to page 7. 6. Provide letter of commitment of construction of Road hnprovements per Commitment made by owner at time of Primary Plat. We will determine the appropriate action in receiving the improvements per the commitment within the coming months. This process is identical to the action taken for the Hayden Run Secondary Plat. Please submit a revised Secondary Plat with the above-mentioned changes. Once these changes have been made and comments addressed, please produce a mylar copy for signature by this Department. Two paper copies of the plat must be filed with the mylar prior to recording. I will return the signed mylar to you for signature by the County Commissioners. Once recorded, our Department needs three paper copies and a mylar of the recorded plat. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. ASincerh Jon C. Dobosiewicz Planning Administrator Lakes @ Hayden Run-SP2 Page 1 ONE crilIC SQUARE CARMEL, INDIANA 46032 317/571-2417 ,- u u One Clvte Square Carmel, IN 4e032 (31 T) 571-2417 Fax: (31 T) 571-2426 To: ~ ":::> .J; /-...",. ....., ~ ~ q - s 91;L, FrQml=~~ Pages: 3 Fax: Phone: DafS2 ReI dr\.....@I,,~~.... CC: Lf'-;;'t'-.,~ .Q. ~ A-.x-::. o Urgent 0 Fo!" Review 0 Please Comment 5 - d..-~ ;;L 7',05; f V11 . o prease Reply o Please Recycle ~ENTEX U HDMES Jon Dobosiewicz Planning Administrator City of Carmel One Civic Square Carmel, IN 46032 /-:~~.~:\'~ !..~~~~~;;,~. ,/~.) - ~ '-"'-<~C:\ !-.)~., 18)12~rr2 '., ,,~\ r,-~,; rnJrsl!,.,le.~{jj \- '; ~~\ APR 15 2002 i.c,~-,i )\ Docs i. I .\\ 1-.../ u/ \. /." _.I V" /, ..;1 "fJ';,. ....('" / "~%-U3~>Y Corporate Office April 12,2002 6602 East 75th Street Suite 100 Indianapolis, IN 46250 Phone: ~ 17.915.2200 RE: Lakes at Hayden Run Declaration of Covenants & Restrictions Dear Jon, Enclosed is a draft copy of the Declarations of Covenants and Restrictions for Lakes at I-Iayden Run as requested per your letter dated April 9, 2002. Call me with any questions or concerns. Sincerely, CENTEX HOMES /7 fG~a,1lA~ ;Odney A.Wller Land Development Project Manager RAM/ram u U LETTER OF TRANSMITTAL STOEPPEL WERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: April 12, 2002 JOB NUMBER: 41848 - TO: Department of Community Services One Civic Square Carmel, Indiana 46032 " I RE: The Lakes at Hayden Run, Section 1 1. ffj/f!tF'~!!n j .0....;:: ~i/~,tlV}P~ r \ A'P/t ,,;." 'Yii;ff) ~" . !\ -~ J:J ('002 ,f! \_~\ DOCS:,' \/\,"'-/ \ ~. ~ ,,- '. .... .I '~j/'; /<, ,./ 11:0 '1'- )';;; ,;/ :l( ~__ ATTENTION: Jon Dobosiewicz WE ARE SENDING YOU [X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. 2 Sets Construction Plans with Secondary Plat " THESE ARE TRANSMITTED as checked below: ] For Approval X I As Requested ] For Review and Comment X] For Your Use REMARKS: The enclosed plans have been revise per the TAC meeting 011 March 20, 2002. If you have any questions, please give me a call at (317) 577-3400, ext. 22. Edward E. Fleming Ce: Rodney Muller April 9, 2002 u u City of Carmel VIA FAX: 849-5942 Original by Mail Edward Fleming Stoeppelwerth & Associates, Inc. 9940 Allisonville Road Fishers, IN 46038 ~ RE' LaIres at Hayden RUD SUbdivi<ion, Section 1, S.condary Plat APP~ copy Dear Mr. Fleming: This letter is in response to your Secondary Plat filing for Lakes at Hayden Run, Section 1. The following issues must be resolved prior to signature of the plat by the director: ;(l. v2' vi ~ ~ .~ ]J Submit a Landscape Plan. This must be included in the construction set and match the Landscape Plan approved by Scott Brewer for the Primary Plat. All sidewalks must be 5 (five) feet in width. Where asphalt paths intersect streets and sidewalks the approach shall be concrete with depressed curbs the full width of the path. See Hamilton County Highway Department for detail. Provide Primary Plat (138-01 PP), and Secondary Plat (28-02) Docket Numbers on page one. Add source of title instrument number to page one. Add Street Names. Add "West" to 131'1 Street. Extend non-access easement to first intersection v;.ithin development from 131 sl Street. Forward a copy of the final review letters from the following agencies: a. County Highway b. County Surveyor c. Hamilton County Soil and Water Have Mylar signed by property owner and surveyor (with R.L.S. seal) prior to signature by director. Provide a copy of the covenants and restrictions. Add instrument number for survey plat to page~~ 1 Remove reference to plat being within City of Carmel from page", second column. Please submit a revised Secondary Plat with the above-mentioned changes. Once these changes have been made and comments addressed, please produce a mylar copy for signature by this Department. Two paper copies of the plat must be filed with the mylar prior to recording, and tluee paper copies and a mylar of the recorded plat must be submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. Sincerely, h!tr ., Jon C. Dobosiewicz J Planning Administrator Lakes @ Hayden Run.SP l.rtf Page 1 ONE CIVIC SQUARE CARil1IEL, lJ.'\lDIANA 46032 317 /571-2417 'i'- 03/25/02 10::17 FAX U'''' HAMILTON CO HWY. ~~~ Carmel DoeD , ...-u 141 0011002 ., HAMILTON COUNTY HIGHWAY DEPARTMENT February 4.2002 Mr. Edward E. Fleming Stoeppelwerth & Associates 9940 AllisonviJIe Road Fishers, Indiana 46038-2005 ~ ~(grWnn m~ j~ '-., I f>} ~sl(j; ft1fl,R 25 2002 DOCS , ~:-..... ~j........~ j":--..." ,- "" "~'''':' .\ \~~~ I- 1;_ ~ I f'-. r--... /----..; ./ y- .