Loading...
HomeMy WebLinkAboutCorrespondence Conn, Angelina V From: Sent: To: Cc: Hill, Dick B Thursday, January 10, 20083:02 PM Duncan, Gary R; 'O'Toole, Daniel' Chastain, Jenny A; Conn, Angelina V; Foley, Amanda J; Glaser, Fred J; McBride, Mike T; Redden, Nick; Duffy, John M RE: 1D3rd Medical Office Building Subject: Water Availability (acreage) and Connection Fees will be due for this phase. BPWS approval for Water Availability (EOD) has not been granted. Connection Fees would be based upon square footage. If the building is 41,000 sq. ft. as indicated on the drawing, the calculation would be 41.000 sq. ft. @ 0.5 EOUs/Ioo0 sq. ft. ~ 20.5 EODs @ $.1,396. aO/EDU ~ $26,618.00. In order to calculate Water Availability (acreage) fees, we will need a le.gal description for the southern half of the property, basically south from a line extended from property line to property line and aligned with the outside of the south wall of the existing building. If there are questions regarding these fees, the engineer or developer should contact John Duffy of Carmel Utilities. -----Original Message----- From: Duncan, Gary R Sent: Thursday, January 10, 2008 2:45 PM To: 'O'Toole, Daniel' Cc: Chastain, Jenny A; Conn, Angelina V; Foley, Amanda J; Glaser, Fred J; Hill, Dick B; McBride, Mike T; Redden, Nick Subject: 103rd Medical Office Building DJ, I have reviewed status of the project based on our conversation today. 1. Drainage Approval was obtained on December 27, 2007. 2. Amanda is prepared to approve the Storm Water Management permit 3. Provided the Utility Department has no requirements for seeking approval for additional availability, the only BPW approval is dedication of right-of-way. While typically required prior to release of construction drawings, Engineering would be willing to allow formal Right-of-Way dedication to be a condition of rough-in inspection or the final Certificate of Occupancy provided that Kite indicates that they agree to this condition in writing or via email. 4. Performance Bonds are only needed for path construction in the right-of-way and Erosion and Sediment Control and any Storm Water Quality Measures. I suggest a certified estimate be prepared by EMH&T and bonds equal to 100% of this value be provided. Please provide an estimated time for delivery of these bonds. If these bonds are not able to be delivered until after the desired start of construction, we can place a hold on a rough-in inspection if not delivered by that date. 5. Based on our conversation today, Items 44, 45, 46, 48, 49, 52, 54, 55, 57, 61, 62, 64, 69, 72, 73, 74, 75, 77, 79, 80 need to be incorporated into the drawings. I will review when plans are re-submitted. I can sit down with EMH&T to review point by point if needed. 6. As we discussed, unless Kite is entirely against the request per Item 83, I will contact DOCS to ask about how best to proceed with this issue, I am certain that we could find the support needed for a variance of the parking count versus the location of the path and make obtaining this variance as easy as possible as well as allowing the project to move forward without having this variance obtained. 7. Items 59, 60, 63, 65, 66, 68, 70, 71, 76, 78, 84 require clarification and hopefully no plan edits. Email response followed by a formal written response is acceptable. 8. Items 50 and 67 will not be applicable if there are no swales proposed. 9. Items 38, 39, 40, 41, 42, 43, 47, 51, 53, 56, 58, 81, 82 no longer appear to be applicable. 10. If the Utility Department indicates that no additional fees are required, then the comments related to these fees will be satisfied. 11. The contractor needs to come in as soon as possible to complete the right-of-way permit. A $2,000 bond will be required. This can typically be turned in around in the same day or the day after the permit paperwork is submitted. The document is available on the Engineering web site. With all that said, here is how we should proceed: 1 Conn, Angelina V From: Sent: To: Cc: Duncan, Gary R Thursday, January 10, 2008 2:45 PM 'O'Toole, Daniel' Chastain, Jenny A; Conn, Angelina V; Foley, Amanda J; Glaser, Fred J; Hill, Dick B; McBride, Mike T; Redden, Nick 103rd Medical Office Building Subject: DJ, I have reviewed status of the project based on our conversation today. I. Drainage Approval was obtained on December 27, 2007. 2. Amanda is prepared to approve the Storm Water Management permit 3. Provided the Utility Department has no requirements for seeking approval for additional availability, the only BPW approval is dedication of right-Of-way. while typically required prior to release of construction drawings, Engineering would be willing to allow formal Right-of-Way dedication to be a condition of rough-in inspection or the final Certificate of Occupancy provided that Kite indicates that they agree to this condition in writing or via email. 4. Performance Bonds are only needed for path construction in the right-Of-way and Erosion and Sediment Control and any Storm Water Quality Measures. I suggest a certified estimate be prepared by EMH&T and bonds equal to 100% of this value be provided. Please provide an estimated time for delivery of these bonds. If these bonds are not able to be delivered until after the desired start of construction, we can place a hold on a rough-in inspection if not delivereq by that date. 5. Based on our conversation today, Items 44, 45, 46, 48, 49, 52, 54, 55, 57, 61, 62, 64, 69, 72, 73, 74, 75, 77, 79, 80 ne'ed to be incorporated into the drawings. I will review when plans are re-submitted. I can sit down with EMH&T to review point by point if needed. 6. As we discussed, unless Kite is entirely against the request per Item 83, I will contact DOCS to ask about how best to proceed with this issue. I am certain that we could find the support needed for a variance of the parking count versus the location of the path and make obtaining this variance as easy as possible as well as allowing the project to move forward without having this variance obtained. 7. Items 59, 60, 63, 65, 66, 68, 70, 71, 76, 78, 84 require clarification and hopefully no plan edits. Email response followed by a formal written response is acceptable. 8. Items 50 and 67 will not be applicable if there are no swales proposed. 9. Items 38, 39, 40, 41, 42, 43, 47, 51, 53, 56, 58, 81, 82 no longer appear to be applicable. 10. If the Utility Department indicates that no additional fees are required, then the comments related to these fees will be satisfied. 11. The contractor needs to come in as soon as possible to complete the right-ot-way permit. A $2,000 bond will be required. This can typically be turned in around in the same day or the day after the permit paperwork is submitted. The document is available on the Engineering web site. With all that said, here is how we should proceed: 1. Revise the drawings as quickly as possible and submit for re-review. I will commit to reviewing these the same day they are submitted. If the platis are found to be in order, the Department will issue the Storm Water Management permit so that the Nor may be submitted IDEM. Earth disturbing activity could then take place within 48-hours I believe. 2. Make any edits to the right-Of-way dedication documents if, per Item 6 above, Kite does not oppose dedicating the additional right-Of-way to shift the path away from the road and submit these documents so that these may be presented at the first meeting in February. Engineering would be willing to allow formal Right-of-Way dedication to be a condition of rough-in inspection or the final Certificate of Occupancy provided that Kite indicates that they agree to this condition in writing or via email. This will allow construction to start of having this formalized with the BPW. 3. Provide the Performance Bonds or an estimated time to deliver the bonds. Engineering would be willing to allow provision of these bonds to be a condition of rough-in inspection in the event that these bonds are not able to be delivered until after the desired start of construction, provided that Kite indicates that they agree to this condition in writing or via email. This will allow construction to start without having these bonds. 4. I will contact DOCS concerning the path/parking space issue to see if construction can start while this is being resolved. 1 EL .. ,... .-'~f""""'""-- "~\ I;>), ~f I\... . ~I -- CL/,t ..;,~ ^ ,." 'I _' ~ .,. ~_ _ /.\,~ / . . -. 'Vc". REC8VED "- \~_ '. 1~ J Jf;.N 1 0 2008 DOCS January 3, 2008 ]A1VIES BRA.1NARD, MAYOR \ \ " '\ Mr. Daniel J. O'Toole, P.E. EMH&T 7400 North Shadeland Avenue, Suite 150 Indianapolis, IN 46250 '. RE: I03rd Street Medical Building Expansion, Phase 2-Project Review #1 Dear Mr. O'Toole: The City has received your construction plans submitted for review at the October 17, 2007 Teclmical Advisory Committee meeting. We offer the following comments: GENERAL INFORMA nON I. These comments represent the Department of Engineering's frrst review of the construction plans for this project. We reserve the right to provide additional review comments as the project moves forward. 2. We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 3. