Loading...
HomeMy WebLinkAboutC001ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES, RULES, REGULATIONS AND STANDARDS, INCLUDING, BUT NOT LIMITED TO: THE INDIANA BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THE AMERICANS WITH DISABILITIES ACT (ADA), INTERNATIONAL BUILDING CODE, AND APPLICABLE TRADE STANDARDS. ALL APPLICABLE RULES AND REGULATIONS ARE TO BE THE MOST CURRENT ADOPTED EDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS AND DIMENSIONS PRIOR TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT/DESIGNER IMMEDIATELY. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL STATE AND LOCAL PERMITS REQUIRED FOR COMPLETION OF THIS PROJECT. ALL WORK IS TO BE COORDINATED BY THE GENERAL CONTRACTOR TO ASSURE ADEQUATE FIT, FINISH, SYSTEM OPERATION, AND FULL COMPLETION OF THE WORK, INCLUDING SERVICE REQUIREMENTS OF THE OWNERS F.F.E. ALL DIMENSIONS ARE SHOWN ON THE DRAWINGS. ANY DIMENSIONS NOT SHOWN OR DEEMED QUESTIONABLE ARE TO BE VERIFIED WITH THE ARCHITECT/DESIGNER. DO NOT SCALE DIMENSIONS ON THE DRAWINGS. ALL DIMENSIONS ARE TO THE FACE OF GYPSUM BOARD, MASONRY/CONCRETE WALLS, OR CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE. CONTRACTOR IS TO SIGN EACH SHOP DRAWING SUBMITTAL HAS BEEN REVIEWED, APPROVED, AND THAT THE CONTRACTOR COORDINATION HAS BEEN PERFORMED. DURING THE ENTIRE PERIOD OF CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES, AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED. FINISHED DOOR OPENINGS IN NEW PARTITIONS SHALL BE SET 4" FROM ADJACENT PERPENDICULAR PARTITIONS, UNLESS OTHERWISE NOTED. ALL FINISH CARPENTRY IS TO BE COMPLETED IN STRICT ACCORDANCE WITH A.W.I. STANDARDS, PREMIUM GRADE. ALL FIRE EXTINGUISHER CABINET LOCATIONS ARE TO BE COORDINATED WITH THE CONTRACTOR, DESIGNER AND THE LOCAL FIRE OFFICIALS PRIOR TO INSTALLATION. CONTRACTOR(S) SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND EQUIPMENT FOR THE WORK IN THESE DOCUMENTS, UNLESS CLEARLY NOTED "NOT IN CONTRACT" (N.I.C.). EXISTING WORK ADJACENT TO OR IN THE AREA OF NEW WORK SHALL BE PROTECTED BY ALL SUITABLE MEANS NECESSARY TO PREVENT OR MINIMIZE DAMAGE. WHERE EXISTING WORK IS TO BE REMOVED OR ALTERED, RESTORE ADJACENT FINISH TO ORIGINAL CONDITION. EXTEND/REFINISH ALL FRAMES, BASE, AND TRIM WHERE CUTTING HAS EXPOSED ANY UNFINISHED SURFACES. REPAIR ANY DAMAGE TO EXISTING WORK AND RESTORE TO ORIGINAL CONDITION. CONTRACTORS SHALL KEEP WORK AREAS AND ADJACENT PUBLIC CORRIDORS AND FACILITIES FREE OF DEBRIS. MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE STORED IN A LOCATION APPROVED BY THE LANDLORD. ALL PLUMBING ITEMS AND/OR EQUIPMENT ITEMS ARE TO BE COORDINATED AND VERIFIED WITH INTERIOR ELEVATIONS PRIOR TO ROUGH-IN. ANY DISCREPANCIES SHALL BE COORDINATED WITH THE DESIGNER. COORDINATED WITH OWNER AND FACILITY STAFF PROJECT PHASING TO MINIMIZE DISRUPTION OF EXISTING FACILITY SERVICES. PHASING TO INCLUDE ASSURANCE FOR CLEAN AIRFLOW, WRITTEN NOTIFICATION OF INTERRUPTIONS, AND COMMUNICATION AUTHORITY. CONTRACTOR, OWNER, AND FACILITY STAFF TO PLAN FOR PROCEDURES ON THE EFFECTS OF NOISE AND VIBRATION ON HUMAN HEALTH AND SAFETY. THE RENOVATED AREAS SHALL BE ISOLATED FROM THE OCCUPIED AREAS DURING ALL PHASES OF CONSTRUCTION USING AIRTIGHT BARRIERS, AND EXHAUST AIR FLOW SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. SUBMIT THE REQUIRED NUMBER