Loading...
HomeMy WebLinkAboutCorrespondence 07/19/2002 09:03 HAMILTON CO USDA PAGE 09/10 .. . -- --- - ~~ . ~ ". .... Date: ~~ t. Project Name: ;.a t RECEIVED .11 II ')f1n? This report was Provided To: v Types Of EVALUATION: l:J (mtiaJ 0 Routine: IIr Follow-up 0 Complaint This evaluation is intended to assess tho level of compliance with 3 7 rA 15-5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion ~d sedWe . . AU practices recommended in this report should be evllJuatod l\$ to tneir fe:uibility by a qualified individual with struc p ctices designed by a qualified engineer. All erosion and sediment control measures shall meet the desi . "Indiana Handbook for Erosion Control in Develo~iDg Areas" Currwt Site Information: Il 1I2 N ~",,' ,:: The Followillg Items H~ve Been Evalu ted nd Assigned a DesigliatioDl of; S ... Satisfaet~ry M = Marginal U'" Un tis dory NA = Not Applicable Constructioq..Slte Man..geroeat for Erollt. 00 and Sediment Con 01 S M ~NA (1) Disturbed I\f~ have bll6n adequately rot ed through ~fleding or othet appropriate eI'Oilion and sedimeIit control mearures. S M (U) NA (2) Appropriateperitn~ter sediment con mea wel> hiwe Qe(:luimplemented. S M "'tff (3) Conveyance Ch. annels have been stabil cd 0 protected with appropriate sediment .control measures, S M U (4) Erosion & sediment cODtI'ollIlcasures in Iled properly. S M U N (5) Storm drain inlets have been adequllte pro <ectcd. .. S M U (ffD (6) Outlets have been adequately stabilize . S M ((DNA (1) Existing erosion & sedimfmt COXll'tol asures arel:>eing maintained S <H) U NA (8) Public &. privatero84wllYs are beingk pt clJar of accumulated sediment or tracked soil. S M U @ (9) Erosion & !Jedjm~t control measures aye een installed and maintained on individual building site~. Status of Sediment llete.ntion On-Site ~ Site conditions present a high potential for off-site scdim o There is evidence of off site sedimeotatipn. o Description provided: III. Please Refer to the CommeotlJ Section ofthls RepQrt Compiled By: Definiti01ls Satisfactory: Tbeltem is (\urreDtDy in compliaDee with the Marginal: A concern hilS been idel'tified; corrective actl UDllfttlsfa(:tory: A "lolado~ hilS been identLfied and tbe 5lte 15 Not Applicable; Does not apply at this stage of CODltTuctlQ"- ule Is s rone:ly TeCOIJl1Jnl~ded to remain iD compliance tin ompUalJl(.ej corrective action Is required &Wscd 4/98 07/19/2002 09:03 317-776-1101 U HAMILTON CO USDA U PAGE 10/10 .' 'ON~SITE EV ALUATlON FORERO ION AND SEDIMENT CONT OL NT1 PROJECT NAME: I unless otherwise noted. areas and lower tying 3NllS. The items checkeabelow mU$t be corrected prior to 't. Install an appropriate sediment control practice between con~ o ReplacelRepllir silt fence and/or straw bale barriers, o ,Entrench silt fepGB (6.8 in.) and/or straw bale barrters (4 -6 i ) en stake straW bales, o Remove :accumulated sediment from: 0 sediment traps/basins 0 bind silt fence/straw balcs, 0 llfound stonn drain inle, protection devices, 0 streets md gunm(Do not flush with w er) "Ii Temporary seed, fertilize. andlormult;h: o Permanen~ S'eed, ft:l'tllize, and mulch areas that are at final grad.,: OPtot~et stonn drain inlets:, 0 curb Inlets, 0 drop inlets . . o. Reshape and s'!abiUre sjdedopes of; 0 s~iment U"apslbasins, . det ntionlretentlon basins p Place greater emphasis on ,erosion and s~dirotnt control on b Idm sites; contrBctors, subcontractors, material Yl;ndQrs, and othe1"5 5hould be ~e aware of erosion and sediment control equ1 ements. Appropriate perimeter sedimfJnt controls (e.g; slIt fence) and stable construction entrances shall be util ed op all sites. Sediment tracked into the street shall be removed (do not flush with wa~er) at the end of each W\lrk da. I o Other Requirements: o InstalllMaintam eonsmJctiQn entnmee(s): o . Rc:s.hape and stabilw: conveyance channels: For questions regarding this report conta~t: Jobn Qutll 06/05/02 11:00 FAX HAMILTON CO HWY, ~~~ Carmel DOCD 141 00110.01 u u 96th Street and COllege Avenue Intersection Improvements Clay Township HAMILTON COUNTY HIGHWAY DEPARTMENT ---~"I1'r 41)\ U",,-:'.f /'\ ~ . ~II"~ ~' v .... '~,0 l'J,J T '\ 00: RECEIVED \~ . JUN 5 2002 ~ ~\ DOCS j;__, . ').. ~r.:;. ,...~. ,,'''' {)/i ' ~lly; ,$q I ~ June 5, 2002 RE: Mr. Blair Carme5ino Duke ConstruGtion 600 East 96th Street, Suite 100 Indianapolis, Indiana 46240 Dear Mr. Catmasino; This letter serves to acknowledge receipt of a transmittal containing the plans for the above~ mentioned project. After reviewing the plans the Highway Department has the rollowing comments: 1. The additional right of way at 1he Intersection should be completed through a grant 01 right of way. When all of the necessary paperwork has been completed, forward the documents to my attention for acceptance by the Board of Commissioners. 2, The curbs within the Village Pantry site will need to be reconflgured 10 match the new entrance curbs. 3, Curb depressions will be needed at all four corners of the intersection. The connection from the depression to the path should be done in concrete. Pedestrian signals are needed at all four comers. 4, Permits will be needed for all work done in areas of Hamilton County Highway Department jurisdiction. All permit information and questions should be directed toward Mr. Oave Lucas. Permit Inspector. 5, Include all necessary details needed for the project. 6. Plans should be submitted to the Hamilton County Survey()r for review ii!nd comment. 7, Please be advised that further comments may be necessary after the final set of plans have b~n completed. 11 you have any Questions or comments concerning this letter. please feel free to contact me al anytime. Sincerely . ~/g~ 4~n J B~oermann ~ff Engineer cc; Jon Dobosiewicz Steve Cash A&F Engineering Dave Lucas G:\USERS\SB\02T AC\06-0s..o2-96coI18gft.doc:. 1700 South 10'~ Street NoblesviUc, In. 46060 w~'W .l:o.hamihoTJ.in.us ornce (317) 173-7770 Fu (317) 776-9814 Dobosiewicz, Jon C From: Sent: To: Cc: Subject: Dobosiewicz, Jon C Thursday, April 11, 2002 3:36 PM Hollibaugh, Mike P Engelking, Steve C; Weese, Kate K RE: ILP's College Hills Project Steve, thanks for the cc. To all, I will proceed with the understanding that the road improvements will be met outside the scope of the current PO (Development Plan). I would encourage the performance bond. I spoke with Blair today and discussed my feeling that the DP (Development Plan) approval is conditional upon approval of the Road Plans. That was my single hang-up. If the CRC has a binding agreement with DUKE regarding the construction of the road improvements then I feel comfortable passing the responsibility of ensuring the fulfillment of the improvements (as proposed at the time of the rezone) to the GRC. Until today (via this e-mail) I was not aware that the CRC was in a position to guarantee oversight of the improvements. I fault myself for not being informed However, I did convey to Charlie Frankenberger back in January that they needed to submit the road plans for approval to obtain OP approvaL His response did not include identification of an agreement that had been reached with the CRC regarding the road improvements. If my understanding, as described above is incorrect, please advise Thanks, Jon -----Original Message----- From: Engelking, Steve C Sent: Thursday, April 11, 2002 2:46 PM To: Weese, Kate K Cc: Dobosiewicz, Jon C; Hollibaugh, Mike P Subject: ILP's College Hills Project Kate: I have again spoken with Brian Carmosino, as well as Mike Hollibaugh about the situation regarding this project and the