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notifY us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. If you have not already done so, please provide a set of drainage plans and calculations to their office for review. We will share Crossroad's comments as they are received. 5. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off-site easements necessary to install utilities to serve the development are secured. e. Fees have been paid. f. Digital file submissions have been made. 6. The Department reserves the right to provide additional comments based upon subsequent reviews. 7. An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. 8. An approved right-of-way permit is required prior to commencing any work in the public right-of-way. 9. If it will be necessary to relocate existing utilities, the cost for such relocations shall be borne by the developer. If utility poles must be relocated, they must be relocated to within one foot of the proposed right-of-way. 10. Compliance with the Thoroughfare Plan includes construction of the improvements prescribed by the Thoroughfare Plan across the frontage controlled by the development. This DEPAHTMENT OF ENGINEERING ONE CI'vlC SQUARE, C.<\.RMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@carmel.in.gov Mr. Daniel J. O'Toole January 3, 2008 RE: I03td Street Medical Building Expansion, Phase 2 Rev. #1 Page 2 of7 shall apply to the lUinois Street frontage. Typically, developers provide a commibnent equal to the value to construct these improvements for deposit into the City's non-reverting thoroughfare fund. Credit is typically given towards this commitment for construction of the improvements prescribed by the 20- Y ear Thoroughfare Plan and any milling and resurfacing of the perimeter streets. Since this is the second phase of a previously approved development plan, the Department is not requesting this commitment. I ] . The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 12. Jurisdictions: a. The project site is located within current City of Carmel Corporate Limits. b. Streets and Right of Way - City of Carmel (Illinois Street) c. Water - City of Carmel Utilities d. Sanitary Sewers - Clay Township Regional Waste District e. Storm SewerslDrainage - City of Carmel. f. Legal Drains - Hamilton County Surveyor's Office. 13. Drawings submitted for approval: a. The design engineer must certifY all drawings submitted for final approval. b. This office will require a minimum of 5 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Cannel Utilities. The Owner will receive I set which must be maintained on the construction site at all times. If additional approved sets are desired, we will approve a maximum of2 additional sets. However, the additional sets must be submitted with the required minimum 5 sets. 14. Cannel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Paul Pace Carmel Utilities Distribution 3450 West 13151 Street Westfield, IN 46074 15. Cannel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 16. We will provide you with digital versions of the following information upon request. Please share these requirements with the developer and future contractors associated with the project: a. Project Approval Checklist b. PerformancelMaintenance Guarantee Requirements c. PerformancelMaintenance Guarantee Release Procedure d. Engineering Requirements for Building Permit Approval e. Commercial Permitting Procedures fUtility JurisdictionslRight of Way Permit g. Water and Sanitary Sewer Fees BOARD OF PUBLIC WORKS AND SAFETY 17. J am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. ] 8. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals (if applicable) and completion of Mr. Daniel J. O'Toole January 3, 2008 RE: 103rd Street Medical Building Expansion, Phase 2 Rev. #1 Page 3 of7 review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or tbe Board of Zoning Appeals (if applicable). 19. Water Availability (EDU) approval from the Board is based upon the usage ofthe proposed building within the development. Reference item #34-37 below for a more detailed explanation. Iran irrigation system is planned for this development, approval for additional Water Availability must be obtained from the Board. 20. Commercial Curb Cut Approval- This approval will require a written request from the developer or the developer's engineer for each curb cut. The request must include 8'i2 x II exhibits of the curb cut or cuts with all pertinent data included such as radii, width, opposing existing curb cuts, etc. If there are no changes planned for the southernmost existing entrance, Board curb cut approval is not required. However, the proposed median cut will require Board approval. 21. Temporary Construction Entrance approval if the location is at a site other than the location of the proposed permanent entrance to the development. 22. The instaJlation ofany permanent, privately owned and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc.) or outdoor seating or other areas within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety. The City Engineer may approve irrigation system agreements. 23. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board ofPubHc Works and Safety approval. 24. Dedication of Right of Way if not platted. Appropriate dedication documents are available upon request. 25. Open pavement cuts of Illinois Street. BONDING REQUIREMENTS 26. Upon initial review, it appears performance guarantees shaH be provided for the following: a. Illinois Street Right of Way Improvements. This could include improvements such as acceleration & deceleration lanes, passing blister, pavement widening, milling, resurfacing, thermoplastic striping, stone shoulders, curbs, existing curb cut modifications, median cut, etc. b. Water Mains. c. Perimeter 10' Asphalt Path. It is assumed that this path will be constructed along the entire Illinois Street perimeter of the development, not just Phase 2. Please confum. d. Erosion and Sediment Control and Storm Water Quality. Please contact Amanda Foley, Engineering Department Stormwater Administrator, for details regarding engineer's estimates/perfonnance guarantee requirements for these items. 27. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes and materials, etc. 28. Upon completion and release of individual Performance Guarantees, a three-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance.amount for all other improvements. 29. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. 30. Please reference the enclosures for more detailed explanation of our procedures. Mr. Daniel J. O'Toole January 3, 2008 RE: I03rd Street Medical Building Expansion, Phase 2 Rev. #1 Page 4 of7 RIGHT OF WAY PERMIT AND BONDING 31. Any work in the dedicated right of way of Illinois Street, including the use of the existing entrance for construction traffic, will require an approved Right of Way Permit and a License & Permit Bond. 32. The bond amount is determined by the nwnber of instances of work in the right of way at $2,000.00 per instance. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of Way Permit. 33. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way permitting and bonding. AVAILABILITY AND CONNECTION FEIES 34. The Availability and Connections Fees are current as of this date but are subject to future revisions. 35. Availability (acreage) Fees must be paid after ail other Engineering Department requirements have been satisfied and prior to approval and start of construction activities. Availability Fees are based upon total platted acreage or legal description acreage for the development at the current rate of $1,010.00 per acre for Water Availability. When Phase 2 was constructed, the building was served by Indianapolis Water and was subject to their requirements. Since Cannel Water now serves this area, Phase 2 construction will be subject to Water Availability (acreage) Fees. Please provide a legal description that encompasses the acreage of the site south and southwest of a line established on the south wall of the existing building extending from the east property line to the west property line. Additionally, as of July 2, 2007, a Development Application Review Fee will be assessed. This Fee is $150.00 for developments with one customer requiring a water connection and $300.00 for developments with more than one customer requiring a water connection. This fee is to be paid with the Availability Fees. 36. Connection Fees are paid with individual buildings after the infrastructure has been completed, satisfactory test results obtained and the development has been released for building permits. Connection Fees are based upon the proposed final use of the building. Reference our Utility Equivalent User Contribution Multiplier tables. A listing of proposed building uses will eventually be required to determine the Water Availability request to the Board of Public Works and Safety. This request is based upon edus and should not be confused with Water Availability Fees, which are acreage based. a. The current Water Connection Fee is $1,396.00. per EDU. "'Including a Tap Inspection Fee of$86.00/EDU effective July 2,2007. 