April 20, 2003
Mr. Jeff Bolinger, ASLA
Fanning/Howey Associates, Inc.
9025 North River Road, Suite 200
Indianapolis, IN 46240
RE: Carmel Junior High School Addition and Renovation-Guilford Road Widening
Dear Mr. Bolinger:
I apologize for the delay in reviewing the Guilford Road Widening plans submitted to our office on March
26th. \Ve would like to thank the school corporation for their cooperation with our request to include the
Guilford Road Improvements with the Carmel Junior High School Addition and Renovation project. We
believe these road improvements will improve through traffic flow on Guilford, improve and clarify access
into and out of school property and improve safety conditions in the area of the school. TIle plans general! y
reflect our requests as outlined in our letter of December 15, 2003. However,there are a couple of
remaining concerns.
Sheet G1.1
Our Street Commissioner, our Construction Manager and City Engineer have reviewed the construction
plans and have made an ansite inspection of the improvement area. They have expressed coricern
regarding existing roadside drainage on the east residential side of Guilford, generally between Emerson
Road and College Way East. There are existing drainage issues in this area and the road improvements
may complicate these issues. Weare requesting the school corporation consider, as part of this proj eet, the
grading/redefining of the existing ditch benveen Emerson and College Way and the addition of new 12"
CMP's under the 4-existing residential driveways in the area to improve surface drainage flow and
minimize potential problems.
Sheet G4.1
The pavement section for Guilford Road (Collector Street classification) is 1 Y. inches of H.A. Surface, 4
inches ofH.A. Binder and 12 inches of Compacted Aggregate Base #53. Our Construction Manager has
indicated Ihal the 4 inches ofRA. Binder wiII be required to be placed in 2 lifts. Please add this statement
to this detail. However, It may be more cost effective to change the 4 inches of binder to 5 inches of base
asphaltto ~nable the conlractor 10 place with one lift. The stone base requirement could be reduced to 11
inches under this scenario. If this is acceptable, change this detail accordingly and add the following
statement 10 the pavement section, "Surface To Be Placed In The Same Paving Season That The Base Is
Placed".
Regarding the Pavement Transition (2) detail, does this refer to right of way pavement and, if so, what is
the purpose of this detail and \vhat does the 5' -0" transition area represent'!
Dr.l'AItT\W,[' OF E,c;lc<fTI\I"!c;
ONE OV[C SQUARE, C~I,,\li'l., Ii\ 46032 CJITICF. 3n.5T12441 FAX 3]7.571.21]39
E\JA I L k\y(,:t'~~'@ci.c;lnllel.in.lL~
;'" ....
Mr. Jeff Bolinger, ASLA
Apri120, 2004
Page 2
Why are there two separate "New Pavement @ Existing Pavement" deta.ils (3 and 6)? It appears that the
No.6 detail would apply to this project. We request that "Tack Coat Edge of Existing Pavement" be added
to this specification.
If you have questions, I may be reached at 571-2459 or email atdhill(ii)ei.carmeUn.us.
Sincerely,
if .
.' ,
.. 1 \
! //V/~
Dick Hill, Assistant Director
Department of Engineering
Cc: Mike McBride, City Engineer
Jon Dobosiewicz, Department of Community Services
Dan Greskamp, Construction Manager
Dave Klingensmith, Street Commissioner
S:\PROJREV04\CARMEUHS2
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: Cannel Junior High School County: Hamilton
Plan Submittal Date: 03/04/04 Hydrologic Unit Code; not provided
Project Location Description: West side of Guilford Ave. 1/2 mile south of Main Street
Latitude and Longitude: not proVided
Civil ':;:' u Clay Quarter: Section: 25 ~ 18N J.,I"no.., 3E
I:
.2
""' Project Owner Name: Cannel/Clay School Corporation
c<:
e Contact: ?
l-. \JJ'-- OV
c.9 Address: ?
I: )S
... ~
'"' City: ? State: ? Zip: ?
~
IlJ Phone: ? FAX: ? E-Mail: ?
'-'
0
l-.
~ Plan Preparer Name:
Affiliation: Fanning/Howey Associates
Address: ?
City: State: Zip:
Phone: FAX: E-Mail:
Review Date: 03/06/04
~ Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
IlJ
~ Address: 1108 South 9th Street
~ City: Noblesville
=:: Phone: 3] 7-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
o PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice ofIntent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hoursfollowing the !>ubmittal of
the NO!. A copy of the NO! must also be sent to the Reviewinz Authority (e.g, SWCD, DNR).
o A preliminary plan review has been cOmlJletedj a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date
and revisions to die plan may be required at that time to address deticieneies.
o Please refer to additional information included on the follo"ing page(s).
o Submit Notice ofIntent (NOI): Attach a copy ofthi:,' cover page when submitting the NO! to the indiana
Department of Environmental Management. Construction activities may begin 48 hour!>following the submittal of
the NO!. A copy of the NOI must also be sent to the Reviewing Authority (e.g, SWCD, DNR).
[2] PLAl'l IS DEFICIENT: Significant deficiencies were identified during the plan review.
[2] Please refer to additional information included on the following page(s).
[2] DO NOT file a Notice of Intent for this project.
[2] DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
[2] Plan Revisions [2] Deficient Items should be mailed or delivered to the Principal Plan Reviewer
identified in the Plan Review Section above.
DNR, Division o[Soil Conservation
Page 1 of 4
Revised J 2/09/03. Poml 1
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Pr<!ject Name: Carmel Junior High School
Date Reviewed: 03/06/04
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater
Pollution Prevention Planfor the project. The Plan submitted was not reviewedfor the adequacy of the engineering
design. All measures included in the plan, as well as those recommended in the comments should be evaluated as to
their feasibility by a qualified individual with structural measures designed by a qualified engineer. The Plan has not
been reviewed for other local, state, or federal permits that may be required to proceed with this project. Additional
information, including design calculations may be requested to further evaluate the Plan.
All proposed stormwater pollution prevention measures and those referenced in this review must meet the design
criteria and standards setforth in the "Indiana Stonnwater Quality Manual"ji-al/! the indiana Department of Natural
Resources, Division of Soil Conservation or similar Guidance Documents.
Please direct questions and/or comments regarding this plan review to:
John B. South P.E. CPESC
Please refer to the addre.ss and contact information identified in the Plan Review Section on page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
o Yes D No
the items checked below are deficient and require submittal to meet the requirements of the rulc.
A
o 1 Index showing locations of required Plan Elements
D 6 Location of all lots and proposed site
improvements (mads, utilities, structures, etc.)
n Notation of any State or Federal water quality
L.:J 8
permits
IJl Specific points where stonnwater discharge wiIlleave IJl Location and name of all wetlands, lakes and
L::..J 9 th . L"J 1 0 d d" th'
e SIte water courses on an a ]acent to e SIte
o Identification of potential discharges to ground
12 water (abandoned wells, sinkholes, etc.)
o 13 100 year floodplains, floodways, and floodway fringes 0 4 Pre-construction and post construction estimate
1 of Peak Discharge (to Year storm event)
D Locations and approximate boundaries of all
16 disturbed areas (Construction Limits)
D Soils map including soil descriptions and
18 1" . "
IffiltatlOns
D 0 Plans for any off-site construction activities
2 associated with this project (sewer/water tie-ins)
D Existing site topography at an interval
22 " "d' d'
appropnate to m lcate ramage patterns
D 3
N alTative describing the nature and purpose of the
project
Legal Description of the Project Site
(Include Latitude and Longitude - NO] Requirement)
o 5
.0 7 Hydrologic unit code (14 Digit)
o 11 Identification of all receiving waters
[] 15 Adjacent landuse, including upstream watershed
D 17 Identification of existing vegetative cover
D Locations, size and dimensions of proposed
19 ( .
stormwater systems e.g. pIpes, swales and channels)
D 21 Locations of proposed soil stockpiles and/or
bOlTow/disposal areas
D Proposed final topography at an interval appropriate to
23 indicate drainage patterns
DNR, Division of Soil Conservation
Page 2 of 4
o 2 11 by 17 inch plat showing building lot
numberslboundaries and road layout/names
D 4 Vicinity map showing project location
Revised 12/09/03, Form I
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Carmel Junior High School
Date Reviewed: 03/06/04
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
000
ODD
000
000
DOG
ODD
00
00
00
00
00
ODE!
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation. and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
necessmy to minimize the discharge of pollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the peljormance of a practice or
the effectiveness of the plan. The plan must be a flexible document, with provisions to modifjl or
substitute practices as necessary
Description of potential pollutant sources associated with construction activities
Sequence describing stormwater quality measure implementation relative to land disturbing
activities
Stable construction entrance locations and specifications (at all points of ingress and egress)
Sediment control measures for sheet flow areas
Sediment control measures for concentrated How areas
Sform sewer inlet protection measure locations and specifications
Runoff contrul measures (e.g. diversions, rock check dams, slope drains, etc .)
