Loading...
HomeMy WebLinkAboutTraffic Letter March 6, 2025 Mr. Mike Diamente, P.E. Director of Engineering Edward Rose 11611 North Meridian Street, Suite 800 Carmel, IN 46032 mike_diamente@edwardrose.com Re: West Carmel Development Dear Mr. Diamente, 8365 Keystone Crossing, Suite 201 Indianapolis, Indiana 46240 (317) 202-0864 www.af-eng.com At your request, I have reviewed the proposed multi-family development with respect to the number of vehicles that will be generated and the surrounding roadway system. The proposed development will be located on the existing RCI office building site. The office building is approximately 230,000 square feet with access to the site primarily from Michigan Road. The proposed development will consist of 360 multi-family units and approximately 8,000 square feet of retail, which will most likely be a sit-down restaurant. A&F Engineering conducted a field review of the site as well as a trip generation calculation to determine what impact the future multi-family development would have on the surrounding street systems. The following table is a summary of the trip generation for the proposed development as well as a comparison of trip generations for potential uses that could occupy the site. These trip generation data are taken from the ITE Trip Generation Manual 11th Edition. The “Total” trips represent the total trips that can be expected at the access drives during the AM and PM peak hours. “Pass-By” trips represent trips that are already in the existing traffic stream along the adjacent public roadway system that enter a site, utilize the site, and then return to the existing traffic stream. A “Non-Pass-By” trip is a net new trip added to the roadway system. Additionally, the table shows the sum of the entering and exiting trips for each trip type for the AM and PM peak hours. EXPERIENCE. REPUTATION. RELATIONSHIPS A&F ENGINEERING CO., LLC Page 2 of 2 Trip Generation Land Use / Scenario Trip Type AM Peak PM Peak AM Peak Total PM Peak Total Enter Exit Enter Exit Multi-Family Housing (360 DU) Total 32 102 110 65 134 175 General Office Building (230k SF) Total 302 41 56 275 343 331 General Retail (8k SF) Total 11 8 33 33 19 66 Pass-By 4 3 13 13 7 26 Non-Pass-By 7 5 20 20 12 40 General Light Industrial (250k SF) Total 153 21 11 67 174 78 Multi-Family Housing (360 DU) + General Retail (8k SF) Total 43 110 143 98 153 241 Pass-By 4 3 13 13 7 26 Non-Pass-By 39 107 130 85 146 215 General Light Industrial (225k SF) + General Retail (8k SF) Total 149 27 43 95 176 138 Pass-By 4 3 13 13 7 26 Non-Pass-By 145 24 30 82 169 112 Big Box Retail Store (200k SF) Total 208 164 424 442 372 866 Pass-By 60 48 123 128 108 251 Non-Pass-By 148 116 301 314 264 615 *Note: DU = Dwelling Units, SF = Square Feet, *Percentages calculated based on individual land use percentages Based on the field review and the trip generation calculations, the following conclusions and recommendations are provided: • Based on the trip generation study, it can be seen that when fully occupied, the existing site would generate significantly more traffic during the AM and PM peak hour as compared to the proposed multifamily development. • Based on a field review and the number of vehicles that will be generated by the multi-family development, the existing access points will adequately function for the site. • Michigan Road is a 4-lane divided roadway which provides significant capacity and, therefore, the proposed use will not negatively affect the surrounding street system. If you have any questions or comments, please contact me. Sincerely, A&F Engineering Co., LLC Steven J. Fehribach, P.E. President /tmr