Loading...
HomeMy WebLinkAboutCorrespondence TAC u u BRENWICK Date: To: From: Re: April 1 8, 2007 Scott Brewer Parks Pifer CVS Landscape Plan Approval The following notes were made on the approval for the CVS landscape plan: Landscape changes for CVS: Due to insect problems, (Japanese Beetle) associated with the Horsechestnut and the proximity of those trees with the public, Brenwick has requested the following changes for all street trees on Pettig'ru Street. ' Aesculus x cornea 'Briotii'/Rubyred Horsechestnut 2 % - 3" are required to be: Cladrastis kentukea/Yellowwood 2 Y2 - 3" . . For CVS this will involve 3 trees. Please let me know if you have any questions or if we need to do anything further regarding requirements. 1282'1 E. New Market St. Suite 200 · Carmel, Indiana 46032 · 317.574.3400 · 317.5743919 Fax brenwick@brl'llwick.com htlp:!/www.brl.llwick.com ~ o u u March 2, 2007 Mr. Craig W. Forgey American Consulting, Inc. 7260 Shadeland Station Indianapolis, IN 46256 EL lJ o6k<JI D(Q II 01) 11) JAMES BRAINARD, IvlAYOR HE: The Village of West Clay, CVS Pharmacy-Project review #3 Dear Mr. Forgey: The City has received your comment letter and drawings dated February 27,2007 based upon the City review of February 20, 2007. The comments from the City review have been satisfactorily addressed with the following exceptions: PROJECT COMMENT8-CONSTRUCTIONPLANS 35. It is apparent that a small portion of the sanitary sewer lateral is to be installed within the Pettigru right-of-way. The trenching and bedding details for plastic pipe (which appear to be duplicate) shall be revised to conform to City standards for the portion of the installation in the right-of-way. Tbank you. Please add a Dote requiring tbe #53 cap per the specifications where within the City's rigbt- of-way Based on additional review, the City provides additional comments: 1. Sheet C9.1, right side column - The backfill and minimum cover requirements are incorrectly labeled "Paving Policy:' These comments represent the Department of Engineering's third review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including cbanges resulting from Plan Commission, Special Studies or other committee meetings. AIL bonds and performance guarantees (ifrequired) must be posted prior to Engineering Department approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. Comments from the City's consultant related to the drainage review will be forwarded to your office when the review is complete. Please confirm that plans and drainage calculations were submitted to Crossroad Engineers for the T AC meeting. The Department of Engineering reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2441. DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.5712441 FAX 317.571.2439 E!'.1AIL engineering@carmel.in,gQv . . " u u Gary R. D Assistant Ci Engineer Department of Engineering cc: Matt Griffin, Department of Community Services 10hn Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg IIko, Crossroad Engineers Kevin Krulik, Brenwick Development C. Weisiger, G.B. Indiana 2 LLC Project File Engineering Department Review S;I.PROJREV07\VOWC-CVSPHARMACYIf.3 .. . 1 u u February 20,2007 Mr. Crnig W. Forgey American Consulting, Inc. 7260 Shadeland Station Indianapolis, IN 46256 EL ~~O\ {J tY DIJ \ JAMES BRAINARD, MAYOR RE: The Village of West Clay, CVS Pharmacy-Project review #2 Dear Mr. Forgey: The City has received your comment letter and drawings dated February 7, 2007 based upon the City review of January 18, 2007. The comments from the City review have been satisfactorily addressed with the following exceptions: PROJECT COMMENTS-CONSTRUCTION PLANS 14. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. All curbing on-site and in the right-of-way must conform to this policy. The polky bas not been added. 15. The City has adopted a new paving policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. All paving in the right-of-way must conform to this policy. Tbe policy bas 110t been added. 16. Please remove the titles for the landscape plan and photometric plan from the Index on the Title Sheet. Also please do not include the landscape plan and photometric plan in plan sets submitted to the Department of Engineering for approval. The titles have not been removed from the Index on the Title Sheet. 19. Please revise CURB JOINT DETAIL such that the maximum transverse expansion joint spacing is 50 feet, the maximum transverse contmctionjoint spacing on tangents is to feet, and the maximum transverse contraction j oint spacing on radii is 5 feet. It needs to be indicated that each of tbese spacings is a maximum spacing. 