- ,-~~V I -1-~~:-'/ Lakes at Hayden Run Secondar.y Plat and Construction Plans - received 3/06/02 S of 131 st Street 1 W of Towne Road Clay Township Dear Mr. Fleming: RE: Thi$ letter serves 10 acknowledge receipt of a transmittal containing the prans for the Hayden Run Subdivision. After reViewing the plans. the Highway Department has the following comments: Secondary Plat 1 , Please label the right of way in the cul-de-sac radii as such. 2. A 50' triangular right of way cut is needed at the intersection. 3. The non-access easement must be extended along Street A to Street D on the east side and to Lot 1 On the west side. 4. Street names must be included. 5. Before any approvals are granted for the Secondary Plat. an Engineers Estimate broken into the following categories will need to be submitted, alon9 with a Performance Bond or Letter of Credit in the amount of 100% of the estimate: .. Stone Base · HAC Binder .. HAC Surface .. Concrete Curbs .. Street Name and Regulatory Signs Construction Plans 6. Note B in Section 6 - Site Grading - should read .05 feet, not .10 feet. 7, Eliminate the asphalt path from crossing the street west of the intersection of Street A and Street D. Only one crossing can be installed at the intersection. 8. The roll curb and SSD must continue across the entrance of the pool house, ,he entrance should be similar to all home drlvewaysc 9. Addltiona' right of way will be needed for the installation of the passing blister lane. COMtruction plans will not be approved until the necessary right of way is acquired and the dedication forms forwarded to the Highway Department. 10. A copy of Ihe Landscaping Plan must be included in the Construction Plans. 11. All curb around the center medians must be 2' chalrback curb with reverse slope, 12. Please include the following note on the water distribution plan sheets "no water main valves are to placed within the streets", 13. Remove Detair U-1 from the detail sheet. No road cuts will be permitted 14, All ADA ramps must be concrete. If an asphalt path is to cross the street, a concrete ramp must be installed behind the curb. 15. Please include flow lines on the Site Development Platl. 1 G. ElimInate the 6' path that extends south of the 10' patti at the west property line. 17, The 26 x 40 GMP and any other pipes that are under 13181 Street will need to be extended to accommodate the widening and shoulcter. Matching si;te pipe shOUld be used and a concrete tollar installed at the Joint. 18. Please Include the following note on the sanitary Sewer sheets. All sanitary sewer laterals that cross the street must be backfilled with full depth granular backfill. 1700 South 10U. Street NoblosviUe, In. 46060 WWw.CO.!1 am.i1TOn.i".~s omec (317) 77)-7770 Fax (3J i) 776.-9814 u HAMILTON CO HWY. U ~~rmel DOCD 14I 002/002 03/25/02 10:38 FAX 19. Relocate storm sewer structure 198 to the baok edge of the right of way. 20. The offsile water main extension. and all other offsite utilities, must be placed behind the future right of way_ 21. All offsite issues must be settled before final approvai of the plans will be given. 22. Please note that further comments may be necessary after the revisions have been completed. If you have any comments or questions regarding this letter or project, pjease feel free to contact me at any ~me. Thank you for your attention and cooperetion, ~in rely, ~L8A?r,-~ . teven 3. Broermann Staff Engineer cc: Jon PObosclewicz v~ Steve Cash G:\U8ERSISB\02T AC\03-2:Kl2Iakes@haydlilnl'\Jn.doc v U I:ENTEX HOMES Corporale Office Mr. Jon Dobosiewicz Department of ConmlUnity Services City of Carmel One Civic Square Carmel, Indiana 46032 /',-- ~.' . . ,/S~IL 2.,~:(~?,. ~ ~~rc~~1l>> NAN 20 2002 DOCS 6602 East 75th Street March 20, 2002 SUite 100 Indianapolis. IN 46250 , . , - .~'" Phone' 317-915-2200 i' '( 1 __I ,\-::i\ \ ". . . \ \.~. . Lakes at Hayden Run Section 1 Plat Filing Fees - Docket #28-02 Sp....... - ~ , RE: .~_.~. '-. J \' \1>- ~ Dear Jon, Attached is check #059668 in the amount of$700.00 tor the Lakes at I-Iayden Run Section 1 Secondary Plan and Construction Plan Filing Fees. Please contact me if you have any question or concerns. Sincerely, ~.~TEX H~MES tfGJu 7111 ~ V~ Rodney A~ul1er Land Development Project Manager RAM/ram .. u u ", Johnson, Sue E Cc: SUbject: Jay Alley [Jay@ctrwd.org] Monday, March 18,20023:56 PM rfarrand@ccs.k12.in.us; AKeeling@cLcarmel.in.us; CTingley@ci.carmeLin.us; DH ill@cLcarmel.in.us; DPattyn@ci.carmel.in.us; Ghoyt@ci.carmeUn.us; GStahl@ci.carmel.in.us; JDobosiewicz@ci.carmel.in.us; JKendall@ci.carmel.in.us; JPFoster@ci.carmel.in.us; KHahn@cLcarmel.in.us; LLillig@cLcarmel.in.us; MFogarty@cLcarmel.in.us; MHollibaugh@ci.carmel.in.us; MMcBride@ci.carmel.in.us; MSnyder@ci.carmel.in.us; PMorrissey@ci.carmel.in.us; PPace@cLcarmel.in.us; RAuler@ci.carmel.in.us; RHancock@ci.carmel.in.us; SBrewer@ci.carmel.in.us; SJohnson@cLcarmeLln.us; slillard@cLcarmel.in.us; WAkers@cLcarmel.in.us; sprater@cmsenergy.com; sjb@co.hamilton.in.us; stC@co.hamilton.in.us; john- south@iaswcd.org; cshupperd@vectren.com blm@co.hamilton.in.us; Candy Feltner; rlauritsen@slmaco.com Re: March 20th Carmel/Clay TAC Agenda From: Sent: To: Hello everyone: Following are CTRWD comments on the agenda items effecting our sanitary sewers or service area for the March 20 TAC meeting. Please feel free to copy and distribute this email or attach it to your meeting minutes. We have also created a new page on our website linked to the "Construction" page where we have posted all CTRWD TAC comments from 2001 and 2002 meetings held to date. We will continue to add to this page every month so please let everyone know they can view our comments online now too. Shelborne Park Section 1 Plans have been received by the District and reviewed by the