HomeMy WebLinkAboutC001ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,
ORDINANCES, RULES, REGULATIONS AND STANDARDS, INCLUDING, BUT NOT LIMITED TO: THE INDIANA
BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THE AMERICANS WITH DISABILITIES
ACT (ADA), INTERNATIONAL BUILDING CODE, AND APPLICABLE TRADE STANDARDS. ALL APPLICABLE
RULES AND REGULATIONS ARE TO BE THE MOST CURRENT ADOPTED EDITIONS.
THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS AND DIMENSIONS PRIOR
TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT/DESIGNER IMMEDIATELY.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL STATE AND LOCAL PERMITS REQUIRED FOR
COMPLETION OF THIS PROJECT.
ALL WORK IS TO BE COORDINATED BY THE GENERAL CONTRACTOR TO ASSURE ADEQUATE FIT, FINISH,
SYSTEM OPERATION, AND FULL COMPLETION OF THE WORK, INCLUDING SERVICE REQUIREMENTS OF
THE OWNERS F.F.E.
ALL DIMENSIONS ARE SHOWN ON THE DRAWINGS. ANY DIMENSIONS NOT SHOWN OR DEEMED
QUESTIONABLE ARE TO BE VERIFIED WITH THE ARCHITECT/DESIGNER. DO NOT SCALE DIMENSIONS
ON THE DRAWINGS. ALL DIMENSIONS ARE TO THE FACE OF GYPSUM BOARD, MASONRY/CONCRETE
WALLS, OR CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE.
CONTRACTOR IS TO SIGN EACH SHOP DRAWING SUBMITTAL HAS BEEN REVIEWED, APPROVED, AND
THAT THE CONTRACTOR COORDINATION HAS BEEN PERFORMED.
DURING THE ENTIRE PERIOD OF CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE
PROTECTIVE DEVICES, AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED.
FINISHED DOOR OPENINGS IN NEW PARTITIONS SHALL BE SET 4" FROM ADJACENT PERPENDICULAR
PARTITIONS, UNLESS OTHERWISE NOTED.
ALL FINISH CARPENTRY IS TO BE COMPLETED IN STRICT ACCORDANCE WITH A.W.I. STANDARDS,
PREMIUM GRADE.
ALL FIRE EXTINGUISHER CABINET LOCATIONS ARE TO BE COORDINATED WITH THE CONTRACTOR,
DESIGNER AND THE LOCAL FIRE OFFICIALS PRIOR TO INSTALLATION.
CONTRACTOR(S) SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND EQUIPMENT FOR THE
WORK IN THESE DOCUMENTS, UNLESS CLEARLY NOTED "NOT IN CONTRACT" (N.I.C.). EXISTING WORK
ADJACENT TO OR IN THE AREA OF NEW WORK SHALL BE PROTECTED BY ALL SUITABLE MEANS
NECESSARY TO PREVENT OR MINIMIZE DAMAGE. WHERE EXISTING WORK IS TO BE REMOVED OR
ALTERED, RESTORE ADJACENT FINISH TO ORIGINAL CONDITION. EXTEND/REFINISH ALL FRAMES,
BASE, AND TRIM WHERE CUTTING HAS EXPOSED ANY UNFINISHED SURFACES. REPAIR ANY DAMAGE
TO EXISTING WORK AND RESTORE TO ORIGINAL CONDITION.
CONTRACTORS SHALL KEEP WORK AREAS AND ADJACENT PUBLIC CORRIDORS AND FACILITIES FREE
OF DEBRIS. MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL
BE STORED IN A LOCATION APPROVED BY THE LANDLORD.
ALL PLUMBING ITEMS AND/OR EQUIPMENT ITEMS ARE TO BE COORDINATED AND VERIFIED WITH
INTERIOR ELEVATIONS PRIOR TO ROUGH-IN. ANY DISCREPANCIES SHALL BE COORDINATED WITH THE
DESIGNER.
COORDINATED WITH OWNER AND FACILITY STAFF PROJECT PHASING TO MINIMIZE DISRUPTION OF
EXISTING FACILITY SERVICES. PHASING TO INCLUDE ASSURANCE FOR CLEAN AIRFLOW, WRITTEN
NOTIFICATION OF INTERRUPTIONS, AND COMMUNICATION AUTHORITY. CONTRACTOR, OWNER, AND
FACILITY STAFF TO PLAN FOR PROCEDURES ON THE EFFECTS OF NOISE AND VIBRATION ON HUMAN
HEALTH AND SAFETY. THE RENOVATED AREAS SHALL BE ISOLATED FROM THE OCCUPIED AREAS
DURING ALL PHASES OF CONSTRUCTION USING AIRTIGHT BARRIERS, AND EXHAUST AIR FLOW SHALL
BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE.
SUBMIT THE REQUIRED NUMBER OF SUBMITTALS FOR DESIGNER REVIEW AND APPROVAL PLUS ONE
EXTRA COPY FOR DESIGNERS RECORDS.