24. The sidewalk detail shall meet City standards for portions in the right-of-way. Thank you. However, transverse joints shall be spaced DO greater than 1.25 times the width of the sidewalk in tbe rigbt- of-way. 29. Is pedestrian access provided along Pettigru? If on-site, and easement shall be provided. Please have Brenwlck confirm to City via e-mail. 35. It is apparent that a small portion of the sanitary sewer laternl is to be installed within the Pettigru right~f-way. The trenching and bedding details for plastic pipe (which appear to be duplicate) shall be revised to conform to City standards for the portion of the installation in the right~f-way. Thank you. Please add 8 note requiring the #53 cap per the specifications where within the City's right~ of-way .... Based on additional review, the City provides additional comments: 1. Add disclaimer that approval by the Department of Engineering of the site plan cannot be construed as approval of the lighting plans by the Department ofCoDllllunity Services. Also, approval of the site plan cannot be construed as the City taking maintenance and power cost responsibility for the lights indicated in the right-of-way. These comments represent the Department of Engineering's second review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide \\Titten responses may result in delay of the review process. DEPARTMENT OF ENGINEERING ONE CiVIC SQUARE, CARMEL, IN 46032 OFFICE 3175712441 FAX 3]7.571.2439 EMAlL engineering@carmel.in.gov u u It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly jf any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notifY us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. All bonds and performance guarantees (if required) must be posted prior to Engfueering Department approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. Comments from the City's consultant related to the drainage review will be forwarded to your office when the review is complete. Please confirm that plans and drainage calculations were submitted to Crossroad Engineers for the T AC meeting. The Department of Engineering reserves the right to provide additional comments based on subsequent reviews. ~uestions, please contact me at 571-2441. cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers Kevin Krulik, Brenwick Development C. Weisiger, G.B. Indiana 2 LLC Project File Engineering Department Review S:\PROJREV06\ VOWC-CVSPHARMACY#2 .. u uO~ ( {00 (0 rAG January 18, 2007 ]Al\1ES BRAlNAlill, MAYOR /~ ~ .. I?tc~1h ~ I r-/) bj1 . -94701 tiCS Mr. Craig W. Forgey American Consulting, Inc. 7260 Shadeland Station Indianapolis, IN 46256 /. RE: The ViUage of West Clay, CVS Pharmacy " I....~ . , , / -.... I Dear Mr. Forgey: We have reviewed the drawings submitted for this project. We offer the following comments: GENERAL INFORMATION 1. The project site is currently located within current City of Cannel Corporate Limits. The following jurisdictions will apply. 2. Jurisdictions: . Street and Right of Way - City of Carmel (Pettigru Drive, Moultrie Street, 13151 Street) " Water Mains - Carmel Utilities service area. . Sanitary Sewers - Clay Township Regional Waste District service area " Storm Sewer - City of Carmel\Hamilton County Surveyor's Office . Legal Drains - Hamilton County Surveyor's Office 3. Board of Public Works and Safety Approval Requirements: III Commercial Curb Cut. Board of Public Works and Safety.approval will be required for new curb cuts and modifications to curb cuts. [t appears that there are requirements for 4-curb cuts, 2-on Pettigru Drive and 2-on Moultrie Street. Please provide 8Y:l x 11 exhibits with your request for commercial curb cut approval. The exhibits should include all pertinent dimensional data including widths, radi~ aceIJdeceVpassing blister (if applicable), existing and opposing streets or drives, etc. . Temporary Construction Entrance. Same requirements as for the Commercial Curb Cut. If the temporary entrance is located at the site of a permanent future curb cut, separate Board approval is not required. . Water Availability approval from the Board is based upon the proposed commercial usage of the building. Reference Item # 11 below for a more detailed explanation. . Dedication of Right-of-Way (if applicable and ifnot platted). . Any permanent improvement to be installed within dedicated right of way. . Consent to Encroach Agreements for any permanent improvement to be installed within dedicated easements and/or dedicated right of way. A schedule for Board of Public Works and Safety meeting dates and agenda deadlines is being provided with these comments. Please use the Engineering Department deadlines for submissions to the Board if applicable. Any submwJon to the Board requires prior final approval by the Carmel Clay Plan Commission and/or