37. Ifan irrigation system is planned for this development, additional Water Availability Fees and Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. CONSTRUCTION PLAN REVIEW COMMENTS 38. General Comments a. This project is subject to the City's Storm Water Manangement and Storm Water Quality Ordinances. The Department acknowledges that storm water management was previously master planned and that detention is provided off-site. Thank you for considering the capacity of the downstream piping system and for providing on-site detention. b. The City has adopted a new curbing and paving policy. Please revise any notes, specifications, and details to accommodate these policies. The language of these policies must be added to a specification sheet on the final construction plans. The paving policy Mr. Daniel J. O'Toole January 3, 2008 RE: 103rd Street Medical Building Expansion, Phase 2 Rev. # I Page 5 of7 will only need to be added ifmedian work for the full access for the existing curb cut is approved. c. Please contact Amanda Foley to review storm water quality/treatment requirements. d. Be advised that the Department of Engineering does not have approval authority of Landscaping. Please do not include these items in future construction plans submitted for review andlor approval. Please remove the Landscape Plan title from the Sheet Index on the Cover Sheet. 43. The drawing does not appear to indicate a water service line connection. Is the 8' water main shown on the drawings an existing main? If so, will the main be extended to serve the proposed building addition? 44. The Illinois Street path shall be indicated one foot off the back edge of the 60' half right-of-way. 45. It appears that portions of the asphalt path are proposed to be constructed outside of the right of way line. 46. Has bicycle parking been provided? 47. A maintenance of traffic plan shall be provided for all work in the right.of.way, iffull access for the existing cut is approved and the proposed work to the existing median is required. The plan shall conform to the INDOT Work Zone Safety Manual. 48. Please include City standard ADA ramp details for ramps in the right-of-way. 49. Please add the following note to the drawings if full access for the existing cut is approved and the proposed work to the existing median is required: "All paving within the existing and proposed City right-of-way shall conform to the requirements of the Department of Engineering. Contractor shall contact the Department of Engineering to schedule a pre-construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right-of-way." 50. All proposed swales shall have a subsurface drain. Please verify if any swales are proposed. The City's standard subsurface drain detail, requiring double wall Hancor Hi-Q or equivalent pipe shall be added to the plans. 51. If full access for the existing curb cut is approved and the median is modified as proposed, please indicate removal of the existing curb to the nearest joint past required limits for the left turn taper and lane in the median. CUrb shall be sawcut at this joint. 52. Please add an Asphalt Path Detail that requires I inch HMA # II surface on 2 inches HMA #8 binder on 5 inches #53 stone. 53. If full access for the existing cut is approved and the proposed work to the existing median is required, please add the following note to the construction drawings: "All paving is to be completed within the same paving season." 54. The City standard trench detail for RCP shall be added to the plans for the pipe run 706-707-XIII and referenced with a unique plan note or keynote on the utility plan or development plan. 55. Please indicate City standard ADA ramps where the Illinois Street path crosses each minois Street entrance with a unique plan note or keynote referencing the City's ADA details. 56. If full access for the existing cut is approved and the proposed work to the existing median is required, please add a note to the site plan that all existing pavement shall be sawcut to a clean edge where new pavement (for widening or for auxiliary lanes) is to be installed adjacent to existing pavement. 57. Please add a note to all appropriate sheets that no earth disturbing activity may commence without an approved storm water management permit. 58. If the full access for the existing cut is approved and the proposed work for the median is required, a striping plan for the median taper and lane shall be provided. All striping shall be thermoplastic. 59. Please verifY that all existing fire hydrants within 300 feet of the development are indicated. 60. Please verify that all existing underground utility vaults, overhead and underground utility lines are indicated on the plans. ~ Mr. Daniel J. O'Toole January 3, 2008 RE: 103rd Street Medical Building Expansion, Phase 2 Rev. # I Page 6 of7 6]. Please indicate why the A TP path is not extended to the north property line. 62. North arrows are incorrectly rotated on some sheets. 63. Please verify that all existing storm piping, bridges, culverts, etc. in the vicinity of the site are indicated on the plans and include top casting, top curb, and invert elevations, pipe sizes, pipe type, and direction offlow. 64. Please include the requisite information per Section 100 of the Storm Water Technical Standards Manual to the plans. 65. Is a N.A.E. provided across the frontage? 66. Please verifY that turning radii on site are adequate for emergency vehicles and all vehicles expected to regularly access the site. 67. Please indicate any subsurface drains on site including ones required for swales and any proposed in parking areas. 68. Please verifY if the Urban Forester will require structural soils on site. 69. Project data on the cover sheet is not complete. 70. Please verify ifthere is an increase in the portion of the site draining to the west. Please verify that the grading along the western property line will essentially be the same between the proposed curb line and the property line. It would be desired by this Department to reduce the on-site watershed draining to structure 74. 71. Please verify that the slope from the right-of-way into the existing site is essentially staying the same. 72. Please clearly indicate the construction limits on all streets. 73. Please update details CUI, CU2, CU3 with the most current details on the City's website. 74. Please revise detail W-7 to indicate maximum expansion joint spacing of 50 feet and a maximum controVcontractionjoint spacing of 10 feet/5' maximum on radii. 75. Please add a note to the plans that all work shall be limited to the hours of7 am to 7 pm. 76. Please verify with DOCS the need for pedestrian connectivity from the site to the perimeter path. 77. Please indicate the maximum cross slope of the perimeter path on the plans. 78. Please verify that storm piping is allowed in the existing buffer zone. 79. Please revise the profile on sheet C5.0 to indicate RCP for pipe runs 706-707 and 707.XI II. 80. The work in the right-of-way for the storm connection is subject to inspection by the City. 48- hour notice is required to the City prior to the work being completed. The connection must be core drilled. Restoration of the right-of-way shall be as stipulated in the right-of-way permit and in accordance with applicable City code. 81. If the full access for the existing cut is approved and the proposed median work is required, hatching delineating the City's right-of-way pavement section with a keynote or plan note referencing PA-] shall be added to the plans for the pavement in the median. Also, the right-of- way pavement section noted in detail PA-! will need to be revised to conform to the City's perimeter road pavement section. 82. As previously indicated, the Department will not support the proposed access. The Department will only support a right in/right out access at the proposed location. Full access for this cut requires approval from the Board of Public Works and Safety. 83. The Department desires to have the path offset from the back of curb across the entire frontage a minimum distance of 5 feet. This would require the right-of-way for the roundabout to be a 180' radius. This would allow a 5-foot mow strip from curb to path. The resulting 5' yard would only affect 2 parking spaces. The City would consider allowing an encroachment in this instance. 