commitments to complete certain road improvements to 96th Street. In fact, I have determined that they have agreed to expend approximately $3.85 million toward Public Improvements which include the intersection and traffic lighting at College, and 96th Street; 96th Street from College to just east of their eastern most entrance; and Storm water management for Road and improvements of existing waterway crossing of 96th Street and College, to name a few. These are all things that would have been a principle point of discussion at the CRC for the approval of the expansion of the TIF district and Bond issues. The CRC would not have acted favorably on the TIF and Bond items without assurances by Duke/Gershwin-Brown that they will fulfill these commitments. Mike is very knowledgeable of their commitments relative to the PUD process that went through the Planning Commission and these issues were remembered by him. Mike sees no problem allowing their construction ILPs being released. Brian Carmosino went so far as to state to me today that they are willing to post a Performance Bond for a timely and proper construction of the road improvements. I think that would be something that you would find desirable, so if you want that, ask him for it. I have asked Mike to see what he can do to assist in the release of the ILP's. 1 Dobosiewicz, Jon C From: Sent: To: Subject: Johnson, Sue E Monday, April 08, 2002 10:30 AM Dawn Pattyn; Jon Dobosiewicz; Kelli Hahn; Laurence Llllig; Mike Hollibaugh; Scott Brewer New Submittal Received Friday, 4/5: St. Vincent Hospital ADLS (Signage) Becky Feigh The new file is on the PC shelf behind my desk. Sue Effim ~cm Planning and Zoning Assistant City of Carmel One Civic Square Carmel, IN 46032 (317) 571-2417 phone (317) 571-2426 fax 1 /. ./., ~?' ~ 1e;r[),?:> I/pp 'c::7M:~'l'i\ II D <:,;r!) bOCS .?rJo; 1.-;'" April 05, 2002 I - ;1 , .' , . ..- \ '\":' '0 M. Kate Weese, P.E. City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 / Re: Parkwood Crossing East CSO Project No. 21377-8 Dear Ms. Weese: Please accept this letter as a formal request to be placed on the April 17, 2002 Board of Public Works and Safety agenda for approval of the following: ' 1. A Commercial Curb Cut on the north side of 961h Street approximately 760 feet east of College Avenue. 2. A Commercial Curb Cut on the north side of 96th Street approximately 1160 feet east of College Avenue. COfl'lorate Headquarters 3. A temporary construction entrance in the location of existing Guilford Avenue. 280 East 96111 Street Indianapolis, Indiana Exhibits depicted the proposed curb cuts are enclosed. If you have any questions or require any additional information, please contact me at your earliest convenience, Thank you for your assistance. Suite 200 46240 Sincerely, :!:~~rn~~~J ~ K Civil Engineer T 317.848.7800 F 317.574.0957 www.cso-arch.com Enclosure cc: Jon Ddbosiewicz Jeff Kendall Bruce Dillon File DA.TE 04/05/02 DWG iI bpw.dwg PROJECT NAME Parkwood Crossinq East PROJECT NO. 21377-5 DRWN. BY GSS SUPPLEMENT Al DRAWING \} ~ ~ ~ '::: t;J ~-~ ~, .c~-...~.o"<-""~~!'E'.","",-,,, 1 ~ '\ rlll~1 JU(ll + .-) -uj- /- \\ I ! ~~: _ = ",. I ~.c.! I__~-- ,l-- ~~I'C"'r~' +6c"pL \ _.~. I ?~(J ~. -'--- \ c~-1 . -. ---j.-L.-.__._.._.~__._ ~ ", ---.L ~ "'=~ -I I . ii' ..----: J ~ . .-\._---------~.---..^~.~-=--'-----=..= ~--c-;---- ~..~~:::.___=...-====-.~.' ~ .~_ ~- ~ ~::::.~~~_~~____=::___;~;===_. '-~,. .- I "~ --====---- ~ YO . I./-- ~ill ------- . - . -'7'~-' ..:::~, ~ "5 - -::::=::=:-----~ ---------=, -- ( '~v~'-WlP"Y~ ~ - .-r'> ,,,,m, -. ... ~-lrt7;i:?;--S; I ( \~ / 0] \ ~ n I>TEIL BOXES '>' / o\~ / L-i9 co "" ,~~-~~~ .-'-... ~.....-<,.... ~~..,.,.,-~.,'~ ~-.....:.~~, ,~=::. "C:' \~) 'i.J_ ~~- ~ "\\ (c)TF'F11 CURB CUT PLAN SCALE: 1" = 30' .-.,,,,,.~=.......'W-~~.......~~ Architecture Engineering Interiors Landscape Architecture Land Surveying Corporate Office 280 East 95th Streel Suite 200 Indianapolis, Indiana 45240 317.848.7800 FAX 317.574.0957 (~~21' . '::. @ 6" BUSN ,.,.~~ ~~ PROJECT NO. 21377-5 DRWN. BY GSS 250 East 96th Street Suite 200 Indianapolis, Indiona 46240 317.548.7800 C S... 0 . FAX 317574.0957 PROJECT NAME !-'an(wood crosslnq last DATE U"+/U:JjUi. DWG i# bpw.dwg ....::::......:~- -- --~ ~. - ---- SUPPLEMENT AL DRA WING ~.... -"'--~~" _. -"""'---,......~~ > "'~~ _.. "''' .= ..n. ~~~ ~ .,.,..,......~~~......""""""-.-.....:_c,....... ~-""'-i'~1oI =--..o...=:;:?~;'_'" ;;;;-~ 11;- -""",= " t;;, ~ ~----- :J1~'--'- I I-~ I ~ " \J ~ Z \l \J " @ 4 ,8" "8" ~\I'..~. 14 ." ," " ~ ::;:i ~l/<:::. ~I/{: ,':,\I(~I!~ ,<S/"\It~.'il. 14" .~ '/Jf\'X;ll{'- 'l,I1\~ ::;lFlo.;.~Y~7J@:t~)~ , C'-.DJ 1"1 I I Yf f( I ,"\ ". I f l- y 1160 ,. ~ LINE "A" . 2. ~9'O 1.:17'.1; --~--- --~~~-- ---- -- ~ ~ - = = ----: ..- --- -- - ---- ~~_.__~._.1iL~~~ __ ~ ~.7 - ~: I, 34" (S] 1;-~3'~'~"" 1X)j I ANDSC/i, '1t,.1f} /--:(-"'> (' . [ ARD LIe/IT ,;-j( . I . .- Un'B" 2 7 so B@S:!Y .... JIfi;~Rr;t '.jn 7' so BII/CK . .~I' ,r I-/~~,~ '~tJr~C: I J - + " ~-1 :----~61. I J"..- (~/~. J:112" r./'~?rl' t .-1: - '- r2 C [(1(~'\ ) . '~("J 1.1 ::'5' 5Q S7fEL..J~l r () \ j) ~ttLL 15 i t) \LJ . rr'.\ UTlI1N 8" / (\ '-)" / C~\*~nWN 10" ~8" STANDPIPE / = " .- ~. .fijl __~ - 15 [~l--l (" )14 _ -- 111; '~~( + _ /~ ~~- + Oy+ '910"" !'(" \) 1--1 ~' 11j! 6'" \':,U ----c~ Y( L RD. MULH . rP:m Sfk 117+0( 2.7' SQ. 8, ,I .;:(. ~.' . ~ ~2 7 so. eml' \F- + ~ - ~~ :---= ,/' , '\. APP. RI V '~Ii-~" 1\ 'i 1 X,\ ". .:~...... --.,.-',-, '-7- -~ 10" B.'?/(;)( I'V.~LL ; ,VJOS/APiNG w/ SIIEL FAC[ - 2.5' SQ STCfL c(T)\ .. -I- ---< 10 0:5-;~' ~-(J.)) L--. +, -I ! CURB cu~r PLAN SCALE: 1" = 3D' ~~_i"'.~......... ~ '''''<...~~~".".-~~ Architecture Engineering Interiors Landscape Architecture Land Surveying '4.-\ ~. /.1' c;';:, , ~ 0.,,_ !i<l .:"0;;'/' A'~~'J? t: ;. (61, U', '~,,',]. ~: \:~ Ii" :'2;;;;1.~ ....:.~~' . ';' <T'ON CO.; City of Carmel DEPARTMENT OF ENGINEERING April 4, 2002 Mr, D. Bruce Dillon, PE Project Manager Duke Construction 600 East 96th Street, Suite 100 Indianapolis, IN 46240 (J COPy RE: Parkwood Crossing East (Building Eight) Foundation Release Dear Bruce: The purpose of this letter is to address the issues surrounding Duke Construction's current request of the Department of Engineering and the Department of Community Services to provide notice to Permit Services and the Building Commissioner that the Parkwood Crossing East, Building Eight site is ready for issuance of Improvement Location Permit (ILP) and Foundation Release. As previously discussed, for specific reasons, neither department can provide full release and approval at this time. The Engineering Department, while it has approved the construction plans, has not bad all items for approval met (see below) and the Department of Community Services has not yet issued approval of the Development Plan, Until all items have been satisfactorily addressed, we will not be able to provide full approval for the site development construction to proceed. In lieu of a full approval, we have notified Jeff Kendall, the City Building Commissioner that at the appropriate time in the Permit Review process, he can provide you with the ILP and Foundation Release, but only those permits. Please be advised that all risk of all construction being installed prior to tlle full approvals being received shall be assumed by Duke Construction. That is, should one of the additional requirements as listed below not be able to be met by Duke, construction beyond the pouring of the foundation may be stopped indefinitely, until such a time as the City deemsa1l requirements