District's engineering consultant and need to be revised before they will be ready for submittal to IDEM for state construction permits. Building permits should NOT be issued unless the District has issued connection permits. Lakes at Hayden Run Section 1 Plans have been received by the District and reviewed by the District's engineering consultant and need to be revised before they will be ready for submittal to IDEM for state construction permits. Building permits should NOT be issued unless the District has issued connection permits. Carmax Auto Superstores While this project is served by Carmel Utilities, any underground work in 96th Street should be done with caution since the District has a 16" force main under the pavement of 96th Street. Towne Meadow Elementary The parking lot additions do not effect any of the District's sewers. However, the School Corporation needs to be advised that any impact on the sewers on site will necessitate inspections by the District for any repairs or modifications. 12411 Towne Road (pond) This property is in the District's service area and sanitary sewer service is available in the Laurel Lakes subdivision west of the property. When permits for any new home on the property are sought, the owners should contact the District about making a sanitary sewer connection. Connection to sanitary sewers may be required by the District. Please remind all TAC applicants to provide plans directly to the District at our main office address at: 10701 N. College Avenue, Suite A, Indianapolis, IN 46280-1098. If there are questions about the District's requirements, then please refer to our website for current information on the District's construction specification and permit standards. 1 .: u U We are a member of the lUPPS underground locate network so call1-80Q-382-5544 before you dig! Please feel free to contact me if you have questions or need additional information. Thanks! . Jay W. Alley, Utility Manager Clay Township Regional Waste District Hamilton County, IN, USA http://www.ctrwd.org/ 317-844-9200 (phone) 317-844-9203 (fax) >>> "Dobosiewlcz, Jon e" <JDobosiewicz@ci.carmel.in.us> 03/11/02 10:08AM >>> To all, Please find the March 20th Carmel/Clay TAC Agenda attached. <<T AC20D2-0320.rtf>> If you have any questions please do not hesitate to call. Thanks, Jon C. Dobosiewicz Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 Phone: 317.571.2417 Fax: 317.571.2426 jdobosiewicz@ci.carmel.in.us 2 U (J EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south~iaswcd.org PROJECT NAME: Hayden Run Sec. 1 REVIE\VED BY: Mr. Tom Kulz Centex Development 6602 E. 75'h Street. Suite 100 Indianapolis, IN 46250 Ph- 317 -915-2200 John B. South P.E. Cerlilierl Professional in Erosion and Sediment Control Mr. Ed Fleming Stoeppelwerth & Associates 9940 AJlisonville Road Fishers, IN 46038 SUBMITTED BY: PLAN REVIEW PROCEDURE: Site Visit Date: Plan Review Date: 3-16-02 LOCA TrON: north side of 13 1 street 3/4 mile east ofShelborne Road LEGAL DESCRIPTION: Sec. 29 TO~'NSHIP: 18N RANGE: 3E Cl VIL TOWNSHIP: Clay SOIL SURVEY MAP SHEET: On the Plans The lechnical review and comments are intended 10 evaluaw the completeness of the erosion and sediment control plan/or the project. The erosion and sediment control plan submit/ed was not revie.iiedfor the adequacy of the engineering design. All practices included in the plan. as well as thuse recOInmended in the comments should be evaluated as to their feasibility by a qualified mdividualwith structura! practices designed by a quaf!fied engineer. The plan has not been reviewedfor local, state, orfederal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to .Iilrther evaluate the erosion and sediment control plan The erosion and sediment control plan has been reviewed and it has been determined that the plan: Satisfies the minimum rcquirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Environmental Managemcnt. Refer to the com ments section for additional information. X Docs not satisfy the minimum requirements and intent of 327IAC 15-5 (Rule 5); deficiencies arc noted in the checklist and in the comments section. Deficiencies constitute potential violations of the rule and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted: Proper implementation of the erosion and sediment cuntrol plan and inspections of the construction site by the developer or a representative are necessary 10 lninimize of):site sedimentation. The developer should be aware that unforeseen construction activities Clnd weather conditions may effect the performance of a practice or the erosion and sediment control plan. Theplan must be aflexible document, with provisions to modifji or substitute practices as necess(IlY- Revised 4 /97 ... PROJECT: Hayden Run Sec. 1 u u Page 2 of3 Yes No X JA x IB X 1C x ID X IE Yes No x 2A x 2B x 2C x 2D x 2E X 2F In Uraill~gc Rcp{)rt2G x 2H 2[ X Yes x No 3A x 3H Yes No x 4A X 48 X 4C x 40 x 4E X 4F x 4G X 4H x 41 x 4J X 4K ARE THE FOLLOWING ITEMS ADEQUATELY ADDRESSED ON THE PLANS '? (All Plum Must Include Appropritrte Legend'~1 Scales, and North Arrow) (Items tllat are Not Appliwble to Illis Project (Ire designated by NA) PROJECT INFORMATION Project Location Map (Show pro.Jecl in relation to other areas oJthe cmmly) Narrative Describing the Nature and Purpose of the Project Location of Planned andlor Existing Roads, Utilities, Structures, Highways, etc. Lot and/ur Building Locations Lalldusc of Adjacent Areas (..,,'how the Emire Upstream Watershed and Adjacent Areas ieVithin 500 Feet oJthe Prnperty Lines) TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES Existing Vegetation (ldentifv and Delineate) Lucation and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site 100 Year Floodplains, Floodway Fringes, and Floodways (Note iINone) Soils Information (IJhydric soils are present, it is the responsibility oJthe owner/developer to investigate the existence of\I'etlamh and to obtain permits li'om the appropriate government agencies) Existing and Planned Contours at an Intcrval Appropriate to Jndicate Drainage PaUerns Locations of Specific Points Where Stormwater Discharge Will Leave the Site Identify All Receiving Waters ( IflJischarge is to a Separate Municipal Storm Sewel', Identify the Name uj"the Municipal Operator und the Ultimate Receiving Water) Potential Areas Where Storm water May Enter Groundwater OVute iINone) Location of Storm water System (Include Culverts, Sturm Sewers, Channels. and Swales) LAND DISTURBING ACTIVITlES Location and Approximate Dimensions of All Disturbed Areas [i.e., Construction Limits] (Areas Where Vegetattve Cover ~Vitl Be Preserved Should be Clearly Designated) Soil Stockpiles and or Borrow Areas (Show Locatiolls or ,Vote ((None) EROSION AND SEDIMENT CONTROL MEASURES Sequence of When Each Measure Will Be Implemented (Relative 10 Earth DiSlurbing Activities) Monitoring and Maintenance Guidelines for Each Measure Perimeter Sediment Control Measures (Location, Construction Detail, Dimensions, and Specificatiuns) Temporary Seeding (SpecificatirJ/1s; Including Seed Mix, FerU!!zer, Lime, and Mulch Rale,) Temporuy Erosion and Sediment Control Measures (Localion. Construction Detail, Dimensions. and Specifications) Permanent Erosion and Sediment Control Measures (Location, Construction Detai!, Dimensions. and ,SfJecifications) Storm Drain Inlet Protection (Location, Construction Detail, Dimensions, and Specifications) Stormwater Outlet Protection (Locolioll, Construction Detail, Dimensions. and .5jJecijicatiol1s) Stable Construction Entrance (LocCltion. Construction Delail, Dimensions, and Specifications) Erosion and Sediment Control on Individual Building Lots (.5jJCcijicatiom) Permanent Seeding (Specifications; Including Seed MI~,. Fertilizer, Lime.. Clnd Mulch Rates) Revised 4 f 97 '"' u U EROSION AND SEDI.I\1ENT CONTROL PLAN TECHNICAL REVIEW COMMENTS PROJECT: Hayden Run Sec. 1 Page 3 of 3 Note: All erosion allll sediment control measures shown Oil the plum' ami relerenced ill this review must meet tlte design criteria, standards, llJUlspec(ficlItions outlined ill the "fruli/IIUI Hmulhookjor Erosion ContJ'OI in Developing Areas" from tlte Indiana Department oflVatllNll Re.wurces, Division of Soil Conservation or similar Guidarlce Documents. Note: An exi sting 8" or 10" clay drain tile crosses the south-,:v'est corner of this site. This tile needs to be renewed to prevent future problems with maintenance of an old tile system. Please specify that the existing well and septic are to be abandoned according to local, county and state codes. Item 3A. & 3B. The erosion control pIall needs to encompass all areas that will be disturbed during construction. Will any part of Sec 2 be included with this first phase of dirt work? Item 4A. 4A. The lack of a site specific installation schedule of each measure in relation to earth disturbing and construction activities is a c:oncern of our office and is a requirement of Rule 5. Erosion control practices will be the most eftective if they are installed in an appropriate sequence. For assistance in developing a schedule please contact our office or consult Section 2.3 ofthe "Indiana Handbook for Erosion Control in Developing Areas" published by the Division of Soil Conservation, Tndiana Department of Natural Resources The Sequence of Construction Activities is not site specific. Item 4C. Perimeter sediment controls are needed. Consider adding temporary diversions with sediment basinsltraps designed according to the drainage area. Sediment traps/basins will need to have size and construction dimensions. The maintenance paragraph (file- METES/23899) could be eliminated as this is covered in your Erosion Control Notes. The two paragraphs about C350 don't seem to be needed. This plan specifies 4" of topsoil for seeding. Wllen reviewing the site T will inspect for the 4" of topsoil. Cc: Carmel DOCS Ha. Co. Surveyor Ea. Co. Higlnvay File 03/15/02 14:05 FAX u a~ILTON CO HWY. 7~Carmel DOCD I4J 001/001 HAMILTON COUNTY HIGHWAY DEPARTMENT March , 5, 2002 Mr. Edward E. Fleming Stoeppelwerth & Associates 9940 Allisorwi1le R.oad Fishers, Indiana 46036-2005 RE: Hayden Run Offsite water plan - received 0310702 131 eI Street! W of r owne R.oad Clay Township Dear Mr. Fleming: This letter serves to acknowledge receipt of a transmittal containing the plans for the offsite water plan for the Hayden Run Subdivision. Aftfilr reviewing the plans, the Highway Department has the following comments: . , , " ~'("I, II'?./). &' ~ ~..I, 'ly ~:':'~ {l1Z./ .~ ^ ifo!' ..... -~ 'f!(0 . ~ .Qi @.t' ~ .if] ~ . I -il \~,\ A. .::{ ., .,1;...." /" lot; "':: ...- /". :/ _~....r. ,:? 1((-' ,. ~d" \:.~' 1. Any street crossings for 13151 Street and 14151 Street will noed to be permitted through the Highway Department. Please contact Mr. Rob Chadwell, Permit Inspector, for the necessary forms and pertinent information pertainine to the permit process. Please note the road cuts will not be permitted for any of the road crossings. If you hav8 any comments or questions regarding this letter or project, please feel free to contact me at any time. Thank you for your attention and cooperliltion. Sin/relY, 4~J~o:f~ ~. Staff Engineer cc: Jon Dobosciewicz G:\U$~FlS\SB\02i AC\03-1S.02haydenrunwater.doc 1700 South 101~1 Street Noblesville. 