84. Are anyon-site easements necessary or planned? Are there any proposed easements that contlict with existing landscaping or tree preservation easements? Are there any existing utility or other easements that croSs the property that require permission for encroachment within the easements for the proposed improvements? Any planned drainage easements must conform with Section 306.02 oftbe Stonn Water Technical Standards Manual. Any easements to be vacated? Mr. Daniel J. O'Toole January 3,2008 RE: 103m Street Medical Building Expansion, Phase 2 Rev. #1 Page 70f7 If you have questions, please contact me at 571-2441. Sincerely, G~EJA <an, Jr., , A~3~ Engineer Department of Engineering cc: Angelina Conn, Department of Community Services John DuffY, Cannel Utilities Paul Pace, Carmel Utilities Greg 1Iko, Crossroad Engineers, PC Greg Hayes, Hamilton County Surveyor's Office Department ReviewfFile Copy \\Apps2\user dataleng\shared\DHi II\PROJREV07\1 03rdS TMEDBLDGEXPPH2S .doc City of Carmel I)EPARTMENT OF CcrVIMIJNITY SEH VICr-:s December 6, 2007 DJ O'Toole EMH&T 7400 N Shadeland Ave ste J 50 Indianapolis, IN 46250 RE: Meridian (oil, 465 - l03rd Street Medical BId!! Dear Mr. O'Toole: The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the re"ised drawings submitted on December 6, 2007 and offer the following commellts: ALTERNATIVE TRANSPORTATION REVIEW COMMENTS 1) Please see the City of Carmel's Parking Ordinance in order to determine appropriate locations, specifications and constnlction details for the above. Section 27.06.03-H of the City of Cannel's Ordinance requires that bicycle racks must be installed a minimum of 24 inches form all walls or obstructions. Please revise your plans to amend this change. We request that all responses to our comments be provided in writing. Failure to provlde written responses may result in delay of tIle review process. It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department ofCOmlTlUllity Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2417. Sincerely David Littlejohn Alternative Transportation Coordinator Department of Community Services cc: Angie C011n, Department of Community Services Engineering Department Review Project File Page I ONE CIVIC SQUARE CAR1vIEL, INDIANJ\ 46032 317/571-2417 o . " W3I-d Street Medical Building - Phase 2 - Plan Revisions Page 1 of 2 IJ () ~f ~JWMjjl!lJ~i!Mb1() %CS 07J f)U/dt1J fY-nl)I/.. ~Wj y Conn, Angelina V From: O'Toole, Daniel [dotoole@emht.com] Sent: Thursday, December 06,20079:40 AM To: Conn, Angelina V; Holmes, Christine B; Redden, Nick; Akers, William P; Hohlt, William G; Duffy, John M; Fogarty, Michael 0; Littlejohn, David W; Ellison, Christopher M; Krueskamp, Theresa A; del@hamilton.in.us; mwestermeier@carmel.in.us; jtl@hamilton.in.us; grh@hamilton.in.us; bmg@hamiltbh.in.us; jason. kirkman@mybrighthOuse.com; shirley. hunter@duke-energy.com; jennifer:marlett@veoliawaterna.com; rfarrand@ccs.k12.in.us; ryan .hartman@ctrwd.org; david .malone@sug.com; ron.morris@aes.com; gilko@crossroadengineers.com; Huffman, David; dale.m.sparks@uspsgov; cshupperd@vectren.com; Faley, Amanda J; Brewer, Scott I Cc: Joy Skidmore Subject: 103rd Street Medical Building - Phase 2 - Plan Revisions Attachments: Sheet P'G3.pdf; Sheet PG1.pdf; Sheet PG2.pdf;20071927.C200Hev2.120407.pdf; 20071927.C204.Rev2.120407.pdf; 20071927.L 1 OO.Rev2.120407.pdf Dear Carmel TAC members, Th is email is to inform you of changes to the design of the 1 03rd Street Medical Building - Phase 2 project. The following changes are reflected on the included plan sheets: The loading area and dumpster at the southwest corner of the proposed building have been removed and a drop-off loop and canopy have been added to the west building entrance. The median cut at the entrance on Illinois Street has also been removed. Utilities and drainage patterns. are uneffected by these changes. Revised building elevations are included on sheets PG1, PG2, and PG3 A revised Site Plan is included, see sheet 20071927.C200.Rev2.120407 Ms. Foley - a revised Erosion Control Plan is included, see sheet 20071927.C204.Rev2.120407 Mr. Brewer - a revised Landscape Plan is included, see sheet 20071927.L100.Rev2.120407 (This change resulted in relocating one serviceberry tree and added 7 dense yews) Please contact me if you require additional information on these changes. Thank you. DJ O'Toole, PE Project Manager Indianapolis Office Evans, Mechwart, Hambleton; & Tilton, Inc. (EMH& T) Engineers, Surveyors, Planners, Scientists 7400 North Shadeland Avenue Suite 150 Indianapolis, IN 46250 317.913.6930 ext. 2217 317.913.6928 Fax _(2mbJ.cQQl 12/6/2007 '$. Y~~~~~EEN WALL $ TID PARAPET +32'-0.. 0) ! i $ @ .1 @ .. .... . L. OIlYN ,TDfTBl):OLo\M :IN ~~"\&l ~. $ SECOND FLOOR f1.6'~O. $ ~:~~, FLOOR sButidinll .'i(;;.~.Lfr }!~... ['.~. /)~ ~,:!.;,.J OVERALL EAST ELEVATION SCAE..E::jm~'-..-l'-l.1' ..iI IICIIFIE . . I?EALTy 6/?OlJP O'P'P.'I.C,E B'U'I-L".D'I .N.G - .2"0.,0 W'. J.Q.3.R D S.T" CARMEL, INDIANA C EM Bf It 3. 2:907 & CSO Architeds CD~(}@I'I @ 1 ! '.' ,. r . i I . I . 08..BElt.. n_NTB. D.. OLMIS... .W,. I ,... .' <:l.EoUMlOl>a:Ul) =".:=c:,", .. r. I. .,m>u....om.crvJ; @ r o i i i/OsGRITN 'liALL~ ii49' -00' . '1/0, f'AAAPET 'I\i'l f32;~O. " 'SECOND fLOOR q, +15' -0' . J , ENLARCi EDELEV ATtON ~':f~I6'."-,I''''. . rlRST flOOR ~, 0:-:0" 5-{.'Al..E:Ji4o\-" : 1"i:I~ I ENLARGED ELEVATION (~~} CD OVfjRALL WEST ELEVATION SCAlE:Ifl?,'"..-'J'.e--. ;j. I KIIFIE .... ,I/EALTYGRDUF Q'P'P'I C'E B"U-I.L'D"'I'N.,G . 2'0-0 W,. I.O.g.R'D S'T. C ,A R M EL, I N D I A N A DE CE.!'A B E R 3. 20D7 I & CSO Architects I -1 Q:~) -({::~i ~'~~ . < COMroSI'fE M:ET,.l\L,; ---\ ~ CAJSTJNE L1~..JL. -. :~IIHr~:~;'r;;~tiL~TT::~r Iir .AND-:~m..LS rl'Ypj \\ t.-;:-~,~ . . \'\, " ~ ..-- '~ .'~, ~~~)~~:~~~~~~.~.,.,--_. SOUTH ELEVATION SCAL!:' ~!H";II'I':Cl" NORTH ELEVATION SCA.LE:: 3/64" "'1'-0" .4 IKfl71'E I?I:ALTYGI?OUP I O'F'FJ-C.E B'U'J'L'D'ING. 20,0 W-. I,O,3,R D S'T. eAR M E L, I N D.I A N A DECEMBER 3, 2007 6:> CSO Architects .J 3.lvq.~ '~goll qiiiltlWd31:141 Il"I'Ifl4 . , CO" ""' n f- ~ I r I . ~. ~ l !!~ '., I ~ i. j II !: I I;~; ~i is !, "I ,ii'''' , '''!'.I " , II"!'" Ui ',il( 11!li!! illll!!! ! I ! ill. " lId Ii Ii! 'II< '!Ihll 8'1' iil l; I II iI! .II !I ;, I!! Illi!l~ I illlil!! ~lllli! II! 11111111 II II IIII!I ""I; ~!~ i si!e~jI~ I'~ ': ,II ... I ~Il' ~ " . P II '.~ !:l ~ 1M m i '~!Ui~!f~ ,h liih! ~! ! ~, ii ~ Ii i H. ui W ,~~ '"1 !" i .'''g'' I,; ~i ~~,< "I i "' '!'. I' , H IiI I," Sf. 1!1l i!i dUMi. !I~! ~I Wi! ; ~l r~ ~ I! ! II: t~j' h~ !~! ~"i l.: '''''"~!i .;~, '!8 I ,; ~~ .~" . ~. " , _ di~!~i ~ mU~;1 m i,~. ."", . " " "b I." _ .," 1/ " . . ~ 11)";- , "'\ ~ Q ~-""'.~'~D ~ ~ " ~ II " ~--:~:IIi~ ::~: ll:iOd gil:dYd,n,od GNT1d "~!)~-t!!;-il'\ ~-,.OG9.,-aS.~~>: dnrnmAllt/38 . , ~;:~ ~~:~~~il'~l iII.&D6 'r . '=;~,~;:....." :.lI=~_....::'=. ."'.,.,J\.___'......"""'I.~ ~ 1}"1I (IiltlWGliId SN". NI 'A.LJ.lr10,U>i01 'IW'dH '1ir'jllrr.;l (;"SBljd UOIS"edx3 BUIPI!"SI""lpat^j 'IS PlCOI .. SNlfld jlJ0L1:lnH1SNOO , ~ ~ 6 V ~L ~ ;' ~ .. ~~o~." !i:'N . "U ill; ..W ~!ilii l!ml hnl3' j iUh' Ii h!!ii ~! '!~ i-t=~ ~.. u~m u ~l!:\~ ~~ ~Ui~i_ U m~i!ii! !;I!gg !i .m!!! 'I ~8~':i::i;JI ~>l ~ m ~ f!i r 1'1 ! I"' " f'r~ ! ,g- ""fl i~ ill'~ ..~ " ~., " ... ! 0,_' l I~i i. i'ii . iti h Ilj i~ n..!i i I.U '"j ~.. l' '>1' ! "1 -I, dl. 'I ihl !iM ,I ~~~'i' Ii m! . Ii". ~~ l'j ~i ;~.' ~~l" i~ ~'~;" '~.!l "'! ~~ '!l!:' I'.: '~". f: l;~l Ii ..W I il!i 11 '!ll ie, H! I!:!! I~ !';r'~i "1" . ~'!I j il!s hi m~ 11 ~~H oj 1'1' pi W' 1 ~h! ~! ~g.l dl uIU Ii ill ~! ,Ii! h; I I- ~. u' ~ ~i' 8 ! ~ liP h I n 1 ~ ,i;~ 1 R ! !! ~ I l np ~U! 1:1 i i i .iii",! IIU l,! ! ~. I!, !, ii' I I ~ I ! HI id Ii fjH I i II h ' ii.i~n~ gld ~!!i j: ~ U. ..' ii. ld..! ~ . I. .Ei "B ~I"'a !i i"I' 'I I, ~! d ib '! j~q h!~ h ~ ~! iU 1e In I. I I f. ~~ !!I ~I! ~f ~n i~ ~ ql . I H . . i I fi . ~ [ 1 , I I r I III Ii n! ! ll;! ~ I ~! ,! · ! !i ~, ; ndh ::i:::! :: ~ ~ I ~ I ~ S ! d I i. ~ ~ ~ I i~ ' ~i ~ id ~ i~ d 81 i~i ill'" ~ j ~ r I I I IU ;' I" I ~ I h j~ !! 1 ii~ 1I ffili I ' ! I ,. r., Ul h ~., h II ~1~1 I" 'i~o " Ii 'j , ! .:i. :! II " HI :!!. II ,1.,1.1 o 9 i Ur Ii Ii ,!,!; . ! UI II I !ll !lJ I !~ " I' 'jl ')'1+'1' "li~ Id ~il'i i~; ~~~;~ ~ ~ I~ ~, !'I ~ I. d ! if I l!i ~ fHH ~Iih ,!= ~hUli l~ I U!H i~~il Ii!; ,~~~I! . i~ i "-.-0 D.... a &II !--_u,..m t -." .'_".IIO:!'1o:""Il. roIOOdl~.)SSQ 31.~-^3l:J !OJJiJI"I1l00:r.'.1l:J]dQUlr.;w-. .LDi/;Hl IlfO.. GnV"nd INn.. ~ -::-~~j~ ~ 1W!1Ip~~,",..o>r~~ ME IA8 Clii:aVcliti'iI S1Wld NVld 3d"\f'::>>SONVl c . -," ~;ro~w . , II~I. ~ ~.. u<; 1~b~~3N~~~~~~ dfJO:dD.ui'o/att mm"~'(JF~M:P~ ~ "" j J~:d } ill, IH I~ ~1: J 'lidts,u. rl tll~ I, I lh ~l_ ~ n · j I:, '\ ~- , I . I ~ ~ ~ , 10 ';!: ~ c I ~' ~ ....;:;<J! ~ ~ ~ ~ jl' 1 ! I f i !.hi U [ Id ~ lli~il ~ ~ ~ .,;""~,." ;.; ~;.: ~ ~ " . '"' ~.. l' j .1;; ~ III .I ,- .. ::::i . w l"j ff w I- , Z! " ~ ~ ~ JUl, j! JH: j i I! j €I a. i1i~~o IH ~ .~ -, H. ! i I .3 i . -H" !~ f i ;I"~ ,; ip~i '1~ ;Ud 1~iJj i! I III..:",,,, li.,.H I ;:i j.ij; a'i; hu N1'J..LNoo:Ji'IDl~II"fIiH'UWl:l'.C ~ aSB4d Uo!suadX3 6U!PI!n~'le,!pa"l 'IS PJf:OL SN'tl1d NOI1::Jnl:LLSNOO "'" ~ r 'I ~. i" ~l ~~ I~ ~l j [!) = If "' ;~ ~ · ~!i~ ,~5 ~.: Ii i ~ ,II! l~ I! I : q~, ~, ~ >' ~ i <f" ~" ' -. · I Ii il ~~l1 f Iii I ~ i ! Ii i I ~" ,l .~, ,,'i ! t! ~ . i I ! I~~ ! , ~~ 0 ,,; .:it 'I;; Ii !j! ~ R ..~! .~ I I!i~l ~ I i I- i I! ~ i Ii j ! .~!'~ .. ~" !! ~ , I; J , ,- l ' ~ ~l j,: "[II .; r' ~ ! '\ i I 11 ! ! ~ d Iii j!O Hill I!PF ~I Jd ,; i! ~l! ~l!l ,'I ~ ~ ! ! h i r"8 ~j .i I ,~ '" ,I i ' · ~ Iii' ~i · i" . I~a !PH~t. d,!! I ql ;L~,~ ~iI !;~ ~ !. 1M ! i' i I n .~ !l i;:~ !~ l ll. d l~ !~d\t I ~~ f l I ~ ~~ Si !~ !~~ ~~ ! ~IS ~. :" :mi 1 t~ 1 i i ; .1 Ii iI iI~ l~ ~ .I.. ~'....' i!:: t" -:! ~ -; ; j ~J I . , f l;h I ~ i I! II M! .~ sl ~~~i <<Q~ I~~ if ~,~ 1 I l ~ Xi I i~ ! ~ i~! I! . ;;: -n il ~ I~!!I " II, 11,1 ! f W :d~ II.', il!' f~'~ .M !!!.~~I m !i: ,.i~ 1 I j In ~~~mi l~ i i~!: I~',~~ :: !I '1' i .i ~ ~ o ~ ~ '4"'.- '"", "'.- :{'o...- '" .... -:.1.:1..