HomeMy WebLinkAboutDept Report 03-18-254
CARMEL PLAN COMMISSION
DEPARTMENT REPORT
MARCH 18, 2025
4. Docket No. PZ-2025-00012 PP Amend: North End Primary Plat Amendment.
5. Docket No. PZ-2025-00014 ADLS: North End Phase 2 Multi-family.
6. Docket No. PZ-2025-00015 ADLS: Viva Bene at North End Phase 2.
7. Docket No. PZ-2025-00030 V: UDO Sec. 2.18: Maximum Front Yard Setback, more than 50 ft.
requested.
8. Docket No. PZ-2025-00031 V: UDO Sec. 2.18: 6 ft. Min. Side yard setback for parking, 0 ft. requested.
9. Docket No. PZ-2025-00032 V: UDO Sec. 3.50.D: 20 ft. Parking Setback behind front line of building, in
front of building requested.
10. Docket No. PZ-2025-00033 V: UDO Sec. 3.54.A.2.a: 15,000 sq. ft. max building footprint, 57,000 sq. ft.
requested.
11. Docket No. PZ-2025-00034 V: UDO Sec. 5.05.C.2: Ground floor design to change every 50 ft., longer
façade designs requested.
12. Docket No. PZ-2025-00035 V: UDO Sec. 5.05.D.3: 2 principal buildings covering 70% of the lot width
required, 1 building requested.
13. Docket No. PZ-2025-00036 V: UDO Sec. 5.05.E: Buildings greater than 3 stories shall be stepped
back, no step back requested.
14. Docket No. PZ-2025-00037 V: UDO Sec. 5.31.C.1: 1.5 parking spaces/dwelling required, 1.25
spaces/dwelling requested.
The applicant seeks site plan and design approval for phase 2 at North End that includes an apartment building
with 170 units for individuals over the age of 55 and 7 townhome type buildings containing 72 apartment units.
The site is located at approximately 300 W Smoky Row, and it is zoned UR/Urban Residential within the
Monon Greenway Overlay. Filed by Charlie Mattox with Crossroad Engineers and Dan Moriarty with Studio
M, on behalf of Old Town Companies and Avenue Development.
Project Overview: The petitioner seeks a primary plat amendment, architecture and site plan approval, and
variances for 2 new multi-family projects at the North End development. This is the second and final phase at
North End. The site is zoned UR/Urban Residential with a small portion in the Monon Greenway Overlay.
Surrounding the property is US 31 to the north and west; the Monon Greenway and open space zoned P-1/Parks
to the east; North End Phase 1 apartments, townhomes and single-family to the southwest; and an urban farm to
the south. Please see the petitioner’s information package for more information.
UDO Standards this project MEETS:
• Permitted Uses: Apartments
• Maximum Building height, 3 and 5 stories proposed
• 2 windows per unit on upper floor facades.
• 1.5 parking spaces per unit required for the 3-story multi-family project, 108 required and 109 proposed
• No Maximum Number of Principal Buildings
• Any facade fronting on a public street shall be a Primary Facade, meaning be architecturally significant.
UDO Standards NOT MET, therefore Variances or Waivers are required:
• UDO 2.18: Max. front setback. Max 50 ft. setback allowed from prior variance, more than 50 ft. requested.
• UDO 2.18: Min. side setback for surface parking. 6 ft. minimum setback required. 0 ft. requested
• UDO Sec. 3.50.D: 20 ft. Parking Setback behind front line of building, in front of building requested.
• UDO Sec. 3.54.A.2.a: 15,000 sq. ft. max building footprint, 57,000 sq. ft. requested.
• UDO Sec. 5.05.C.2: Ground floor design to change every 50 ft., longer façade designs requested.
5
• UDO Sec. 5.05.D.3: 2 principal buildings covering 70% of the lot width required, 1 building requested.
• UDO Sec. 5.05.E: Buildings greater than 3 stories shall be stepped back, no step back requested.
• UDO Sec. 5.31.C.1: 1.5 parking spaces/unit required for age restricted multi-family, 1.25 spaces/unit
requested.
• UDO Sec. 7.10.F.3: 25 ft. water quality preservation easement required along a stream and floodway
fringe. Reduced easement proposed. A waiver will need to be submitted.
• UDO Sec. 7.13.D: No parking within a Special Flood Hazard Area. Parking is proposed in the flood
plain for the 3-story buildings. A waiver will need to be submitted.
• UDO Sec. 7.25.E.2: Permanent dead end streets and hammerheads not permitted. Hammerhead
street proposed. A waiver will need to be submitted.