Storm water outlet protection specifications
9 Grade stabilization structure locations and specifications
10 Location, dimensions, specificatiuns, and construction details of each stormwater quality measure
11 Tempurary surface stabilization methods appropriate for each season (include sequencing)
12 Permanent surface stabilization specifications (include sequencing)
13 Material handling and spill prevention plan
14 Monitoring and maintenance guidelines for each proposed stornlwater quality measure
15 Erusion & sediment controJ specifications for individual building lots
Q,l ....
.... =
~Q,l
0'" 'zj
. <lj '-=
"0 Q,l
-< ~
DB
DB
Q,l
....
l:\l
:=:
:::r'
Q,l
";I <lj
-< ~
OB
DD
D0
DB
DB
The post construction componellt of the Stormwater Pollution Prevention Plan includes the
implementation of storm water quality measures to address pollutants that will be associated with the
inallanduse, Post construction stormwater quality measures should befimctional upon completion of
the project. Long term functionality of the measures are critical to their performance and should be
monitored and maiiztained.
Description of pollutants and their sources associated with the proposed land use
Sequence describing stormwater quality measure implementation
Description of proposed post construction storm water quality measures
(Include a written description of how these measures will reduce discharge of expected
Location, dimensions; specifications, and construction details of each stormwater quaJity measure
Description of maintenance guidelines for post construction stormwater quality measures
DNR, Divisioll of Soil Conservation
Page 3 of 4
Revised 12/09/03. Form 1
I
..
ConstructionfStormwater Pollution Prevention Illan - Technical Review and Comment
Project Name: Carmel Junior High School
Date Reviewed: 03/06/04
See the Hamitlon County SWCD web site for helpful materials to meet the requiremetns of Rule 5.
www.hamiltonswcd.orq
Recommend that none of the exisiting grass areas be disturbed unless the area can be completed and seeded in a 30 day
time period. I don't won't to see the sight stripped and areas lie dormant because the tile or irrigation cannot be installed
until it can be installed all at once for the entire site.
cc: Carmel, Surveyor, File
Patrick Kirby, Skillman Corp. Fax- 782-2926
DNR, Division of Soil Conservation
Pagc 4 of 4
Revised 12/0!J/U3
Babbit~, Pamela A
From:
Sent:
To:
Stahl, Gayle H
Wednesday, February 25, 2004 9:23 AM
Adrienne Keeling; Dawn pattyn; Hoyt, Gary A; Jeff Kendall; Jim Blanchard; Jon Dobosiewicz;
Laurence Lillig; Pamela Babbitt; Ramona Hancock; Sarah Lillard; Scott Brewer; William Akers;
Duffy, John M; Hill, Dick B; McBride, Mike T
'mphennessy@skillman,com'; John South (E-mail)
Pre-Submittal Meeting: Carmel Junior High, South Guilford
Cc:
Subject:
The Dept. of Community Selifice, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit~'
Project: Carmel Junior High School Addition & Interior Renovations @ 300
South Guilford Rd.
Meeting Date: Pending
Related Plann'ing & Zoning docket numbers:
!I."'''f~9'~O~' . .' !1!!!il'llC-r.'ft~""iA'~~a""'g.
t:vj,.-OJi;' .. . ~ill'anu'''''I'::R:~.y,AuguslL'':.i;;u . ~:, .
~~~~W_
SUA 154-02, V155-92 ttiro't:8gh~
Representative:
Mike Hennessy, Skillman Corp.
If there are concerns that might affect the issuance of this permit, please REPL Y
TO AILL on this e-mail.
1
Babbitt. Pamela A
From:
Sent:
To:
jsouth [john-south@iaswcd.org]
Wednesday, February 25,2004 12:08 PM
'Stahl, Gayle H'; 'Adrienne Keeling'; 'Dawn Pattyn'; 'Hoyt, Gary A'; 'Jeff Kendall'; 'Jim
Blanchard'; 'Jon Dobosiewicz'; 'Laurence Lillig'; 'Pamela Babbitt'; 'Ramona Hancock'; 'Sarah
Lillard'; 'Scott Brewer'; 'William Akers'; 'Duffy, John M'; 'Hill, Dick B'; 'McBride, Mike T'
mphennessy@skillman.com
RE: Pre-Submittal Meeting: Carmel Junior High, South Guilford
Cc:
SUbject:
If the proposed construction will exceed 1 acre a Stormwater pollution
prevention plan is needed.
John B. South P.E.
-----Original Message-----
From: Stahl, Gayle H [mailto:GStahl@ci.carmel.in.us]
Sent: Wednesday, February 25, 2004 9:23 AM
To: Adrienne Keeling; Dawn pattyn; Hoyt, Gary A; Jeff Kendall; Jim
Blanchard; Jon Dobosiewicz; Laurence Lillig; Pamela Babbitt; Ramona
Hancock; Sarah Lillard; Scott Brewer; William Akers; Duffy, John M;
Hill, Dick B; McBride, Mike T
Cc: 'mphennessy@skillman. com'; John South (E-mail)
Subject: Pre-Submittal Meeting: Carmel Junior High, South Guilford
The Dept. of Community Service, Building & Code Enforcement division,
has
received a request to schedule a pre-submittal meeting for the purpose
of
obtaining a building permit.
Project: Carmel Junior High School Addition & Interior
Renovations @
300 South Guilford Rd.
Meeting Date:
Pending
Related Planning & Zoning docket numbers: SUA 154-02, V155-92
through
V159-02 and TAC August 2002
Representative:
Mike Hennessy, Skillman Corp.
If there are concerns that might affect the issuance of this permit,
please
REPLY TO ALL on this e-mail.
1
Babbitt, Pamela A
From:
Sent:
To:
Dobosiewicz, Jon C
Wednesday, February 25, 2004 11 :58 AM
Stahl, Gayle H; Keeling, Adrienne M; Pattyn, Dawn E; Hoyt, Gary A; Kendall, Jeff A;
Blanchard, Jim E; Lillig, Laurence M; Babbitt, Pamela A; Hancock, Ramona B; Lillard, Sarah
N; Brewer, Scott I; Akers, William P; Duffy, John M; Hill, Dick B; McBride, Mike T
'mphennessy@skillman.com'; 'John South (E-mail)'
RE: Pre-Submittal Meeting: Carmel Junior High, South Guilford
Cc:
SLi bject:
We need 10 verify that right-of-way issues have been resolved.
Thanks,
Jon
muOriginal Message-----
From: Stahl, Gayle H
Sent: Wednesday, February 25, 2004 9:23 AM
To: Adrienne Keeling; Dawn Pattyn; Hoyt, Gary A; Jeff Kendall; Jim Blanchard; Jon Dobosiewicz; Laurence Lillig; Pamela Babbitt;
Ramona Hancock; Sarah Lillard; Scott Brewer; William Akers; Duffy, John M; Hill, Dick B; McBride, Mike T
Cc: 'mphennessy@skillman.com'; John South (E-mail)
Subject: Pre-Submittal Meeting: Carmel Junior High, South Guilford
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit.
Project: Carmel Junior High School Addition & Interior Renovations @ 300
South Guilford Rd.
Meeting Date:
Pending
Related Planning & Zoning docket numbers: SUA 154-02, V155-92 through
V159-02 and TAC August 2002
Representative:
Mike Hennessy, Skillman Corp.
If there are concerns that might affect the issuance of this permit, please
REPL Y TO ALL on this e-mail.
Babbitt, Pamela A
From:
Sent:
To:
Hoyt, Gary A
Wednesday, February 25, 2004 11 :36 AM
Stahl, Gayle H; Keeling, Adrienne M; Pattyn, Dawn E; Kendall, Jeff A; Blanchard, Jim E;
Dobosiewicz, Jon C; Lillig, Laurence M; Babbitt, Pamela A; Hancock, Ramona B; Lillard,
Sarah N; Brewer, Scott 1; Akers, William P; Duffy, John M; Hill, Dick B; McBride, Mike T
'mphennessy@skillman.com'; 'John South (E-mail)'
RE: Pre-Submittal Meeting: Carmel Junior High, South Guilford
Cc:
Subject:
I believe all issues concerning the fire department have been addressed
Gary
CFD
n"nOriginal Message--m
From: Stahl, Gayle H
Sent: Wednesday, February 25, 20049:23 AM
To: Adrienne Keeling; Dawn pattyn; Hoyt, Gary A; Jeff Kendall; Jim Blanchard; Jon Dobosiewicz; Laurence Lillig; Pamela Babbitt;
Ramona Hancock; Sarah Lillard; Scott Brewer; William Akers; Duffy, John M; Hill, Dick B; McBride, Mike T
Cc: 'Illphennessy@skillman.com'; John South (E-mail)
Subject: Pre-Submittal Meeting: Carmel Junior High, South Guilford
The .Dept. of Community Service, Building & Code Enforcement division, has
received a request to SChedule a pre-submittal meeting for the purpose of
obtaining a building permit.