1n. 46060 www.ro.h2.milton.in..us omce (311) 773-7770 Fax (311) 716-4)814 03/14/02 16:17 FAX u. HAMILTON CO HWY 0 .9armel DoeD 14I 0011004 "I HAMILTON COUNTY .. H/GHWA Y DEPARTMENT March 14. 2002 Mr. Edwa~d E. Fleming $taeppelwerth & Assoelates. 9940 AIIIsonvllle Road FiSher~a..4.6038-2005 ~, ~ R.E: Hayden Runy,.Sectiori1 and Shelbome Park, Seetion 1 '--RevisioRs-tt) Cons~c~on Plans S of 131!ll StrBell W of Towne Road Clay Township . Dear Mr. Fleming: This letter serves to Inform you of changes that the Highwey Department is requiring to be made to the construction drawings for the Hayden Run, Section 1 and ShelbomePark. Section 1 Subdivisions. With the conalr\.lction of the Shelborne Park Subdivision to occur at apptOXimateJY the same time, the Highway Department will require that opposing left tum lanes be constructed on 131 Street at the entrance to ttle new subdivisions. The new construction should be completed accordIng 10 the attached draWings. Centex Homes w!ll be required to construct theneeessary pavement on the south side of 13151 street with Shelborne ParK LLG to complete the north side of 131&\ Street. When the widening is completed, a butt joint will need to be milled at the east and west end of the project and 1" of HMA surface placed over the area so that new pavement markings can be installed. The two develOpers will share the Installation and cost of the surface maberial and pavement markings. The pavement markings will need to be thermoplastic. ~ fR~(C[~11W~~ nh .!, ,{ DOCS Several revisions will be required, Hsted below are some of the major points: III Increase the curb radius from 40' to 50' . Adjustments to the widening to accommodate the new lanes- Instead of the 24' of pavement needed for the decellane, approximately 19' will be needed on each stde of the centerline. 9 A plan for the pavement markings. The revisions will need to ce completed and submitted for revIew before the construction plans will be approved. If you have any comments or questions regarding this letter or project, please feel free to contact me at any time. Thank you for your attention and cooperation. Sincerely, //t~/8~ Steven J. Broermann Staff E.ngineer co: Jon DobosGiewicz Steve Cash Tam Kutz. Roger Kessler o.:\USERS\S 8\02 T AC\OJ..' 4-{]2haydenrun.doc 1700 South 10'h St;-oct Noblcsville.ln.46060 www.to.h:lmiltQ".in.u~ Office (317) 773-7110 F:'lx (317) 776-9814 03/14/02 16:17 FAX U-;~ HAMILTON CO HWY .u__~armel DoeD I I ~ lot i~ ~ i::: 'It < u..~~ . "< ':) <:;y ~ .Ii; ~~t ~ ~ ~ \.,\\ ~u lu ::..,J <~ ~ 0021004 03/14/02 16:17 FAX ! U HAMILTON CO HWY.~ I I ~arme1 DoeD .. = ~ 0031004 03/14/02 16:18 FAX U ~ 004/004 HAMILTON CO HWY 0 . Carmel DOeD I I II. ~ ~ ~ ~ ~ ~ ~ \.... ~ ~ ~ .... "'I(. "..... -.la. .... ~ ~ u March 13, 2002 Mr. Edward D. Fleming Stoeppelwerth & Associates, Inc. 9940 Allisonville Road Fishers, IN 46060 RE: The Lakes at Hayden Run, Section 1 Job Number: 41848 Dear Mr. Fleming: I have received and reviewed the information for the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. R~spectfully, ~fo~~ Chief of Police MDF:vb cc: Dept. of Community Services/ .-(\~ ~>}'-'" A\..Y-- . 12::? ~ / ~: / rF3~(G@1W~!l5l f.1 MAR 14 2002 \ p' DOCS \~.' \ '\," ....., ,:/.......... "',~-.~:-L rT- \~.~.;.. ~.. (317) 571-2500 A Nationally Accredit Fa" (317) 571-2512 u u Edward E. Fleming Stoeppelwerth & Associates 9940 Allisonville Rd. Fishers, IN 46038-2005 RE: The lakes at Hayden Run, Section 1 lETTER OF APPROVAL The undersigned has reviewed the proposed plans for The Lakes at Hayden Run, Section 1 and has approved the plans subject to the following: 1. Our office requests the installation of a Knox box for emergency access located on the clubhouse facility. 2. 3. 4. 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: March 11, 2002 By: Gary Hoyt, Fire Marshal Carmel Fire Department u u CARMEL/CLAY TECHNICAL ADVISORY COlVIl\1ITTd AGENDA ~~~M~~ l.jAR 13 2f~12 DOCS Date: March 20, 2002 Place:Department of Community Services Conference Room 3rd Floor - Carmel City Hall 9'00 a m <VWnm 10'00:J m 10'10 am 1O'4~ II m 11'00 II m 11'10 n m Shelborne Park, Section 1 (Secondary Plat & Construction Plans) The site is located on the north side of West 131 st Street approximately one-quarter mile east of Shelbome Road. The site is zoned S-llResidential- Estate. Filed by Dennis Olmstead of Stoep pel werth & Associates, Inc. for Roger L. Kessler. Lakes at Hayden Run, Section 1 (Secondary Plat & Construction Plans) The site is located on the north side of West 131 st Street approximately one-quarter mile west of Towne Road. The site is zoned S-llResidential - Very Low Density. Filed by Dennis Olmstead of Stoeppelwerth & Associates, Inc. for Centex Homes. Carmax Auto Superstores (Construction Plans) The applicant seeks approval to construct a auto sales facility. The site is located at the northwest corner of East 96th Street and Gray Road. The site is zoned B-3! Business. Filed by Dave Coots of Coots Henke & Wheeler for Carmax. Towne Meadow Elementary (Site Improvements) The applicant seeks approval to construct additions to existing parking areas. The site is located at 10640 Towne Road. The site is zoned S-llResidential- Very Low Density. Filed by FanningIHowey Associates, Inc. for CarmeVClay Schools. Prairie Trace Elementary (Site Improvements) The applicant seeks approval to construct additions to existing parking areas. The site is located at 14200 North River Road. The site is zoned S-llResidential- Low Density. Filed by FanningfHowey Associates, Inc. for CarineVClay Schools. 