---..,..._,..,,- _u."", ....0 Conn..AngEllina V From: Sent: To: Cc: Subject: Duncan, Gary R Sunday, November 04, 2007 8: 17 AM 'Joy Skidmore' Kelly, Rich (E-mail); Conn, Angelina V; Hill, Dick B; McBride, Mike T; Redden, Nick 103rd Street MOB Expansion Joy, The Department has reviewed the request for a full access from Illinois Street for the second phase of the project. The Department can only support a right-injright-out access. The site has a full access to the north and the roundabout coupled with the right-in access allows access for northbound Illinois Street traffic without an undue inconvenience. The existing full access just to the south is located in accordance with City Access Management policy and will likely be the first full access provided considering possible future improvements to the 103rd Stree't and Illinois Street intersection and expected traffic increases on Illinois Street. Thanks so much, Gary Gary R Duncan Jr., P.E. Assistant City Eng'ine'er City of Carmel Department of Engineering O'ne Civic Square Carmel, Indiana 46032 (3i 7) 571-2441 (317) 571-2439 (fax) gduncan@carmel.in.gov Conn, Angelina V From: Sent: To: Subject: David Lucas [del@co.hamilton.in.us] Wednesday, October 17, 2007 8:20 AM Conn, Angelina V TAC 10/17/07 Good morning Angie! Looks like all of the item on the agenda are outside of Highway jurisdiction. If anything comes up during the meeting, please let me know. Have a good day. Sincerely, David E. Lucas HCHD Staff Engineer/Road 1700 South lOth Street Noblesville, IN 46060 (317) 773-7770 - Office (317) 776-9814 - Fax e-mail: del@co.hamilton.in.us website: www.co.hamilton.in.us 1 10/16/2007 16:54 3177769628 HAMILTON CD SURVEYOR PAGE 01/02 .., ,. -. ...~ . , I':'~ ,'. ." / .:. <~:<-:-..J 'l-) i.:/ (.,~).......- '~:.' ~ _" ('. J "'0, '.~ ''; . l ~'l .' , \-,~ (' C'') ) I" '~>,.. .\ ,'~ _./ :' ~~. " (', ) '""; .....';., .~ '...... _.:..~ ._;~;.r ('I~ ... . ~ l' ':/ C~ ."-- . :Kenloll C. '!\~'(/,,{, C'F.7'rr Surveyor of .Hamilton COl/liiy 'Pfirmr [jT;:'} 77~;'S+~l,S' 'Fax (F7} 77L;.'H~1S .-,uat JSS Oil!' -1illmiltol/ ((/JilT/)! ,~(I'"Ir/' ]\robll'.'r~I/('. Im/itlmt ~(,;('6("::~ ~l' October 15, 2007 /" :. l [),.." .. lrr-/11..../i ~ ,....,fJP)..."l , "'.iC!/ EMH & T Inc. ATTN: OJ O'Toole 7400 North Shadel and Avenue Suite 150 Indianapolis. IN 46250 VIA FACSIMILE: 913-6928 D01f1n Vu IRE: t03n1 Street Medical Building - Phase 2 07/DOO(j~ ~ Dear Mr. O'Toole: We bave reviewed the construction plans submitted to the Hamilton County SW'VeyOt'S Office on October 2, 2007 for this project and have the following comments: 1. This proposed project falls within the incorporated area and.MS4 jurisdiction of the City of Carmel. 2. This proposed project DOES NOT fall within a Carmel Wellhead Protection Zone. 3. This proposed project fall in the Williams Creek Watershed. 4. The detention for thi,$ site is provided fo(' in the Mtridian at the Interstate detention pond on this site. 5. While the detention 'Vo]wne is provided for the site. a conveyance issue to the detention pond exists. Please provide calculations that prove the pooposed .'in- line detention structure" will work for up to the 10 year storm event. Also, what happens in lltorm events larger then the 10 year event? Does it become an overland flow'situation or does it start surcharging m.an.hole on othe( surrounding properties? 10/16/2007 15:54 3177759628 HAMILTON CO SURVEYOR 6. Please submit revised plans once all comments by TAC ag~ies have been . addressed. . 7. Please note that further comments may be necessary at a later date. Should you have any quegtions~ I can be reached at 317-776-8495. Sincerely~ /~~ Greg Boyes, AC, .eFM Plan Reviewer' . cc: Christine Barton-Homes ~ Carmel DOCD Amanda Foley- Cannel Engineering Dick Hill - Carmel Engine~g Greg Ilko - Crossroads Engineering PAGE 02/02 j City of Carmel DEPARTMENT OF CO.tvllVIUNTI\' SERVICES October 11, 2007 OJ O'Toole EMH&T 7400 N Shadeland Ave ste 150 Indianapolis, IN 46250 RE: Meridian (ji) 465 - l03rd Street Medical B1dg Dear Mr. O'Toole: The following letter represents comments for this project specifically addressing the area of altemative transportation. I have reviewed the revised drawings submitted on October 17,2007 and offer the following comments: ALTERNATIVE TRANSPORTATION REVIEW COM1\1ENTS 1) The City of Carmel Parking Ordinance requires that all commercial and retail venues include bicycle parking. Bicycle parking spaces are required at a rate of five (5) bicycle parking spaces per one hundred (100) automobile parking spaces with a minimum of four (4) spaces. Please revise your plans to show the required bicycle parking spaces on your site. Please see the City of Carmel's Parking Ordinance in order to determine appropriate locations, specifications and construction details for the above. 2) Please cOlmect all internal sidewalks to each other and to exterior multi-use paths and sidewalks. Please revise the plans to reflect these changes. 3) Please indicate ADA ramps at all sidewalk crossings and near the parking locations. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re- submitted, paliicularJy if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revislOns. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. Page 1 ONE CIVIC SQUARE CARNIEL, INDIANA 46032 317/571-2417 The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2417. Sincerely, 9~~ David Littlejohn Transportation Systems Coordinator Department of Commumty Services cc: Angie Conn, Department of Community Services Engineering Department Review Project File Page 2 ONE CIVIC SQUARE CARlvJ:EL, INDIANA 46032 317 /571-2417 Carmel illJrtment r....... ',.'" ~-:~ '".' October 8,2007 r; (... \1:~'~';::) Daniel J. O'Toole, PE Evans, Mechwart, Hambleton & Tilton, INC. 7400 North Shadeland Avenue, Suite 150 Indianapolis, IN 46250 07/D{j(JO~ t7tC RE: Springmill Medical Building Dear Mr. O'Toole: The Construction Plans for the above-referenced project have been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforce- ment efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~~i~ Chief of Police MDF:vb cc: Dept. of Community Services 1317} 571-2600 A Nationally ~ccreditl't'F~~vt;?$~forcement Agency ~_lK~h:~1.i* IF"" 13JI7D 571-2512 Page 1 of 1 Conn, Angelina V From: Wood, Mark A. [Mark.Wood@SUG.com] Sent: Friday, October 05, 2007 2:45 PM To: Conn, Angelina V Subject: RE: October 17 Technical Advisory Committee meeting agenda Panhandle Eastern Pipe Line Company has no conflicts with the items listed on this agenda. Thanks -----Original Messagem-- From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Friday, October 05, 2007 2:40 PM To: Akers, William Pi Blanchard, Jim E; Boone, Rachel M.; Brewer, Scott I; Brook Gajownik; Carter, Ronald Ei Chuck Shupperd; Dale Sparks; David Lucas; DeVore, Laura B; Donahue-Wold, Alexia K; Duffy, John Mi Duncan, Gary R;' Ellison, Christopher M; Fogarty, Michael D; Foley, Amanda J; Greg Hoyesi Greg IIkoi Hancock, Ramona B; Hill, Dick B; Hohlt, William Gi Hollibaugh, Mike P; Holmes, Christine B; Huffman, David; Jason Kirkman; Jason LeMaster; Jennifer Marlett; Joel Thurmani Judy Hagan; Keeling, Adrienne M; Knott, Brucei Krueskamp, Theresa Ai Larry Castetter; Lillard, Sarah Ni Littlejohn, David W; Marilyn Anderson; Wood, Mark A.i McBride, Mike T; Pace, Paul V; Redden, Nick; Richard Heck; Ron Farrand; Ron Morris; Ryan Hartmani Schmiesing, Rebecca; Shirley Hunteri Snyder, M Todd; Stewart, Lisa M; Tingley, Connie 5; Westermeier, Mark Cc: Jim B. Euleri Diane Hall; Reis, Paul; Ken Cave; dolmstead@stoeppelwerth.com; Brian Robinson; dotoole@emht.com; Jim Shinaver Subject: October 17 Technical Advisory Committee meeting agenda Hello, everyone: Please see attached agenda for the October 17 Technical Advisory Committee meeting. (lAC members: please let me know if you have not received any plans for any of these items yet.) Thanks, Angie Conn, Planning Administrator Dept. of Community Services - Planning & Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p.317-571-2417 f.317-571-2426 aconn@carmsl.in.gov Private and confidential as detailed lLt::ct;. If you cannot access hyperlink, please e-mail sender. 