SWIMMING POOL PURCHASE
AND INSTALLATION CONTRACT
THIS PURCHASE AND INSTALLATION CONTRACT ("Contract"), executed on
November 30, 2004 between Will & Deborah Woods, hereinafter called the "Purchaser",
whose address is 14510 Quail Pointe Drive, Carmel, IN 46032, and MIKE McGHEE &
ASSOCIATES, INC., hereinafter called "Contractor".
WHEREAS, Purchaser is desirous of having Contractor build a swimming pool/spa at
13701 West Road, Westfield, IN 46074; and
WHEREAS, Contractor agrees to build and install a swimming pool/spa for Purchaser at
the above location; and
WHEREAS, Contractor and Purchaser agree that the swimming pooVspa shall be built and
installed under the following terms and conditions.
NOW, THEREFORE, Purchaser and Contractor agree to the following terms and
conditions:
PROJECT
Contractor shall furnish, except for such work specifically excluded, all labor, materials,
tools, equipment and services as called for in the plans and specifications, said in-ground gunite
pool/spa shall be completed in a workmanlike manner:
The Purchaser agrees to make these payments to the Contractor on the day the Contractor
presents an invoice. The Purchaser agrees that the Contractor has the right to stop worm if these
payments are not timely received- The Contractor agrees that the pool will meet or exceed the
National Spa & Pool Institute's residential swimming pool standards.
SWIMMING POOL MEASUREMENTS
The pool will be built in accordance with plans, specifications and other documents
attached to this Contract.
Pool Shape: Rectangle
Pool Greatest Width: 20'
Pool Greatest Length:
Water Depth: 3'5" to 9'
Activity of Pool: Diving Pool
SCOPE OF WORK
A detailed description of the work, materials, and equipment and a scale drawing (on a
separate sheet) showing shape, size and pool dimensions are as follows:
GENERAL CONSTRUCTION SPECIFICATIONS:
1. POOL LOCATION:- Per drawings
2. POOL STRUCTURE DESIGN SHAPE: Rectangle
POOL FINISH: Gunite Shell
PIPING MATERIAL: Sch 40 pvc
3. TILE: 6 x 6 TYPE: Frostproof
COLOR: Owners Choice
4. SURFACE SKIMMER: I LOCATION: As determined
5. COPING TYPE: Poured in Place
6. INTERIOR FINISH. White Marcite
S. OTHER: Undertrack auto-cover wlpre-cast lid to match coping, S' Gunite Sp
7
PLUMBING AND FILTERING SPECIFICATIONS:
STEPS: Standard WALKS:
9. PUMP AND MOTOR: MAKE: Sta-Rite MODEL. TBD_
SIZE: 1 Y2 HP TYPE: Medium Head
MAIN SUCTION LINE SIZE: 2"
RETURN TO POOL LINE SIZE: 2"
FILTER SYSTEM: MAKE: Sta-Rite- MODEL:-450 sq. ft_ Modular Media
10. HEATER: MAKE: Rati ak MODEL: RP2100
BTU: 265 000 TYPE: Natural Gas
POOL CLEANER: MAKE: Paramount TYPE: In-Floor
CHLORINATOR: MAKE: Rainbow type Erosion TYPE:
OTHER EQUIPMENT:_
LIGHTS: _I WATTS: 500 VOLTAGE: 120
IL DIVING BOARD: MAKE: S.R.Smith MODEL: Frontier III SIZE: _10'_
2
DIVING STAND: MAKE:S.R. Smith TYPE: Steel SIZE: 1/2 Meter
LADDER: MAKE: TYPE:
SIZE:
HANDRAIL: _1 set Stainlees Steel with recessed plastic steps
12. CLEANING EQUIPMENT,-35' vac hose, 12'' flex vacuum head, 16' telescopic
Poke
WALL & FLOOR BRUSH: J S" Gunite
LEAF SKIMMER: Deluxe
WATER TEST KIT: DPD type
OTHER ACCESSORIES: _1 - 12" x 12" main drain sumps, 1 Hydrostatic valve
FOR ANY DESIGNATED X4A.TERIAL, EQUIPN /FENT, PRODUCT, METHOD
CONSTRUCTION, INSTALLATION OR SERVICE IDENTIFIED BY SPECIFIC BRAND
TRADE NAW, CONTRACTOR HAS THE RIGHT TO SUBSTITUTE AND FURN
ANOTHER MATERIAL, EQUIPMENT PRODUCT, METHOD OF CONSTRUCTI,
INSTALLATION OR SERVICE OF COMPARABLE QUALITY OR UTILITY.
ADDITIONAL WORK
If Purchaser requests Contractor to perform additional work and if the Contractor is willing
to perform such additional work, Purchaser agrees to pay Contractor for each item of extra work at
the actual cost of subcontracts, labor, materials and equipment plus Fifteen Percent (15%) for
Contractor's overhead and fee. Request for extra work or modifications shall be in writing, signed
by both parties and shall become part of this contract. All sums for e. teas or modifications shall
be due and payable when completed, concurrent with the other progress payments, and the
Contractor shall have the right to stop work and keep the job idle if payments are not made when
due.
Extra work shall include, but is not limited to the following:
Any changes requested by the Purchaser not included in the scope of work.
Expense incurred because unsuitable or hard soil, filled ground, rocks, ground water or any
other material not removable by ordinary hand tools is encountered.
The removal or rerouting of pipes, sprinkler systems, electrical wires, water or sewage
disposal or conduits in areas of excavation.
Any change or alteration from the drawings or specifications.