HomeMy WebLinkAboutCorrespondence TAC
u
UO~I 0000<6' i.A:c
December 5, 2006
..\ ..--&.....-.:..
,'y- "-
. j/ ~,.~ ", "
. '!'ir:rf\\\~~:;
~,(.;..; -' .
JAMES BRAINARD, MAYOR
\ .r I.
\.
Mr. Michael B. Jett
American Consulting, Inc.
7260 Shadeland Station
Indianapolis, IN 46256
'.
RE: Methodist Medical Plaza Parking Expansion-Project Review #1
Dear Mr, Jett:
We have reviewed the construction plans submitted for this project for review for the October 18, 2006
Technical Advisory Committee. We offer the following comments:
GENERAL INFORMATION
I. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
. Streets and Right of Way, Pennsylvania Parkway - City of Carmel
. Water - City of Carmel Water Utility service area
. Sanitary Sewers - Clay Township Regional Waste District service area
. Storm SewersfDrainage - City of Carmel
. Regulated! Legal Drains - Hamilton County Surveyor's Office.
3. Board ofPubHc Works and Safety Requirements:
Cl It does not appear that this project will require Board of Public Works and Safety approvals.
l!l Please be adv~ed that any open cuts 01 existing perimeter-dedicated streets under City of
Carmel jurlsdiction will require separate Board of Public Works and Safety approval
. Any permanent improvement (including irrigation systems) to be installed within dedicated
right of way or dedicated easements. This approval would require a Consent to Encroach
Agreement between the Owner and the City of Carmel.
. Right of Way Dedication (if applicable)
I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda
deadlines for your use. Please use the Engineering Department deadlines for submissions to the
Board.
Any submission to the Board requires prior approval by the Carmel Clay Plan Commission
and/or the Board oj Zoning Appeals (if applicable) and completion of review by the Technical
Advisory Committee. All written requests to be placed on the Board's agenda must include the
appropriate Docket Number and the date (or dates) o[ approval by the Plan Commlsslon and/or
the Board oj Zoning Appeals (if applicable).
4. T.A.C. ReviewfDrawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing
and be accompanied by a drawing reflecting requested revisions. Final drawings will not be
approved for construction until all Engineering Department and Carmel Utilities issues have been
resolved. The design engineer must certifY all drawings submitted for fmal approval. We will
require a minimum of four-sets of drawings for approval after all issues have been resolved. The
drawings will be stamped as approved and will be signed by the City Engineer. One set will be
distributed to the Owner/Developer to be maintained on the construction site. The Engineering
Department will retain two sets and Cannel Utilities will receive one set. [fmore than one
DEPARTMENT Of ENGINEERING
ONE CIVIC SQUARE, CA.RIvIEL. [N 46032 OFFICE 317.571.2441 FAX 317.571.2439
EMAIL engineering@carmeLin.gov
I
'.
u
u
approved/signed set is desired, we will approve a maximum of two additional sets for a total of
six. However, the additional sets must be submitted with the required four sets.
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
right of way or dedicated easements will require a Consent to Encroach Agreement with the City
of Carmel's Board of Public Works andSafetv.
6. We are enclosing copies of the following information for your use:
. Commercial Project Approval Procedures
. Permit Data, Contacts, etc.
BONDING REOUIREMENTS
7. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance GuaranteeslEngineer's Estimates
Erosion Control
It is our assumption that the storm sewers/storm drainage system will be privately owned and
maintained. Please contact Amanda Foley, Engineering Department Storm Water Administrator,
for erosion control requirements.
The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100%
of the cost oflabor and materials to construct the individual improvements, to be provided by the
design engineer. Please provide detailed Engineers Estimates for each improvement including
unit costs, quantities,. materials and types of materials, etc. Upon completion and release of
individual Performance Guarantees, a three-year Maintenance Guarantee may be required. The
Maintenance Guarantee amount is based upon 10% of the Performance amount. Performance
Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please
reference the enclosures for more detailed explanation of our procedures.
Right of Way Permit and Bonding
Any work in the dedicated right of way of Pennsylvania Parkway will require a Right of Way
Permit. If the work is included in the scope of work ofa posted Performance Guarantee, no
additional bonding will be required. If it is not included, a License & Permit type Right of Way
bond will be required in the amount of $2,000.00 per instance of work in the right of way. Any
open cut in the pavement of Pennsylvania Parkway will require separate Board of Public
Works and Safety approval.
8. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations
submitted to this office for review. We will share Crossroad's comments as they are received.