the Board 01 Zoning Appealr; and completion of review by the Technical A.dvlsory Commiltee. All written requests to, be place on the Board's agenda ItUIst include the appropriate Docket Numbers and the date (or dates) of IlfJproval by the Plan Commission and/or BZA. DEPARTMENT OF ENGINEERING ONE CiVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571 ,2439 EMAIL engineering@carmeLin.gov L, u u 4. T AC ReviewlDrawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. All Carmel Utility issues must also be resolved. The design engineer must certifY all drawings submitted for final approval. Due to the dual jurisdiction regarding storm drainage, this office will require eight sets of approved drawings after all issues have been resolved. The drawings will be stamped, approved and signed by the City Engineer and by Carmel Utilities. After Carmel Approval, the eight sets of drawings wilI be submitted to the Hamilton County Surveyor's Office for approval. After Surveyor approval, the Developer/Owner, the Engineer and Contractor will each receive one-set. The Surveyor's Office wilI retain two sets and three-sets wilI be returned to the Engineering Department. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated easements and/or right of way will require a Consent to Encroach Agreement between the OwnerlDeveloper and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. 6. Carmel Utilities will provide separate reviews of this project. Please assure that copies of all drawings for review are sent to: Paul Pace City of Carmel Water Utility 130 1 Sf Avenue SW Carmel, IN 46032 7. Carmel Utilities subscribes to "Holey Moley" who should be contacted regarding water main locations 8. I am including copies of the following with this correspondence: . Commercial Project Approval Procedures. . Permit Data, Contacts, etc. . Commercial permitting Procedures. . Water Fees BONDING REQUIREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performance Guarantees Erosion Control. Please contact Amanda Foley, Engineering Department Stormwater Administrator, for details regarding Engineer's Estimates/Performance Guarantee requirements for erosion control. Other than erosion control, there do not appear to be any other Performance Guarantee requirements by the City of Carmel. Street CutJRigbt of Way Permit and Bonding Requirements Any work in dedicated right of way ofPettigru Drive, Moultrie Street or 13 l51 Street will require a Right of Way Permit and a License and Permit Bond. The bond amount will be determined by the number of instances of work in the right of way (curb cut, stonn sewer work, etc.) @ $2,000.00 per instance. Open pavement cuts in dedicated streets require approvlI by our Board of Public Works and Safety. 10. We nave engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. Please provide drawings and calculations directly to Crossroad. AVAILABILITY AND CONNECTION FEES ] I. Water Availability (acreage) and Connection Fees must be paid after all other Engineering Department requirements have been satisfied and prior to approval and start of construction activities. Availability Fees are based upon total platted acreage or legal description acreage for the development at the current rate of$I,010.00 per acre for Water Availability. This area has not been platted and we request a copy of the legal description oftbe property. Based upon the site plan, the preliminary Water Availability Fee calculation would be: 1.22 Acres @ $1,OlO.OO/Acre Current Water Availability Fee = $l,232.20 or $1,232.00 Connection Fees - Based upon data from the site plan, the preliminary Water Connection Fee calculation would be: -~:/ u u 12,900 1P Retail Facility @ 1.0 EDU/l,OOO ft2 == 12.9 EDUs 12.9 EDUs @ $1,31O.00IEDU Current Water Connection Fee = $16,899.00 The Availability and Connection Fees are CWTent as of this date but are subject to future revisions. If an Irrigation system using Carmel water Is planned for this project, additional Water Connection Fees wiD be assessed based upon the recommendations of the Director of Carmel UtUities. PROJECT COMMENTS-CONSTRUCTION PLANS 12. Please label Moultrie Street. 13. Please identify the street on the south boWldary as a private street. 14. The City has adopted a new curbing policy. Please revise.any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. All curbing on-site and in the right-of-way must conform to this policy. IS. The City has adopted a new paving policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. All paving in the right-of-way must conform to this policy. 16. Please remove the titles for the landscape plan and photometric plan from the Index on the Title Sheet. Also please do not include the landscape plan and photometric plan in plan sets submitted to the Department of Engineering for approval. 