Site Analysis:
• The primary plat amendment consists of 2 lots and common areas.
• There will be seven 3-story apartment buildings that front on the extended North End Drive. These are
being developed by Old Town Companies and will provide 72 multi-family units.
• There is also an age-restricted apartment building which looks like 4 stories on the north side and 5
stories on the south side.
• This height change is to accommodate the large change in grade from the south to the north and the 5
stories will include a parking garage on the first floor.
• The 55+ age-restricted apartment building, called Viva Bene, will include 170 units and will be
developed by Avenue Development.
• Parking for the 3-story buildings will be provided through perpendicular surface parking located along
the street, similar to the parking in Phase 1. There will be 109 spaces.
• Parking for Viva Bene will be through a parking garage and a surface parking lot. There will be 215
spaces.
• Site access is from an extension of North End Dr. and will follow a similar cross section with
perpendicular parking located adjacent to the drive lanes. This was allowed with a waiver approved
during the primary plat.
• Stormwater infrastructure will be designed and constructed off site. A pond is proposed on a separate
parcel east of Keystone. The Engineering Department is comfortable with this offsite storage.
• However, no water quality measures are proposed on this site and it would make sense that even if the
stormwater storage is offsite, water quality measures should be installed onsite before the water flows
into the stormwater system or the creek.
Active Transportation:
• Sidewalks and paths are shown throughout the development; however, there are some additional areas
where sidewalks should be provided and petitioner is working on revisions.
• A 10 ft. wide asphalt path will be installed along the north side of the property and an 8 ft. path will run
the length of the east side of the property. Both paths meet at the northeast corner and connect to the
Monon.
• Petitioner, please provide the details of the trailhead/connection to the Monon.
• Bike parking locations are shown in the garage and on the landscape plan, but these should also be
shown on the site plan.
Architectural Design:
• Both developments are being reviewed and approved separately under their own ADLS docket numbers.
North End Phase 2 Multi-family.
• The townhome style buildings will be constructed of brick, fiber cement lap siding, fiber cement panels,
and faux wood accent siding.
• The buildings look like a 3-story townhome building, but each “townhome” has 2 units in it. One unit is
6
on the ground floor, and one unit occupies both the 2nd and 3rd floors.
• All units have an outdoor patio or balcony space.
• Currently, all buildings have the same color scheme. Is there a way to add some anti-monotony in the
development?
• The 8-Bay building has an especially long façade, and staff would like to see this broken up more.
• Staff continues to work through architectural comments with the petitioner.
Viva Bene
• The building will be constructed of a variety of materials to help break up the large facades.
• The materials include brick, white and gray fiber cement lap siding, fiber cement accent siding, and
EIFS.
• EIFS will be used only 8’ above ground, but some facades have a large percentage of EIFS and staff
recommends reducing the amount of EIFS and using a more durable material like incorporating
more brick.
• When viewing the building from the north, it will be 4 stories tall. However, there is significant grade
change moving south on the site, so when viewing the building from the south, it will be 5 stories tall.
• This grade change allows for the first story on the south façade to be a parking garage.
• The building design follows the requirements for Primary Façades, which means that each façade is
architecturally significant and detailed.
• Petitioner, how will mechanical equipment be screened?
• Staff continues to work through architectural comments with the petitioner.
Lighting:
• The Lighting Plan is still being worked on. Petitioner, please show street and parking lot light
fixture locations and the spec sheets for each type of light.
• Streetlights will be required and should match the lights in phase 1.
• Petitioner, will there be any other building accent lighting?
Landscaping:
North End Phase 2
• Tree preservation areas are shown on the landscape plan.
• Building base plantings are not shown on the landscape plans. Petitioner, please show what
landscaping will be installed around the buildings.
• Can street trees be added in some areas along the street?
• Additional trees should be planted in the open common areas. We recommend 10 trees per acre.
Viva Bene
• Parking lot islands will have trees and shrubs.
• Building base plantings are shown on the north sides of the building. Petitioner, please provide a level
of foundation plantings on the south, west, and east sides of the buildings, as appropriate.
• Please add trees and landscaping along the south and east facade to soften the 12 ft. concrete wall.
• Please add some trees in front of the garage elevations to help soften the view.
Signage:
North End Phase 2
• No exterior signage has been proposed, staff has requested more information.
• Petitioner, please show where address numbers will be located on the elevations.
Viva Bene
• One blade-sign, one canopy-sign, one parking wall-sign, 2 public access entrance-signs, and one
clubhouse wall-sign are proposed.