10/5/2007 -Conn, Angelina V From:' . Brewer; Scotti Sent: Tuesday, October 02, 2007 3:32 PM To: Conn, Angelina V Cc: 'O'Toole, Daniel' Subject: R E: Docket No. Assignment: (T AC) M erid ian @ 465 - 103rd Street Medical Bldg (071 00003T AC) Angie: I met with Mr. O'Toole on September 21 on site, and went over the trees that were still there and could remain. One large tree that was scheduled to be preserved looks as if will not survive the construction process, so it will probably be taken down, but the soil volume preserved in almost the same place, and 4-5 trees planted in its place. They still need to get me revised plans though. Scott Brewer, City Forester Environmental Planner, DOCS City of Carmel, One Civic Square Carmel, IN 46032 PH: 317-571-2478 FAX: 317-571-2426 From: Conn, Angelina V Sent: Tuesday, October 02, 2007 1:24 PM To: Stewart, Lisa M Cc: Coy, Sue E; Hollibaugh, Mike P; Keeling, Adrienne M; Brewer, Scott I; Hancock, Ramona B; Brennan, Kevin S; Littlejohn, David W; DeVore, Laura B; Lillard, Sarah N; Haimes, Christine B; 'jmolitor@prodigy.net'; Boone, Rachel M.; Tingley, Connie S; Duncan, Gary R; Donahue-Wold, Alexia K; 'Doug Pedersen'; 'dotoole@emht.com'; 'Reis, Paul' Subject: Docket No, Assignment: (TAC) Meridian @ 465 - 103rd Street Medical Bldg (07100003TAC) I have issued the necessary Docket Number far (T AC) Meridian @ 465 - 103rd Street Medical Bldg. It is as follows: T AC Application Fee: Total Fee: $277 .50 ($270.00, already paid) Dock,et No. 07100003 TAC: Meridian @ 465 -103rd Street Medical Bldg The applicant seeks construction plan approval for a previously approved building expansion. The site is located at 200 W 103rd St, and is zoned B-3/Business. Filed by DJ O'Toole of EMH&T, Inc. Petitioner, please note the following: 1. This item will be on the October 17 agenda of the Technical Advisory Committee (TAC). The petitioner must submit plans and review materials to all TAC members directly by October 2 (already done). (Failure to submit plans and review materials to TAC members by this time will result in the tabling of this petition to the November T AC :'e]iAW~n'"'e1iirnal" ~''''-''<l;~'~"",,{i,,;vi'Hg;'''r.P.m\~!!;'''j,.fi-''h!S~'\., From: Brewer, Scott I Sent: Tuesday, October 02, 2007 10: 10 PM To: 'O'Toole, Daniel' Cc: Conn, Angelina V Subject: FW: Docket No. Assignment: (TAC) Meridian @ 465 - 103rd Street Medical Bldg (07100003TAC) Attachments: Treedelail-Carmel.pdf; Shrubdetail-Carmel.pdf Dear Daniel: I reviewed the revised plans today, and here are my comments. 1. On the graphic planting detail, there are two notes Ihat lalk about planting. The one that says "Plant tree 6" Higher than Grade" should be eliminated. 2. Thornless Cockspur Hawthorn is a species that has a lot of problems wilh pests and disease. I would caution against using it. The serviceberry would be a better species, or yellowwood, or tri-color beech. 3. Amur maple is an ornamental tree, but is shown as a shade tree. Please change the species to a large maturing shade tree such as Kentucky coffee tree, London plane tree, or ginkgo. 4. The three serviceberry in the new jsland (to replace the existing elm) should be shade trees 10 provide shade and intercept stormwater over the pavement, rather than small ornamental trees. Please make them large maturing shade trees as are there now, such as Kentucky coffee tree, London plane tree, or ginkgo. 5. Please add another red oak or zelkova to the large parking lot island in the middle of the lot. Please contact me if Ihere are any further questions or comments. You may use our planting details if you desire. Treedetail-Carmel.p Shrubdetail-Carmel. df (288 KB)... pdf (235 KB... Scott Brewer, City Forester Environmental Planner, DOCS City of Carmel, One Civic Square Carmel, IN 46032 PH: 317-571-2478 FAX: 317-571-2426 From: Brewer, Scott I Sent: TuesdaYI October 02, 2007 3:32 PM To: Connl Angelina V Cc: 'O'Toole, Daniel' Subject: RE: Docket No. Assignment: (TAC) Meridian @ 465 - 103rd Street Medical Bldg (07100003TAC) Angie: 1111 ,~ '," ,'^: '. :~"~I'" r.~ -:[3 8i:~ .- 'rrI., I' ~iJt:"'-'~ ~ ~t- ",-. " !II l Evans. Mechwart, Hambleton & Tillon. Inc. Enginee/s. Surveyors, Planners, Scientist, letter of Transmittal To: Michael Fogarty Office of Police Chief Three Civic Square Carmel, Indiana 46032 From: Date: DJ 0' Toole October I, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 Weare sending you herewith via: !XI Courier D U.S. Mail D Fed. Ex. Dups The following items: [XJ copies D originals 0 [other] Copies Date Number of Description sheets I 10-01-07 Constmction Plans - Cl.O, C2.0 These are transmitted as checked below: [XJ for approval o for your tile o as requested 0 for review & comment D for execution / signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45~02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To; EMH&T File Signed: If enclosures are not as noted, kindly notify us at once. r,'"i (', M :". X ") j 7 4DO ~,j(Jr'th Shcclc'IO,t:::'~ .t..,I,:':~nue, Sui~~) 150, inolcnopol:s, 1H 4.'=)2:')[1 . PhO~8 317,9 1 ~.6930 . Fo~< 317 _913.tj92f~ ('~c.~;'-'I\,b\.l;; . Ci,x;i,-,,;;"J~: ~ Im..1~G'l'::F~',ji:; . .~'i:"'Jf!:)r~c- 8hih'I ,C~)rYi IEIIIJ :' ~~,'j,. ;-J ~'m"l ., Ai "'PI' , t.. ~i ~ ~l , fil: > . " "~rt. " . J ., "" r. _, il;'o _~ '~f:;,:..z \"..' Evans, Mechwart, Hambleton & Tilton, Inc. Engineers, Surveyors. Planners. Scientists Letter of Transmittal To: Ron Farrand Cannel Clay Schools 5201 East 13lsr Street Cam1el, Indiana 46033 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: SpringmiIl Medical Building Phase 2 We are sending you herewith via: o Courier [Xl u.s. Mail 0 Fed. Ex. o UPS The following items: 00 copies o originals D [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans - Cl.O, C2.0 These are transmitted as checked below: OOfor approval o for your file o as requested 0 for review & comment o for execution I signatillcs o [othcr] Remarks: This project was originally submitted through the Plan Commission (45-02 DP AmendlADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This rcsubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: If enclosures are not as noted, kindly notify us at once. ;-...'L C J.A .0" J.~ ,/ I 7.1()O j"-}Gr-th Si"'o('k::k)(,~)' /.,v(~'nUG, -SU!!E:l ! 50, inc'ior'lOPOlis. ir-.! 4625D ' Prior,=.;} ?17_913_(~93t) . ~o;'< '31/,913. ::;928 C:';'.c",'b'y . Cir;,:ln,\Cj!' . h,k.<n,,~,;.-;ii~ . ClllJ,:c~-i~c, Er~hl,(:c.."'::(['j [lJIJ TC:; roo;:,.,',' tf;"2~"" 'H"\ .. ' ~ ~ ' ~,1, ~{ ~, ,~ ' /' " ~.::',)~l~ IJI t _" _ ;" Evans, Mechwart, Hambleton &. Tilton. Inc. Engineers. Surveyors. Planners. Scientisfs Letter of Transmittal To: David Littlejohn Transportation Systems Coordinator ~ DOCS One Civic Square, 3ld Floor Carmel, Indiana 46032 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: SpringmiH Medical Building Phase 2 We are sending you herewith via: [X] Courier o U.S. Mail 0 Fed. Ex. OUPS The following items: [X] copies o originals D [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans These are transmitted as checked below: Wfor approval o for your file Das requested 0 for review & comment o for execution I signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and pennitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed:~~ Danie . O'Toole, PE If enclosures are not as noted, kindly notify us at once. t,'l c. (.,1 ,'t, ), \/ I 7400 !'JC;'I-ti'l Sh!_]tj'~~f(JrE) Avs,nuc" Slj;~c;? l50.1nJ.Jicnopol:s, !;'-~ .,162SD. rhor:~: :117.9i3.~d30. Fo;( 0317.913.6928 '.:,_,;:,q"b..;: . .... '~cl,o",-fi . ij1,-;:r..;'KJ[]dj~ . CIYI':~_'.;~"" emh"I.CDrY\ [1111 ;:;J!,'fj ,011'_ ;~ ;~'~). ~ v~ .:'lffli~~ ~'" ~ j} 11 t~ ~ ~!/ ~ 'j'" ~~__ _~~ y/;._~f Evans, MechwarL Hambleton & Tilton, Inc. Engineers, Surveyors. Plor;ners, Scientists Letter of Transmittal To: Gregory I1ko, PE CrossRoad Engi neers 3417 South Sherman Dri ve Beech Grove, Indiana 46107 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: o Courier [iJ u.s. Mail D Fed. Ex. OUPS The following items: [iJ copies o originals 0 [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans 1 9-28-07 Drainage Report 1 10-01-07 O&M Manual These are transmitted as checked below: [iJfor approval D for your file o as requested 0 for review & comment D for execution / signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our offtce. Copies To: EMI-I&T File Signed: ~ Danie . O'Toole, PE If enclosures are not as noted, kindly notify us at once. fA C. i,,~ /. >- \; I 7 400 ~,.J0d!, Shoclc:L:Kld /\V(;nU-2. Siik~ ! SO. 1J';(_ii('J:"10P(lE~, !~,J 4/)'250 . Pnon'~ :31 7.91 3.6Q3C . Fc:/( :~ I? 913.t/i2H r>~;-..m:~~'j: . Cin,j~m~,~~ L Irll~:~J"<'!_~c"'j':' . \-,)',j7;~;!~':' crnrli ,cern fllIl /f,H1i: .",' m' . 'J . '" 'Iii ... J < ~ " ~. &: : ; . ('";' Jlc _~ .of.. ,: ",', I" ';('" i!!.._~" ~ Evans. MechwarL Hambleton & Tilton, Inc. Engineers, Surveyors. Planners. Scientists Letter of Transmittal To: Greg Hoyes Harnillon County Surveyor's Office One Hamilton Square, Suite 188 Hamilton County Judicial Center Noblesville, Indiana 46060 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: SpringmiH Medical Building Phase 2 We are sending you herewith via: o Courier !Xl u.s. Mail 0 Fed. Ex. Ours The following items: [X] copies o originals D [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans 1 9-28-07 Drainage Report 1 10-01-07 o &M Manual These are transmitted as checked below: 00 for approval Ofor your file Das requested 0 lor review & comment o for execution I signatures D [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about t!1e enclosed, please contact our office. Copies To: EMH&T File Signed: Daniel J. O'Toole, PE If enclosures are not as noted, kindly notify us at once, tA C j,,'! :.: }~ v I 7400 t)o!'th Shod~~I(Jn~j ,t.., \,fen!,}:::. Su:t~~ J 50, ~r'cjiCJ~CJP0Ii$, ii'J 46250 . PhO~',E~~ ,31 7 SJ j 3_(~Q3() . Fc),{ .317. 91 3.~92-3 (>.}:~lrl'-~U:: . Cif'r:i"~'\cjr: . irI6:.<;",-:r_~('.h . '~-]-:(Jf;f;i!"," ~~rnhr _C()f~ Gllll ~, '0-; ",. 'es:fi':a~ , "Mi";" ' , ~ ! ;fJf 1.". .