17. The City of Carmel does not allow extruded curb. Please remove keynote A on Sheet C2.t, the 6" extruded concrete curb detail on Sheet C6.1, and any other references to extruded curb. 18. The required sidewalk must be within an easement as it is not shown within right-of-way. 19. Please revise CURB JOINT DETAIL such that the maximum transverse expansion joint spacing is 50 feet, the maximum transverse contraction joint spacing on tangents is 10 feet, and the maximum transverse contraction joint spacing on radii is 5 feet. 20. Open pavement cut connection to West Clay structure #912 requires Board approval. The City's RCP bedding detail shall be included in the plan set for the portion of this storm sewer ron in the Moultrie Street right-of~way. 21. Depressed curb detail shall be replaced by the City standard detail. 22. There are notes "by others" on Sheet C3.I. Is this infrastructure not installed? 23. The City utilizes 1" ribbing in Hew of the trWIcated domes for ADA ramps in the right-of-way. 24. The sidewalk detail shaIl.meet City standards for portions in the right-of-way. 25. Striping in the right-of-way shall be thermoplastic. 26. Is the walk on Moultrie Street already installed or to be installed with this project? 27. The proposed connection to West Clay structure #775 shall be by a bonded contractor. 28. Site Note 16 - Please revise to read "Existing pavement and curbing..." 29. Is pedestrian access provided along Pettigru? Ifon-site, and easement shall be provided. 30. Are cuts of Moultrie to be constructed with this project or with Moultrie Street? 31. Is the southbound aisle/travellane on Pettigru wide enough to allow proper maneuvering of cars backing out? 32. The Department of Engineering acknowledges that the drainage management system was previously master planned. Please contact Amanda Foley to review construction and post-construction storm water quality requirements. 33. Final plans shall be approved for the CVS parcel and associated right-of-way improvements alone. All other improvements indicated that have not been approved or are not existing shall not be considered approved with this project. 34. Site Note 11, Grading Note 6, and Utility Note 6 shall be revised to require trenching and backfilling procedures and materials to conform to City standards in the right-of-way. 35. It is apparent that a small portion of the sanitary sewer lateral is to be installed within the Pettigru right-of-way. The trenching and bedding details for plastic pipe (which appear to be duplicate) shall be revised to conform to City standards for the portion of the installation in the right-of-way. These comments represent the Department of Engineering's initial review of the construction plans for this project. We request that aU responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. -~ . u u It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. All bonds and performance guarantees (ifrequired) must be posted prior to Engineering Department approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. Comments from the City's consultant related to the drainage review will be forwarded to your office when the review is complete. Please confmn that plans and drainage calculations were submitted to Crossroad Engineers for the T AC meeting. The Department of Engineering reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2441. Sin9eTcly, ~./i~ ! Gary R. D can, Jr. Assistant ty Engineer Departme of Engineering cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg IIko, Crossroad Engineers Kevin Krulik. Brenwick Development C. Weisiger, G.B. Indiana 2 LLC Project File Engineering Department Review .J u ~ lJtQ, fl Qf2Io~ 'YA;C U ~--~- November 20, 2006 Mr. Michael B. Jett American Consulting, Inc. 7260 Shadeland Station Indianapolis, IN 46256 RE: Village of West Clay, CVS Pharmacy Dear Mr. J ett: The following letter represents comments from the Engineering Department for this project specifically addressing the areas of storm water quality. We have reviewed the construction drawings submitted for this project for the November 15, 2006 Technical Advisory Committee meeting and offer the following comments: BONDING REQUIREMENTS 1, The following bonding requirements apply to this project: Performance Guarantees An Erosion and Sediment Control Perfonnance Guarantee is needed for thlS project. STORMWATER QUALIT.Y REVIEW COMMENTS-CONSTRUCTION PLANS The following items of the storm water pollution prevention plan have not been satisfied: AS. Legal Description of the Project Site Then: was not a Cl.l, AIS. Soils map including soil descriptions and limitations The soils map was not included. 