August 8. 2006
RE: ACES Power Marketing Improvememts
f :~
Snelling Engineering. LLC.
A TTN: Greg Snelling
13295 Meridian Comers Blvd.
Suite 142
C$1nnel, IN 46032
VIA FACSIMILE: 663.3208
Dear Mr. Snelling
We bave reviewed the construction plans submitted to the Hamilton County Surveyor's Office
00 August 1,2006 for this project and have the following comments:
1. The proposed proj eet falls in the unincorporated area. .and MS4 jurisdiction of
Hamilton CQunty.
2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone.
3. The proposed project falls in the Crooked Creek Regulated Drain Watershed, via the
Mayflower Park Ann. Crooked Creek has an allowable release rate of 0.25 cfs/acre,
4. Please submit an outlet permit for the indirect discharge into the Mayflower Parle
Ann of the Crook Creek Regulated Drain. The a.pplications are available on our
website at wv:w.co.hamilton,in.us, click on Department Directory, Surveyor's
Office. and then Forms.
5. While HCSO agrees section 302.05 #7 states no orifices smaller then 6" are
allowed, the "intentionn behind that is for single ori'fice outlet structures. The issue
becomes maintenance (pluggin.g of the orifice) verses exceeding allowable release
ra.tes. HCSO would suggest leaving the lower orifice at 6~? and size the upper orifice
to hold the 10 to 100 year release rate (1.0 cfs minus flow thru lower 6"' orifice""
flow allowed tbrn upper orifice). This may make the upper orifice a 3" opening but
this is the best possible design that keeps both issues. in mind. Another option to
consider would be a "slot" in the outlet stro.cture to act as the weir.
08/08/2006 17~59
3177759628
U
HAMILTON CO SURVEYOR
U
PAGE 02/02
6. All casting should be labeled "Dump No Waste - Drains to W~rway:~ which are
readily available now from local casting di$tributors. PleMe add a note to the plans
that will make 1h~ contractor away of this requirement.
7. Please submit 1 final copy of the construction plans that address both drainage and
erosion control comments when submitting the outlet pennit.
8. Please note that further comments may be necessaty at a later date.
Should you have any questions, I can be reached at 317~ 776-8495.
Sincerely.
-~~
Greg HQYe$t AC
Plan. Reviewer
CC; Matt Griff'm- Carmel naCD
John South- HCSWCD
Dick Hill- Cannel Engineering
Mike McBride - HCHD
Greg Ilko - Crossroad Engineers
I
u
u
/
SNELLING
ENGINEERING, LlC
Letter of Transmittal
1 ]295 Meridi.ll1 Corners Rlvd., SUite 142
Carmel, IN 46032
Ph: (117) 6(,3-3206' F.lX: 1317) (,63-3208
gs nell i ng@snellingeng.com
To: Matt Griffin
DOCS
One Civic Square
Carmel, IN 46032
Date: July 31, 2006
Project: ACES Power Marketing
Site Improvements
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
i 7/31/06 Construction Plans
1 7/31/06 T AC Correspondence
1 7/31106 T AC Application
I."
THESE ARE TRANSMITTED as checked below:
D For approval
D For your use
X For review and comment D As requested
REMARKS:
The enclosed information is submitted for the 8-16-04 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
Page 1 off
u
u
Greg Snelling
From:
Sent:
Greg Snelling [gsnelling@snellingeng.com]
Monday, July 31, 2006 1 :26 PM
To: 'wakers@carmel.ingov' 'mfogarty@carmel.in.gov'; 'gduncan@carmel.in.gov';
'whohlt@carmel.in.gov'; 'jd uffy@carmel.in.gov'; 'kryg@carmel. in. gov';
'tkrueskamp@carmel.in.gov'; 'mbm@co.hamilton.in.us'; 'jll@co.hamilton.in.us';
'bmg@co.hamilton.in.us'; 'shunter@duke-energy.com'; 'rfarrand@ccs.k12.inus';
'mwestermeier@carmel.in.gov'; 'jason. kirkman@mybrighthouse.com';
'Jen nifer ma rlett@veoliawaterna.com'; 'tmmagee@panhandleenergy.com';
'gilko@crossroadengineers.com'; 'cynthia.l.klaiber@usps.gov'; 'ron morris@aescom';
'dklingensmith@carmel.in.gov'; 'csh upperd@vectren.com'
Cc: 'mgriffin@carmel.in.gov'; 'Lanich, Darin'; 'Emily Smith'
Subject: ACES Power Marketing Site Improvements
Attachments: C201-Layout1.pdf; COO 1-Layout1. pdf
The attached information is submitted for the August 16, 2006 Technical Advisory Committee meeting in Carmel.