Project: Carmel Junior High School Addition & Interior Renovations @ 300
South Guilford Rd.
Meeting Date:
Pending
Related Planning & Zoning docket numbers: SUA 154-02, V155-92 through
V159-02 and TAC August 2002
Representative:
Mike Henn~ssy, Skillman Corp.
If there are concerns that might affect the issuance of this permit, p)ease
REPL Y TO ALL on this e-mail.
Babbitt, Pamela A
J
From:
Sent:
To:
Hoyt, Gary A
Monday, February 09, 2004 9:21 AM
Stahl, Gayle H; Duffy, John M; Hill, Dick B; McBride, Mike T; Keeling, Adrienne M; pattyn,
Dawn E; Kendall, Jeff A; Blanchard, Jim E; Dobosiewicz, Jon C; Lillig, Laurence M; Babbitt,
Pamela A; Hancock, Ramona B; Lillard, Sarah N; Brewer, Scott I; Akers, William P
'm phennessy@skillman.com'
RE: Pre-Submittal Meeting: Clay Junior High Additions/Renovations
Cc:
Subject:
The fire department would like confirmation on the location of the sprinkler system hook-up in writing, and had requested
an additional Knox box along with Knox fire department connection caps for the building. Knox products can be purchased
on-line at <www.knoxbox.com>
Gary Hoyt
CFD
HmOriginal Message-m-
From: Stahl, Gayle H
Sent: Friday, February 06, 2004 10:35 AM
To: Duffy, John M; Hill, Dick B; McBride, Mike T; Adrienne Keeling; Dawn Pattyn; Hoyt, Gary A; Jeff Kendall; Jim Blanchard; Jon
Dobosiewicz; Laurence Lillig; Pamela Babbitt; Ramona Hancock; Sarah Lillard; Scott Brewer; William Akers
Cc: 'mphennessy@skillman.com'
Subject: Pre-Submittal Meeting: Clay Junior High Additions/Renovations
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit.
Project: Clay ,Junior High at 5150 E. 126th St.
Meeting Date: Pending ___ ____
Related Planning & Zoning docket number~:66.02 and TA~~9Ust
2002 ~.-=-_)
..... - --- --
Representative:
Mike Hennessy
If there are concerns that might affect the issuance of '.his permit, piease
REPL Y TO ALL on this e-mail.
1
Babpitt, Pamela A
From:
Sent:
To:
Cc:
Subject:
Hill, Dick B
Friday, February 06, 2004 10:53 AM
Stahl, Gayle H; Duffy, John M; McBride, Mike T; Keeling, Adrienne M; Pattyn, Dawn E; Hoyt,
Gary A; Kendall, Jeff A; Blanchard, Jim E; Dobosiewicz, Jon C; LilJig, Laurence M; Babbitt,
Pamela A; Hancock, Ramona B; Lillard, Sarah N; Brewer, Scott I; Akers, William P
'm phennessy@skillman.com'
RE: Pre-Submittal Meeting: Clay Junior High Additions/Renovations
This project will be on the BPW 2/18 Agenda for commercial curb cut approval. There is a right of way dedication
requirement they have committed La and are working on but don't know it it will make the 18th agenda. There is a
Performance Guarantee requirement for right of way improvements. We still require an updated drawing to approve.
There are no additional water or sewer availability approval requirements.
m..Original Message...n
From: Stahl, Gayle H
Sent: Friday, February 06, 2004 10:35. AM
To: Duffy, John M; Hill, Dick B; McBride, Mike T; Adrienne Keeling; Dawn Pattyn; Hoyt, Gary A; Jeff Kendall; Jim Blanchard; Jon
Dobosiewicz; Laurence Lillig; Pamela Babbitt; Ramona Hancock; Sarah Lillard; Scott Brewer; William Akers
Cc: 'mphennessy@skillman.com'
Subject: Pre-Submittal Meeting: Clay Junior High Additions/Renovations
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a buildling permit.
ProjechClay Junior High at 5150 E. 126th St.
Meeting Date:
Pending
Related Planning & Zoning docket numbers: _ in August
2002
Representative:
Mike Hennessy
If there are concerns that might aHect the issuance of this permit, please
REPL Y TO ALL on this e-mail.
1
u
-u
CI EL
J'\.MES BRAINARD, M.fi.\"OR
December 15, 2003
rvIr_ William E. Payne, AlA
Fanning/Howey AssoCiates, Inc.
9025 North River Road, Suite 200
Indianapolis, TN 46240
i rO 1-
IS
,- Ll
./
RE: e~ruIeL:1.u~iorlifi.gJl~Cho:or::-A,;(JijiT~(l!l Jan-t! .~enoYal~on~G~~ir~OFd~~oa~ns~ue ~
Dear Mr. Payne:
This is in response to your letter of October 17, 2003 regarding our requests concerning Guilford Road
Improvements to be completed in conjunction with the Addition and Renovation Project to Carn1el Junior
High School.
This project was reviewed at the August 21, 2002 T.A.C. review meeting. Unfortunately, the Engineering
Department was not able to provide a comment letter until September 23, 2002, for which we apologized in
our letter. However, when weare not able to provide written COlllinents prior to 'LA.c. meetings, we have
always verbally conm1itted to provide written comments to the petitioner as soon as possible. As I recall,
we did verbally question the plans that were submitted in regard to Guildford Road improvements at the
T.A.C. meeting. We were not clear on what improvements were being included \Vith the project. While it
is unfortunate that om comments were received after the BZA meeting, it is our assumption that you
realized that there would be detailed Engineering comments forthcoming and that our comments, even
though they were delayed, would be part of the Technical Advisory Comn1ittee comments to be resolved as
a condition of approval by the Board.
/
This issue has been reviewed with our interim City Engineer Mike McBride and Jon Dobosiewicz of Ollr
Department of Community Services. We have come to the following determination:
We will not require that a full lane be added to the east side of Guilford Road as requested in our
September 23, 2002 review letter. However, traffic flow through this section of Guilford Road does need
improvement and we are requesting that these improvements be included with this planned renovation of
Carmel Junior High School. We are requesting Guilford Road improvements that will result in a 12-foot
wide northbound lane, a 12-foot wide southbound lane and a 14-foot wide center turning lane resulting in a
38-foot wide roadway_ It appears that this will require the construction of approximately 3-feet of asphalt
pavement on the east side of Guilford, Therefore, we are requesting the following:
" Construction of an approximately three foot wide base and binder pavement section on the east
side of existing Guilford Road \vith a pavement section as designated by the Department of
Engineering. Curbs will not be required to be constructed on the east side of Guilford.
a The existing pavement of Guilford Road adjacent to the school site be milled to a depth of one-
inch.
a Resurface the milled roadway, including the additional pavement, with one-inch of asphalt.
. When this work is completed, we request that the pavement be str-iped as required for two through
lanes and one center left t11m lane and left turns markings be designated appropriately. All
pavement striping and markings shall be thermoplastic_
DI:Pi\lH:\I!'::\;r OF ESGINEERI:\C
ONE CrvJC SQUAFE, C\I(i'JEL IN 46032 OFFICE .317.571.2441 FAX 317.571.2439
E'IIAIL kwec"dDci.Gll'tlld.i11.U:,
,..
u
My William Payne
December 15, 2003
Page '2
If you have questions, please contact Mike McBride or me at 571-2441.
7)diiu
Dick Hill, Assistant Director
Department of Engineering
Enclosures
cc: Mike McBride, Assistant City Engineer (w/o encl.)
Jon Dobosie\vicz, Department ofConununity Services (w/o encl.)
Rollin Farrand, Carmel Clay Schools
S :\PROJREYO I \CARMEUHS2
u
/
-----
:'- ..
D'\lDI"JF . /H
!~ . annmg. owey
, (Ju AssoCiates] me.
Architects Engineers Consultants
~o"\\) ,
. ~,/ -r
t- \ ..-
Re: Addition and Renovation to
Carmel Junior High School
Carmel Clay Schools
Carmel, IN
Project No. 201104.00
~I
tiCi' ~,~ ,'"
~ A ,I'"
, ~,~ '/\
:&: \f""
R =iflC~'IV~r~~:'E v\~
\~(1::J --
\ ~ , D. Des. .~!}r
\ ' "~I
/.......1
h.....' .
~ ~:ya-
. ...0
00-- f..>\ ~ \ c;./
, . <:{08;!02/:.
