HomeMy WebLinkAbout1363.96 Sewer/Water Permit/sAft; ?.
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
-PERMIT
Project Title. PRIMARY AR
Location:
owner/Builder:
Lot # Street Address
tJ?
City: Zip:
Availability Paid: Connection Fee Paid:
Interceptor Charges Paid: Surcharges:
pLE-Q_SE.N_QTEz installation of building sewer shall be per the specifications of the Clay
Township Regional Waste District (see reverse). All installations shall be Inspected by District
personnel during "open trench" phase and before backfilling with sand or stone to six inches
above the pipe. NO footing or foundation drains, or other sources of ground or ston-nwater, shall
be permitted to enter the District's sanitary sewer system- The District will assume no liabllify for
drains which are below the grade level of the nearest downstrearn manhole nor for laterals which
are extended beneath driveways or sidewalks. The permit holder (properly owner, developer or
builder) will be responsible. For damages to the District's sewers system including manholes,
castings, manhole lids and the like, caused by construction activity on the building site which is
the subject of this permit, the permit holder is also responsible.
Inspections by the District are MI NV TORY and shall be arranged by contacting the District's
office at 844-9240 one to four hours in advance. All new construction vitil be placed on billing six
months after connection has been made.
By signing below, I allest that I am familiar with the District's specifications and agree to accept
responsibility for all work done under this permit.
Bui Cmwner gnature Phone,A
Inspection Fee Paid: U_5_ Plans ubtnitted ?•?
Permit iss his day of 99
Jay INV. Alley, Utility Manager ?FCl09?*
Permit valid only with CTRWD seal in rest ink.
fe, 11-?1 WC 11
'te
CLAY TOPVN$ P REGIONAL<.WASTg. DISTRICT '.
SUMMAtiY?!FIATERAL INBTALLAT111QN_REa?i!!t3EMEATS
1. All houses, buildings, etc., shall connect to the District's sanitary sewer system within 90
days of notice providing a sewer is within 300 fleet of the property line.
2- No foundation or other storm water drains shall be interconnected to the sewer lateral
installed and connected to the District's sanitary sewer.
3. The existing sewer line from the building to the septic tank may only be used if it is
located under a building addition, palio, porch or paved driveway and can be air tested to show it
is acceptable for re-use- The properly owner shall bear the cost of all testing and pay the District
for Inspection of the air test.
4. The owner or contractor shall notify the District prior to covering the installed lateral so
that the District can make an inspection to determine compliance with the District's sewer use
ordinance. Such notification shall be made one to four hours prior to the need for the inspection.
It the inspection fails and a second inspection is required, an additional fee or $55.00 will be
charged at the time of the follow up inspection.
5. Property owners are hereby advised that Hamilton County regulates the operation and
maintenance of private sewage disposal (septic) systems. County Ordinance No. 8-11-83 provides
in part that, upon connection to a public sewer, a septic tank "...shall be abandoned and filled
with earthen material in a safe and sanitary manner." Compliance with this ordinance Is strongly
encouraged. Please contact the Hamilton County Board of Health for further information.
6. Acceptable Pipe Materials
PVC PIPE: SDR 35, ASTM D-3034, SIX INCH PIPE
GASKETED JOINTS: ASTM D 3212
GASKETS: ASTM F-477
FITTINGS: SDR-26
7. Bedding:
Use fill sand or Number 8, 9 or 11 stone
Fill material is to be placed from 6 inches below In 6 inches above the pipe.
The trench should be a minimum of 18 Inches wide.
8. Laterals shall be installed no closer than 20 feet from water wells unless water grede,PVC
pressure pipe is used meeting SDR 26 and ASTM D-2241
9. Laterals shall terminate within 3 feet of the building unless the conditions in Item 03 above
are met.
10. Additional information on District standards and specifications may be obtained from the
District's office during business hours of 8:00 a. M. to 12:00 Noon and 1:00 p, m. until 8:401 p, m.
Monday through Friday:
Clay Township Regional Waste District
10801 N. College Avenue
Phone: 844-9200 Fax: 844-9203
not be pumped out into the new sanitary sewer system.
1 1 . Septic effluent L I R
Rw tt-9-%