When construction plans are submitted for review for this development, please provide 2-sets of
plans and calculations to allow us to send the extra set to Crossroad to save some time in the
review process. Please contact Crossroad Engineers to obtain a drainage review checklist. The
Depamnent will expect .the design submitted for the development of construction drawings to
adhere to this checklist.
CONSTRUCTION PLAN COMMENTS
9. A seven-page Plan Certification Form has been enclosed. This form was created with the desire
and intent to streamline the plan review process. We request that you please complete this form
and return it to the Department of Engineering as soon as possible. Additional comments will be
provided by the Department of Engineering after the Certification Form is returned. Please treat
each item on the form as a requirement of the Department of Engineering. Providing a "no" or
"NI A" response to any ofthe items does not relieve the Developer of the responsibility of meeting
the requirements of the Department of Engineering. The Department of Engineering will make
the fmal determination as to the acceptability of any "no" or "N/A" responses.
10. The addition of an overall site plan that would include the parking expansion area would be very
helpful. It is difficultto determine where this parking expansion area is located in relation to
Pennsylvania Parkway and the Methodist Medical Plaza.
11. The Engineering Department does not review or approve landscape plans or lighting plans. Please
remove Sheets C6.1, Landscape Plans and C7.l, Site Lighting Plan from sets presented to this
.,
-:'
u
u
Department for approval. Please remove the reference to these sheets from the Index on Sheet
CO.l
12. The Department requires that the construction drawings be developed in accordance with the City
of Carmel digital submission standards and that all required submittals for primary plat, secondary
plat, and construction drawings be made. The digital files must be submitted to the Department of
Engineering prior to.approval of the construction plans.
13. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to
accommodate this policy. The language of this policy must be added to a specification sheet on the
plans.
14. This project is subject to the Carmel Stormwater Management Ordinance, which was adopted
February 6, 2006.
15. Erosion and sediment control measures and post-construction best management practices must be
bonded.
16. .A storm water management permit is required prior to commencing any earth disturbing activity.
This permit is not issued until the construction plans are approved. Please add a note to this effect
to the plans and revise General Grading Note 2.
17. Please review erosion and sediment control measures and post-construction best management
practice requirements with Amanda Foley.
18. City standard curb is required by ordinance. Please replace the curb detail on C5.l with the
appropriate city standard details.
19. Please confum with the Urban Forester requirements for structural soil in the parking lot islands.
20. The City defers to the County for approval of the legal drain easement encroachinent and for
approval of the installation of structure #3 on the legal drain.
21. Please indicate the outfall of the existing pipe to the east from existing structure #4.
22. Where is the storm water detention for this expansion provided? If the area was master plarmed, is
the proposed "c" value the same value anticipated for this area at the time of master planning or is
it less (or higher)? Does the acreage of the expansion match what was anticipated at the time of
the master plarming?
23. Please verifY the capacity of the existing piping to convey the new flows from the expansion.
24. A portion of the parking lot drains to storm structure No.6, directly into the legal drain. Is this
runoff detained in a downstream facility? If it is not, provisions shall be made to detain the
increase in runoff.
These comments represent the Department of Engineering's initial review of the development plan for this
project. We request that all responses to our comments be provided in writing. Failure to provide written
responses may result in the delay of the review process.
It is critical that our office be made aware of all modifications made on the plans being resubmitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
provide revised plans including all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, BZA or other committee meetings.
All bonds and performance guarantees must be posted prior to Engineering Department approval of
construction plans. Also, Board of Public Works and Safety approvals and any other governing agency
approvals (if required) must be obtained prior to Engineering Department approval.
The Department reserves the right to provide additional comments based on subsequent reviews.
If you have questions, please call me at 571-2441.
r
u
u
cc: Matt Griffin, Department of Community Services
John Duffy/Paul Pace, Cannel Utilities
Greg Hoyes, Hamilton COWlty Surveyor's Office
Greg Ilko, Crossroad Engineers
Project File
Engineering Department Review
S:\DHILL\PROJREV06\METHODISTMEDICALPLAZAP ARKEXT
w
Q.~..~ -.... " .. -,' .- '"
...... ',- ~ ' . '. -., . ' .
u ~ JQ~UOotJo:~~r~c::
.~
November 21,2006
Mr. Tim King, EI
American Consulting, Inc.
7260 Shadeland Station
Indianapolis, IN 46256
RE: Methodist Medical Plaza Parking Expansion
Dear Mr. King:
The Engineering Department has received your comment letter and drawings dated November 15, 2006
based upon the storm water quality review comments of October 18, 2006.