necessary are met. The exceptions to this stop-work potential are on-site grading and installation of private stonn sewers. The outstanding items that need to be addressed, approvals received, or documents completed, filed and recorded are as follows: .. BPW AJ)Jlroval for two (2) Commercial Curb Cuts - Thc next Board of Public Works and Safct). meeting is April 1 tho You will necd to submit a letter requesting to receive this approval for these curb cuts (and a construction entrance if not in the same location as one of these cuts), '\\ith the 8'1~ x 11 Exhibits as ())'cyiously described to your engineer. Our deadline for materials to be submitted to uS for this meeting is April 5th, bowe,'cr we will work with ~'ou if you gct these materials early next week We have a deadline to turn in all materials to the Clerk Treasurcr by Wednesday, April 10th at 4:00pm. .. Annexation/Road Illll,rovements - I understand that annexation fot' the Parkwood Crossing East site is complete, however thc section of land betwcen the site and College is still under consideration (or in the process). This mcans that the section of road bordering the un-anncxed sections still falls under Hamilton County Highway's jUlisdiction and thereforc, approval for thc road improyemcnts and the signal/intersection shall have to be coordinated with both the City of Carmcl and Hamilton County. Sincc all dctails of the construction are not finalized or ap])roycd, and Dukc has not acquil.ed all properties nL'Cessary to construct the road improycments as generally shown on the preliminary ONE CIVIC SQUARE CARMEL, INDIANA 46032 JI7(5il-2441 .l"~ ...). plans, the City of Carmel and Hamilton County reserve the right to submit additional comments and revision requests for these road plans as they are further finalized. Regarding the road improvements, Duke will be required to make all such additions or changes to the road system plans deemed reasonable and necessary to ensure the safe and proper use of the roads, as these improvements are primarily necessitated by the additional traffic volumes expected to be generated by this development. .. Dedication of Right-of-Way - Any RW shown on plans or hereby committed to be dedicated must be followed through with all appropriate legal descriptions, dedication documents and formal dedication and acceptance (by way of Board of Public Works and Safety). .. Approval of the Development Plan Application filed under Docket No. 20-02 DP "ill be granted upon approval of the road improvement plans by the engineer of jurisdiction (consistent with the preliminary plans submitted April 2, 2002), dedication ofthe required rights-of-way, and signing of an agreement betl'\'een the City of Carmel and Duke regarding the construction of the improvements as they relate to the occupancy of the proposed buildings. The Department of Community Services is willing to allow the release for the construction of the building foundation at this time. However, there are several variables that could delay the approval of the Development Plan. Duke shall assume any and all risk associated with proceeding prior to acquiring the necessary a]Jproyals. The Penn its Section is willing to facilitate holding your pre-submittal meeting as you have requested in order to progress Lo permit issuance. However, please recognize that your participation in such meeting at this time shall constitute your understanding and acceptance or the conditions stated above and shall require your conunitment to comply with all outstanding requirements as stated herein. Additionally, we strongly request that they be completed in a timely fashion, as no further permit or inspection request shall be granted until full and [mal approvals are in place. If you have any questions on the issues above, please call Kate at 571-2441 or Jon at 571-2417. Sincerely, rn,l~ Wc-e# M. Kate Weese, P,E. City Engineer I n Dobosiewicz, Planning A strator epartment Of Community Services cc: Blair Cannosino, Duke Greg Snelling, CSO JcfJKendall, DOCS Dick Hill, Mike McBrid, Engineering Steve Broennan, Hamilton County Highway ~ . Duke CONSTRUCTION MEMORANDUM TO: Jeff Kendall Kate Weese Jon Dobosiewicz ~ ~~t\t~~? . ~V~ 1 LooL CoCS , ../\ FROM: Bruce Dillon <7 DATE: April 2, 2002 RE: Parkwood Crossing East Attached is a set of preliminary drawings from A & F Engineering for the road improvements for 96th Street and College Avenue. A & F Engineering is scheduled to complete the drawings for this project by the end of April. It is my understanding that during the ADLS process for Parkwood Crossing East that an agreement was reached between Duke and the City of Carmel regarding the road improvements that Duke would perform related to the Parkwood Crossing East development. The attached preliminary drawings should be in compliance with that agreement. Upon completion of these road improvement drawings Duke will be submitting the road improvement project to the City of Carmel for formal approval. At this time it is the desire of Duke to receive the ILP and foundation permit for Parkwood Crossing East Building Eight. Please contact me with your questions at 808-6183. , Duke D. Bruce Dillon, PE Project Manager CONSTRUCTION 600 East 96th Street Suite 100 Indianapolis, IN 46240 317.808.6000 317.808.6183 [direct) 317.808.6797 (fax) www.dClkerealty.com bruce.d illon@dukerealty.com 600 East 96" Street Suite 100 Indianapolis, IN 46240 317.808.6000 www.dukel"ealty.com Atlanta CIl icago Cincinnati Cleveland Columbus Dallas Indianapolis Minneapolis Nashville Orlando Raleigh SI. Louis Tampa . ~ " Dobosiewicz, Jon C From: Sent: To: Cc: Subject: Weese, Kate K Wednesday. April 03, 2002 9:59 AM 'Steve Broermann' Kendall, Jeff A; Dobosiewicz, Jon C RE: FW: Parkwood Crossing East OK, thanks for letting me know so we can make sure Duke is al-Jare that they must be coordinating this project and approvals with ALL of us. No surprise, but I think they are going to be persistent in hoping to be able to move ahead somehow (they want to receive the Improvement Location Permit and foundation permit for the Parkwood Crossing East Building Eight right now). Do you see any way that if we can get some form of corrLTIlitment from them in lieu of them having the plans completely done and approved - a conditional release of sorts, that the first permits (foundation) can be granted'? I am told the road plans won't be done until the end of April. I know they're ready to get permits today. I also know this is not my problem, but I am trying to find a solution that is acceptable to the City and County that protects us both adequately. If you maintain that no permits should be issued until the plans are done and approved and all annexations issues are resolved, we can certainly live with that and I wouldn't make it appear to Duke that "the County" is the hold up. We need to be unified in this request, so I just was asking if there is any flexibility on your end so I can gauge how much we might be able to allow accordingly.... Thanks Steve. -----Original Message----- FI"Om: Steve Broermann [mailto:sjb@co.hamilton.in.us] Sent: frJednesday, April 03, 2002 9: 27 AM To: I\li'Jeese@ci. carmel. in. us Cc: jdobosiewicz@ci.ca:ullel.in. us; j kendall@ci.carmel.in.us Subject: Re: FW: Parkwood Crossing East Kate, We want to be involved in the design process and final approval of the intersection improvements until the annexation is completed. The last time that I spoke with Duke representatives, they did not know the status of annexation at the intersection of 