OF SUBMITTALS FOR DESIGNER REVIEW AND APPROVAL PLUS ONE EXTRA COPY FOR DESIGNERS RECORDS. C B ARCHITECTURAL NOTES A BIFOLD WOOD PAIR DOOR SEE SCHED SEE SCHED SEE SCHED SEE SCHED HOLLOW METAL SEE SCHED SOLID WOOD DOOR SEE SCHED SOLID WOOD DOOR, GLASS KIT SEE SCHED SEE SCHED D E F G H I J L M N 1 LEVER HANDLE PASSAGE LATCH SET 1 DOOR STOP 3 SILENCERS 1 LEVER HANDLE PASSAGE LATCH SET 1 DOOR STOP 3 SILENCERS DOOR TYPES FRAME TYPES HARDWARE LEGEND PROVIDE FIRE DAMPERS AT FIRE-RATED PARTITIONS AS REQUIRED PER APPLICABLE BUILDING CODES. CEILING IN ALL AREAS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS, AND ALL APPLICABLE BUILDING CODES. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DUCTWORK, SUPPLY AND RETURN AIR AND THERMOSTATS. COORDINATE ALL ELEMENTS OF THE HVAC SYSTEM TO PROVIDE A COMPLETELY BALANCED AND EFFICIENT HEATING AND COOLING SYSTEM. HVAC THERMOSTAT CONTROL FOR ALL ROOMS SHALL BE LOCATED WITHIN DEMISED SUITE. VERIFY AND REWORK EXISTING DUCTWORK AND THERMOSTATS AS REQUIRED. MECHANICAL CONTRACTOR SHALL VERIFY WORKING CONDITION OF ALL EXITING THERMOSTATS, VAV BOXES, EXHAUST FANS, AND ANY OTHER DEVICE DIRECTLY RELATED TO THE HVAC SYSTEM. CONTRACTOR TO NOTIFY ENGINEER/DESIGNER IMMEDIATELY UPON DISCOVERY OF DEFECTIVE DEVICE. C B REFLECTED CEILING NOTES A D K THE ELECTRICAL CONTRACTOR IS TO PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT, AND CONTRACTORS SERVICES NECESSARY TO COMPLETE INSTALLATION OF SYSTEMS REQUIRED IN FULL CONFORMITY WITH APPLICABLE CODES AND ORDINANCES. THE FINISHED JOB SHALL BE FUNCTIONAL AND COMPLETE IN EVERY DETAIL INCLUDING ANY AND ALL SUCH ITEMS FOR A COMPLETE SYSTEM. ALL MATERIALS AND WORKMANSHIP SHALL MEET ALL APPLICABLE STATE AND LOCAL CODES, ORDINANCES, UTILITY COMPANY REGULATIONS AND NATIONALLY ACCEPTED CODES AND STANDARDS. THE ELECTRICAL CONTRACTOR WILL BEAR ALL COSTS ARISING IN CORRECTING ANY NON COMPLIANCE WITH THE REQUIREMENTS OF APPLICABLE CODES. CONTRACTOR TO SUPPLY AND INSTALL ALL ELECTRICAL WIRING, INCLUDING RUNS FROM JUNCTION BOX TO INDIVIDUAL WORKSTATION UNITS. CONTRACTOR TO SUPPLY PLENUM RATED BOXES AND PULLS AS REQUIRED TO ACCOMMODATE TENANT'S TELEPHONE, DATA AND SECURITY DEVICES. ELECTRICAL NOTES C B A O E THE GENERAL CONTRACTOR SHALL PROVIDE ALL TEMPORARY PARTITIONS AND TEMPORARY DOORS AS INDICATED ON THIS DEMOLITION PLAN, OR AS DEEMED NECESSARY BY THE ARCHITECT AND OWNER. THEY SHALL BE MAINTAINED AND REPAIRED IMMEDIATELY IF ANY DAMAGE OCCURS. THESE DOOR ARE TO AVOID MIGRATION OF DUST INTO THE ADJOINING AREAS. GENERAL CONTRACTOR TO VERIFY DUCTWORK OR PIPING PENETRATIONS THROUGH WALLS ABOVE CEILING. IF PENETRATIONS OCCUR AND DUCTWORK OR PIPING IS TO BE REMOVED OR RELOCATED, FILL IN OPENINGS TO BE FLUSH WITH AND OF THE SAME MATERIAL AS THE SURROUNDING WALL. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER SUITABLE TO ACCEPT NEW SPECIFIED FINISHES AND OR SURFACES. REFER TO ARCHITECTURAL PLANS, SPECIFICATIONS, AND DETAILS FOR SPECIFIC INFORMATION REGARDING APPLICATION OF NEW MATERIAL. C B DEMOLITION NOTES A C0012 GENERAL NOTES GENERAL NOTES DOOR NOTES ALL DOORS ARE TO BE MARSHFIELD, ROTARY WHITE BIRCH, BUILDING STANDARD FINISH. ALL DOOR HARDWARE IS TO MATCH BUILDING STANDARD MANUFACTURER, STYLE AND FINISH. ALL DOOR FRAMES ARE TO BE HOLLOW METAL KNOCK-DOWN. A B C SEE SCHED DRYWALL WRAPPED OPENING SEE SCHED