These comments have been satisfactorily addressed with the following exceptions:
BONDING REQUIREMENTS
I. The following bonding requirements apply to this project:
Performance Guarantees
An Erosion and Sediment Control Performance Guarantee is needed for this project
STORMW ATER QUALITY REVIEW COMMENTS-CONSTRUCTION PLANS
The following items of the storm water pollution prevention plan have not been satisfied:
B6. Sediment control measures for storm sewer inlet protection
The note on C4.1 should be corrected to reflect changes to planned inlet protection.
810. Location, dimensions, specifications, and construction details of each sturmwater quality
measure
The note on C4. I should reflect the statement in your response letter.
B14. Monitoring and maintenance guidelines for each proposed stormwatcr quality measure
Specific maintenance requirements for the Catch-All inlet protection are needed.
C2. Sequence describing stonnwater quality measure implementation
The City of Carmel requires that an stormwater leaving a site (post construction) be treated by a
minimum of two different water quality BMPs and that the maj or pollutants [rom the project be
treated. Although the existing pond was not originally designed as a water quality BMP and has
not been demonstrated to meet the City o[ Carmel Stormwater Technical Standards Manual COT
post-construction BMPs, the City is accepting it as one of the two required BMPs. This site is
being converted from primarily woodland to impervious parking, which can have a significant
impact on water quality. Taking these factors into account, a second BMP will still need to be
planned, and the major pollutants listed in Cl will need to be addressed.
C3. Description of proposed post construction slormwater quality measures
C4. Location dimensions, specifications, and constl'uction details of each stormwater quality
measure
C5. Description of maintenance guidelines for post construction storm water quality measures
Submit an executed Ov.rner Acknowledgement Agreement for the second water quality BMF.
,:"
q'
w
u
We request that all responses to our comments be provided in writing. Failure to provide written responses
may result in delay of the review process.
It is critical that this office be made aware of an modification made on the plans being re-submitted,
paltieularly if any such changes arc considered "new" or fall outside of our previous reviews. Please
provide revised plans indicating all revisions. Please notify us of any changes and specifically state a.ny
changes, including changes resulting from Plan Commission, Special Studies or other committee meetings.
All bonds and performance guarantees (ifrequired) must be posted prior to Engineering Department
approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if
required) must be obtained prior to Engineering Department approval.
The Department of Engineering reserves the right to provide additional comments based on subsequent
reVIews.
[f you have questions, please contact the Engineering Department at 571-2441.
Sinct:rely,
Amanda Foley
Storm Water Administrator
Dt:partment of Engineering
cc: Matt Griflin
Scott Brewer
Project File
.4
u
: ;C:V';K1~'Z\O r1:C-:-~--"
u~-L~U c} -11\C. ~:
October 18, 2006
Mr. Michael B. Jett
American Consulting, Inc.
7260 Shadeland Station
Indianapolis, IN 46256
RE: MethodistMedicalPlaza Parking Expansion
Dear Mr. Jell:
Thc following letter represents comments from the Engineering Departmcntfor this project specifically
addressing the areas of storm water quality. We have reviewed the c,onstruction drawings submitted for
this project for the October 18, 2006 Technical Advisory Committee meeting and offer the following
comrnents:
BONDING REQUIREMENTS
1. The following bonding requirements apply 10 this project:
Performance Guarantees
An Erosion and Sediment Control Performance Guarantee is needed for this project.
STORMW ATER QUALITY REVIEW COMMENTS-CONSTRUCTION J>LANS
The following items of the storm water pollution prevention plan have not been satisfied:
A5. Legal Description of the Project Site
I did not see this in the plans.
B2. Sequence describing storm water quality measure implementation relative to land disturbing
activities
A preconstruction meeting should be scheduled with the City of Carmel Engineering Department.
There is not any building construction. Make the sequence specific to this project.
B4. Sediment control measures for sheet llow areas
Where are the refetenced existing pond and wetland loeatcd?
B6. Sediment control measures for storm sewer inlet protection
The silt fence inlet pro'tectiondetail is the only inlet protect shown. This practice is not acceptable in
paved areas. Specify another inlet protection measure for these areas. Straw bales are not a
sufficient inlet protection measure either.
Inlet protection is needed at the storm inlet in the existing parking lot nearest the conshuction
entrance.
Alllhe water appears to be draining to two existing storm inlets inside the project limits. Address
how these inlets, and the Ihird inlet located inside the construction limits, will be handled during
grading and construction.