96th and College. We suggested to them that they include the right of way for 96th Street and College in their annexation, but we have not heard anything back from them yet. Because of all these issues, we would like to see the design and give our approval before any permits are issued or all of the annexation issues are settled. During our meeting with them, we did tell them that if the City wanted mast arms for the signals. that we would be fine with that. Thanks. >>> "Weese, Kate K" <KWeese@ci.carmel.in.us> 04/02/02 01:13PH >>> Steve - we are working on this with them. Do you (or did you) have these plans and/or do you need them also, or is the County leaving this up to the City since annexation is eminent...? -----Original Message----- From: Bruce Dillon [mailto:Bruce.Dillon@dukerealty.com] Sent: Tuesday, April 02, 2002 11;43 AM To: 'jkendall@ci.carmel.in.us' Cc: I j dobosiewicz@ci. carmel. in. us ': 'kweese@ci. carmel. in. us I Subject; Parkwood Crossing East Regarding the improvements to 96th Street, I will be delivering plans to Jon Dobosiewicz and Kate Weese this afternoon, which show the work we will be performing. The drawings for the road improvements are only 50% to 75% complete but they should show compliance with the agreements made when 1 ~ r Parkwood CrosBing East was going through ADLS and zoning. Bruce Dillon, Project Manager Duke Construction Phone (317) 808-6183 Fax (317) 808-6797 e-mail: bruce.dillon@dukerealty.com 2 Dobosiewicz, Jon C From: Sent: To: Cc: Subject: Hoyt, Gary A Wednesday, April 03, 20029:39 AM Hill, Dick B Fleming, Terry T; Dobosiewicz, Jon C; Lillig, Laurence M Townhouses at Hazel Dell Dick, I was reading TAC minutes regarding Townhomes @ Hazel Dell. What is the engineers department feeling on the street widths? I realize these will be private streets. Is there a standard out there that they must meet that deals with the minimum street width allowed for private streets? I have received a letter from a homeowner who is concerned that we would allow this type of project. Any help is appreciated. Thank you Gary A. Hoyt, Fire Marshal Carmel Fire Prevention Bureau (317) 571-2600 1 :;.. .. Dobosiewicz, Jon C From: Sent: To: Cc: Subject: Steve Broermann [sjb@co.hamilton.in.us] Wednesday, April 03, 2002 11 :06 AM KW eese@ci.carmeLin.us JDobosiewicz@ci.carmel.in.us; J Kendall@cLcarmel.in.us RE: FW: Parkwood Crossing East Kate, We have no objection to issueing the permits for the Improvement Location Permit and the foundation permit provided that an agreement is reached with Duke that is satisfactory with the City. Thanks. >>> "Weese, Kate K" <K\"ifeese@ci.carmel.in.us> 04/03/02 09: 59/1..M >>> OK, thanks for- letting me know so we can make sure Duke is a'J'/are that they must be coordinating this project and approvals with ALL of us. No surprise, but I think they are going to be persistent in hoping to be able to move ahead somehow (they want to receive the Improvement Location Permit and foundation permit for the Parkwood Crossing East Building Eight right now). Do you see any way that if we can get some form of commitment from them in lieu of them having the plans completely done and approved - a conditional release of sor-ts, that the first permits (foundation) can be granted? I am told the road plans won't be done until the end of April. I know they're ready to get permits today. I also know this is not my problem, but I am trying to find a solution that is acceptable to the City and County that protects us both adequately. If you maintain that no permits should be issued until the plans are done and approved and all annexations issues are resolved, we can certainly live with that and I wouldn't make it appear to Duke that "the County" is the hold up. We need to be unified in this request, so I just was asking if there is any flexibility on your- end so I can gauge how much we might be able to allow accordingly. . . . Thanks Steve. --~--Original Message----- From: Steve Broermann [mailto:sjb@co.hamilton.in.us] Sent: vJednesday, April. 03, 2002 9:27 AM To: KWeese@ci.car-mel.in.us Cc: jdobosiewicz@ci.carmel.in.us; jkendall@ci.carmel.in.us Subject: Re: FW: Parkwood Crossing East Kate, We want to be involved in the design process and final approval of the intersection improvements until the annexation is completed. The last time that I spoke with Duke representatives, they did not know the status of annexation at the intersection of 96th and College. We suggested to them that they include the right of way for 96th Street and College in their annexation, but we have not heard anything back from them yet. Because of all these issues, we would like to see the design and give our approval before any permits are issued or all of the annexation issues ar-e settled. During our meeting with them, we did tell them that if the City wanted mast arms for the signals, that we would be fine with that. Thanks. >>> "I'Jeese, Kate K" <KTtJeese@ci.carmel. in. us> 04/02/02 01: 13PM >>> Steve - we are working on this with them. Do you (or did you) have these plans and/or do you need them also, or is the County leaving this up to the City since annexation is eminent...? ,". -----Original Message----- From: Bruce Dillon [mailto:Bruce.Dillon@dukerealty.com] Sent: Tuesday, April 02, 2002 11:43 AM To: 'jkendall@ci.carmel.in.us' Cc: 'j dobosiewicz@ci. carmel. in. us '; I kweese@ci. carmel. in. us ' Subj eet: Parkwood Crossing East Regarding the improvements to 96th Street, I will be dellvering plans to Jon Dobosiewicz and Kate Weese thiB afternoon, which show the work we will be performing. The drawings for the road improvements are only 50% to 75% complete but they should shmv compliance with the agreements made when Parkwood Crossing East was going through ADLS and zoning. Bruce Dillon, Project Manager Duke Construction Phone (317) 808-6183 Fax (317) 808-6797 e-mail: bruce.dillon@dukerealty.com 2 ;o;~&~ ,,I ~ ~ ~~ cso -- . ... \ ... /_":-'1-0-.. " ..", \. > I .......... March 4, 2002 .' . , ~~~' MA~ECh~l . ;'}\ ."\ DOCS /_~ . ,- \ ; , '\(". /';'-.) 'to n... _ _ _/\.'ty ~-1IJ]iY Mr. Mike McBride City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 Re: Parkwood East Crossing CSO project No. 21377 Dear Mr. McBride: Enclosed please find one set of construction drawings for Phase I of the subject project. The first building to be constructed will have an address of 800 East 96th Street and will be named Eight Parkwood. The enclosed plans depict construction activity for Eight Parkwood only. In addition to the construction drawings, we have enclosed an updated overall "Final Development Plan" as described in the Planned Unit Development Ordinance. Corporate Headqual';er& The enclosed construction plans and Final Development Plan address your comments outlined in a letter dated January 7, 2002. The specific project comments were addressed as follows: 280 East 961h Street 8. A drainage report was sent to your office on December 7, 2001 and January 22, 2002, Please note that we are requesting a change to the material for the underground detention system to Contech Aluminized Steel Type 2 Hel-Cor Perforated Pipe. This request was also noted in a memo to your office dated February 22, 2002. Since we have been made aware that the City is concerned about the possibility of the NO.8 stone envelop becoming filled with fines and losing its abillty to detain storm water, we modeled the system as if it were a completely enclosed system. The resulting 1 OO-year flood elevation will be contained within private property. Hopefully, this satisfies your concerns about the perforated pipe. Copies of the revised calculations are enclosed. Suite 200 Indianapolis, Indiana 46240 T 317.848.7800 F 317.574.0957 www_cso-arch.com 9. Your assumption that the system will be private is correct. 