Loading...
HomeMy WebLinkAboutDrainage Narrative .< HAMIL TON CROSSING III A TIVD. KlOSK DRAINAGE NARRATIVE The subject site is located w'ithin the existing Hamilton Crossing office development nOlihwest of the intersection of 126111 Street and U. S. 31 in Cannel. CULTently, the location of the proposed kiosk is \vithin an area occupied by an asphalt parking lot, concrete curb and grass at the northwest comer of the parking lot for the southem Hamilton Crossing office building. The site is located v/ithi11 Zone C Flood Hazard Area per the City of Carmel Flood Insurance Rate Map. Existing drainage patterns for the site are such that nmoff flows overland to the south through the grass area and onto the parking lot. The parking lot in this area likewise drains to the south into stOlm sewer inlets. The proposed drainage design for the site is also by overland flow through two swales around the structure. A high point within the swales 'will be located directly north of the kiosk. Runoff fyom the swales will discharge over the curbs both east and west ofthe kiosk. Similar to the existing conditions, all runoff from the kiosk area will be collected by the aforementioned stOTI11 sewer inlets. r- ,;-~~, ~\-;- o NORTH ~l-j LOCATION MAP SCALE: ["==500' " ZONE C SlTE 6 (/) (/) I- I- 2": 2 .-I .-I Ll.J w f- f- <( <( CI: CI: o 0 CJ.. n. 0: a: o 0 u u z :<: o 0: eJ 2 q z :<: > .J >- V1, Z Z c.J Cl. lONE C F.LR.M. MAP 11f'\IVIILI UI~ 0\....JUI't I ~. ,- .0-- NORTH SalLS MAP SCALE: I "=13