BI0. Location, dimensions, specifications, and construction details of each stormwater quality
measure
If the ponds are used for sediment control purposes, then they will need to be dredged following
construction. Otherwise a plan describing what practices arc needed in order to keep sediment on
site.
;"
Ii
/ /
.,
~'
~.
u
u
A detail for silt fence was not provided.
Ell. Temporary surface stabilization methods appropriate for each season
Mulch should be applied with all seed.
B12. Permanent surface stabilization specifications
Mulch should be applied with all seed.
B14. Monitoring and maintenance guidelines for each proposed stormwatcr quality measure
Inspection reports may be requested by the City of Carmel, not the Soil and W aler Con~ervation
District.
The existing adjoining parking lot and all perimeter City slreets shall be monitored daily to prevent
sediment from leaving the construction site.
Only include those practices specific to this project.
C2. Sequence describing.stnrmwater quality measure implementation
The City of Carmel requires that all ~torniwater leaving a site (post construction) be treated by a
minimum of two different water quality BMPs. A second EMP (in addition to the pond) is
required for thi~ project. Due to the amount of trees that will be lost, we reconm1end you consider
a permeable pavement'System as your second BMP.
C3. Description Of proposed post construction stormwater quality measures
C4. Location dimensions, specifications, and construction details of each stormwater quality
measure
C5. Description of maintenance guidelines for post construction storm water quality measures
The included BMP owner agreement should be completed and submitted with the O&M manual for
the second BMP.
The City of Carmel will require yearly inspection reports of the water quality BMPs. The first will
be due one year after the Notice of Termination is submitted.
Wc request that all responses to oUr comments be provided in writing. Failure to provide written responses
may result in delay of tlle review process.
It is critical that this office be made aware of all modification made on the pI arts being re~submitled,
particularly if any such changes are considered "ncw" or fall outside of our previous reviews. Please
provide revised plans indicating all revisions, Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, Special Studies or other committee meetings.
All bonds and performance guarantees (if required) must be posted pr:ior to Engineering Department
approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if
required) must be obtained prior to Engineering Department approval.
The Department of Engineering reserves the right to provide additional conmlents based 011 subsequent
reVIews.
If YOll have questions, please contact the Engineering Department at 571-2441.
Sincerely,
Amanda Foley
Storm "Vater Administrator
Department of Engineering
cc: Matt Griffin
Project File
,
/1
I ./
10/15/2885 15:15
3177759528
U
HAMILTON CD SURVEYOR
PAGE 1211/02
u
,Xcillon C. 'UJal'OJ Sltn1t.')!OI'
'Ph",,/, U 17.1 77(;"':)4~'S
'1-11,'- U I";) i7(;-_')('';:S
Slrilc 188
October 16, 2006
American Structurepoint, Inc.
AnN: Mike Jett
7260 Shadeland Station
Indianapolis. IN 46256.3917
VIA FACSIMILE: 543-0270
. .RE: Meth()did.Me-diCirJl>ll!lz~ I,JafkiQ:g.~~paDsi~n
Dear Mr. J en:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's
Office on October 4. 2006 for this proje(;t and have the following comments:
]. The proposed project fall within the in.coIporated area and MS4 jurisdiction of the
City of Carmel.
2. The project falls in the Clara Knotts Regulated Drain Watershed.
3. The proposed project has the Clara Knotts Regulated Drain running tbrough this
area.
4. The proposed site DOES NOT fall 1n a CamJ.el Wellhead Protection Area.
5. Please submit the following procedural items to this office. outlet permit (new
Structure on Clara Knotts Drain) and Individual Non-enforcement agrcemen.t
(encroachments of parking lot in RD.E.). The applications are avaiJable on our
website at httv:I/v,.ww,co.hamilton.in.us. go to Departments, Surveyor~ and
Forms.
6. As a condition of the outlet penmt,. as-built data will need to be provided to the
Hamilton County Swveyor's Office Standards for the new manhole placed on the
regulated drain and the TC for the existing casting that i~ being changed..
10/16/2005 16:15
317776952B
U
HAMILTON CO SURVEYOR
PAGE 132/132
;'
u
7. Structure #3 win not bea1lowed to be a doghouse type structure and must be a full
manhole per HCSO Standard Detail D~21 or Dm22. Please note this on the plans
so the contractor is aware of this requirement and include the appropriate detail in
the construction plans.
8. The casting placed on the Clara Knotts Regulated Drain will need to be per HCSO
Standard Detail CT-l and CT~10. Please include these in the construction plans.