13719 Smokey Ridge (Developmental Standards Variance) The applicant seeks approval to construct a swimming Pool. The site is located at 13719 Smokey Ridge. The site is zoned R-IlResidence. Filed by Tom Endicott of Pools of Fun. 12411 Towne Road (pond) The applicant seeks approval to expand an existing pond. The site is located at 12411 Towne Road. The site is zoned S-llResidential- Estate. Filed by Shelley L. Stout. J::.I.?:.:Q.?-- [) ~-;;t ;:~ Dlc- D/C- +~- 4c- rf- 9L 4C ~'-- '; 00 o 0 ~ \L>J-, Y\1~ Q~~. ~ ~W\11~"\<; CARMEL/CLAY TECHNICAL ADVISORY COMMITTEE AGENDA Date: March 20, 2002 Place: Department of Community Services Conference Room 3rd Flool' - Carmel City Hall 9:00 a.m. 9:30 a,m. 10:00 a.m. 10:30 a.m. 10:45 a.m. 11 :00 a.m. 11 :20 a.m. Shelborne Park, Section 1 (Secondary Plat & Construction Plans) The site is located on the north side of West 131 st Street approximately one-quarter mile east of Shelborne Road. The site is zoned S-llResidential - Estate Filed by Dennis Olmstead of Stoeppelwerth & Associates, Inc. for Roger L. Kessler. No comment at this time..,. We will work with contractor when work has begun.. Lakes at Hayden Run, Section 1 (Secondary Plat & Construction Plans) The site is located on the north side of West 1315t Street approximately one-quarter mile west of TO\\'lle Road. The site is zoned S-lIResidential- Very Low Density. Filed by Dennis Olmstead of Stoeppelwerth & Associates, Inc. far Centex Homes. No COlllillent at this time... We \\>111 work with contractor when work has begun.. Carmax Auto Superstores (Construction Plans) The applicant seeks approval to construct a auto sales facility. The site is located at the northwest corner of East 96th Street and Gray Road. The site is zoned B-3/ Business. Filed by Dave Coots of Coots Henke & Wheeler for Carmax. IPL territory... Towne Meadow Elementary (Site Improvements) The applicant seeks approval to construct additions to existi.ng parking areas. The site is located at 10640 Towne Road. TIle site i.s zoned S-1IResidential- Very Low Density. Filed by Fanning/Howey Associates, Inc. for Carmel/Clay Schools. No action for us to do.... Prairie Trace Elementary (Site Improvements) The applicant seeks approval to construct additions to existing parking areas. The site is located at 14200 North River Road. The site is zoned S-llResidential- Low Density. Filed by FamliuglHowey Associates, Inc. for CamlellClay Schools. No action for us to do. . . 13719 SmokeyRidge (Developmental Standards Variance) TIle applicant seeks approval to construct a swilmning Pool. The site is located at 13719 Smokey Ridge. The site is zoned R-IlResidence. Filed by Tom Endicott of Pools of Fun. No conunents... 12411 Towne Road (Pond) The applicant seeks approval to expand an existing pond. The site is located at 12411 Towne Road. TIle site is zoned S-llResidential- Estate -. .:--'>- 00 00 . . page 2 of 2 Technical Advisory Committee Agenda March 20, 2002 Filed by Shelley L. Stout. IPL territory. u u r'J~"-"~ :.jr~':~~'f-~c~~~::: -;'I'~~:. 'Z~:~ ~- ~ ~"I~ ;-'1. ~,.. .. ~ -I" :~-6Ift~OFjm~RM"&(1)iC '..~ , ';?', , ~ I"~" -- ~ <-'{ "'..... _ .,.." ~ ,~. J: ~. [_- :=. t;;lr ~ :-lf~p~F!~h\~~1~~~~AI?-~uri~~S~J~~c~'s; :~ :~ .~,,~~ >~'~. ~ .~~ .~...!; ...., .~: ~ II:~;[ ~ ..,-~ ~:__ ,..~.. S-:Ul,..'~:lU One CiVIc eqUatE! Carmel. IN 4S:JS2 ('317) 571~2417 F~ (31T1 571~42B 'Fax , ,....... ,.r--...... Tdl .cb..) ~\\.. '----l, Faxt ~o/i- 'Sz,q i;L Phan~ Frol1n ~~ ~'" ~age&1 ~ Da~B'I i> U ~ . . Ret {J\~ra.~.~ ~.~ .~to.-..~.. CCI . t1 Urget1t CI Far Review [J Pleasa C.amment [J IF'lease ReFly o Please, Recycle ~L-~ ~~"'t IE . . . ,~:'~~'.fv+...' .~ ~ ~ ~ '~~~'~N "',~ ~'N\. ~\~"'-~~ ~3/07/2002 11:51 317-776' ' ,1 01 I I HAMILTON CO USDA, ,_" PAGE 81/02 V ~~~ 1108 SQuth 91n Sh'eet /.{)V~ "'ZJ~ J' Nobluvi/le, IN 46060-J74!~$>'" ~/~ Ph. (317) 773.1432 kf>J7 ~ F~ (317)776-1101 (~ "NAHI!;;~,ro~@ gl~~" \ ~(J,,- Draidage, Erosion wid Sediment Cbntrol Plan 00 !J~ r "I! : Tcehnical.Revie.w and Comment Cs I .'" Reviewed By: Plan Review Procedun:; Site Visit 'Date; Location: Le,gaI Description: Townsh;p: ,,;.1. Plan Reyj;w Date: ~Jj" 8 f /-}~...fJ.a -J-il '~"L. ~. t) z.. Proj ect: Name: Subinitted By: Range: Civil ToWnship: ~ L.A" The technici:zI review and c()mmenrs ar/? intended to t:ilaluf:rt fhe ~l/fplerenu~ a/1M. .UC,fioh and sediment control ptanfcr. th4 projed. The erosion and sedlme1ff contral pla subm~tted wa1 1!atriWle'rWd fr;,.!.he ~ of the eitgineerinJ dufgn.. An practicer i~c/u.ded in the plan, as II as ~hose recommende.t! iff ihe comment:> :>nauld be. . evalwted as to thlJr feasibility by g fPlalffied individual wi s~rural pr~tice.: designed by Q qualified engineer. The plan has no't bun l'ft'liewedJor local, state or federal p mitsithat may b~ req'Uireti ta procud with (hi:; project. Additional irrformartoi'l. including de-rign calcu/atl lIS m/[)i be requested tofimhe evaluate the erosion sediment con!ToT plan. . , , 'The erosion and sedimeut cootrol plan "has been reviewed d it.~ been determined that the plan: o SatWle$ the minimum I'~uirements.and intent of 27IA:C 15.5 (Rule 5). Notification will be forwarded to the Indiana Deplll1mcnt of Environmental"Man emelll . 0 . Refer to the comments section for additional info atio~. i Does not sa~fY the minimwn requirements and i. ent olf327IAC 1$-5 (RIlle 5); defiden.eies are noted in the checklist md. in the comments sectio!!