October 17, 2003
Dick Hill, Assistant Dire.ctor
Department of Engineering
City of Carmel
One Civic Square
Carmel, IN 46032
~
~CT 2003
Rt:.CEIVE
~ CITY 0
c.NGINEER
Dear Dick:
Thank you for the opportunity to discuss your September 23, 2002, correspondence regarding this
Project. Our primary discussion focused on Project comments/Guilford Road Improvements/Items
16 and 17. Specifically, Carmel Clay Schools questions whether they should be required to provide
an additIonal pavement lane on Guilford Road as has been requested in these items.
You asked that we summarize Carmel Clay Schools understanding of their commitments regarding
Guilford Road and this Project and forward this to you for review by Kate Weese.
1. In our meeting on February 6, 2002, the City of Carmel requested that acceleration and
deceleration lane improvements be provided at the north entrance to Carmel Junior High
School.
2. In our meeting on May 6, 2002, the City of Carmel requested that in lieu of closing the south
entrance drive, this drive should be realigned to match College Way Road on the east side of
Guilford Road, Necessary acceleration and deceleration improvements should also be
provided.
3. In the Carmel Clay Technical Advisory Committee meeting on August 21, 2002, requested
improvements at Guilford Road were presented and accepted.
4. At the Board of Zoning Appeals meeting of September 23, 2002, this Project was approved
with the condition "That all Technical Advisory Committee (comments) be resolved
satisfactorily prior to the issuance of an Improvement Location Permit." Carmel Clay
Schools accepted this condition as part of the approval based upon the Technical Advisory
Committee minutes and follow-up comments to date.
'1--
Fanning/Howey Associates, Inc. received your letter dated September 23, 2001, on
September 25, 2002. In this letter the aforementioned request for additional pavement lane on
Guilford Road was identified. This request was new to the Project Team as of September 25, 2002,
and was neither included in the Project nor in the Project budget. We have enclosed the following
drawings dated October 15, 2003, that illustrates our understanding of the City of Carmel's
requirements for improvements at Guilford Road per the Board of Zoning Appeals approval of
September 23, 2002:
9025 Nor1b River Road, Suite 200 "l Indianapolis, Indiana 46240
(317) 848-0966 "'l Fa... (317) 848-0843 "I htlp:/lwww.fuai.com
Dick Hill, Assistant Director
Department of Engineering
Project No. 201104.00
October 17, 2003
Page 2
Drawing No. G1.0 - Site Demolition
Drawing No. G1.1 - Overall Site Layout
Drawing No. G1.2 - Enlarged Site Layout
Drawing No. G1.4 - Site Layout
Drawing No. G2.1 - Overall Site Grading
Drawing No. G2.2 - Enlarged Site Grading
Drawing No. G2.4 - Site Grading.
Carmel Clay Schools wishes to proceed with this Project based upon Guilford Road improvements
as identified in this Drawing.
Please contact us after you have an opportunity to review this information with Kate Weese.
Sincerely,
~G/HOWEY ASSOCIATES, INC.
c: Rollin E. Farrand, Jr., RA, Carmel Clay Schools
ll{J[f1anning/Howey
U "qLJI~ Associates)nc.
Architects Engineers Consult~nts '.
- 0;
...~J.tlZT~,::::z>
rf:::;' Of C-4t9.";'~
J)~~~'~
'. 0, U"( N
S' ,It: 'Z.~ ~
~.: ~ ~- ;'-1
iO.,f. _, fo ~lllr f.",
,) \"' ;;;J \;
~:..\ /,/l
.~ -).:' . '0 ,',
.", i'1;::~:><~ 'It
~{(rON G'!iI) V ,
""-:'.:~:::z_"7i.. :
City of Carmel
DEPARTMENT OF ENGINEERING
September 23, 2002
F:/J,NN
INGIJ.(
OWe-I'
Sfp 25 4sSOc.
IN ,. 1001
'DJAN,qPOi..1
S'/IV
Mr. William E. Payne, AIA
FanningIHowey Associates, Inc.
9025 North River Roa<I, Suite 200
Indianapolis, IN 46240
RE: Carmel Junior High School Addition and Renovation-Project Review #1
Dear Mr. Payne:
We apologize for the delay in responding to the plans submitted for T AC. review. We have now reviewed the
drawings submitted for this project and offer the following comments:
GENERAL INFORMATION
1. -- The project site is located 'Within current City of Carmel Corporate Limits,
2. Jurisdictions:
. Street and Right of Way - CitY of Carmel.
. Water, Sanitary Sewer, Storm Sewer - City of Cannel.
3. Board of Public Works and Safety Approval Requirements:
. Water II11d Sanitary Sewer Availability.
.. Commercial CUrb Cut. It appears the existing curb cuts will be modified, This will require approval by our
Board ofPuhlic Works and Safety, Please provide an exhibit that shows the location of the curb cuts and
accelJdecellanes if applicable; appropriate dimensions including drive width, overall width at the street,
accelJdeeel dimensions; radii, etc.; and location of existing opposing curb cuts, if applicable. The exhibit
should be 8 7';. x 11 or of a size that can be reduced to & II, x 11 such as 8 ~ x 14 or 11 x 17. Please show all
existing drive locations on the exhibit using dashed or lighter lines.
" Temporary Conitruction Entrance. Same requirements as for the Commercial Curb Cut.
" Consent to Encroach Agreements for any permanent improvement to be installed within dedicated right of
way and/or dedicated easements. If an inigation system is planned for this project, additional Water II11d
Sewer Availability approval will be required from the Board.
I am enclosing a schedule, for Board of Public Works and Safety meeting dates and agenda deadlines for your use.
Please use the Engineering Department deadlines for submissions to the Board.
Any submission to the Board requiTes prior fimd approwl by the Cannel Qay Pian Commission tuttVor tl,e
Board of Zoning AppeaL~ and compleJion of review by tlu! Technkal Admory Committee. All written requests
to be pUu:e on the Board's agenda must incbule tJJe appropriate Docket Numbers and tlu! dine (or dlltes) of
approval by tlu! Plan Commission antVor BZA.
4. Water fiIld Sanitary Connection Fees:
Since there is a building addition, this project may be subject to additional water and sanitary sewer
Connection Fee& ClIIll1el Utilities will be responsible for this determination.
S. TAC ReviewlDrawings submitted for approval:
We request that all comments and comment letters genemted by this office be answered in writing and be
accompanied by a drawing reflecting requested revisions. Final dra\\ings will not be approved for construction
until all issues have been resolved. All Cannel Utility issues must also re resolved. The design engineer must
certify all drawings submitted for final approval. This office will require five-sets of approved drawings after all
issues have been resolved. The drawings '>vill be stamped approved and signed by both the City Engineer and
Director of ClIIll1el Utilities. The Developer/OWner will receive one-set which is to be maintained on the
construction site at all times, Cannel Utilities ",ill receive two-sets. Our Public Works Inspector will receive one-
set and one-set will be maintained in the Department of Engineering. If more than five-sets are requested to be
approved, the additional sets must be submitted \vith the five required sets.
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571~2441
Mr. William E. Payne, AIA
September 23, 2002
Page 2
6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way and/or
dedicated easements will require a Consent to Encroach Agreement between the Owner!Developer and the City of
Carmel. This Agreement requires Board of Public Works and Safety approvaL
7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main and
sanitary sewer main locations.
8. Cannel Utilities will provide a separate review of this project for water and sanitary sewer issues.
9. I am including copies of the following with this correspondence:
.. Board of Public Works Meeting Dates and Deadlines
D Conimercial Project Approval Procedures.
.. Performance Release Procedure.
.. Permit Data, Contacts, etc.
.. Commercial Pennitting Procedures.
I ""ill send a copy of our Residential Subdivision and Commercial Irrigation System Requirements upon request
BONDING REQUIREMENTS
10. If the new water mains and sanitary sewer mains to be installed with tIlis project will be dedicated mains, the
following bonding requirements will apply to this project:
Performance Guarantees
.. Water Mains
" Sanitary Sewers
Additionally, the following will require a Perfonnance Guarantee:
.. Sidewalk in right of way.
.. Guilford Road Improvements
Please provide individual, detailed certified Engineers Estimates for 100% of the cost oflabar and materials for
the above improvements. Post-individual Perfonnance Guarantees in the amount of the Engineer's Estimates.
Three-year Mafutenance Guarantees will be required upon release of the Perfonnance Guarantees.
Street CutJRight of Way Permit and Bonding Requirements
Any work in dedicated right of way will require a Street Cut/Right of Way Permit and a License and Permit Bond.
The bond amount will be detennined by the number of instances of work in the right of way (curb cut, storm
sewer work, etc.) @ $2,000.00 per instance. At a minimum, the bond amount would be $6,000.00 based upon the
work in the right of way for the curb cuts. Additional work such as water, sanitary sewer, storm sewer work in the
right of way -.yould be additional at $2,000.00 per instance. If any of the work planned in the right of way is to be
covered by Performance Guarantees, right of way permits and bonds would not be required for that work.