10. The existing apartment complex entrance on the south side of 96th Street is now shown on the plans. The left turn lanes for the Parkwood East entrance and the apartment complex are generally aligned. Steve Fehribach of A&F Engineering has indicated that the alignment of the left turn lanes is the critical component of the entrance design. ~> .;; ~~ eso Mr. Mike McBride March 4, 2002 Page Two 11. Detailed plans for the 96th Street improvements are currently being prepared by A&F Engineering. 12. The walk adjacent to 96th Street will be part of the 96th Street improvement plans. We are anticipating an 8-foot wide asphalt path at this time. 13. See the response to Comment No. 11. Please review the enclosed information and contact me with any additional questions or comments. Sincerely, ~~ Civil Engineer Enclosures cc: Jon Dobosiewicz, Department of Community Services Jeff Stone, Duke Construction Blair Carmosino, Duke Construction Bruce Dillon, Duke Construction Larry Longman, Duke Construction Charlie Frankenberger, Nelson & Frankenberger steve Fehribach, A&F Engineering ~~ eso March 4, 2002 /(.<;rJJ:~I/~> I~')" ~ ~ {(\' / R. f ',\:\i: ~r /(4/CEtV[D \~ ~ 5 2()()2 !~'Q' \~, DOCS ,1,--, U''':J\ I~ \~::.-- 1"...... />-- .~ . $.1Ti7>f(\'v' rE Mr. Jon Dobosiewicz City of Carmel DOCS One Civic Sq uare Carmel, IN 46032 Re: Parkwood Crossing East CSO Project No. 21377-8 Dear Mr. Dobosiewicz: Enclosed please find an updated "Final Development Plan" for the subject project. In addition, we have addressed your comments outlined in a letter to Charlie Frankenberger dated January 15, 2002. Your comments were addressed as follows: 1. The DeveJppmeht Plan application was submitted and a docket num ber of 155-01 ADLS was assigned. 2. The 6.0 feet h?lf right-of-way is shown on the Development Plan. 3. We have submitted revised plans to the City Engineer. The letter of approval isfoMhQ<;)(11iP9; . " COrpara1~Jieadquarters 4. It is our clnderstanding that'all comments from the.Urban Forester have been ,aqdressed. 28.0 Easl9BthS.treel Syite',20p' " 5. The ro?dplans are currently in the design pf;!ase ?nd' a.re being prepared by , A&,FEhgineering. PI~ase:revi~wth~>~nclosedpLari,a(1d conta.ct" ri1~ With'a~y addihoha L q uestionsor com mellts', '!hdiitnapolis! Ihdiana I '4B2;'lO . , 1'317.848:78.00 .. .. ",,\ -'", .,' .'," ..... , ':E317:57 4,09'57 'Sinc~rf;!!Y\ Bf/0~/2002 15:17 317-77F-1101 , . U .: .: ~LtON C:OtrNTY: . .' :" :o,;'.:.Soil&: Water; .. H~MILTON CO USD~ P~GE 03/03 . ~. , I " ,", -,' ~ .:'.'~~ .~...~~.~w.:. .~.~"-"':~~..-..I' ~.'~" . '" 3l7.773~i18r .:' i f~: 317",n~.~1.of'..' .;. : '. ~l ~4 -- ~.(,i~'iJdPi~U}~rS:~l:tr~;QJ:((';fr . ...., . .' .1108 Sou'tb 9t Stred . Nobles.ville .. IN .. 4 6'fH~() q 7.4,5 .... /'1 ;''',:-' :~ ~ ~: ~, :' " , . ,. " r ," . . ':' . . \.': ".. .' Feb~t"~~'8 26ca : . .,. .:\'..~"...'..: i i ~. ;," " . . .' ---r7\ \ ;;;. 1-1---....: .' ./C" \j...J---1.. .j .!.~"'-. .. /' , , ./. .' .. . . / ...... '.")" t' . -; /\ ." . ",,-/' , ,:<'{.", rL_; '.,' '".':" . --.j 'RECE\\f~D ,;. .', ':~ fEB; 8 2002 .' ;~~i. .' ~. Ooes' '''C:f " -: .. r,~. . /.;../ .. .... .~:> < ;/':::9 ' ~', "" )>~. '., ~;;...<y . ~ ;:"(':--,:"11.:'\...\.3/ '~~" :,j .,'l >":. ,1'-::"" " .'. . ". ......Mr~~~gSne1.lin~. . :.t.: SO.:.' ...... .... ,"' \ ..' .. :.,:~.".:' .... .::....SiX.p~~oodDmce .' ';:'.,..;;:'..:: .:. .:' ...:"~.~~.~:~.~~~. SUiteSOO .. .:"; . . 'I; ,':Jbdi$lapO~-18, IN 4<)240::. '. ',,<', ' '. ',' d. ,.,.' ," ;..: ' .~" '. ,,;'. v~ed plan. rock spill~ay for the sedim~nt basio... :., m the installations~uen~? n the temporary sedim~t .basin, .is lOpe '. . .' . .., . .~:.::- ,,:.:.Re;..~ar~ood';Cro~sllitJ~.a~t~ : ,'::'(:"'i~,~:~ :'~'. '.'~ .\ , : '. '.' ..: 'Deat'Greg', ~'~'.,',",~::,,:'~<,"- ,'. ,~ . :;' " .._, .":~:.ha~ a. ~~ co.~~Bts'~'qu~~t;iolig;aJ,out the " :::' -, ,.' ';.. .', I. ,,' . .; l~ Pltase. inclUde a, Cl!oS'~-'Seciion:~d Proftie of .' . :l~\~~yj$ th~ detep~ori:,outi~t pip.~ inabulCd at' ":~,:.:t~ i.nsialhitiQn..~qu~Bce:need&t~i~ent:lfy w. :..t.~m~t~d..':' .::~'. '.:. '... .' .::. i'" .' ~'hoid~ you .have qlrestlOns, please gi-ie me a call .' ,- ~ ' I.....: "," ,~ , "'. \. ' - , ' .", . ~,;:.. ,'.",' ,", '.:>,' " . ",';, I' 'j i,:' :"!".', ,'"':-', . ,. ...' .'" '" .:i....~<. ~-<:sm~beI..~...... .,'" '. '." . ,. ,..';. . ':J' ':bn"S" f~';' .'0 '.. OU~ -'. ,",,'.. '" .:,,-,,'.:\ . .. .':'/" ,",n. > '. ',;' "':~' /, ',";, "'(;:c: ." . . Car,me(DOCD . S~t.veyp.r v: . '. At~ .,t.. " / " ,:';, , '~"' ".", '.' ~-" /-';. "....:. " . ",i. ,. " .'" .'" .~, > . '.' . . ,. '~. . ;", . ,- ,"1\ , " , ' . .;..CO~~R~V^tION ~ DeVfLOPMEN ~SCl1'-O(}VI!RNM1:.NT ,_.. " ',., - . . . "AN EQUAL OI'l'ORTUNITY I! . 0)'1;." ,'," ..' ,': " ;': ,. . ... ";" - u ~.J-*:" u Johnson, Sue E From: Sent: To: Cc: Subject: 'Dobosiewicz, Jon C Friday, February 08, 2002 1:16 PM Johnson, Sue E Lillig, Laurence M; Hahn, Kelli A; Hollibaugh, Mike P Docket Number Assignment - Parkwood Crossing East (College Hills PUD), Development Plan Sue Ellen, Please issue the necessary Docket Number for the Parkwood Crossing East (College Hills PUD), Development Plan. It will be the following: ozo .. NiH:"02 DP $700 + $701.75 ($700 + $35 per acre at 20050 acres) Total Fee: $1,401.75 Docket No~-02 UP - Parkwood Crossing East (College Hills PUD), Development Plan Petitioner seeks administrative approval of a Development Plan for an office center. The site is located northwest of East 96'h Street and North College Avenue. The site is zoned PUD (Planned Unit Development). Filed by Charles D. Frankenberger of Nelson & Frankenberger for Duke Realty Corporation. The petition has been to T AC and will require only administrative approval. Please contact Charlie Frankenberger at 844~0 106 with this information. Once the docket is assigned please :::::~efilc?\O::x~~ ~~a~~ b'.~~ Jon l 'y //0 ~ \7(6 fr-0; u ~ u One Civic SC(l.lsre Carmel, IN 4&l32 (317) 57i-2417 Fax: (317) 571~2426 To~ c.. ~ p,. Q....\...A fJr From~ ~~ F'ages~ ~ Date: r:::2.... B~d- Fax: 5'1J-S/7~ Phone= ~AM~OOQ Q()..,. ~ . cc: o Urgent o For Review o Please COn1l11ent 0 Please Reply CI please Reeyele "~ u NELSON & FRANKENBERGER A.PROFESS10NALCORPORATION ATIORNEYS"AT-IAW u JAMESJ. NELSON 'CIJARLES D. FRANKENBERGER JAMESE. SIll.I~l;\YER , LA~VRENCEJ.'KEiMP~ JOHN B.FLAIT of. counsel JANE B; J\IlERRILL 3021EAsi'98th SrREEI: SI)n'E 220 ' OOIANAPOUS,lNUIANA 46280 317-844-0106 FAX:'317~S4(io.8782 February 5, 2002 Via ~and Delivery Jon Dobosiewic:z City of Carmel Department of Community SeFViCes One Civic. Center Carmel, IN 46032 R~: Parkwood Grossing East Dear .Jon: Enclosed is ih~ OP applicati.on 'and the ftIing tee. In thi:lt I previously submitted the q:evelopment plan, I l1ave not enclosed another copy. Please assign a docket number and lettnelknbw if anything mbre is needed. Thanks. Very truly yours, NELS.ON & FRANKENBERGER Cc- Charles D. Frankenberger CD;F Ijlw Enclosures 11:\JancliUcrsh man \Do, oosicwicz.ltr 020502, wpd u u City of Carmel VIA FAX: 846-8782 January 15, 2002 Charles D. Frankenberger Nelson & Frankenberger 3021 East 98th Street, Suite 220 Indianapolis, IN 46280 RE: Parkwood Crossing East - Administrative Development Plan Review Dear Charlie: This letter is in response to the request you filed for Parkwood Crossing East. The following comments need to be addressed and/or plans/applications updated accordingly: 1. Overall: Please submit a tonnal Deve lopment Plan application form. Use the standard Development Plan Application format. Once tins application is received I ,"vill issue a docket number. The fee for the application will be $700. 