82. Sequence describing storm water quality measure implementation relative to land disturbing activities Where are the referenced tree preservation areas? B6. Sediment control measUres for storm sewer inlet protection The silt fence inlet protection detail is the only inlet protect shown. This practice is not acceptable in paved areas. Specify another inlet protection measure for these areas. B14. Monitoring and maintenance guidelines for each proposed stormwater quality measure Submit spill information to the City of Carmel, not the SWCD. C2. Sequence describingstormwater quality measure implementation The City of Carmel requires that all stormwater leaving a site (post cOllstmction) be treated by a minimum of two different water quality BMPs. A second BMP (in addition to the pond) is required for tllis project. C3. Description of proposed post construction storrmvater quality measures C4. Location dimensions, specifications, and construction details of each stormwater quality measure CS. Description of maintenance guidelines for post construction storm water quality measures Theincluded BMP owner agreement should be completed and submitted with an O&M manual for the second BMP. .~ r4' u u The City of Carmel will require yearly inspection reports of the water quality B:tvlPs. The first will be due one year after the Notice of Temlination is submitted. We reqliest that all responses to our commcnts be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of allmodificafion made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating al1 revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or otber committee meetings. All bonds and performance guarantees (if required) must be posted prior to Engineering Department approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department of Engineerillg reserves the right to provide additional comments based on subsequent reVIews. [fyou have questions, please contact the Engineering Department at 571-2441. Sincerely, Amanda Foley Storm Water Administrator Department of Engineering cc: Matt Griffin Project File 11/14/2806 11:06 ;:f.. 3177759628 U HAMILTON CO SURVEYOR U PAGE 131/132 Ow II COI DT4C.. p./- . .- / ", ) )-..., /'. ....~.::::,.,.... .~ ~ .~_.. -C)X>- :::-,-:-:'.:::..:"~ J ' :.KcntMt C. 'l,~.r/lrdr S,mll!'or '-pflOn~ U 17) iP^.S.1:l5 . Fax iJ 17) i7(~':;(~;'!'~ Suire rSS On~' 3{rrlll ,fIrm COJl/lly Sllr/al'c .'Yl>(,/rwil/c, frulirlltr7 V_I;C1L;"'Z2jL' RE: Village of West Clay - CVS Pharmacy November 14, 2006 Aml:rican Consulting, Inc. ATTN: Mike .Tett 7260 Shadeland Station Indianapolis, IN 46256-3917 VIA FACSIMILE: 543-0270 Dear Mr. J ett; We have reviewed the constnlc::tion plans submitted to the Hamilton County Surveyor's Office on November 6,2006 for this project and have the following comments: 1. This project falls within the corporate limits a-q,d MS4 jurisdiction of the City of Carmel. 2. The proposed project DOES NOT fall in a Cannel Wellhead Protection Zone. 3. The proposed project falls in The Village of West Clay Regulated Drain Subdivisjon and The Village of West Clay watershed. Th.e proposed project also falls jn the J.W. Brendle Regulated Drain Watershed. 4. Storm water detention for the site is provided in the master plan for Village of West Clay. 5. Please submit an outlet permit for the direct discharge into the Village of West Clay Regulated Drain and an outlet pennit for the direct discharge into the J.W. Brendle ReguJ.ated Drain. The applicat10n is available on our website at http://www.co.hamilton.in..us. go to Departments, Surveyor, and Fonns. 6. The storm drains being installed with this projeet will be consider private and the maintenance responsibility will be that of the property owner or association. 11/14/2006 11:05 -, 3177759q2e U HAMILTON CO SURVEYOR U PAGE 02/02 7. How is this paf(~el being conveyed to the new owna. by plat or legal description? 8. The Hamilton County Surveyor's Office has some comments on easements for regulated drain that falls in this area.. A 20' R.D.E. will neOO. to be granted over the storm sewer frgm Stt. 774 to 715 then to 91.S. How this is handled will depend on. the fInal determination from comment #7 above. 9. Please contact Brandon Burke at Schneider to get the correct location for West Clay Str. #912, as the current shown location does oot match the design we are approvi.ng for the l.W. Brendle Drain Relocation. 