The project generally consists of a new parking area within Mayflower Park, northwest of the existing ACES
Power Marketing site along 99th Street. I have attached a cover sheet showing the site location along with a site
plan.
Hard copies of the full set of plans are being submitted to the Carmel DOCS, Urban Forester, Fire Department,
Hamilton County Surveyor and Clay Township Regional Waste District. Please let me know if you need a hard
copy. You may contact me with any questions or comments. Thank you.
Greg Snelling, PE
Snelling Engineering, LLC
13295 Meridian Corners Boulevard, Suite 142
Carmel, IN 46032
(317) 663-3206 (telephone)
(317) 663-3208 (fax)
7/31/2006
u
u
SNELLING
ENGINEERING, LLC
letter of Transmittal
13295 Meridian Corners Bivd. Suite 142
Carmel, IN 46032
Ph: (317) &&3-320&' Fax: (317) 6&3-3208
gSllel1 i I1.g@snellingeng_com
To: Greg Hoyes
Hamilton County Surveyor's Office
One Hamilton Square, Suite 188
Noblesville, IN 46060
Date: July 31, 2006
Project: ACES Power Marketing
Site Improvements
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 7/31/06 Construction Plans
1 7/31/06 Drainage Report
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 8-16-05 T AC meeting in Carmel.
From: Gregory S Snelling, PE
u
u
SNELLING
ENGINEERING, LLC
Letter of Transmittal
13295 Meridian Corners Blvd" Suite 142
Carmel, IN 46032
Ph: (317) 663-320&' Fax: (3171 &63-3203
glnell ing@lnellingel1g.com
To: Gary Hoyt
Office of Fire Chief, Fire Station #1
Two Civic Square
Carmel, IN 46032
Date: July 31,2006
Project: ACES Power Marketing
Site Improvements
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 7/31/06 Construction Plans
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 8-16-05 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
u
u
SNELLING
ENGINEERING, LLC
Letter of Transmittal
13295 Mendl"n Corners Blvd.. Suite 142
Carmel, IN 46032
rho 1317i 663-3206. FilX: (317) 663-3203
g\ nell I ng@snelllnge,'g.com
To: Scott Brewer
DOCS
One Civic Square
Carmel, IN 46032
Date: July 31, 2006
Project: ACES Power Marketing
Site Improvements
WE ARE SENDING YOU VIA:
D Mail
D Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 7/31/06 Construction Plans
THESE ARE TRANSMITTED as checked below
D For approval
o For your use
X For review and comment D As requested
REMARKS:
The enclosed information is submitted for the 8-16-05 TAC meeting in Carmel.
From: Gregory S, Snelling, PE
u
u
SNELLING
ENGINEERI Ne, LLC
Letter of Transmittal
13295 Merir!jCill Corners Blvd., Suite 142
Clrm,,1, IN 46032
Ph (]17/ 66]-3206. F.x: (317) 663-320B
t',S;rll: II i pg.@sne!lingeng_cofll
To: Jennifer Bruner
CTRWD
10701 N. College Avenue, Suite A
Indianapolis, IN 46280
Date: July 31,2006
Project: ACES Power Marketing
Site Improvements
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The foJlowing:
COPIES DATE DESCRIPTION
1 7/31/06 Construction Plans
THESE ARE TRANSMITTED as checked below:
D For approval
D For your use
X For review and comment D As requested
REMARKS:
The enclosed information is submitted for the 8-16-05 TAC meeting in Carmel.
From: Gregory S, Snelling, PE