~ ,&" ..; :, 1 ~ ~""l I I ~ ~. . ~tr 'tJ ",'. r - , " Evans, Mectlwort. Hambleton &. Tilton, Inc. Engineers. $ur{eyo/s, Planners. Scientists Letter of Transmittal To: Bill Hohlt Deputy Building Commissioner One Civic Square Carmel, Indiana 46032 From: Date: OJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: [i] Courier o U.S. Mail D Fed. Ex. Ours The following items: 00 copies D originals o [other] Copies Date Number of Description sheets 1 10-0]-07 Construction Plans These are transmitted as checked below: 00 for approval o for your file Das requested Dfor review & comment o for execution I signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and pennitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File If enclosures are not as noted, kindly notify us at Ollce, fA ~~-_ r,_c~ -' },: \' i 7d.:m :"j~,:'ir!1 :::;hC1(j~~ror-:L---; p.venue, ;:u~te 150, !nU!c~nc:p()lit;, li'.J 46'250 .. Phon~; j 1 :;.9 i 3.b73D . ':=0:< ~~l7_9) J.6928 (:':ii'.:n-,l-i-\J:; . Ci'lcir,~';:J< a 1n(~:~;r',jp~A: . ,:,',:~"~)'~:;-~-!~~f 2rnrll,cc)r;,\ I!I[I) 'H~""~-:'" 'W- "", ~ ; '. J~ . . ~ :&/ ~;. "-~ I i ~ t r "'('j1 ~...' da .... ,-" ~ ' Evans. Mechwart, Hambleton & Tilton. Inc. EngineefS. Surveyors, Planners. Scienlisis Letter of Transmittal To: Amanda Foley Stonn Water Administrator Cannel Engineering Department One Civic Square, Isl Floor Cannel, Indiana 46032 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: IX] Courier o U.S. Mail D Fed. Ex. Dups The following items: !XI copies D originals D [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans 1 9-28-07 Drainage Report 1 10-01-07 O&M Manual These are transmitted as checked below: 00 for approval Dror your file D as requested 0 for review & comment o for execution I signatures D [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: Danic If enclosures are not as noted, kindly noMy us at once ~,..; C ,.".1 _'''.. '< '..t' I 74()O Nedh ShG~j~~jnn(~' ,Il,venue. $u;t~; ! 50, 1nciicncpo!is. :r-.J Jt6/50 .. Fhone 3] 7.913.693D . Fox 317.9! 3.6928 ':>:';-!;_""~~;'r . CinCfr"'.i~; . IrId':-mt:::~'~jl;~ . (>,,~~1-:';l~-=--: cTr~hl ,C~-.Tn [lfIJ ,;~tki;~.rn" R,~"hl~'" t 'JJ,t.1- ..b \._ ,....:~'" >'" 'I Evans, Mechworl, Homblelon & Tilton, Inc. Engineers, Surveyors, Planners, Scientists letter of Transm ittal To: Gary Duncan or Nick Redden Carmel Engineering Department One Civic Square, 1 SI Floor Cannel, Indiana 46032 From: Date: DJ 0' Toole October I, 2007 Job no.: 2007-1927 Re; Springmill Medical Building Phase 2 We are sending you herewith via: IX] Courier Du.s. Mail o Fed. Ex. o UPS The following items: IX] copies D originals D [other] Copies Date Number of Description sheets I 10-01-07 Construction Plans I 9-28-07 Drainage Report 1 10-01-07 O&M Manual These are transmitted as checked below: 00 for approval D for your file D as requested D for review & comment DfoT execution I signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amcnd/ADLS Amend) and pennitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: If enclosures are not as noted, kindly notify us at once, r\'i ~-.-. !,,1 ,i >: "'1' I 74UO i',Jonh Shc:delonc! A.VGnl.j~~. $i_iite 5::':), !nc~in~lOCoii5. 46250 .. Ph()n~? =~ I? .91 :j_{:,~;:~C . Fo:~' 317 .913,~~928 (.',~~,_T,:1-"J:- . '::~ir;c:r:r1;jt: . i~'r_'!'_~'~"JF.'C;.!~~ . (~h,l~i~~--t~<7 G{nrrl.ccr:1 [1111 " ~ ~'-'~- '~- . 1_ ~ c , &' .It.l. . ~ ' ..-jr~,." 8>,_2' ~~(' ~ ~- - Evans, Mecl1warL Hambleton & Tilton, Inc. Engineers. Surveyors, Planners, Scientists Letter of Transmittal To: John Duffy Cannel City Utilities 760 Third Avenue SW Carmel, Indiana 46032 From: Date: OJ 0' Toole October], 2007 Job no.: 2007-]927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: o Courier [Xl U.S. Mai] 0 Fed. Ex. o UPS The following items: 00 copies o originals D [other] Copies Date Number of Description sheets 1 10-01-07 Constnlction Plans These are transmitted as checked below: (X] for approval o for your file o as requested D for review & comment o for execution / signatures D [other] Remarks: This project was originaJJy submitted through the Plan Commission (45-02 DP Amend/ ADLS Amend) and pennitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: Daniel J. O'Toole, PE If enclosures are not as noted, kindly notify us at once rA C joll _". >: 74()O f'rc-d!1 Shc~delon(j i'.\.',::;nUt~, 5uif(-3' ! 50, in()i()nU.l')ol~s, '(\j 'U~250 . Phon'2 3 t 7.9 i 3.t/):~D . Fox 317.913.6928 ~'>-::!'-'Il;b\;t . CfnGl;",~-:':~~ . ifl',:1;,-]r~'Jp{"Jij~ . ,-','i":'~JI'-';h': 0r.-,r1!,csrn [Ill ~t2J~ ~~t:.ri,. "'.I3Z1:~ ~~~l,3!' ...._.r.... ~-""~ rl :J~. ~1;\~~.1 Evans, MechwarL Hambleton 3. Tilton, Inc. Engineers. Surveyors. Planner" Scientists Letter of Transmittal To: Mark Westenneier Cannel/Clay Parks Department 1411 E. 116th Street Cannel, Indiana 46032 From: Date: DJ 0' Toole October 1,2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: o Courier lXJ U.S. Mail D Fed. Ex. o UPS The following items: [XJ copies o originals D [other] Copies Date Number of Description sheets 1 10-01-07 Constmctioll Plans - C 1.0, C2.0, L 1.0 These are transmitted as checked below: [X] for approval o for your file o as requested D for review & comment o for execution I signatures o [other) Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constmcted. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact OUf office. Copies To: EMH&T File Oani If enclosures are not as noted, kindly notify us at once. ,"/: C r~', /, X \: ! 7i.C)Q r-Jorth Shcc1':~I(Jr-ld A.\:~-Hlt;e. Suii(:'0 50. hCji(~napoi;5-, 1i-,) .j525C ' P:':cr~e 31 7.9 i :~,693D . Fc:~ 31!'.9 j :i.tj928 C~)'llrli:",!)~ . <~;Jl(;I,,,,,-,~i . ~r:(-i:":"J~l.',p,:-,!ij . CI:_-'r~:)~!~ C;?mr't'i.c~:\:'l lIlI1 . ,;: i"'" .' 'm -''1,,- " H,." ~ c '&f "1 ., . ~ , " . ,--1 ( ~) .-".r._~,'fi."'~""~' .~ Evans, Mechwart, Hambleton & Tilton, Inc. Engineers, Surve'y'ors. Planners, SCientists Letter of Transmittal To: Scott Brewer, City Forester Urban Forestry - DOCS One Civic Square, 3'd Floor Cannel, Indiana 46032 From: Date: OJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: 00 Courier o u.s. Mail D Fed. Ex. Dups The following items: 00 copies D originals o [other] Copies Date Number of Description sheets 1 10-01-07 Conslruction Plans - Cl.O, CCl.l, C2.2, Ll.O These are transmitted as checked below: 00 for approval D for your file D as requested D for review & cOIrunent D for execution I signatures D[other] Remarks: This project was originally ~ubmitted through the Plan Commission (45-02 DP AmendJADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first pha~e was constmcted. This rcsubmittal is for the constmction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: If enclosures are not as noted kindly nolify us alonce. ,i>/, (~-_ i\1~': >: \r ~ 7 ~CD Nc~rth ShC(J(~lon!j !"venu::'.L SU!1e ] 50. jn<jiDt.KJpot\ ii'l 46250 . Phone 31 7 .91 :~.~q30 10 F:1:< 317.91 :'..-':.923 C'f,'I],i.:;"J:' . '~'::h~:r,r'C1' . 3rll.~!-"~",")~',A, . <~I\"j,-:.-;~~*, cJY1rri.C:GFi [I] ,1tI"'lf' , ~'T'7;' ",'0"", '(;)(;ol ~ -d ~ : '.Ill ~ \ ~1'~J If 1;" --':~ ~ . ~ Evans, Mechwart, Hambleton & lillon, Inc. Engineers, Surveyors, Planners, Scientists letter of Transmittal To: Chuck Shupperd Vectren Energy P.O. Box] 700 Noblesville, Indiana 46061 From: Date: DJ 0' Toole October I, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: o Courier 00 U.S. Mail 0 Fed. Ex. Ours The following items: [Xl copies D originals o [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans - C 1.0, C2.0, C2.2 These are transmitted as checked below: [XJfor approval D for your file o as requested 0 for review & comment o for execution / signatures o [other) Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ ADLS Amend) and pennitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about tJ?,e enclosed, please contact our 0 ffice. Copies To: EMH&T File Signed: If enclosures are not as noted, kindly nolify us at once. t/L (.'. (,,1 ..." :;< \' l 74{}(J r-Jorrh Shodelcnc! ,t. VGnl_!~:, .)t~!iie 150. ~nci!cnop:)ii)_, :1"') ~6'25C ~ P;~or:t~ 31 7_913_6~'3() . Fa,\{ 317.913.6925 :'>:..,,-,<;:L),;;,' :.~'p,~,r;,-,,";r'i . ~rl'.:.i:c;';i\'-Jf-C'~);' . (~hcr::_',!~c-, ':0m;"YI,(:o:-n f!l1I1 ""H' . --''',' ':T-" . " ~ i : , ,0.- , ~~~ ~I ~."".. I!, "'- <> ~ ~ ~ ~ '.P ~; Evans, Mechwarl, Hambleton & Tillon, Inc. Engineers. Svrreyars. Planners. Scientists Letter of Transmittal To: David Malone Panhandle Eastern Pipeline Co. P.O. Box 3~ Zionsville, Indiana 46077 From: Date: DJ 0' Toole October 1 , 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: D Courier 00 U.S. Mail D Fed. Ex. o UPS The following items: lXJ copies o originals D [other) Copies Date Number of Description sheets 1 10-01-07 Construction Plans - C1.0, C2.0, C2.2 These are transmitted as checked below: 00 for approval D for your file D as requested 0 for review & comment D for execution / signatures o [other) Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File If enclosures are nol as noted, kindly notify us at once. '/ C r", :' >: V I 7 4CJD I-'!(~!~!I Shoch,?:,lond (\v€-nue, Slfte 150. ~r';(ji:YiOC;)!:S_, ir'l .16250 . Pnone :3l ?v j :-L~q~KJ .. Fo:< :317.913_6928 :>~'~~'ll'b:j:O . ("11(_'ir\r~,:-:!~: . jrl,-i'-:';f1C"H..'\)i~ . Ct,;;:riG:~t'; ~;;{n;'l!