10. The current landscape plans show a huge amount of landsca.ping in Regulated Drain Easement and over the VilIa.ge of West Clay Regulated Drain. Please modify the landscape plans to remove aU or minimize the landscape planting in the R.D.E. 11. Please note the additional comments may be warranted at a later date. Should you have any questions, I can be reached at 317-776-8495. Sincerely. ~~~~ Plan Reviewer CC: Matt Griffin - Cannel DOCD Amanda Foley - Carmel Engineering Dick Hill- Cannel Engineering Joel Thunnan- HCHD Greg Ilko - Crossroads Engineers Kevin Krulik - Brenwick lJ CarmeR November 13, 2006 Michael B. Jett American Consulting, INC. 7260 Shadeland Station Indianapolis, IN 46256 RE: CVS Pharmacy Project No. IN20050626 Dear Mr. Jett: u The plans submitted for the above-mentioned project have been reviewed. At the present tIme, I see nothing in the plans that would hamper law enforce- ment efforts. If we can be of any further assistance to you, please contact us. Respectfu lIy, J1w./utd~J). ~4{7cd) Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services CH7)fi,71-2500 A Nationally Accredit ll'<.,,13117D S7l-.25112 ,ljiforcement Agency :f1..-l! AMERICA1\1 CONSUL~rlIN Q;0J1ENtC. "7' !:>7', ? -\' . ,-(;~)., - Architects /260 Shadelan9.StatlOn, IndlJ})!l'pol lS. rN~'6t)6 Consultants (317) S4 7 -p~g& 8f.;;'~X;I!(€U7) 54tQ,470 II A N(jI.illrO((i.hn.lCrcon~:,,20I11 Ellgilleeni \ <J U I '''un'; ~"I LETTER OF TRANSMITTAD,~ DOCS t I , ~~ J?jl ~\,. / ~.~~' Da It' 11 /03106 Project Name: CVS Pharmacy West Clay Project Number: fN200S0626 We are ~ Enclosed via 0 Mail [(] Messenger 0 Overnight sending you: 0 Separately 0 As Requested [(] For Your Review & Comment ~ For Your Information Deliver by: Time: From: Michael B. Jett Remarks: The attached items are being submitted fur YUlIr review. This p.-ojeet has been filed at the Carmel Department of Community Service for TAC Application Review. If you have any questions regarding this project, please contact our office. Th k an . you. o John Duffy o Terry Krueskamp D Dale Sparks Carmel City Utilities City of Carmel Information Systems Carmel Postmaster 760 Third Avenue SW Three Civic Square United States Postal Service Carmel, IN 46032 Carmel, IN 46032 275 Medical Drive Carmel, IN 46032-9998 D Bill Akers D Mark Westermeir D Ron Farrand Carmel/Clay Communications Carmel/Clay Parks Department Carmel/Clay Schools 31 First Avenue NW 760 Third Avenue SW 5201 East 131 st Street Carmel, IN 46032 Carmel, IN 46032 Carmel, IN 46033 D Bill Hohlt o Karyn Ryg Duputy Building Commissioner Carmel DOCS Transportation Systems One Civic Square Coordinator Carmel, IN 46032 One Civic Square Carmel, IN 46032 D Jennifer Bruner D Scott Brewer D Gary DuncanfNick Clay Township Regional Waste Dislrict Dept. of Community Services Ridden/Amanda Foley 10701 N. College Ave., Suite A One Civic Square Dept of Engineering Indianapolis, IN 46280-1098 Carmel, IN 46032 One Civic Square Carmel, IN 46032 D Joel Thurman D Carmel Department D Jason LeMaster Hamilton Co. Engineering/Hamilton Co. Dept. of Community Services Hamilton County Health Department Highway One Civic Square Hamilton Co. Judicial Center, Suite 30 1700 South 10th Street Carmel, IN 46032 One Hamilton Square Noblesville, IN 46060 Noblesville, IN 46060-2229 D Greg Hoyes Hamilton County Surveyor Office One Hamilton Square, Suite 146 Hamilton County Judicial Center Noblesville, IN 46060 (j u .. '17 1 J. I/"~" ^ Y',' " ..,-" --'Y I f~"",' I '~., /1 ~?\ (.~ I'" ~" '~), ,~..;:/ I,~CS . ~~\ /" j''''', l!ll;l) ~1 I "I{?, .. J \ ' ., t!':?n,~ ','- "l i't ':;(jl/[} t..: I .,~ VOeS 't/ .J " AMERICAN CONSULTING, tN~C. Architects COJlsultants Engineers 7260 Shadeland Station, Indianapolis, IN 46256 (317) S47~5580 FAX: (317) 543-0270 info@alllercons,com We are [2J Enclosed sending you: 0 Separately LETTER OF TRANSlVIITT AL via D Mail [Z] Messenger D As Requested [Z] For Your Review & Comment D Overnight D For Your Information Deliver by: Time: Date: From: Michael B. Jett Rema.rks. CVS Pharmacy West Clay IN20050626 D Chuck Shupperd o Ron Morris o Jennifer Marlett Vectren Energy Indianapolis Power & Light Co Indianapolis Water Co. PO Box 1700 3600 N. Arlington Avenue PO Box 1220 16000 Allisonville Road Indianapolis, IN 46218 1220 Waterway Blvd. Noblesville, IN 46061 Indianapolis, IN 46206 o Jason Kirkman o Gregory IIKO, PE D Gary Hoyt Brighthouse Networks Crossroads Engineering Office of Fire Chief, Fire Station #1 3030 Roosevelt Avenue 3417 South Sherman Drive Two Civic Square Indianapolis, IN 46218 Beech Grove, IN 46107 Carmel, IN 46032 o Michael Fogarty D Teresa Magee/Mark Wood D Brooke Gajownik Office of Police Chief Panhandle Eastern Pipeline Co. Hamilton County Sheriff's Office Three Civic Square PO Box 38 18100 Cumberland Road Carmel, IN 46032 9371 Zionsville Road Noblesville, IN 46060 Zionsville, IN 46077 o Shirley Hunter D Dave Klingensmith Duke Energy Carmel Street Department 1441 S. Guilford Road 3400 W. 13151 Street Carmel IN 46032 Westfield, IN 46074