PROJECT COMMENTS
Street, Sidewalk, Right of Way Issues
II. Dimension and identity all right of way lines on all sheets that include Guilford Avenue.
]2. Identify all dedicated streets intersecting with Guilford Avenue on 1he east side of Guilford on all appropriate
sheets as '.vas done on Sheet G 1.2 and G 1.4.
] 3. It is difficult to determine new paving to be done in the rightof way and/or Guilford A venue. Please clarify
existing and proposed pavement edges shown on the plans.
14. The sidewalk along the southern drive that extends to Guilford should follow the drive and end at the intersection
of the relocated drive and the existing street. The crosswalks should be corrected to cross at appropriate
perpendicular aligrunent and connect with the existing sidev,'a!k on thc cast side of Guilford.
Right of Way Dedication
15. The school was requested to dedicate right of way along the south property line of Carmel Junior High School for
future street construction. This is not indicated on the plans submitted to our office. The Department of
Community Services has requested the dedication of 60-feet of right of way along. the south school property line.
Guilford Road Improvements
16. In order to appropriately accommodate both the current and post-development needs of traffic traveling along
Guilford Road, in addition to that traffic entering/exiting thc school, this department will require that certain road
improvements be made to Guilford Road_ At certain hours during morning arrivals and afternoon dismissal, the
heavy influx of traffic has a defmite impact on the efficiency ofthru-traffic and the neighboring drives and
residences. There is a need for a passing lanc for northbound traffic to be able to bypass the left-turn traffic
waiting to enter the many school entrances. CllITcntly, there exists a widened gravel shoulder that is utilized for
.,
'. .."
'. .,
Mr. William E. Payne, AIA
September 23, 2002
Page 3
this passing pmpose but v/a.s not intended to serve this purpose and is inadequate to be continued to be used as
such.
17. Therefore, the Engineering Department \\ill request the widening of Guil ford Road to accommodate the
following: northbound tbru-lane, northbound/southbound center left-turn lane, southbound thru-lane, southboWld
right-turn (acceVdecel) lane. This extra lane which will primarily be to the east can be found by using the majority
of the gravel shoulder width, and if needed, fmding the additional road width on the west side toward the schoo!.
This will help centralize the road within the right of way, and will help safely serve the school site and
neighboring properties.
Grading, Drainage
18. It is difficult to determine the limits/dimensions of the expanded portion of the building, thereby illustrating
changes to impervious surface on-site, Please show in light or dashed lines where the existing building boundaries
are on the overall site layout plan (Sheet G 1.1).
19. Show connecting storm sewers, all pipes, sizes, structure elevations (Sheet G2.2)
20. We have received drainage calculations. However, the City Engineer has not completed review of the
calculations. We reserve 1he opPortunity for further review and submission of comments regarding grading and
drainage upon full review of the calculations.
Utility Plan
21, Identify water pipe size and material.on SUI.l.
22. It appears the new water line extends across Guilford A venue, Is this the case? If so, what are the plans for
installation regarding Guilford Avenue? Open pavement cuts in dedicated streets require full justification as to
their necessity and separate Board of Public Works and Safety approval.
23. There is a new sanitary sewer connection to the concession building on SUl.2. Is this facility already connected
to city water?
Other Comments
24. Our standard asphalt pavement section for CollectorStreel~ (Guilford) is 1 Y;" liA. surface on 4" H.A. Binder on
9" stone base (Sheet G4.1, lA).
25. Any further plans on the potential removal of the sv.irnming pool?
Please share these comments with all persons to be associated with this project including the Owner/Devcloper,
Contractors, etc.
The above comments are based upon the Engineering D'epartment's initial review. Please provide our office with a
follow up letter and revised plans, indicating all revisions. Second and subsequent reviews will focus only on revised
items. It is critical that our office be :made aware of all modifications made on the plans being re-submitted,
particularly if any such changes are Considered "new".or fall outside of our initial review. If you have questions, please
contact Kate Weese, Mike McBride or me at 571-2441.
ro~
Dick l-Iill, Assistant Director
Department of Engineering
Enclosures
ec: M. Kate Weese, City Engineer (w/o encl.)
Mike McBride, Assistant City Engineer (WiD end)
Jon Dobosiewicz, Department of Community Services (w/o enc!.)
Laurencc Lillig, Department of Community Services (w/o encl.)
John Duffy, Carmel Utilities (w/o ene!.)
Rollin Farrand, Carmel Clay Schools
S:\PROJREVOl \CARMElJHS
U
[R~~anning/Howey
Associates, me.
Architects Engineers Consultants
u
July 28, 2003
~~--,-,
/ \\~LU-ZL " ",
/\ /" ", '-,
;;~> 4 ";..
.;;/ RECf\VED
\ . .~ JUL 29 2003
\;J\ DOCS
'(./\
\/~
""~- ;-..
'<.l;--,.
---...."--::>:-:.
,'.
,,:
,.t."
Jon Dobosiewicz
Planning and Zoning Administrator
Department of Community Services
City of Carmel
One Civic Square
Carmel, IN 46032
0'?J
-'\'
\ ,r'j,
13zA
/c' ~
Special Use Amendment and Developmental Standards Variance, SUA-160-02 and V-166-02
Re:
Addition and-Renovation ,to
Clay Junior High School
Carmel Clay Schools
Carmel, IN
Project No. 201103.00
Dear Mr. Dobosiewicz:
We are requesting a one-time, 6-month extension of these Approvals per Section 21.02.07 and
Section 30.05.05.
Sincerely,
~e~()
~ ~J, .'-
(N (J'f ~ d--();~
t ~ 27-0y
N..u..J I r=- '. -----------.~
.-IUyfl~'~- G I-Otj~
~----~)
lIin E. Farrand, Jr., RA, Carmel Clay Schools
t1l~J;~ -&YfU1)fi'!Y--, I'y~
d cu/f- ~awhjj
9025 North River Road, Suite 200 ., Indianapolis, Indiana 46240
(317) 848-0966 "'l Fax (317) 848-0843 "'l http://www.fbai.com
.'
~ ""-..
:.~f~~:0'-CI{1~:..,.,
:~~ .. \~ . , I ~) * Y,;
. . . .
. ,
: \ .' ,
':~~~?9~rG~'~:!:
u
City of Carmel
u
S~ftf3P;1/f~T OF ENGINEERING
/..'> .)-- "'''.>)~
" ,./' A. './ .'\
/ 'I T ..,/_~,
/~~' RECEIVED \j
, _!, 8EP 23 2002 t:)
,;;\ DOCS ::- ;'
Mr. William E. Payne, AIA \'..) /{' ,
FanningIHowey Associales,fuc./'~, ~/(..)
9025 North River Road, Suite 200(:':n--roo- /\ ~/.;\/
Indianapolis, IN 46240 ':"'~~.,_Y
September 23, 2002
RE: Carmel Junior High School Addition and Renovation-Project Review #1
Dear Mr. Payne:
We apologize for the delay in responding to the plans submitted for TAC. review. We have now reviewed the
drawings submitted for this project and offer the following comments:
GENERAL INFORMATION
]. The project site is located within current City of Cannel Corporate Limits.
2. Jurisdictions:
o Street and Right of Way - City of Carmel.
o Water, Sanitary Sewer, Stonn Sewer - City of Cannel.
3. Board of Public Works and Safety Approval Requiremenls:
.. Water and Sanitary Sewer Availability.
o Commercial Curb Cut. It appears the existing curb cuts will be modified. 'Illis will require approval by our
Board of Public Works and Safety. Please provide an exhibit that shows thelocation of the curb euts and
acceUdecellanes ifapplicable; appropriate dimensions including drive width, overall width at the street,
acceUdecel dimensions, radii, etc.; and location of existing opposing curb cuts, if applicable. The exhibil
should be 8 Yo x II ot of a size that can be reduced to 8 Yo x II such as 8 Y, x 14 or 1 1 x l7. Please show all
existing drive locations on the exhibit using dashed or lighter lines,
. Temporary Construction Entrance. Same requirements as for the Commercial Curb Cut.
. Consent to Encroach Agreements for any permanent improvement to be installed within dedicated right of
way andJor dedicated easements. If an irrigation system is plarmed for this project, additional Water and
Sewer Availability approval will be required from the Board.
I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use.
Please use the Engineering Department deadlines for submissions to the Board.
Any submission to the Board requires prior filtal approml by the Carmel Clay Plait COlfmUsswn lUuVor the
Board of Zoning Appeals and completion of review by the 1'ec1",kaL Advisory COffl11ljJjee. All writtell requests
to be place Olt the Board's agenda must include the appropriate Docket Numbers alld the date (or dates) of
approval by the Pum COl1mUssion and/or HZA.
