Loading...
HomeMy WebLinkAbout0256.91 Miscellaneous BUILDING PERMIT INFORMATION CARMEL-CLAY TOWNSHIP Department of Community Development CARMEL ZONING ORDINANCE 2-160, SECTION 29.4.2(3): The Building Commissioner (Director, Department of Community Development or staff) shall approve or deny the improvement location permit (building permit) within five (5) working days of the receipt of the written application form and accompanying materials. The improvement location permit (building permit) shall be issued when the proposed structure, improvement or use and its location conform in all respects to this ordinance. The following must be received by the Department of Community Development before any building or remodeling permit can be reviewed or issued by staff: 1. ONE completed Improvement Location Permit (Building Permit) application. 2. TWO (2) complete sets of construction plans. In compliance with the State Energy Code, must list R-values on walls, ceilings, etc. If a commercial construction, Plans must be stamped approved by the Indiana State Department of Fire Prevention & Building Safety. Indicate total height of building on plans. 3. ONE copy of sewer permit (from City of Carmel Engineering Dept., Hamilton Western Utilities or Clay Regional Sewer District whichever applies), or septic permit (Hamilton County Health Department). 4. ONE (1) copy of plot plan from subdivision development plan. 5. THREE (3) copies of a site plan or plot plan showing the following REQUIRED information (can be obtained from the landowner or developer): --Lot drawn to scale - all dimensions --Scale and north arrow --AII roads, alleys, rights-of-way, etc. --All other utilities and drainage rights-of-way and easements --Any applicable flood plain area -Building pad elevation and lot comer elevations -All accessory buildings -- existing or proposed -All sidewalks and driveways --Sewer and water lines, septic system and well location --Drainage flow arrows --All drainage swales and subsurface facilities (retention/detention areas, etc.) --Dimensional cross sections of all drainage swales --Sump pump (sump pump pits) showing discharge locations --Geothermal heat pump discharge locations Drainage Swales: All required drainage swales must be shown on the plot plan and constructed in all subdivisions prior to the Department of Community Development performing a final inspection of any structure per plans on file or per the following: Constructed swales shall be a minimum of 1'6" deep with side slopes of not less than 4 to 1. If this information is not submitted, it will extend the time it takes to get an approved building permiL I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL-CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. I FURTHER CERTIFY THAT THE JOINING OF WATER SUPPLY PIPING SHALL BE MADE WITH LEAD-FREE SOLDERS AND FLUXES. FAILURE TO COMPLY WILL RESULT IN A REPLACEMENT OF THE SYSTEM. PLLWNr9G CODE f_-?09-5. /1 A , . NAME OF PLUMBING STATE PLUMBING BUILDER'S April, 1991