9. Please label aU $torm sewers that are part of the Clara Knotts Regulated Drain.
10. Per Indiana Code 36-9-27-33, no landscaping is to be placed in the Clara Knotts
Regulated Drain Easement. Sheet C6.I does not show the existing R.D.E. and
shows several trees in the easement area.
11. Please submit revised plans after all initial HCSO, Crossroad Engineering. and
Cannel Engineering comments have been addressed.
12. Please note that further comments may be necessary at a later date.
Should you have any questions, I can be reached at 317-776-8495.
~'~
Greg Boyes, ACl CFM
Plan Reviewer
cc: Matt Griffin - Cannel DOCD
Amanda Foley - Carmel Engin,eering
Mike McBride - RCHD
Dick Hill - Carmel Engineering
Greg Ilko ~ Crossroads Engineers
u
'~t%-
.r.... -~ .; .~~\~b(""~~~~?C...
"..' .,., .,~,c1" I~~
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571-2600 Fax (317) 571-2615
Fire Prevention Bureau
Michael Jett
American Consulting, Inc.
74260 Shadeland Station
Indianapolis, IN 46256
~j:: . Meth,~qJsrPI~e..@:t!ill1g~
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Methodist Plaza Parking
and has approved the plans subject to the following:
1, After review of this project, I have no additional requirements to be met at this time
2.
3.
4.
5.
6.
Please respond to the above noted condition(s) in writing and submit to our office prior to
the scheduled Technical Advisory Meeting for this project.
Date: October 12. 2006
By: Gary Hoyt. Fire Marshal
Carmel Fire Department
Carmd Cbv School, TAC C()lIImn~.17,06
u
11'~O ::II.m. Docket No. 06100006 T AC: Carmel Science and Tech Park. Block 11
Construction Plans
The applicant seeks to construct site infrastructure.
The site is located at the SE corner of 122nd Street and Carmel Drive and is zoned
M3.
Filed by Robert Doster of Schneider Engineering for REI Real Estate.
CCS: No comment.
11 :45 a.m. Docket No. 06100007 SP: Stafford Lane Subdivision Secondary Plat
The applicant seeks approval to plat 50 lots on 29.04 acres.
The site is located at 4235 East 146111 Street and is zoned S I .
Fi led by Eric Batt of Schneider Engineering, Tnc. for The Drees Company.
CCS: No comment.
12:00 pm Docket No. 06100008 TAC: Methodist Medical Plaza Parking Expansion
The applicant seeks to expand parking lot into previously approved banked
parking area.
The site is located at 201 Pennsylvania Parkway and is zoned B5.
Filed by Bill Butz of American Consulting for HCPT Indiana LLC.
CCS: No comment.
12:15 p.m. Docket No. 06100009 TAC: Police Maintenance Department Expansion
The applicant seeks to construct the Cmnel Police Mai ntenance Dep~U1mcnt
addition at the existing Carmel Street Department Maintenance facility.
The site is located at 3562 West l3ls1 Street and is zoned S1.
Filed by Karen Collins of Cripe Engineering for the Carmel Police Department
CCS: No comment
12~~0 p.m, Docket No. 06080004 Z and 06080005 ADLS: Global Financial Consultants
The applicant seeks rezoning construction approval for a proposed office building
and related parking. The site is currently zoned S I, with a request to rezone to the
B2 classification.
The site is located at 3745 West 98th Street.
Filed by Robert Clutter of Clark Quinn Moses Scott and Grahn, LLP for Global
Financial Consultants.
CCS: No comment.
u
u
ilLJt"lbm e Jl1L t
October 6, 2006
Michael B. Jett
American Consulting, INC.
7260 Shadeland Station
Indianapolis, IN 46256
RE: Methodist Plaza Parking
Project No. IN20050482
Dear Mr. Jett:
The plans submitted for the above-mentioned project have been reviewed.
At the present time, I see nothing in the plans that would hamper law enforce-
ment efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
J#MkdD. ~~_.
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
131l71571-2&00
A Nationally Accredit
'forcement Agency
IF"x (3]]) 5n-2G1l2
.. . ( \
AMERICAN CONSUL lING, INC.