4. Water and Sanitary Connection Fees:
Since there is a building addition, this project Illay be subject to additional water and sanitary sewer
COlmection Fees. Cannel Utilities ",ill be responsible for this cletcnnination.
5. TAC ReviewlDra"\"ings submitted for approval:
We request that all comments and conmlent letters genera led by this oflice be answered in writing and be
accompanied hy a dra\\ing reflecting reqllested revisions. Final dra\\~ngs \\~1l not be approved for construction
until all issues have been resolved. All Cannel Utility issues musl also re resolved. The design engineer must
certify all drawings submitted for final approv(\1. This office ",ill require five-sets of approved dmwings after all
issues have been resolved. The drawings will be stamped approved and signed by both the City Engineer and
Director of Cannel Utilities. The Developer/Owner \\~J1 receive one-set which is to be maintained on the
construction site at all times. Cannel Utilities "ill receive two-sets. Our Public Works Inspector \vill receive one-
set and one-set will be maintained in the Department of Engineering. lfmore than five-sets are requested to be
approved, the additIOnal sets must be submitted with the five required sets.
ONE CIVIC SQUARE CARMEL, IND1ANA 46032 317/571-2441
I .
u
u
Mr. William E. Payne, AlA
September 23, 2002
Page 2
6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way and/or
dedicated casements will require a Consent to Encroach Agreement between the ~ller/Developer and the City of
Carmel. This Agreement requires Board of Public Works and Safety approval.
7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main llild
smlitary sewer main locations.
8. Carmel Utilities ....i11 provide a separate review of this project for water and sanitary sewer issues.
9. 1 anl including copies of the follomng with this correspondence:
. Board of Public Works Meeting Dates and Deadlines
o Commercial Project Approval Procedures
o Perfonnance Release Procedure.
o Pennit Data, Contacts, etc.
. Conunercial pennitting Procedures.
I will send a copy of our Residential Subdivision and Conunereiallrrigation System Requirements upon request
BONDING REQUIREMENTS
10. If the new water mains and sanitary sewer mains to be installed with this project will be dedicated mains, the
[ollowing bonding requirements \\ill apply to this project
Performance Guarantees
. Water Mains
. Sanitary Sewers
Additionally, the following will require a Perfornlance Guarantee:
. Sidewalk in right of way.
. Guilford Road Improvements
Please provide individual, detailed certified Engineers Estimates for 100% of the cost of labor and materials for
the above improvements. Post-individual Perfonmmce Guarantees in the amount of the Engineer's Estimates.
Three-year Maintenance Guamntecs wil1 be required upon release of the Pcrfonnance Guarantees.
Street CulJRight of Way Permit <lnd Bonding Requirements
Any work in dedicated right of way will require a Street Cut/Right of Way Pennit and a License and Permit Bond.
The bond amount will be dctcnnined by the nnnlber of instances of work in the right of way (curb cut, storm
sewer work, etc.) @ $2,000.00 perinstanee. At a minimum, the bond amount would be $6,000.00 based upon the
work in the right of way for the curb cuts. Additional work such as water, sanitary sewer, storm sewer work in the
right of way would be additional at $2,000.00 per instance. Ifany of the work planned in the right of way is to be
covered by Perfornlance Guardlltees, right of way pennits and bonds would not be required for that work.
.\
PROJECT COMMENTS
Street. Sidewalk, Right of Way Issues
II. Dimension and identify all right of way lines on all sheets that include Guilford Avenue.
12. Identify all dedicated streets intersecting with Guilford Avenue on the east side of Guilford on all appropriate
sheets as was done on Sheet G 1.2 and G 1.4.
13. It is difficult to detemline new paving to be done in the right of way andlor Guilford Avenue. Please clarify
existing and proposed pavement edges shown on the plans.
14. The sidewalk along the sonthem drive that e>.1ends to Guilford should follow the drive and end at the intersection
of the relocated drive and the existing street The cross\.valks should be corrected to cross at appropriate
perpendicular alignment and COlUlect with the existing sidewalk on the cast side of Guilford.
Right of Way Dedication
15. The school was requested to dedicate right of way along the south propc!1y line of Carnlel Junior High School for
future street construction. TIlls is not indicated on the plans submitted to our office. The Department of
Community Services has requested the dedication of 60-feet of right of way along the south school property line.
Guilford Road Improvements
16. In order to appropriately accommodate both the current and post-development needs oftraffic traveling along
Guilford Road, in addition to that traffic entering/exiting the school, this department ",ill require that certain road
improvements be made to Guilford Road. At cerroin hours during moming arrivals and afternoon dismissal, the
heavy influx of traffic has a definite impact on the effieicncy of thm-traffic and the neighboring drives and
residences. There is a need [or a passing lane for northbound trafTlc to be able to bypass the lefl-tuTIl tramc
waiting to enter thc m<UlY school entrances. Currently, there exists a \\idcned gravel shoulder that is utilized for
"'. '
u
(0
Mr. William E. Payne, AIA
September 23,2002
Page 3
this passing purpose but was not intended to serve this pUJ1Xlse and is inadequate to be continued to be lL.~d as
such.
17. Therefore, the Engineering Department will request the widening of Guilford Road to accommodate the
following: northbound thru-Iane, norilibouncVsouthbotmd center left-tum lane, southbound thru-lane, southbound
right-turn (acceVdccel) lane. This extra lane ..hich will primarily be to the east can be found by using the majority
of the gravel shoulder v.idth, and if needed, fmding the additional road width on the west side toward tile school.
This will help centmlize the road within the right of way, and ",ill help safely serve the school site and
neighboring properties.
Grading. Drainage
18. It is difficult to detennine the limits/dimensions of the exnanded portion of the building, thereby illustrating
changes to impervious surface on-site. Please show in light or dashed lines where the existing building boundaries
are on the overall site layout plan (Sheet G 1.1 ).
19. Show connecting storm sewers, all pipes, sizes, structure elevations (Sheet G2.2)
20. We have received drainage calculations. However, the City Engineer has not completed review of the
calculations. We reserve the opportunity for further review and submission of comments regarding grading and
drainage upon full review of the calculations.
Utility Plan
21. Identify water pipe size and material on SUI. 1.
22. It appears the new water line extends across Guilford A venue. Is this the case? If so, what are the plans for
installation regarding Guilford Avenue? Open pavement cuts in dedicated streets require full justification as to
their necessity and separate Board of Public Works and Safety approval.
23. There is a new sanitary sewer connection to the concession building on SUl.2. Is this facility already connected
to city water?
Other Comments
24 Our standard asphalt pavement section for Collector Streets (Guilford) is I y;" HA. surface on 4" H.A Binder on
9" stone base (Sheet G4.1, IA).
25. Any further plans on the potential removal of the sINimming pool?
Please share lhese comments with all persons to be associated with this project including the OwnerlDeveloper,
Contractors, etc.
The above comments are based upon the Engineering Department's initial review. Please provide our office v.ith a
follow up letter and revised plans, indicating all revisions. Second and subsequent reviews will focus only on revised
items. It is critical that our office be made aware of all modifications made on the plans being re-submitted,
particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, please
contact Kate Weese, Mike MeBridc or me at 571-2441.
\
~
Dick Hill, Assistant Director
Department of Engineering
Enclosures
cc: M. Kate Weese, City Engineer (w/o encl.)
Mike McBride, Assistant City Engineer (w/o encl.)
Jon Dobosiewicz, Department of Community Services (w/o encl.)
Laurence Lillig, Department of Co nun unity Services (\v/o encl.)
John Duffy, Carmel Utilities (w/o cnel)
Rollin Farrand, Camle] Clay Schools
SWROJREVOl\CARMEUHS
Lillig, Laurence M
u
u
--,~- -~ .~.-
From:
Sent:
To:
Cc:
Subject:
Dobosiewicz, Jon C /" .
Friday, September 13, 2002 9:53 AM': .
Hill, Dick B .~.
Lillig, Laurence M; Hollibaugh, Mik~,P
RE: Carmel JHS i'~-,
", \ -"-' -~-~ / "
~ tlJ
~tG\~ 1~~7.
~t? \{0JJ~
,'.
\,
\ - -
, .
/' 4
,i:. '
Dick,
/ '
<... /
.,/" .
I will leave that call up to you. It does not make sense to me that there'w()Uld-I;~'\fnultiple passing blisters in proximity to
the offset intersections along that stretch of Guilford It would be nice to have a three lane segment with middle turn lane
but I'm not sure how Kate feels about that.
On Clay JHS I do not agree with their logic. That being that people are used to doing it "that way", I would like to see
dedicated turn lanes, passing blister, etc. The middle design with the in and out crossing makes no sense and I think that
FH knows that but they are seeking what their client "wants". I say we stand on the issue and get them to do what is right.