2. The required right-of-way for 96th Street is a 60' half. Show on plans. Where 60' has not been provided additional right-or-way will need to be dedicated. 3. Provide letter of approval form City Enginet:f regarding driveway location and design. 4. Revise plans to address corrnpentsfrom Scott Brewer (Urban Forester). 5. As we discussed in TAC I need abetter understanding oftbe "Road Improvements" that are to be constructed as part ofthis project. To date 1 have not received any plans ilIustrating the required improvements. I understand that the improvements will be constructed under tht: TIF. However, we need to see them on the plans. Please advise. If you have any questions or if! may be of assistance please do not hesitate to call. The docket numbers will be issued upon receipt of additional information necessary to complete the application. T AC has reviewed the plans at their December meeting. However, due to the revisions necessary to address the road improvements it may be necessary to relum to T AC once the plans are updated. Sincerely, kIL ' ~ Cc. Dab::::-=> Planning Administrator Park\'1011d East-DP I.rtf Page 1 ONE CIVIC SQUARE CARlvlEL, INDIANA 46032 317/571-2417 u - u City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 317-571-2417 Fax: 317-471-2426 FACSIMILE TELECOPY COVER LETTER DATE: January 15, 2002 TO: Charles Frankenberger FAX: 571-5176 FROM: Jon Dobosiewicz Attached hereto are 2 pages, including this cover letter, for facsimile transmission. Should you experience any problem in the receipt ofthese pages, please call 317/571/2419 and ask for Connie. NOTES: Please call if you have any questions. CONFIDENTIALITY NOTICE The materials enclosed with this facsimile transmission are private and confidential and are the property of the sender. The information contained in the materiai is privileged and is intended only for the use of the individual(s) or entity(ies) named above. If you are not the intended recipient, be advised that any unauthorized disclosure, copying. distribution or the taldng of any action in reliance on the contents of this telecoped information is strictly prohibited. If you have received this facsimile transmission in error, please immediately notify us by telephone to arrange for return of the forwarded documents to us. ., u u Dobosiewicz, Jon C From: Sent: To: Subject: Brewer, Scott I Sunday, January 13, 2002 8:47 PM DObosiewicz, Jon C Parkwood East - landscaping comments Jon: I have a few species comments on the Parkwood East (College Hills). I apologize for being so late, Charlie's letter had PARKWOOD WEST on it and for some reason it just didn't click in my mind. I can get a letter to him on Monday, but I wanted to let you know. I'm going to ask them to select an alternative species for red maples and the two crabapple varieties, and put shade trees in one set of parking lot islands instead of crabapples. Scott 1 '" :-". u u ,;iP'2;~CC:C-<~;"' ,t\-.J. ,9-..--':1.'91.1'" ;')(;;1/1\ ~"'~~ H :W\:~H ~~;fj;~g8~~~~{Jo;,-;y City of Carmel January 7, 2002 Mr. Charles D. Frankenberger Nelson & Frankenberger 3021 East 98th Street, Suite 220 Indianapolis, IN 46280 I- I / 1_ (=-' \. \ '. '\ ~ . /if~(;~lm/!1?:, JA/v ijlVl!~!l) PooP DOCS RE: Parkwood East Crossing Dear .Mr. Frankenberger: We have reviewed the drawings submitted for this project and offer tile following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: " Street and Rigllt of Way - City of Carmel. " Water - Indianapolis Water " Sanitary Sewer - Clay Regional Waste District " Storm Sewer - City of Carmel. 3. Board of Public Works and Safety Approval Requirements: " Commercinl Curb Cut. Please provide an exhibit that shows tile location of the curb cut and acell/decellanes if applicable; appropriate dimensions including drive width, overall width at the street, acellJdecel dimensions, radii, etc.; and location of existing opposing curb cuts, if applicable. The exhibit should be 8 1h x 11 or of a size that can be reduced to 8 Yi x 11 such as 8 112 x 14 or 11 x 17. .. Temporary Construction Entrance. Same requirements as fOf the Commercial Curb Cut. o Any penrument improvement to be installed within dedicated right of way. . Consent to Encroach Agreements for any permanent improvement to be installed within dedicated easements. If an irrigation system is planned for this project, additional Water and Sewer Availability approval will be required from the Board. I am enclosing a schedule for Board of Public Works and Safety meeting dales and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior final approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals and completion of review by the Technical Advisory Committee. All written requests to be place on the Board's agenda must include the appropriate Docket Numbers and the date (or dates) of approval by the Plan Commission and/or RZA. 4. T AC Review/Drawings submitted for approval: We request ti13L all comments and comment letters generated by tlus office be ans\vered in writing and be accompanied by a drawing reflecting requesLed revisions. Final drawings will not be approved for construction until all issues have been resolved. All Carmel Utility issues must also re resolved. The design engineer must certify all drawings submitted for final approval. TIus office will require tl1ree- sets of approved drawings after all issues have been resolved. The drawings will be stamped approved and signed by the City Engineer. TIle Developer/Owner ,vill receive one-set which is to be maintained on the construction site at all times. Our Public Works Inspector will receive onc.set and one-set will be maintained in the Department of Engineering. If more Uk'Ul Uuee-sets are requested to be approved, the additional sets must be submitted with tile three required sets, DNE CIVIC SQUAI-U': CAR!\-tEL, INDlANA '16032 317/571-2400 .. u u Mr. Charles D. Frankenberger January 7, 2002 Page 2 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated easements will require a Consent to Encroach Agreement belween the Owner/Developcr and the City of Cannel. TIlis Agreement requires Board of Public Works and Safety approvaL Installations within dedicated right of way require separate Board approval. 6, I am including copies ofthe foHowing with tllis correspondence: .. Commercial Project Approval Procedures. .. Performance Release Procedure. .. Permit Data, Contacts, etc. . Commercial Permitting Procedures. I will send a copy of our Residential Subdi"ision and Commercial Irrigation System Requirements upon request. BONDING REQUIREMENTS 7. Upon initial review, it appears the following bonding requirements will apply to tllis project: Performance Guarantees .. Sidewalk (in right of way) Please provide individual, detailed certified Engineers Estimates for 100% of the cost of labor and materials for the above improvements. Post irldividual Performance Guarantees in the amowlt of the Engineer's Estimates. TIme-year Mairltenance GuaranLees will be required upon release of the Perfonnanee Guarantees. Street Cut/Right of Way Permit and Bonding Requirements Any work in dedicated right of way will require a Street CutJRight of Way Permit and a License and Permit Bond. TIle bond amount will be deterrnirled by the number of instances of work in the right of way (curb cut, storm sewer work, etc,) @$2,000.00per instance. PROJECT COMMENTS 8. Please provide drairlage calculations. The drainage analysis should include examination of the downstream waterway and its ability to handle the proposed site drainage. Mr. Greg Snelling indicated in the December 19,2001 TAC meeting that he had sent drainage calculations to the Engineering Dept., however, we have not received them. Please forward another copy for our review. We reserve the opportunity for further review and submission of comments regarding drainage upon receipt of such calculations. 