_C:G:'1 1!I1II " e "W-' \ "')f'" , "' I"] '" :,= ~: ~_: ::. ~ ~-- q q,,, ~ 111.';' . ,~ Evans. Mechwart. Hambleton & Tilton, Inc. Engineers. Surveyors. Planners, Scientists Letter of Transmittal To: Jason Kirkman Brighlhouse Networks 3030 Roosevelt Avenue Indianapolis, Indiana 46218 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: o Courier [XJ u.s. Mail 0 Fed. Ex. o UPS The following items: [XJ copies D originals o [other] Copies Date Number of Description sheets I 10-01-07 Construction Plans - C 1.0, C2.0, C2.2 These are transmitted as checked below: [X] for approval D for your file o as requested 0 for review & comment D for execution / signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: If enclosures are not as noted, kindly notify us at Oilce. t,-i C I,j, :,-' >~ '.,/ r 7400 Ncrth ~~iC1(k;i~;n~j ~.v(snue. .suitc.~ 150, ir:c:lona;JO!\. nJ 46250 . PnQn~~'31/.913.6q~KJ .. Fo:< 317 .91 :~J>928 (.~';,-I:l,~d'; . Cinl.:{t'~c~! . [r"_';':'"_;'\(J;';;(:Ji~ . Ch~:((~!~~,;: f:;,~nrii.C{'),':1 11[1 f1I";; , ,".";'; rrr'" ,c,.. " &' " \.:.' " -l :;i< ~ ) '( ,.. _ . _ ,,)'~ ~ ::~ . r rt Evans, Mechwort, HClm~Jlelon & Til1on, Inc. Engineer" Surveyors, Plonners. Scientists Letter of Transmittal To: Shirley Hunter Duke Energy 16475 Southpark Drive Westfield, Indiana 46074 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: o Courier 00 U.S. Mail 0 Fed. Ex. o UPS The following items: 00 copies o originals 0 [other] Copies Date Number of Description sheets 1 10-01-07 Constnlction Plans - Cl.0, C2.0, C2.2 These are transmitted as checked below: [i] for approval Ofor your file o as requested D for review & comment o [other] D for execution I signatures Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amendl ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: If enclosures are no/as noled, kindly notify us at once. !A c: i..~ .:.: >: 'y' I 7,100 t<.lodh Shod~:I()n~:l ;'\vcn~!c:. SU~t2 ~ SO. jn(jicJnGp(jj1S. H'.j 'f/~?SO . ~"t:'Ion~-?" 317.9- i :3.~;9:~() , Fo;< :317.9 i 3.692(3 r_,:~:;..,rrlJ"~ . Ci~'C:i,:';;J~~ . :m:,',}n,jr~,,".!i~' C'~t;r!,_,ti~_. crL!1 r .c~~~r':'-j IIIJ 'H'"V~1R~J.:I!r~'~":' 'r. b " , 8[;, . " " ,. ~ (~" <, " -0.' .0 Q" r ",-:- . h...,--, Evans. Mechwarl. Hambleton & Tillon, Inc. Engineers, Surveyors, Planners, Scientists Letter of Transm ittal To: Dave Huffman Carmel Street Department 3400 W. 131 S! Street Westfield, Indiana 46074 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: SpringmilI Medical Building Phase 2 We are sending you herewith via: D Courier !Xl U.S. Mail 0 Fcd. Ex, Durs The following items: [X] copics o originals o (other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans - CI.O, C2,O, C2.2 These are transmitted as checked below: 00 for approval D for your file o as requested 0 for review & comment Dfor execution! signatures D[other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP ArnendJADLS Amend) and pennitting process in 2002. It was then broken into two phases and only the tirst phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File If enclosures ere not as noted, kindly notify us at once, ~'/. r.,,,-;..,;'~ v 1 7 <X} l".k~'rY' ShO(}.:~t00~j /--.venue. Suite] 50, if:{:::lc'YiOP()iis, i~-~ 46250 .. PhGr':~~ .? 17 .91 ;-5.6930 " Fo.'\ 317.9 :.;.f/928 C~A.-'f~.,t,u~ . Cil'(_';(,nr.c~: . jrid'<,,',npc;;lr:; . (~il':JI-~':;"!C' el"il^"corr III1l ,,,..,> T" H'" ~ {1; .. i(.)iJ ~ (. - i ~ -) ~ =~ '. Evans, Mechwart, Hambleton & Tilton, Inc. Engineers, Surveyors, Planners, Scientists Letter of Transmittal To: Ryan Hartman Clay Township Regional Waste District 10701 North College Avenue, Suite A Indianapolis, Indiana 46280 From: Date: OJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmi1l Medical Building Phase 2 We are sending you herewith via: o Courier [XJ U.S. Mail 0 Fed. Ex. Dups The following items: 00 copies D originaLs o [other] Copies Date Number of Description sheets I 10-0 I -07 Construction Plans - C L .0, C2.0, C2.2 These are transmitted as checked below: [iJfor approvaL Of aT your file o as requested 0 for review & comment D for execution I signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and pennitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File ~ If enclosures are not as noled, kindly notify us at once. ~,~'l I,,~ _:<: "': v I 7 4DO {\k:.rt;1 S!lo(k~~ond /,.vc:m.h:;, Sui:c ] SO. ir~c:)c~opcl~~, it< 46'250 . Phon~:J 317_7' I :-s.t:.93CJ . Fox .317.9 j ~~.6928 (~-:"!;.'n:L"J:O . Cb<+~,",,:;~! . 1~\C"_;;~,--"j_"::,li, . C;1\-:r~;;,Yl'> c;m~li-,(';c.::r(l I!I[I) .- "-q;,<~;:, r';TP--'-- ~ I:d~. 'O~ I "00"-- ~ : ~ . t. , .. lj~'~ .b..~ ~~. Evom, Mechwart, Hambleton & Tilton, Inc. Engineers, Surveyors, Plonners, Scienfists Letter of Transmittal To: Chris Ellison Office of Fire Chief, Fire Station #1 Two Civic Square Carmel, Indiana 46032 From: DJ 0' Toole October 1, 2007 Date: Job no.: 2007-1927 Re: Springmil1 Medical Building Phase 2 We are sending you herewith via: [iJ Courier D u.s. Mail 0 Fed. Ex. Ours The following items: [Xl copies o originals 0 [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans - CI.O, C2.0, C2.2 These are transmitted as checked below: Ii] for approval o for your file D as requested 0 for review & comment o for execution I signatures D [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File If enclosures are not as noted, kindly notify us at once. i'-/, C. i,,-\ '1 >: \/ l 74CO r"cJGrnl Shude!nnd ;:'.VE~tll}e. Su:t~~ 15(:. [rv.j~r:::nopo!;~, :N ,t6250 a Pr)()nc ~,17.9 3.f}}3D . F~H 3 J 7 _912-_{~92B C>....".:t,,!;-,I.);: . ',-.-inG:r:,,;:~!; ~ l:lc';'~J'k'r.';"lj~ . Ccy;:~!::t~"" cnlrll.cor-r' rllII "'H~ ,,: "'tr'Y " " " ,& ,," ':. t 1",7 .J' I "", ,. . Evans, Mechwart Hambleton & Tilton, Inc. Engineers, Surveyors, Plonners, Scienlisis letter of Transmittal To: Bill Akers Cannel Clay Conununications 31 First Avenue NVl Cannel, Indiana 46032 From: Date: DJ 0' Toole October 1, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: D Courier 00 U.S. Mail D Fed. Ex, Dups The following items: 00 copies D originals D [other] Copies Date Number of Description sheets 1 10-01-07 Construction Plans ~ C2,O These are transmitted as checked below: 00 for approval D for your file D as requested D for review & comment D for execution I signatures D [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amendl ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed:U~ Dan' 1 J. O'Toole, PE If enclosures are not as noted, kindly notify us at once. !A C ""~':-: ~; \/ I 7 400 ~.Jc:rth Sho(j(~IClld ,:., ....'cnu~;, 'Slj;t~~ ! SO, 1~~(ji()r1~;pDj;s, ~t,j ,~62S0 . PriCjne .317.9 J ~3_69.30 ~ Fo;( 2. J 7,9 i 3.6928 C,,;','.'~,~l"';::: . Cine:;"';,,!; . ;:-,~~'-:1nCJLy;ji~ . Cl.,,~!>,i!~ ernhl.c~)rn 11111 :[~:l~:~j~ .0 ,,'~I', Evans, Mechwart, Hambleton &. Tilton, Inc Engineers, Surveyors, Planners, Scientists . . 1 ~~~', Letter of Transmittal I .', '- j ;.J~L~i To: Postamster clo Dale Sparks Cannel Post Office United States Postal Service 275 Medical Drive Carmel. Indiana 46032 From: Date: DJ 0' Toole October l, 2007 Job no.: 2007-1927 Re: SpringmilI Medical Building Phase 2 We are sending you herewith via: D Courier [XJ U.S. Mail D Fed. Ex. Ours The following items: [XJ copies D originals D [other] Copies Date Number of Description sheets 1 ]0-01-07 Construction Plans - C1.0, C2.0 These are transmitted as checked below: 00 for approval D for your file D as requested 0 for review & comment Ofor executIOn / signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed, This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact our office. Copies To: EMH&T File Signed: If enclosures are not as noted, kindly notify us at once. ~,.j C L1/>; \: I 7400 j-.:cdh ShccJ'3'lonj ?V(;rlue. S<.:ite 'I 50, ~r';t-.riQr:c,~-;DJis. ~~,j ,:~()25C . Ph00=:? ,J 17.91 J.6930 . FQ;< .317.91 ,:L{,9?8 ~:'-_'~_'fd)~):; . C>ldr"~-..,,.~ . :'l{i;:~"lj[C,jli:: . (-IYJ~~~j~1F: enlrii.com IIIIJ . ~ 'A.. "': T' H.~~~ . '00' :>,. -.ol c , . ~ \ ",_" , -'t /, ~ ~ 1\ 1:,\ RECEIVED OCT ~, 'Ll"" I . I)' DOCS Evans. Mechwarl. Hambleton & Tillon. Inc. Engineers. Surveyors. Planners. Scientists Letter of Transmittal To: Angie COlU1 Dept. of Community Services One Civic Square, yd Floor Carmel, Indiana 46032 From: Date: DJ 0' Toole October I, 2007 Job no.: 2007-1927 Re: Springmill Medical Building Phase 2 We are sending you herewith via: [X] Courier D u.s. Mail D Fed. Ex. Dups The following items: [X] copies o originals D [other] Copies Date Number of Description sheets 2 10-01-07 Construction Plans I 9-27-07 T AC Application 1 9-27-07 Check #3657 for $277.50 1 10-01-07 O&M Manual 1 9-28-07 Drainage Report 1 10-01-07 Copy of all TAC transrrnttalletters These are transmitted as checked below: 00 for approval Dfar your file D as requested D for review & comment Dfor execution I signatures o [other] Remarks: This project was originally submitted through the Plan Commission (45-02 DP Amend/ADLS Amend) and permitting process in 2002. It was then broken into two phases and only the first phase was constructed. This resubmittal is for the construction of Phase 2. If you have any questions about the enclosed, please contact OUf office. Copies To: EMH&T File ~ Signed: If enclosures ere not es noted, kindly nolify us 8t once. r\" ,=-~ t-i: .". ); \i I ? 400 NeJrth Shaael:]nd ,A,venuH. Su!r~;; ! 50. 1r',(j!OrlCpClis 4-~250 . Prionf~ ~~ 17.9 L~.6930 . Fa;-< 31? .Y13J/)28 C::"'!~I~1'l,;_'::: . :'iIXji":..l!~ . iflrj~{""I;:Jpcr, . ::]\C1;:GH~ cmnl.CQin