HomeMy WebLinkAboutTAC1999.0721CARMEL/CLAY TECHNICAL ADVISORY
COMMITTEE AGENDA
Date: July 21, 1999
Place: Department of Community Services Conference Room - 3rd Floor
Carmel City Hall
9:00 a.m. Altum Gardens (SU)
Petitioner seeks approval (Special Use) to provide an enclosed sales area and
office for a landscape contracting business known as Altum Gardens. The site is
located at 11335 N. Michigan Road (US 421). The site is zoned B-3/Business and
is located within the US 421 Overlay Zone.
Filed by Adam L. DeHart of Keeler-Webb Associates
9:30 a.m. Sprint Spectrum Tower (SE/V)
Petitioner seeks approval (Special Exception and Developmental Standards
Variance) to construct a Wireless Telecommunications Tower in an S-1 residential
district and to permit the accommodation of two wireless telecommunication
service providers as opposed to the four required by the Ordinance. The site is
located south of 141st Street between Towne Road and Ditch Road. The site is
zoned S-1/Residence.
Filed by Larry J. Wallace of TBD.
10:00 a.m. West Carmel Center (SU-49-99/V-50-99)
Petitioner seeks approval (Special Use and Developmental Standards Variance) to
construct a retail shopping and service center including a jewelry store known as
the West Carmel Center. Petitioner also seeks approval of variance to 23C.9
which requires that buildings ninety feet and greater in width be designed with
offsets. The site is zoned B-3/Business and is located within the U.S. 421
Overlay Zone.
Filed by Kevin McKasson of Glendale Partners.
10:30 a.m. The Retreat (SU)
Petitioner seeks approval (Special Use) to construct a multifamily residential
development on 70 acres known as The Retreat. The site is located northwest of
the intersection of Westfield Boulevard and E. 96th Street. The site is zoned S-
2/Residence.
Filed by James Nelson of Nelson & Frankenberger.
11:00 a.m. Inlow Channel and Pond Improvements (SU-41-99)
Petitioner seeks approval (Special Use) to construct a retention pond and relocate
a stream channel. The site is located at the southeast corner of the intersection of
Ditch Road and W. 116th Street. The site is zoned S-1/Residence.
Filed by Richard Smikle.
Page 2 of 2
Technical Advisory Committee
July 21, 1999
11:30 p.m. Lunch Break
12:30 p.m. Parkwood Crossing Building 7 (63-99 DP/ADLS)
Petitioner seeks approval (Development Plan and Architectural Design,
Landscape, Lighting and Signage) to construct an 86,435 square foot office
building on 4.36 acres known as Parkwood Crossing Building 7. The site is
located north of E. 96th Street and east of US Highway 31. The site is zoned B-
6/business.
Filed by Blair Carmosino of Duke Realty Limited Partnership.
1:00 p.m. Carmel Bus Maintenance Facility (SU)
Petitioner seeks approval (Special Use) to construct a Facilities and
Transportation building and additional parking known as the Carmel Bus
Maintenance Facility. The site is located at 5201 E. 131st Street. The site is zoned
S-1/Residence.
Filed by Rollin Farrand Jr. of Carmel Clay Schools.
1:30 p.m. Plum Creek (SP)
Petitioner seeks approval (Secondary Plat) to construct 28 lots on 10.014 acres
known as Plum Creek Section 4. The site is located north of 126th Street and east
of Hazel Dell Parkway. The site is zoned S-1/Residence and is located within the
U.S. 31 Overlay Zone.
Filed by J. Cort Crosby of The Schneider Corporation.
2:00 p.m. Parks at Springmill Section 9 (SP)
Petitioner seeks approval (Secondary Plat) to replat 3 lots on 4.301 acres known
as the Parks at Springmill Section 9. The site is located at north of 131st Street
and southeast of Meridian Corners Boulevard. The site is zoned S-1/residence.
Filed by Dave Sexton of the Schneider Corporation.
2:15 p.m. Chapman’s Claim at Prairie View (SP)
Petitioner seeks approval (Secondary Plat) to replat 46 lots on 24.647 acres
known as Chapman’s Claim at Prairie View. The site is located north of E. 131st
Street and west of River Ave. The site is zoned S-1/residence.
Filed by Keith Lash of the Schneider Corporation.
No other items filed as of July 12, 1999