9. It is our assumption that the stoml sewer system will be private. lO. Additional survey information for the south side of 96th Street is required on the site plans. This is necessary for the Enginccring Dept. to detennine if the proposed drives for this site align properly with the existing drives on the,south side of 96U, Street. 11. Detailed plans for the improvements to 96th Street should be submitted with this project for verification of compatibility with site improvements, TIle existing and proposed 96th Street Pavement should be represented on the site plan, Infonnation on the sequence of site improvements and road improvements should be provided. 12. Is the walk adjacent to 96U, Street to be asphalt or concrete? The walk should also be dimensioned, 13, The proposed 96th Street should be clearly labeled and dimensioned, ~. u u Mr. Charles D. Frankenberger January 7, 2002 Page 3 The above comments are based upon the Engineering Department'sinitial review. Please provide our office with a follow up letter and revised plans, indicating all revisions. A second review will focus only on revised items. It is critical that our office be made aware orall modifications made on the plans being re-submitted, particularly if any sllch changes are considered "new" or fall outside of our initial review. If you have questions, please contact Kate Weese or me at 571-2441. Sincerely, lJtdJ?l&W- Michael T. McBride Assistant City Engineer Enclosures cc: M. Kate Weese, City Engineer Dick Hill, Assistant DiJector Dept. Of Engineering Jon Dobosiewicz, Department of Community Services Z:\cng\shared\mmcbride\Project Revicw\2002lParkwood East.] .doc f' u u JbY\ - 'f~t ( ~ JAN 2002 RECEIVED CiTy ENGiNEER rViemo Date: 12/6/2001 To: .:,:}?.qlskHill,~harles Frankenberger, Steve Broermann .,.:'~..i?'/,~~_:'''''''''''-~-.-: c>" - Cc; Larry Longman, Jeff Stone, file From: B!air D. Carmosino RE: Parkwood EAST (College Hills) Find attached a copy of a resolution passed by the Hamilton County Commissioners that clarifies the matter relating to jurisdiction of 96lh Street in the College Hills Area. The attached was drafted and approved as a part of the work on the Tax Increment Finance district established for this project. We at Duke construe this document to mean that the portion of roadway that is included in the TIF Boundary for this project is under the jurisdiction of the Re-development authority, which, we are assuming would provide far the City Jurisdiction. . Attachments 12/6/200 1 - u u BINGHAM MCHALE LLP 1100 Chamber of Commerce Building 320 North Meridian Street IndianapolisJ IN 46204~2982 Fax To: Blair Gannosino Fax: 808-6797 Phone: Re: Duke Re~[ty Return Fax #: Usar #: Client #: o Urgent D For Review From: J. Peter Miller Pages: 4 ~te: January 14,2002 cc: Ratum Phone #: Sec. Inltl~ls: KER M~tter #: tJ PI~,>~ Comment 0 PI~asl9 Rt)ply o P"~aae Recycle CONFlDENTlALITY NOTICE THIS MESSAGE IS PRIVATE AND CONFIDeNllAL AND IS INTENDED ONLY FOR 'THE PRIVATE USE OF THE SENDER AND THE.INDNIDUAl OR ENTITY TO WHOM IT IS ADDRESSED AND MAY CONTAIN CERTAIN INFORMATlON THAT IS PRIVIU:GEO, CONFIDENl1Al AND EXEMPT FROM DISCLOSURE. If tile reader of this message is not.the Intended recipient or an employee of agent responsibl~ for delivering the message to the intended redplen~ you are hereby notCfied that any dissemination, distributiOn or copying of this communication is strictly prohibited, AI1yinCldvertent receipt by you of such confidential infol1l1ation shall not constitute a waiver of any privilege. If you have received this communication in error, please refrain from reading or copying it and notify uS immediately by telephonE! and return the originat message to us by mail. Thank you, ~ Comments: If you experience any problems in receiving any of these pages, please call 62A-758B. Thank you. 5i11~,S Operator Initials: _ 17/1 3~l;id , OJ , ...1 0 ~.;;I Ii) E ' 1 1 Z (') - v 1 - N' .o' ~~\\({7' - r'f l ~ JAN 2002 RECEIVED CITY ENGINEER rVl erno Date: 12/6/2001 TO:ii~:~LR!,sreill,Charles Frankenberger, Steve Broermann ',~'.!...0':;.-:~,,,,'~','~'-<''';'' -'" -- Cc: Larry Longman, Jeff Stone, file From: Blair D. Carmosino /is>,?> ~ ll'if;~= I '- If '~;Z;j!f/,?, J4/y Iri (/4,1~ DOCS lilt?? RE: Parkwood EAST (College Hills) 1'1 /~/ . ':y'1/ '. ;'>'. ,." ' '" :';. --(\, ' ~, / ..---, -:--- - .~. \->"' ~_/ Find attached a copy of a 'resolution passed by the Hamilton County Commissioners that clarifies the matter relating to jurisdiction of 96111 Street in the College Hills Area. The attached was drafted and approved as a part of the work on the Tax Increment Finance district eslablished for this project. We al Duke construe this document to mean thai the portion of roadway that is included in the TIF Boundary for this project is under the jurisdiction of the Re-development authority, which, we are assuming would provide for the City Jurisdiction. . Attachments 12/612001 - If BOARD OF COM:MJSSIONERS OF HAMILTON COUNTY, INDIANA RESOLUTION NO. 10-22-01-1 wHEREAS, Ie 36-7-25-4 authorizes Hamilton County and the Carmel Redevelopment Commission ("City Redevelopment Commission') to jointly undertake economic development projects in contiguous areas within each unit's jurisdiction; and \VHEREAS, the City Redevelopment Commission did on January 10. 2001, adopt a declaratory resolution, which Declaratory Resolution was confim1ed by a resolution adopted on March 14, 2001, designating an area knO\VI1 as the parrnood Economic Development Area (f1Parkwood ED A") as an economic development area under Ie 36-7-14 and Ie 36-7-25; and WHEREAS, the City Redevelopment Commission now desires to expand the Parkviood EDA;and WHEREAS, the portion of the proposed e?-.--pansion to the parkwood" EDA within the jurisdiction of the Hamilton County Redevelopment Commission ("County Area") is contiguous with the portion of the proposed expansion within the jurisdiction of the City Redevelopment Commission as shown in Exhibit A: NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COM:11ISSIONERS OF liAMILTON COUNTY, INDIANA; Section 1. The Board of CoIDJJJ.issioners hereby assigns the County Area to the City Redevelopment Commission fur the purpose of economic development and the allocation of. incremental property tax proceeds. . Section 2. The City Redevelopment COronllssionmay take all action in the assigned area that would be taken by a redevelopment commission in an allocation area in the manner and to the extent provided in Ie 36-7-254. Section 3. This Resolution shall be effective upon passage. P'TICctO v/('; 3~\id '01 ').-jOi'l.-I !E'!! 60-\;d~N\:i e CI Approved this a'A day of October, 2001. BOARD OF COMMISSIONERS OF HAMILTON COUNTY,~IANA , , ./4f. CJ JilL.,. - . Steven C. Dillinger Steven A. Holt ~~. Sharon R. Clark ATIEST: ~ W\.lU.tb ,.dm<!. Robin M. Mills, Auditor PerfectO -2- v/C 3:J\:fd 'or 'I-IO~d: If>r. i";O-I;,L-N'=' ., 1,/ b :::1 :)Vd . (I I . l-I 0 CI .c.l IF:. 