This will be our only opportunity to have them make the necessary improvements to access at this location. Like they said
at T AC there has not been significant changes at this location in 25 years. Why they think revisiting access at this time
should not be an issue I can just can't figure out.
Both of these petitions will be in front of the BZA on Sept 23. To date J am not aware of revisions to the plans that DOCS
recommended at TAC (similar to what I stated above). As it was with Forest Dale we will end up getting bad PR by making
them spend more money than they want but we need to get the appropriate improvements to make it safe. These guys
need to know that we do not have an interest in cutting them any slack because they are the "school district" especially
when it comes to public safety as it relates to access on our public streets. If anything, they should want to be an example
of the best way to do things within the community.
Thanks,
Jon
-----Original Message-un
From: Hill, Dick B
Sent: Friday, September 13, 20029:18 AM
To: Dobosiewicz, Jon C
Subject: Carmel JHS
Jon-Refresh my memory from TAC. Was it your desire to have another northbound lane constructed on Guilford, in
place of the gravel shoulder, or just passing blisters at appropriate locations?
Also, give me a quick update regarding your concerns on the traffic issues at Clay JHS.
u
u
~~3~
.., Fa.n.nll1g;tIowey
U Associates, me.
1\rchitects Engineers Consultants
T
R
A
N
s
M
T
T
A
L
To:
Laurence M. Lillig, Jr.
Planning Administrator
Board of Zoning Appeals
Department of Community Services
City of Carmel
One Civic Square
Carmel, In 46032
William E. Payne, AlA WYi..
Owner -I n-Charge/PrinciP~r
Date:
September 13, 2002
~.~ "
...~
~~S-~':"
&S
'\S
Project:
Addition and Renovation to
Carmel Junior High School
Carmel Clay Schools
Carmel, Indiana
Project No. 201104.00
From:
NO. OF COPIES DESCRIPTION OF ITEMS
8 Special Use Permit SUA-154-02 Board Member P.ackets
8 Developmental Standards Variance V-155-02 Through V-159-02 Board Member
Packets
1 Proof of Publications, Proof of Adjacent Properties Owners Notice, and Completed
Petitioners Affidavit of Notice of Public Hearing
Sent via: 0 Mail
D Fax
D Overnight
D UPS
[g) Hand Deliver
D Pickup
COMMENTS:
WEP/jkc
c: Rollin E. Farrand, Jr., RA, Director of Facilities and Transportation, Carmel Clay Schools
9025 North lliver Road, Suite 200"\ Indianapolis, Indiana 46240
(317) 848-0966 'I Fax (317) 848-0843 "! http://www.fhai.com
\
~
U
~[JfFanning;t-Iowey
U ~u~ Associates, me.
Architects Engineers Consultants
u
T
R
A
N
s
M
T
T
A
/~~~>;.,
l:;~ Rrf\/"~ . -:\
g A 11,'1 i,'I-//It'D
. .u() 27 rC
~. /'1~~
~~ UOCS -'-
~~~QI>.
To:
From:
Laurence Lillig
Carmel Department of Community Services
One Civic Square
Carmel, IN 46032 .
William E. Payne, AlA li~-
. Owner-I n-Charge/Prin~t)
Date:
August 27, 2002
Project:
Addition and Renovation to
Carmel Junior High School
Carmel Clay Schools
Carmel, Indiana
Project No. 201104.00
NO. OF COPIES
DESCRIPTION OF ITEMS
1
Drawing Sheet A3.1, Dated August 6, 2002
Sent via: D Mail
o Fax
D Overnight
D UPS
IZl Hand Deliver
D Pickup
COMMENTS:
Elevations with main building wall sign area and main exit numbers indicated.
WEP/ejr
9025 N01th River Road, Suite 200 '1 Indianapolis, Indiana 46240
(317) 848-0966 ~ Fax (317) 848-0843 '1 http://www.tnai.com
AUG 22 ' 02 11 : 46AM
P.1/1
u
(.J ''y /
..~,.._,) ,"1. 'I"'_'~
~.:. 1-.. ........ . .,.r" II"
0,;-: ... '--..."" "'-. - ()
C" v .., .--.-
o -
Xelltol1 C. '1f)ord, Sutveyor
1"Pliall~ (J,t;,,) 7?t;"~495
''17/1),' (j II') 7;,ti-~,{.;;!/?
Suift, I ,I(<~
Orlc .~{amiltol/ CmlJlty Sllltllrf
.;N(JbI~'<l'illc, !mIlQII1/ 4-6"60-22JO
August n. 2002
4~
/ \-1'- . ""':./ >
/"-. "\, / ~
;(> ' ,~. Vl'<'~'
/~., 'Rr ~'V,: .' ~~)
(,-, (,6'(~: c- m
: ~v,..'" G.J -
" s:s i-f
'\- - <::);........ I
\ lvl
,.,', "f"<~"/
"-"I---~'\ \ 'u/
._~--'::J~\/"'
Fanning/Howey Associates, Inc.
Ann; Mr. William E. Payne, AlA
9025 North River Road, Suite 200
Indianapolis. IN 46240
VIA F ACSIMTLE: 317 -848-0843
Re: Carmel Junior High School (300 South Gilford Road)
Dear Mr. Payne:
We have reviewed the site constnlction plan$, $ubmitted to the Hamilton County Sur.reyot's office on
August S, 2002, We have the following comments:
I. Little Cool creek is not a count)' regulated drain at this locati!l!1. Th$~ are no pennits required from the
Hamilton County SurVtwor'$ office for tllis deveIQPID,:nt.
2. Please provide our office a copy of your drainage calculations.
Sh(ll]]d. you have any questions please contact me at 776-8495. Thank you.
Sincerely, ~.
(~ ..'-fJ II,
f /1IVy\..;>!-, J ltL,r.A.Vj)
enny MilaM
Plan Reviewer
Cc: City of Cannel. Engineer
Cio/ of Carmel-Department of Community Services
Hamilton County Departmel1t of Soil Conservation Services
Hamilton County Highway Department
u
u
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL,.INDIANA 46032
~II""""-'~
./ y~tJ-l"7157;1'7:Z.600
"", \ ~" :>-..
tt .~~
.~~t\)~ (~\
8 ~~ - ~ (.. \
William E. Payne, AlA ,,~\\ :-'"
Fanning/Howey AssocfateS\-18,c. ~~ 'Jr;:Jv'S ~
9025 North River Road, Suit~2..o0
Indianapolis, IN 46240
RE: Carmel Junior High School AdditionfRenovation
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Carmel Junior High School Addition/Renovation
and has approved the plans subject to the following:
1. After review of this project the fire hydrant along the south side of the building at Ihe west end is
not shown as being relocated. Our department would like this hydrant relocated in the grassy
area at the southwest corner of the building.
2.
3.
4.
5.
6.
Please respond 10 the above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project
Date: Auqust 13. 2002
By: Gary Hoyt, Fire Marshal
Carmel Fire Department
Fire Prevention Saves Lives and Property
Page 2 of 2
Technical Advisory Committee Agenda
August 21, 2002
11'10Hm
Vr(10 ~ m
11'':;;0 11 m
"'-
Filed by Becky Feigh ofBSA Design for 81. Vincent Hospital and Health Care
Center, Inc.
Carmel Clay Historical Society (Use Variance Development Plan)
The applicant seeks approval to construct an additional structure. The site is
located at 211 First Street Southwest. The site is zoned R-2/Residence within the
Old Town Overlay Zone.
Filed by Balay Architects for the Carmel Clay Historical Society.
Carmel Junior High School (Special Use Construction Plans)
The applicant seeks approval of additions and renovations to an existing school
facility. The site is located at 300 South Guilford Road. The site is zoned R-
l/Residence.
Filed by Jeff Bolinger of Fanning /Howey Associates for Carmel/Clay Schools.
~G
~
Clay Junior Higb School (Special Use Construction Plans)
The applicant seeks approva1 of additions and renovations to an e. xisting school ~
facili~. The site is lo~ated at 5150 East 1261b Street. The site is zoned s~ J 1'\ .
l/Resldence - Low DensIty. fL)
Filed by Jeff Bolinger of Fanning/FIowey Associates for Carmel/Clay Schools.
,~~!::~:~::' :",.f ~ci1i1;e'
..~.sS!J "l" r~' ~)jt:Cl
'-.' .i. ._^t:..~~ 0' .
'::O'l.j/l. ..' .._.._....~--_. I) 'OJ 3 ,1'
. - -'--"-::-~,k_
Date
Page 1 of2
rt.":.
".
j'l
CARMEL/CLAY TECHNICAL ADVISORY COMMITTEE
AGENDA
" -/r
Date: August 21, 2002
Place: Department of Community Services Conference Room
3rd Floor - Carmel City HaD
9'00 a m.
