Loading...
HomeMy WebLinkAboutCorrespondence TAC 08/08/2005 17:59 317775.%28 (j HAMILTON CO SURVEYOR U PAGE 01/02 XcntO:r1 C. '{..(Ja,.d, SII fl'eyVf (/'fiOI1, (Y7) 7i(~"l4'5 '{nx (Y7.J 77t.l...:~6~S Sld!e l ~,~ Olle .7(,lrllil,orr C~lmly Sqlrfln' )illhlmrillc', lud/alln 4~"~~(.'-"'zy.' August 8. 2006 RE: ACES Power Marketing Improvememts f :~ Snelling Engineering. LLC. A TTN: Greg Snelling 13295 Meridian Comers Blvd. Suite 142 C$1nnel, IN 46032 VIA FACSIMILE: 663.3208 Dear Mr. Snelling We bave reviewed the construction plans submitted to the Hamilton County Surveyor's Office 00 August 1,2006 for this project and have the following comments: 1. The proposed proj eet falls in the unincorporated area. .and MS4 jurisdiction of Hamilton CQunty. 2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone. 3. The proposed project falls in the Crooked Creek Regulated Drain Watershed, via the Mayflower Park Ann. Crooked Creek has an allowable release rate of 0.25 cfs/acre, 4. Please submit an outlet permit for the indirect discharge into the Mayflower Parle Ann of the Crook Creek Regulated Drain. The a.pplications are available on our website at wv:w.co.hamilton,in.us, click on Department Directory, Surveyor's Office. and then Forms. 5. While HCSO agrees section 302.05 #7 states no orifices smaller then 6" are allowed, the "intentionn behind that is for single ori'fice outlet structures. The issue becomes maintenance (pluggin.g of the orifice) verses exceeding allowable release ra.tes. HCSO would suggest leaving the lower orifice at 6~? and size the upper orifice to hold the 10 to 100 year release rate (1.0 cfs minus flow thru lower 6"' orifice"" flow allowed tbrn upper orifice). This may make the upper orifice a 3" opening but this is the best possible design that keeps both issues. in mind. Another option to consider would be a "slot" in the outlet stro.cture to act as the weir. 08/08/2006 17~59 3177759628 U HAMILTON CO SURVEYOR U PAGE 02/02 6. All casting should be labeled "Dump No Waste - Drains to W~rway:~ which are readily available now from local casting di$tributors. PleMe add a note to the plans that will make 1h~ contractor away of this requirement. 7. Please submit 1 final copy of the construction plans that address both drainage and erosion control comments when submitting the outlet pennit. 8. Please note that further comments may be necessaty at a later date. Should you have any questions, I can be reached at 317~ 776-8495. Sincerely. -~~ Greg HQYe$t AC Plan. Reviewer CC; Matt Griff'm- Carmel naCD John South- HCSWCD Dick Hill- Cannel Engineering Mike McBride - HCHD Greg Ilko - Crossroad Engineers I u u / SNELLING ENGINEERING, LlC Letter of Transmittal 1 ]295 Meridi.ll1 Corners Rlvd., SUite 142 Carmel, IN 46032 Ph: (117) 6(,3-3206' F.lX: 1317) (,63-3208 gs nell i ng@snellingeng.com To: Matt Griffin DOCS One Civic Square Carmel, IN 46032 Date: July 31, 2006 Project: ACES Power Marketing Site Improvements WE ARE SENDING YOU VIA: o Mail o Overnight Delivery o Courier X Hand Delivery The following: COPIES DATE DESCRIPTION i 7/31/06 Construction Plans 1 7/31/06 T AC Correspondence 1 7/31106 T AC Application I." THESE ARE TRANSMITTED as checked below: D For approval D For your use X For review and comment D As requested REMARKS: The enclosed information is submitted for the 8-16-04 TAC meeting in Carmel. From: Gregory S. Snelling, PE Page 1 off u u Greg Snelling From: Sent: Greg Snelling [gsnelling@snellingeng.com] Monday, July 31, 2006 1 :26 PM To: 'wakers@carmel.ingov' 'mfogarty@carmel.in.gov'; 'gduncan@carmel.in.gov'; 'whohlt@carmel.in.gov'; 'jd uffy@carmel.in.gov'; 'kryg@carmel. in. gov'; 'tkrueskamp@carmel.in.gov'; 'mbm@co.hamilton.in.us'; 'jll@co.hamilton.in.us'; 'bmg@co.hamilton.in.us'; 'shunter@duke-energy.com'; 'rfarrand@ccs.k12.inus'; 'mwestermeier@carmel.in.gov'; 'jason. kirkman@mybrighthouse.com'; 'Jen nifer ma rlett@veoliawaterna.com'; 