1 1 ;:: [~ ,- 17 I - N V J " BINGHAM MCHALE LLP 1100 Cham ber of Com merce Building 320 North Meridian Street IndianapolisJ IN 46204~2982 Fax To: Blair Carmosino Fax: 808-6797 PhotHlo~ Re: Duke Realty Return Fax #; User #: Client #: [J Urgent o For Review From: J. Peter Miller Pages: 4 bate: January 14, 2002 cc: Rotum Phone #: Sec. InJtl4'\ls: KER M3Itter #: o PI~J;;e CQmment 0 Ph~age Reply o Please Recyela CONADENTIALITYNOTICE THIS MESSAGE IS PRIVATE AND CONFIDENTIAL AND IS INTENDED ONLY FOR THE PRIVATE USE OF THE SENDER AND THE INDNIDUAl OR ENTllY TO WHOM IT IS ADDRESSED AND rMY CONTAIN CERTAIN INFORMATION THAT IS PRrvlLEGED. CONFIDENTIAl AND EXEMPT J="ROM DISCLOSURE. If tile reader of this message is notthe intended recipient or an employee of agent responsible for delivering the rnessage to the intended recipient you are hereby notified that any dissemination, distribution or copying of this communication is strictty prohibited. MY inadvertent receipt by you of such confldential information shall not constitute a waiver af any privilege If you have received this communication in error, p!ease refr<3in from reading or copying it and notify uS immediately by telephone and retum the original message to us by maiL Thank you. 4> CommQtlt9= If you experience any problems in receiving any of these pages, please call 634-7588. Thank you. 571185 Operator Initials: _ 1;/1 3::JIc!d '01 'WD~~ 0C'll Z0-~1-N o NELSON & FRANKENBERGER A P.ROFESSIONAL CORPORATION ATTORNEYS-AT-LAW u JAMES J. .NELSON CHARLES D, FRANKENBERc:;ER .l<\MES E. SIDNAVER LAWRENCE J. KEMPER of counsel JANE B.. MERRILL 3021 EAsT 98th STREET ~U1TE '220 [r..'DlANAPOLl8, INDIANA 46280 317-844,0106' FAX: 317-846-8782 December 10, 2001 Jon DobMiewicz City oreatIneL Department of Community Services One Civic Center Carmel, IN 46032 Re: ADLS ApprovaL - Parkwood Crossing East (f0n11Crly College Hills) Docket N Q. 15 ~ g 1 AlQbS Dear Jon: The PO Ordinance (Z-362-0l) provi'des that the Plan Commission will approve the corice:ptual development pLan and that the Director will approve a final devefopment pl~n that i~ i ri substantial conformance withthe conceptualdevelopll1cnt plan. TheconteptuaL development plan was approved" in connection with the change in zpniIlg cJassiti~;;ttionand, purs\iant to the Ordinance, I have enclos,ed the final.develppmenlplan foradminist17ative review'aild approval. Pleaseconfer with me about this. Than~s. Very truly yours, NELSON .~ FRANKENBERGER c~ Charles D. Frankenl1erger CDF (jlw Enclosures Ii ,.\I"ns,'GcL,hmM'pobosicw;cz' II,. 12 1001 ,,"pd I /I' I I ) I DCL~\d)r=D ^T~"'V""'" M. . F1"'PB="R'^~ ^ ~F';"" Il:?~~-'\M . ~ t: ..j~ U ~lt '~A discussion purposes only om DRAF1"' .- for .... " I fli 11'\.. .'. 10"\ ,,j! :::>; t""W4!' , ~ COLLEGE HILLS Gershman Brown Associates, Inc. Presentation to CITY OF CARMEL REDEVELOPMENT COMMISSION l\1ay 9th, 2001 I Introductions II Project Overview Brief presentation of the project. Status of Zoning, Annexation, Plat Vacation and Assemblage of properties Economic aspects of project 1 The entire estimated project costs is currently in the range of $50-60 Million, exclusive of public improvements. 2 Projected Tax Revenue generated by project ultimately would be in the range of $400,000-$500,000 annually. The initial phase of a two building scenario would generate approximate $200,000-$250,000 annually. III Public Improvements Public improvement portion of the project will construct improvements identified in the completed 96th Street Corridor study. Public improvement portion of the project will fund improvements to sewers servicing the project site and surrounding Carmel service area that is currently suspect of capacity problems. Public improvement portion of the project will continue and solidify this corridor reputation of being the prime office real estate location along a major gateway to the City of Cmltel and this land component of the corridor is the last economically realistic obtainable component that could be added to this corridor. Outline public improvements; 1. Road improvements along 96th Street, being primarily on the north side of 96lh Street with minor improvements along College. 2. Signal improvements associated with road improvements. 3. Storm water runoff improvements associated with roadway improvements and existing major drainage ways along public roadways. 4. Re-development of property and allowing for the aggregation of parcels in compliance with all heath and safety standards. 5. Secondary Utility improvements/relocations associated with roadway improvements. (Gas, Cable, Electric, Fiber) 6. Water main adjustments/modifications associated with public roadway improvements. 7. Continuation of and enhancement and connection to the Cannel Trail system along 96tb Corridor. 1 of 3 Last Updated: 05/04/0] COLLEGE HILLS - Redevelopment Commission 5-2-0Ldoc :' D liVE discussi ftPl lit l"'C ~ ~~~}"li ,,~ ~ ~,% - u ~ W' II urposes n 1 IV Project Benefits The proposed project meets the statutory requirements for a TlF-supported economic development project in several ways: It will promote significant opportunities for gainful employment. This project will create a minimum of 1,000 jobs and a maximum of 1,200 jobs with a projected annual average salaries, excluding benefits, exceeding $12-$13 per hour. H will attract at least one major new business enterprise. This process is already occurring as potential tenants receive information on what will be a first-class $50-60 million corporate campus project. It will increase the economic well being of the city. Certainly we believe this is the case as outstanding corporate citizens and their employees are attracted to the community. The project is estimated to generate a yet to be detennined substantial amount in County Option Income Tax revenue and personal property taxes. The Parkwood East TIF will benefit the citizenry of Carmel and surrounding areas. The development plan calls for a park~like setting and wide transitions for public streets, sidewalks, pedestrian paths and areas for passive outdoor recreation, with particular emphasis on the aesthetics of the area. The plan will establish an attractive landmark to the City's gateway while minimizing the impact on surrounding areas. The Project will enhance property values. The project will include the aggregation of several parcels not currently adequately equipped with certain utilities. The aggregation of these parcels and enhancement of utilities will increase property values in the area. ,. 20f3 Last Updated: 05104/01 COLLEGE HILLS - Redevelopment COlTUl1ission 5-2.01.doc ,~ r,: ~~'t''\i~ ~ ~ "',,- y Item Roads Road Signals Storm Aggregation of Property Secondary Utilities Water Trail Consultant Fees ''''' COLLEGE HILLS - PUBLIC IMPROVEMENTS Description 96th Street from East of College past Eastern entrance for development College A venue Intersection approaches Enhancement of Signals Storm water management for road and Improvements of existing waterway Crossing of 96lh Street and College Decommissioning of Wells and Septic, hazardous material abatement and remediation of existing infrastructure. Relocation of electric, gas, cabIe, phone and fiber Water main adjustments Pathway to Monon .. Capitalized Interest, years 1 and 2 Estimated Amount $ 800,000.00 $ 200,000.00 $ 150,000.00 $ 275,000.00 $ 425,000.00 $ 750,000.00 $ 200,000.00 $ 150,000.00 $ 450,000.00 $ 450,000.00 $3,850,000.00 Total 3of3 COLLEGE HILLS - Redevelopment Conunissioll 5-2-01.doc Ii" ~ :r4;1 I Last Updated: 05/04/01