~y
Q-?O a m
c)-40 ~ m
10'00::1 nL
)0.?0 <l m
)0'40 ~ m
'-
,f'Docket No. 108-02 SP; West Carmel Center, Block B, Lots 1 & 2
(Secondary Plat)
The applicant seeks approval of a Secondary Plat for a 2-lot subdivision. The site
is located on the southeast comer of Commerce Drive and West 106th Street. The
site is zoned B-5/Business and is subject to the US 421 Overlay requirements.
Filed by Paul G. Reis of Drewry Simmons Pitts & Vomehm for West l06th
Properties. LLC.
Meridian Corners Professional Building #1 (Development Plan)
The applicant seeks development plan approval to construct an office building.
The site is located at the southeast corner of Meridian Corners Boulevard and
Shakarnac Drive. The site is zoned B-5/Business.
Filed by Milce DeBoy of Mid States Engineering for Thornberry Investment, LLC.
Aberdeen Bend (Secondary Plat and Construction Plans)
The applicant seeks Secondary Plat approval to plat 26 lots on 24.23::l: acres. The
site is located on the north side of West 131 st Street, V:z mile west of Towne Road.
The site is zoned S-lIResidence - Estate.
Filed by Doug Corey of Mid-States Engineering for the Jones Company.
LaurelwoodlHendersoD Maintenance Building (Site Construction Plans)
The applicant seeks to construct a maintenance building within the Floodway. The
site is located at 10211 Ditch Road, Y4 mile south of 1061h Street. The site is
zoned S-l/Residence - Very Low Density.
Filed by R J. Klein & Associates for Richard Henderson.
Evangelical Baptist Mission (Use Variance Development Plans)
The applicant seeks development plan approval to construct an office building.
The site is located on the east side of Shelbome Road. 1/S mile north of West 96th
Street. The site is zoned R-l/Residence.
Filed by Charles D. Frankenberger of Nelson & Frankenberger for the Evangelical
Baptist Missions.
Carmel Ambulatory Surgery Center & Endo Center (Development Plan)
The applicant seeks construction plan approval for a medical office building. The
site is located at 13421 Old Meridian Street.
Page 1 of 2
(:,-~~ i;.~'
:'-i,;;l~} ~rlC' CO!,;",I
~~J;'GiJ;'SC.'Xlc~/_~_
'7
oF-
Df-
~
~
cr-
u
u
\ . ~"'-~. .t ':-;' ~...:: : . .- '=, ~'l;.' ~;.J. ';"/~'1;1 "'~"'~ . .:r' . =l -'::tz
,'. G.";OF1:0mlMEL!'~" ..::; . :'..:,
. <;'. '., - " '. I < ",
,.'j'~~rtmii~ ~~CP~~LJ~~ s~~ic~$ ilc":
:-...':rp:;::"''-;/~1'_~,.':J- . j"~~' s;.~.~i">:~~~ :"Tf~~~' .~:::... :.'J-/,-:.: ~l}. '~ ',' ::L~'",;r '-.),1" :1,
One Civic SC!uare
Carmel, IN 4em2
{:317} 571.2417
Fax: (317) 571-2426
Fax:
Pages:
JyCrL
,
1.3
1"'/01. -O~
To~
Jl'~ &~~~~
?-Y/'- tJli't3V
From:
Phone~
Date:
Re: -;?:4e... A9t1/JcM CC~
o Urgent 0 For Review D Please Comment 0 Please Reply
o Please Recycle
{1r/7l~/ Jt./,,~~F" 1I'(.ji ~d'~/
(' 5p<z:C/~/ ()JI2 a"J/wch;'/J ;.a;b/,\..r)
08/09/02 08:48 FAX
HAMILTON CO HWY. ~~~ Carmel DoeD
141 0011001
u
u
HAMILTON COUNTY
HIGHWAY DEPARTMENT
RE: Carmel Clay Schools
5150 Easl126th Street
300 South Guilford Road
Construction Plans
Clay Township
August 9, 2002
Mr. William E. Payne
Fanning/Howey Associates, Inc.
9025 North River Roael, Suite 200
Indianapo~is, Indiana 46240
Dear Mr. Payne;
This letter serves to acknowledge receipt of a transmittal received 08108/02 containing the plans
for the above-mentioned projects. After reviewing the plans the Highway Department has the
following comments:
1. It appears that both projects are located within the limits of the City of Carmel. Therefore, all
future comments should be directed toward the City. If you have any information contrary to
this statement, please contact me immediately.
If you nave any questions or comments concerning this letter, please feel free to contact me at
anytime.
Sincerely,
i:.i!!=--
Staff Engineer
cc: Jon Dobosiewicz
Steve Cash
G:\USE RS\SB\02T AC\08-08-02carme Ischools.doc
1700 South 10'" Street
NoblesviUe, In. 46060
www.co.hamilton-in.us
Office (317) 773-7770
Fax (317) 776-9814
u U
[F8~anning;Howey REi ~
41/8 Ct;vro
Associates, me. 1Jo~ ltJo?
Architects Engineers Consultants
T R A N S M T T A L
To: Laurence M. Lillig, Jr.
Planning Administrator
Board of Zoning Appeals
Department of Community Services
City of Carmer
One Civic Square
Carmel, In 46032
Date: August 9, 2002
From: William E. Payne, AI
Owner-ln-Charge/Prin I
Project: Addition and Renovation to
Carmel Junior High School
Carmel Clay Schools
Carmel, Indiana
Project No. 201104.00
NO. OF COPIES
DESCRIPTION OF ITEMS
2
2
Special Use Application
Developmental Standards Variance Application
Sent via: 0 Mail
o Fax
o Overnight
o UPS
[g] Hand Deliver
D Pickup
COMMENTS:
Drawings required for this submission were previously forwarded under separate cover.
WEP/sal
c: Rollin E. Farrand, Jr., RA, Director of Facilities and Transportation, Carmel Clay Schools
9025 North River Road, Suite 200 'I Indianapolis, Indiana 46240
(317) 848-0966' Fax (317) 848-0843 'I htlP://Www.fll3i.com
.-/
r
U
~qrpanningJtIowey
U~LJ~ Associates} me.
Architects Engineers Consultants
u
T
R
A
N
s
M
T
T
A
L
~ '~-=~
'I:b.\ 11.f;.'iiJ{A,
\C ......<.:. .,~
~'\ " ,~"':Z.i'~~
~ ...ze1 v:>,
. i/i)/p ~<!llll ''f''j''
';/;/;-ClilltJ '~, ",
~ 3 "=">1
tJ.,' ltlOl ~:,~
- Van ~
.., I. .
i~
'..
To:
Laurence M. Lillig, Jr.
Planning Administrator
Board of Zoning Appeals
Department of Community Services
City of Carmel
One Civic Square
Carmel, In 46032
Date: August 9, 2002
From: William E. Payne, AI~M ~ Carmel, Indiana
Owner-ln-Charge/Prin I Project No. 201104.00
l
.....
NO. OF COPIES DESCRIPTION OF ITEMS
2 Special Use Application
2 Developmental Standards Variance Application
Project: Addition and Renovation to
Carmel Junior High School
Carmel Clay Schools
Sent via: 0 Mail
D Fax
D Overnight
D UPS
[Z] Hand Deliver
o Pickup
COMMENTS:
Drawings required for this submission were previously forwarded under separate cover.
WEP/sal
c: Rollin E. Farrand, Jr., RA, Director of Facilities and Transportation, Carmel Clay Schools
9025 North River Road, Suite 200'" [ndianapolis, lndiana 46240
(317) 848-0966 'I Fax (317) 848-0843 "II http://www.thai.com
u
u
D~[JrpanningIHowey
cJlS AssoClatesi ID.c.
Architects Engineers Consultants
~
RECEIVED
fI'
;J
Dore:;
T
R
A
N
s
M
T
T
A
L
From:
Laurence Lillig
Carmel Department of Community Services
One Civic Square
Carmel, IN 46032
William E. Payne, AlA V1l.
owner-In-Charge/prin~
Date:
August 6, 2002
To:
Project:
Addition and Renovation to
Carmel Junior High School
Carmel Clay Sch~ools
Carmel, Indiana
Project No. 201104.00
NO. OF COPIES DESCRIPTION OF ITEMS
2 Drawing Set Dated August 6, 2002
2 Drawing Index
2 Lighting Specification Sheets
Sent via: D Mail
D Fax
o Overnight
IZJ UPS
')3( Hand Deliver
o Pickup
COMMENTS:
This Project for Carmel Clay Schools includes additions of approximately 26,847 square feet and a
renovation of existing facilities, for a total of 245,278 square feet. Site work includes reconstruction of the
tennis courts and pavement, sidewalk, and landscaping improvements. A Special Use Application for a
school building in a R-1 residential district and developmental, and standard variances applications for
building height and for signage, are being made to the Board of Zoning Appeals.