_ Defici ncieslcon.sti.tute potential violation of the rule amI must be adequately addressed for eompliance. The infi rll1atipn necl;Sslll)' to &atisfy the deficiencies must bc submitted: . Pl&a3C address revisions to the reviewer. PropuimplementatJrll1 a/the. erosion and sedfmer. contr p{aniarrd itlSpe.ction.nlthe consfnJclion .1ite by tne de'lelopeJ" or a representative are neccisary (0 minimize 0 -sire #dimwr(afiol1. 1'he developer should be Q'W(:rre that unforeseen ccnstr1JCtion QctMtfes and weather cOridi! ns TriP>' effect the. pe.rfr;rmarrcr: of a practU:e or the e.ros/(m and sedimUlt ~cl1tr(]1 plan.. The plol1 hllUt b~ a fl ible documeJ1t, wifh prwisfons to modify or substifU18 pl'(J.crices (:ll: n~clU~ary. ' 03/07/2002 11:51 317-nE-U01 H~MIL:ON CO USDA~ PAGE 02/02 Project: (' pase 3 of.3....- Not~: All erosion amisedimrmt control measures shown on t/1 ph:,,* r;md refereneed in this review must meet the dulgn cl'itel'ia, standards, and speciftcarions outlined in tne." diana Handbook/or Erosioh Control in Df!Veloping Areas" from the Indiana Department 0/ NaMal o1tr~es, Divf.3ion of Soil Conservatton O/" similar GuidanaeDbCuments. f).Jt ~" ./ , ,. co: v/ u ., u LETTER OF TRANSMITTAL -- '.' ~ STOEPPELWE RT.H & ASSOCIATES, IN~C .'(~~:-~ ~~/~)\ 9940 Allisonville Road ~'J']il. ~x,\) ":;-\ Fishers~ Indiana 46038-2005, ~'\~~) ~\Sl\~.-j~> Phone (317) 849-5935 1:1. ~ ~ !:- FAX (317) 849-5942 ~~ ~'\)<:JS {.,: <-':,; DATE: March 5, 2002 JOB NUMBER: 41848 TO: Department of Community Services 1 Civic Square Carmel, Indiana 46032 ATTENTION: Jon Doboseiwicz RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X J UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. 2 Sets Construction Plans 2 Secondary Plat 1 Utility Summary 1 Subdivider Agreement Form 1 Plat Application with Description 1 Transmittals to Agencies THESE ARE TRANSMITTED as checked below: I For Approval x I As Requested I For Review and Comment x I For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL ~ :1'lfECf//I[.tl j ,1/1 5 U 200 ~l DOCS '- / \ :>' : - \ \ STOEPPELWERTH & ASSOCIATES, INC. 9940 AJlisonville Road ' Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Clay Tovrnship Regional Waste District 10701 North College Avenue Suite A Indianapolis, Indiana 46280-1098 ATTENTION: Jay Alley RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ 1 Courier [ ] Other: COPIES SHEET DESCRIPTION NO. 2 Sets Construction Plans 2 Secondary Plat 1 Wasteload Application Packet THESE ARE TRANSMITTED as checked below: J For Approval x J As Requested ] For Review and Comment X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz . John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Samuel L. Moore & Associates 7102 Lakeview Parkway West Drive Indianapolis, Iildiana 46268 ATTENTION: Vasco Kirby HE: The Lakes at Bayden Rum, Section 1 WE ARE SENDING YOU [X ] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans. THESE ARE TRANSMITTED as checked below: ] For Approval X] As Requested ] For Review and Comment X] For Your Use REMARKS: Please review as soon as possible so that we can get package together and sent to Clay Waste for IDEM. Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisollville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Hamilton County Surveyor One Hamilton County Square Suite 188 N oblesville, Indiana 46060 ATTENTION: Steve Cash RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat 1 Storm Calculations 1 Outlet Request .1 Check No. 059484 for $150.00 (Filing Fee) THESE ARE TRANSMITTED as checked below: ] For Approval x I As Requested ] For Review and Comment X I For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road.. Fishers, Indiana 46038-2005 Phone (317) 849~5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Hamilton County Highway Department 1700 South loth Street N oblesville, Indiana 46060 ATTENTION: Steve Broermann RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPs [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat 1 Application Project Review THESE ARE TRANSMITTED as checked below: ) For Approval X] As Requested ] For Review and Comment r""- ~ X] For Your Use REMARKS; Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fisbers, Indiana 46038-2005 Phone (317) 849-5935. FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Hamilton County Soil & Water 1108 South 9th Street Noblesville, Indiana 46060 ATTENTION: John South RE: The Lakes at Hayden Run, Section 1 WE ARE SENDiNG YOU [X] UPS [ ] Cuurier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans t Secondary Plat 1 Storm Calculations THESE ARE TRANSMITTED as checked below: J For Approval X) As Requested ] For Review and Comment x I For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz U' ( , u LETTER OF TRANSMITTAL STOEPPEL WERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: City of Carmel City Engineer 1 Civic Square Carmel, Indiana 46032 ATTENTION: Dick Hill RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [- X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: ) For Approval X] As Requested ] For Review and Comment X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 AllisonviUe Road Fishers, fudiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Indianapolis Power & Light Company 3600 North Arlington Avenue Indianapolis, Indiana 46218 ATTENTION: Ron Morris RE: The Lakes at Hayden Run, Section 1 'WE ARE SENDING YOU [X] UPS [ ] COlJlier [ J Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans t Secondary Plat THESE ARE TRANSMITTED as checked below: J For Approval x J As Requested ] For Review and Comment x J For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL . STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Vectren