• All sign locations and numbers requested are allowed per UDO, except one wall sign on the north
7
elevation to the east of the Clubhouse entry sign. This sign should be removed.
• All allowable signs must follow UDO sign standards for size.
• Staff has requested an incidental sign plan.
Variances:
Buildings Front Setbacks: Max 50 ft. setback allowed from prior variance, more than 50 requested. This
variance pertains to the Viva Bene building which doesn’t have a typical urban residential design with a
building pulled up to the street. It is setback and isn’t a typical 4-sided, square building.
Min. Side Setback for Parking: A 6 ft. minimum setback is required for surface parking and 0 ft. is requested.
This requirement is in place to allow some landscaping between a parking lot and a property line. The Viva
Bene site is requesting this variance on the north side of the building. With the grading and other site
constraints, they aren’t able to meet a 6 ft. setback in all areas. However, there is common area on the other
side where landscaping can be installed to provide some buffer from US 31. No landscaping is currently shown
to the north, but we would recommend that as a condition of approval for this variance.
Parking Setback behind front of building: The Monon Overlay - Natural Sub-Area requires parking areas to
be set back not less than twenty (20) feet behind the Front Line of Building, and shall include landscaping. Only
the very northeastern tip of the Viva Bene site is in the Monon Overlay, but the building itself is setback
considerably from the Monon. There is a small amount of parking that is in front of the Viva Bene building on
the north façade. Landscaping is proposed around this parking lot to help buffer any views from the Monon.
Perhaps some additional landscaping could also be added along the east side of the path to provide more buffer.
Maximum Building Footprint: The maximum building footprint allowed in the Monon Overlay - Natural Sub-
Area is 15,000 sq. ft. and 57,000 sq. ft. is requested. The very northeastern tip of the Viva Bene site is in the
Monon Overlay, but the building itself is setback considerably from the Monon. The intent of the maximum
building footprint in the Natural section of the Monon Overlay is to limit large and long buildings adjacent to
the Monon, outside of the center of the city. Instead, the natural buffer should be preserved in this area. The
large setback of the building and the variation in the shape of the building help meet the intent of this standard.
Ground Floor Facades: Any ground floor facade design shall not be used for more than 50 ft. before changing
design such that no dominant design spans more than 50 ft. Both projects need this variance as the same ground
floor level design is used over 50 ft. The Viva Bene building provides architectural variations on the upper floors
that help break up the building and still provide other architectural details on the ground floor. The townhome
type buildings are not suited well to provide a typical urban mixed-use building style streetscape, but provide
other architectural features, like the faux wood siding accent, that bring interest to the facades.
Massing Wide Width Lots: 2 Principal buildings covering 70% of the lot width is required per the UDO for
the Urban Residential Zone, and only 1 building is requested. While there is only 1 building for the Viva Bene
site, the building shape and the grade change provide some relief from the size of the building. The grade
change also makes it difficult to meet this requirement to the letter of the law.
Building Stepback: Buildings greater than 3 stories tall shall be stepped back resulting no more than 3 stories
of facade being on the same vertical plane. Required stepbacks shall be a minimum of 12 ft. The Viva Bene
building is 4 and 5 stories tall and is proposed to have no stepback. The roof line, balconies and change of
materials help break up the scale of the building, instead of having the stepbacks.
Parking Variance Viva Bene: The UDO requires 1.5 parking spaces/unit for residential units in the Urban
Residential zone and 1.25 spaces/unit is requested for the Viva Bene project. The residential units for the Viva
Bene project are 55+ age restricted units and will not function exactly the same as a traditional apartment
building. The petitioner is confident there will be enough parking for their needs. There will be 102 garage
parking spaces and 113 surface parking spaces.
8
DOCS Remaining Comments/Concerns: The Dept. will continue to work with the Petitioner on all of the
review comments as this project moves onto Committee review. A few of the outstanding comments include:
• Please provide the details of the trailhead/connection to the Monon.
• Consider adding some anti-monotony to the townhome project and breaking up the 8-bay building.
• Reduce the amount of EIFS on the Viva Bene building and improve the large concrete wall on the east
elevation.
• Lighting details needed.
• Add building base landscaping around all the buildings where appropriate.
• Find locations to add street trees.
• Plant additional trees in the common areas.
• Can additional landscaping be added in the US 31 right-of-way to help provide a buffer and meet the
minimum perimeter landscaping requirements, similar to Phase 1?
• Apply for additional waivers needed.
• Address ProjectDox comments.
Recommendation:
The Department of Community Services recommends the Plan Commission sends this item to the Plan
Commission Committee meeting on Tuesday, April 1, 2025 for further review and discussion.