C
B
ARCHITECTURAL NOTES
A
BIFOLD WOOD
PAIR DOOR
SEE SCHED SEE SCHED SEE SCHED
SEE SCHED
HOLLOW METAL
SEE SCHED
SOLID WOOD
DOOR
SEE SCHED
SOLID WOOD
DOOR, GLASS
KIT
SEE SCHED
SEE SCHED
D
E
F
G
H
I
J
L
M
N
1 LEVER HANDLE
PASSAGE LATCH SET
1 DOOR STOP
3 SILENCERS
1 LEVER HANDLE
PASSAGE LATCH SET
1 DOOR STOP
3 SILENCERS
DOOR TYPES
FRAME TYPES
HARDWARE LEGEND
PROVIDE FIRE DAMPERS AT FIRE-RATED PARTITIONS AS REQUIRED PER APPLICABLE BUILDING
CODES.
CEILING IN ALL AREAS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S
SPECIFICATIONS, AND ALL APPLICABLE BUILDING CODES.
MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DUCTWORK, SUPPLY AND RETURN AIR
AND THERMOSTATS. COORDINATE ALL ELEMENTS OF THE HVAC SYSTEM TO PROVIDE A COMPLETELY
BALANCED AND EFFICIENT HEATING AND COOLING SYSTEM.
HVAC THERMOSTAT CONTROL FOR ALL ROOMS SHALL BE LOCATED WITHIN DEMISED SUITE. VERIFY
AND REWORK EXISTING DUCTWORK AND THERMOSTATS AS REQUIRED.
MECHANICAL CONTRACTOR SHALL VERIFY WORKING CONDITION OF ALL EXITING THERMOSTATS, VAV
BOXES, EXHAUST FANS, AND ANY OTHER DEVICE DIRECTLY RELATED TO THE HVAC SYSTEM.
CONTRACTOR TO NOTIFY ENGINEER/DESIGNER IMMEDIATELY UPON DISCOVERY OF DEFECTIVE
DEVICE.
C
B
REFLECTED CEILING NOTES
A
D
K
THE ELECTRICAL CONTRACTOR IS TO PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT, AND
CONTRACTORS SERVICES NECESSARY TO COMPLETE INSTALLATION OF SYSTEMS REQUIRED IN FULL
CONFORMITY WITH APPLICABLE CODES AND ORDINANCES. THE FINISHED JOB SHALL BE FUNCTIONAL
AND COMPLETE IN EVERY DETAIL INCLUDING ANY AND ALL SUCH ITEMS FOR A COMPLETE SYSTEM.
ALL MATERIALS AND WORKMANSHIP SHALL MEET ALL APPLICABLE STATE AND LOCAL CODES,
ORDINANCES, UTILITY COMPANY REGULATIONS AND NATIONALLY ACCEPTED CODES AND STANDARDS.
THE ELECTRICAL CONTRACTOR WILL BEAR ALL COSTS ARISING IN CORRECTING ANY NON
COMPLIANCE WITH THE REQUIREMENTS OF APPLICABLE CODES.
CONTRACTOR TO SUPPLY AND INSTALL ALL ELECTRICAL WIRING, INCLUDING RUNS FROM JUNCTION
BOX TO INDIVIDUAL WORKSTATION UNITS. CONTRACTOR TO SUPPLY PLENUM RATED BOXES AND
PULLS AS REQUIRED TO ACCOMMODATE TENANT'S TELEPHONE, DATA AND SECURITY DEVICES.
ELECTRICAL NOTES
C
B
A
O
E
THE GENERAL CONTRACTOR SHALL PROVIDE ALL TEMPORARY PARTITIONS AND TEMPORARY DOORS
AS INDICATED ON THIS DEMOLITION PLAN, OR AS DEEMED NECESSARY BY THE ARCHITECT AND
OWNER. THEY SHALL BE MAINTAINED AND REPAIRED IMMEDIATELY IF ANY DAMAGE OCCURS. THESE
DOOR ARE TO AVOID MIGRATION OF DUST INTO THE ADJOINING AREAS.
GENERAL CONTRACTOR TO VERIFY DUCTWORK OR PIPING PENETRATIONS THROUGH WALLS ABOVE
CEILING. IF PENETRATIONS OCCUR AND DUCTWORK OR PIPING IS TO BE REMOVED OR RELOCATED,
FILL IN OPENINGS TO BE FLUSH WITH AND OF THE SAME MATERIAL AS THE SURROUNDING WALL.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER SUITABLE TO ACCEPT NEW SPECIFIED
FINISHES AND OR SURFACES. REFER TO ARCHITECTURAL PLANS, SPECIFICATIONS, AND DETAILS FOR
SPECIFIC INFORMATION REGARDING APPLICATION OF NEW MATERIAL.
C
B
DEMOLITION NOTES
A
C0012
GENERAL NOTES
GENERAL NOTES
DOOR NOTES
ALL DOORS ARE TO BE MARSHFIELD, ROTARY WHITE BIRCH, BUILDING STANDARD FINISH.
ALL DOOR HARDWARE IS TO MATCH BUILDING STANDARD MANUFACTURER, STYLE AND FINISH.
ALL DOOR FRAMES ARE TO BE HOLLOW METAL KNOCK-DOWN.
A
B
C
SEE SCHED
DRYWALL WRAPPED
OPENING
SEE SCHED