Energy 15900 Allisonville Road N oblesville, Indiana 46060 ATTENTION: Chuck Shupperd RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier { ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: J For Approval x I As Requested ] For Review and Comment [ X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPEL WERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 . Phone (317) 849~5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: PSI Cinergy tOO South .Mill Creek Road N oblesville, Indiana 46060 ATTENTION: Rick McClain RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier I ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans t Secondary Plat THESE ARE TRANSMITTED as checked below: J For Approval X] As Requested ] For Review and Comment X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Ameritech 5858 North College Avenue Indianapolis, Indiana 46220 ATTENTION: Jeff Rice RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. 1 Set Construction Plans 1 Secondary Plat - THESE ARE TRANSMITTED as checked below: J For Approval x ] As Requested ] For Review aud Comment Xl ForYourUse REMARKS: Edward E. Fleming Cc: TomKutz John Doboseiwicz u u LETTER OF TR1\NSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 AlIisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Office of Fire Station Fire Station No.1 Two Civic Square Carmel, Indiana 46032 ATTENTION: Gary Hoyt RE: The Lakes at Hayden Run~ Section 1 WE ARE SENDING YOU [X ] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. 1 Set Construction Plans 1 Secondary Plat - THESE ARE TRANSMITTED as checked below: ] For Approval x I As Requested ] FOil" Review and Comment X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849~5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Carmel Clay School Administration 5185 East 131 st Street Carmel, Indiana 46033 ATTENTION: Ron Farrand RE~ The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: J For Approval x J As Requested I For Review and Comment x J For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 F.AX (317) 849.5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Carmel City Utilities 130 First Avenue Carmel, Indiana 46032 ATTENTION: Paul Pace RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. 1 Set COlllstruction Plans 1 Secondary Plat THESE ARK TRANSMITTED as checked below: J For Approval X] As Requested I For Review and Comment X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Carmel Clay Parks Department lOSS Third Avenue SW Carmel, Indiana 46032 ATTENTION: John Lester RE: The Lakes at Hayden Run, Section 1 WE ARE SENDIN"G YOU [X] UPs [ I Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: I For Approval X] As Requested ] For Review and Comment x I For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Hamilton County Local Emergency 18100 Cumberland Road N oblesville, Indiana. 46060 ATTENTION: Robert Hendricks RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING VOU [X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: ] For Approval X] As Requested I For Review and Comment X] For Your U5e REMARKS: Edward E. Fleming Cc: Tom Klitz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPEL WERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317)849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Deputy Building Commissioner One Civic Square Carmel, Indiana 46032 ATTENTION: Jeff Kendall RE: The Lakes at Hayden Run, Section 1 WE ARE SENDlNG YOU [X] UPs [ ] Courier [ I Other: COPIES SHEET DESCRIPTION NO. 1 Set Construction Plans 1 Secondary Piat ~" THESE ARE TRANSMITTED as checked below: 1 For Approval x I As Requested J For Review and Comment x 1 For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John. Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Department of Community Services One Civic Square Carmel, Indiana 46032 ATTENTION: Scott Brewer RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans t Secondary Plat THESE ARE TRANSMITTED as checked below: ] For Approval X] As Requested ] For Review and Comment. X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPEL WERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Hamilton County Sheriff Department 18100 Cumberland Road Noblesville, Indiana 46060 ATTENTION: Lt. Joe Cook RE: The Lakes at Hayden R.un, Section 1 WE ARE SENDING YOU [X] UPS [ ] COllrier [ Other: COPIES SHEET DESCRIPTION NO. t Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: I For Approval x I As Requested ] For Review and. Comment Xl For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 .JOB NUMBER: 41848 TO: Carmel Communications 31 First Avenue NW C3Irmel, Indiana 46032 ATTENTION: Bill Akers RE; The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPs [ ] Courier [ ] Other: COPIES SHEET DESCRIPTION NO. - 1- Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: I For Approval x l As Requested ] For Review and Comment X] For Your Use REMARKS: Edward E. Fleming Cc: Tom Kutz John Doboseiwicz u u. LETTER OF TRANSMITTAL STOEPPELWERTH & ASSOCIATES, INC. 9940 Allisonville Road Fishers, Indiana 46038-2005 Phone (317) 849-5935 FAX (317) 849-5942 DATE: March 5, 2002 JOB NUMBER: 41848 TO: Office of Police Chief Three Civic Square Carmel, Indiana 46032 ATTENTION: Michael Fogarty RE: The Lakes at Hayden Run, Section 1 WE ARE SENDING YOU [X] UPS [ ] Courier [ ) Other: COPIES SHEET DESCRIPTION NO. 1 Set Construction Plans 1 Secondary Plat THESE ARE TRANSMITTED as checked below: 1 For Approval > [ X] As Requested ] For Review and Comment X] For Your Use REMARKS : Edward E. Fleming Cc: Tom Kutz John Doboseiwicz