Architects
Consultants
Engineers
7260 Shadeland Station, Indianapolis, IN 46256
(317) 547-5580 FAX: (317) 543-0270
info@amercons.com
LETTER OF TRANSMITTAL
Date: 10/3/06
Project Name: Methodist Plaza Parking
Project Number: IN20050482
"
We are [SJ Enclosed via. C8J Mail D Messenger D Overnight
sending you: D Separately D As Requested [g] For Your Review & Comment [8J For Your Information
Deliver by: Time:
From: Michael B. Jell
Remarks: The attached items are being submitted for your review. This project has been filed allhe Carmel Department of
Community Service for TAC Application Review. If you have allY questions regarding this project, please contact our office.
Th k
an . you.
D John Duffy D Terry Krueskamp D Cindy Klaiber
Carmel City Utilities City of Carmel Information Systems Carmel Postmaster
760 Third Avenue SW Three Civic Square United States Postal Service
Carmel, IN 46032 Carmel, IN 46032 275 Med ical Drive
Carmel, IN 46032-9998
D Bill Akers D Mark Westermeir D Ron Farrand
Carmel/Clay Communications Carmel/Clay Parks Department Carmel/Clay Schools
31 First Avenue NW 760 Third Avenue SW 5201 East 131 st Street
Carmel, IN 46032 Carmel, IN 46032 Carmel, IN 46033
D Shirley Hunter D Bill Hohlt D Karyn Ryg
Duke Energy Duputy Building Commissioner Carmel DOCS Transportation Systems
16475 South park Drive One Civic Square Coordinator
Westfield, IN 46074 Carmel, IN 46032 One Civic Square
Carmel, IN 46032
o Jennifer Bruner D Scott Brewer D Gary Duncan/Nick
Clay Township Regional Waste District Dept. of Community Services Ridden/Amanda Foley
10701 N. College Ave., Suite A One Civic Square Dept. of Engineering
Indianapolis, IN 46280-1098 Carmel, IN 46032 One Civic Square
Carmel, IN 46032
D Steve Broermann o Carmel Department D Jason LeMaster
Hamilton Co. Engineering/Hamilton Ca. Dept. of Community Services Hamilton County Health Department
Highway One Civic Square Hamilton Co. Judicial Center, Suite 30
1700 South 10th Street Carmel, IN 46032 One Hamilton Square
Noblesville,lN 46060 Noblesville, IN 46060c2229
D Robert Hendricks o John South o Greg Hoyes
Hamilton County Local Emergency Hamilton County Soil & Water Hamilton County Surveyor Office
Planning Committee Conservation One Hamilton Square, Suite 146
18100 Cumberland Road 1108 South 9th Street Hamilton County Judicial Center
Noblesville, IN 46060-1624 NOblesville, IN 46060 Noblesville, IN 46060
"
,,,..
u
u
AMERICAN CONSULTING, INC.
Architects
Consultants
Engineers
7260 Shadeland Station, Indianapolis, IN 46256
(317) 547-5580 FAX: (317) 543~0270
info@amercons.col1l
LETTER OF TRANSMITTAL
We are ~ Enclosed
sending you: D Separately
via ~ Mail 0 Messenger
D As Requested ~ For Your Review & Comment
o Overnight
D For Your Information
Remarks:
Deliver by:
From: Michael B. Jell
Methodist Plaza Parking IN20050482
Time:
Date:
D Chuck Shupperd D Ron Morris o Jennifer Marlett
Vectren Energy Indianapolis Power & light Co. Indianapolis Water Co.
PO B'ox 1700 3600 N. Arlington Avenue PO Box 1220
16000 Allisonville Road Indianapolis, IN 46218 1220 Waterway Blvd.
Noblesville, IN 46061 Indianapolis, IN 46206
D Jason Kirkman D Gregory IIKO"PE o Gary Hoyt
Brighthouse Networks Crossroads Engineering Office of Fire Chief, Fire Station #1
3030 Roosevelt Avenue' 3417 South Sherman Drive Two Civic Square
Indianapolis, IN 46218 Beech Grove, IN 46107 Carmel, IN 46032
D Michael Fogarty D Teresa Magee/Mark Wood o Brooke Gajownik
Office of Police Chief Panhandle Eastern Pipeline Co. Hamilton County Sheriff's Office
Three Civic Square PO Box 38 18100 Cumberland Road
Carmel, IN 46032 9371 Zionsville Road Noblesville, IN 46060
Zionsville, IN 46077
D Mike McBride o Shirley Hunter D Dave Klingensmith
Hamilton County Highway Duke Energy Carmel Street Department
1700 South 10" Street 1441 s. Guilford Road 3400 W. 131s1 Street
Noblesville, IN 46060 Carmel IN 46032 Westfield, IN 46074