HomeMy WebLinkAbout0269.90 MiscellaneousBUILD NC p FR I T I NFORMA T T O
Carmel-Cloy TownarY?-lp
• ? Dapaartm+ant of Comtnurslt:y D?.valopmarat
CARMEL ZONING ORDINANCE Z-160, SECTION 29.+.2(3)= THE BUILDING COMMIS-
SIONER IDIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE
OR DENY THE IMPROVEMENT LOCATION PERMIT IUUILDING PERMIT) WITHIN FIVE
151 WORKING DAYS OF THE RECEIPT OF THE WRITTEN APPLICATION FORM AND
ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING
PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE
AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE.
1. A completed Improvement Location Permit (Building Permit)
- application.
2. Two (2) complete sets of construction plans. In
with the State Energy Code, must list R-values o
ceilings, etc. If a commercial nonBtlru^&-t_. -1
Lag on plans. - - --- '-- "'-y"? .+a waau•
3. A copy of sewer permit (from city of Carmel Engineering
Dept. or Hamilton Western Utilities, whichever applies), or
septic permit (Hamilton County Health Department).
4. One (1) copy of plot plan from subdivision development plan
S. Three (3) copies of a site plan or plot plan showing the
following REOUIRED information (can be obtained from the
landowner or developer):
--Lot drawn to scale -- all dimensions
--Scale and north arrow
All roads, alleys, rights-of-way, etc.
n --All other utilities and drainage rights-of-way and easements
--Any applicable flood plain area
--Building pad elevation and lot corner elevations
--All accessory buildings -- existing or proposed
-All sidewalks and driveways
--Sewer and water lines, suptic system and well location
--Drainage flow arrows
--All drainage swales and subsurface facilities (retention/
detention areas, etc.)
--Dimensional cross sections of all drainage swales
-
- Sump pump (sump pump pits) showing discharge locations
-Geothermal heat pump discharge locations
Drainage Swiales- All required drainage swales must be shown on
the plot plan and constructed in all subdivisions prior to the
Department of Community Development performing a final inspec-
tion of any structure per plans on file or per the following:
Constructed swales shall be a minimum of 1'6" deep with side
slopes of not less than 1 to 1.
If this information is not submitted, it will extend the time it takes
to gat an approved building permit.
I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY
AND ACCURATELY ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A
BUILDING PERMIT APPLICATION TO THE CAMEL-CLAY DEPARTMENT OF COMMUNITY
DEVELOPMENT.
I FURTHER CERTIFY THAT THE JOINING OF WATER SUPPLY PIPING SHALL BS MADE WITH
LIAD-FRXS SOLDERS AND FLUXES. FAILURE TO COMPLY WILL YLSULT IN A RAPLA KMENT
OF TUX SYSTEM. PLUMBING CODE P-509-5. `
NAME OF PLUMBING CONTRACTOR: l l l1 YlC Q` /?
STATE PLUMBING LICSNSS NIBSRt ?C C G?
BUILDER'S SIGNATURSt PtgNE:
ADDRSS't