HomeMy WebLinkAbout08010012 ApplicationbApps2?docs sharedlPennitslTEMPORARY ILPslTemporary Construction Facility Application 2007.doc
CITY OF CARMEL, INDIANA - DEPARTMENT OF COMMUNITY SERVICES
TEMPORARY USE APPLICATION
TEMPORARY CONSTRUCTION OR SALES FACILITY
DIVISION OF BUILDING AND CODE SERVICES
INCOMPLETE APPLICATIONS WILL DELAY PERMIT REVIEW.
TEMPORARY USE REGULATIONS AND PERMIT REQULRENMENTS ARE ON BACK OF APPLICATION.
This application is for temporary uses utilized in temporary structures for construction offices, material or supply storage, or
temporay sales facilities. Temporary Construction Facilities are regulated by §25.08 Additional Use Regulations of the
Carmel Zoning Ordinance.
Each Construction Facility trailer will require a separate application."
APPLICANT/ COMPANY INFORMATION (PLEASE PRINT OR TYPE)
APPLICANT NAME: J i Hof sryt S PHONE #: (3, q) S - 1?& QS9 S
COMPANYAUILDER NAME: -S121 . LJ I S v ?^+ FAX #: ( ; I q) / S 7 00
ADDRESS OF COMPANY/BUILDER: 2,1 or hdAmex -v A-v_ Sf'• lams W 1 q /,31-31
PROPERTY OWNER NAME Sz ADDRESS:
,f L ZI So 3 Q1d itVa, S?. e- L
`Should a violation (s' age or general use) arise during the operation of this temporary use,
the applicant (wiio must be an individual) will be the individual contacted by the City of Carmel to resolve the violation
TEMPORARY USE INFORMATION CONSTRUCTION FACILITY ? SALES FA
SUBDIVISION/PROJECT NAME: )LI Kr P_ tJ... ?... Liv 1OBILE UNIT CERTIFI
ADDRESS OF PROPOSED USE: O t o
CERTIFICATION AND NOTICE OF INTENT TO COMPLY
PERMIT. ANY TEMPORARY CONSTRUCTION FACILITY OPERATING NlyTrHOUT A VALID PERMIT
CIVIL ZONING VIOLATION SUBJECT TO ENFORCEMENT ACTION BY THE CITY OF CARMEL
TEMPORARY SALES FACILITES WISHING TO OPERATE IN EXCESS OF THE PERMITTED DURATION REQUIRE A VARIANCE
FROM THE BOARD OF ZONING APPEALS WHICH MAY BE APPLIED FOR IN THE DIVISION OF PLANNING AND ZONING.
I hereby certify that I have the authority to make the foregoing application, that the application and plans filed with the application are
correct, and that_* operation and conduct of the temporary use will conform to the regulations of the Carmel Zoning Ordinance.
Signature o operry veer (RbQUIRED)
1'1;? ?ILX
OFFICE USE ONLY (DO NOT WRITE IN)
ARCEL i?,": 3S0o b v o t ! o o PERMIT FEES:
PERMIT td&
APPLICATION REVIEWED BY: MO I Wja DATE: 61 l? 03 13$277.50 (Temporary Use Fee)
13$104.00 (Site Inspection Fee)
FINAL C/O ISSUED ON: 1 / ZONING: ?f 0$83.00 (Sign Permit Fee)
TOTAL FEES DUE: $
THIS TEMPORARY USE PERMIT WAS ISSUED ON
AND IS VALID FOR MONTHS, L"NTIL 0 7 SCANNED
Six-month extension granted by on ! ( until /
Six-month extension granted by on until r
Six-month extension granted by on l until /
DEPARTMENT OF CONQ4UNITY SERVICES
ONE CIVIC SQUARE CITY OF CARMEI, INDIANA (317) 571-2444
f__2>
\'Apps2ldocs shared\Permits\TEMPORARY ILPs,Temporary Construction. Facility Application 2007.doc
TEMPORARY USE
REGULATIONS AND CHECKLIST
TEMPORARY CONSTRUCTION FACILTY OR SALES FACILITY
REGULATIONS:
• REFER TO §25.08 OF THE CARMEL ZONING ORDINANCE FOR THE FOLLOWING REGULATIONS:
• PERMITTED ZONING DISTRICTS: itiiay be permitted in all zoning districts as a temporary use ONLY, provided the
use would NOT detrimentally affect the health, welfare, safety, or morals of the neighborhood under construction.
• DURATION OF TEMPORARY USE
• TEMPORARY CONSTRUCTION FACILITY: May not exceed eighteen (18) months. Provided the applicant
submits in writing to the Department of Community Services prior to the expiration of permit, the use may be
extended by increments of up to eighteen (18) months. The temporary construction facility must be removed
within thirty (30) upon the issuance of a Certificate of Occupancy for the project and the temporary use permit
shall expire at the end of that thirty (30) days.
¦ TEMPORARY SALES FACILITY: This permit is valid for four (4) months or upon the issuance of the
certificate of occupancy for the project's first model home, WHICHEVER OCCURS FIRST.
• SIGNAGE:
¦ TEMPORARY CONSTRUCTION FACILITY: Only one sign not to exceed thirty-two (32) square feet is
permitted to identify the contractoribuilder utilizing the temporary construction facility. The sign must be
located on the temporary construction facility and a diagram or illustration of the sign must be submitted with
this permit application.
¦ TEMPORARY SALES FACILITY: One ground sign is permitted per hundred lots and may NOT be larger than
six (6) square feet in size and may NOT be taller than three (3) feet in height. Sign(s) must be located on the
same lot as approved model home and shall not interfere with Vision Clearance and shall be a minimum of ten
(10) feet from the street right-of-way.
CHECKLIST FOR APPLICATION:
1. ? TEMPORARY USE APPLICATION: Two (2) copies of completed application are required with signatures.
a. ADDRESS: If the permanent address for the property is unknown, you should contact Operations Supervisor
William Akers of the Department of Communications at (317) 571-2586 or at wakers@carmel.inZa.
2. ? LEGAL DESCRIPTION: Provide a legal description of the platted lot on which the temporary use will utilize.
3. ? DEVELOPMENT PLAN/MAP: Two (2) copies of a map which illustrates where the lot is located within the
overall development or project site (indicate the specific lot on the plan). Context Map.
4. ? SITE PLAN: Two (2) copies are required which shows the following information:
a. Adjacent public road right-of-way
b. Location and footprint of model home/temporary sales office structure on the property; show applicable
setbacks from the public right-of-way and adjacent property lines.
c. Adequate access and off-street parking facilities.
d. Photometric plan showing light intensity at the lot lines. If no lighting is to be installed, submit a written
statement to this effect.
e. Location and diagram/illustration of ALL signs, regardless of whether or not a sign permit is required.
5. ? FOR MOBILE UNITS: Supply mobile unit certification number issued from State Fire Prevention &t Building
Safety, Division of Code Enforcement. And submit one copy of mobile unit structure plans (i.e. floor plan, overall
dimensions, standard equipment, restroom facilities and egress).
6. ? SIGN: Supply a diagram or illustration indicating location and dimensions of the one permitted sign.
REVIEW &t APPROVALS:
The following Departments will review and approve all temporary use permit packages and may require inspections:
Building & Code Enforcement, Planning and Zoning, and the Carmel Fire Department-
FEES:
Temporary Use Fee (for Sales Facilities) is $277.50. Site Inspection fee is $104.00. Sign Permit fee is $83.00
DEPARTMENT OF COLIMUN= SERVICES
ONE CIVIC SQUARE CITY OF CARMEL, INDL4NA (317) , 571-2444