'tmmagee@panhandleenergy.com'; 'gilko@crossroadengineers.com'; 'cynthia.l.klaiber@usps.gov'; 'ron morris@aescom'; 'dklingensmith@carmel.in.gov'; 'csh upperd@vectren.com' Cc: 'mgriffin@carmel.in.gov'; 'Lanich, Darin'; 'Emily Smith' Subject: ACES Power Marketing Site Improvements Attachments: C201-Layout1.pdf; COO 1-Layout1. pdf The attached information is submitted for the August 16, 2006 Technical Advisory Committee meeting in Carmel. The project generally consists of a new parking area within Mayflower Park, northwest of the existing ACES Power Marketing site along 99th Street. I have attached a cover sheet showing the site location along with a site plan. Hard copies of the full set of plans are being submitted to the Carmel DOCS, Urban Forester, Fire Department, Hamilton County Surveyor and Clay Township Regional Waste District. Please let me know if you need a hard copy. You may contact me with any questions or comments. Thank you. Greg Snelling, PE Snelling Engineering, LLC 13295 Meridian Corners Boulevard, Suite 142 Carmel, IN 46032 (317) 663-3206 (telephone) (317) 663-3208 (fax) 7/31/2006 u u SNELLING ENGINEERING, LLC letter of Transmittal 13295 Meridian Corners Bivd. Suite 142 Carmel, IN 46032 Ph: (317) &&3-320&' Fax: (317) 6&3-3208 gSllel1 i I1.g@snellingeng_com To: Greg Hoyes Hamilton County Surveyor's Office One Hamilton Square, Suite 188 Noblesville, IN 46060 Date: July 31, 2006 Project: ACES Power Marketing Site Improvements WE ARE SENDING YOU VIA: o Mail o Overnight Delivery o Courier X Hand Delivery The following: COPIES DATE DESCRIPTION 1 7/31/06 Construction Plans 1 7/31/06 Drainage Report THESE ARE TRANSMITTED as checked below: o For approval o For your use X For review and comment 0 As requested REMARKS: The enclosed information is submitted for the 8-16-05 T AC meeting in Carmel. From: Gregory S Snelling, PE u u SNELLING ENGINEERING, LLC Letter of Transmittal 13295 Meridian Corners Blvd" Suite 142 Carmel, IN 46032 Ph: (317) 663-320&' Fax: (3171 &63-3203 glnell ing@lnellingel1g.com To: Gary Hoyt Office of Fire Chief, Fire Station #1 Two Civic Square Carmel, IN 46032 Date: July 31,2006 Project: ACES Power Marketing Site Improvements WE ARE SENDING YOU VIA: o Mail o Overnight Delivery o Courier X Hand Delivery The following: COPIES DATE DESCRIPTION 1 7/31/06 Construction Plans THESE ARE TRANSMITTED as checked below: o For approval o For your use X For review and comment 0 As requested REMARKS: The enclosed information is submitted for the 8-16-05 TAC meeting in Carmel. From: Gregory S. Snelling, PE u u SNELLING ENGINEERING, LLC Letter of Transmittal 13295 Mendl"n Corners Blvd.. Suite 142 Carmel, IN 46032 rho 1317i 663-3206. FilX: (317) 663-3203 g\ nell I ng@snelllnge,'g.com To: Scott Brewer DOCS One Civic Square Carmel, IN 46032 Date: July 31, 2006 Project: ACES Power Marketing Site Improvements WE ARE SENDING YOU VIA: D Mail D Overnight Delivery o Courier X Hand Delivery The following: COPIES DATE DESCRIPTION 1 7/31/06 Construction Plans THESE ARE TRANSMITTED as checked below D For approval o For your use X For review and comment D As requested REMARKS: The enclosed information is submitted for the 8-16-05 TAC meeting in Carmel. From: Gregory S, Snelling, PE u u SNELLING ENGINEERI Ne, LLC Letter of Transmittal 13295 Merir!jCill Corners Blvd., Suite 142 Clrm,,1, IN 46032 Ph (]17/ 66]-3206. F.x: (317) 663-320B t',S;rll: II i pg.@sne!lingeng_cofll To: Jennifer Bruner CTRWD 10701 N. College Avenue, Suite A Indianapolis, IN 46280 Date: July 31,2006 Project: ACES Power Marketing Site Improvements WE ARE SENDING YOU VIA: o Mail o Overnight Delivery o Courier X Hand Delivery The foJlowing: COPIES DATE DESCRIPTION 1 7/31/06 Construction Plans THESE ARE TRANSMITTED as checked below: D For approval D For your use X For review and comment D As requested REMARKS: The enclosed information is submitted for the 8-16-05 TAC meeting in Carmel. From: Gregory S, Snelling, PE