Loading...
HomeMy WebLinkAboutUnited Construction Services LLC/ENG/$7,837.06/20-ENG-06 Haverstick Road Multi-Use Path CO#5City of Carmel Project 20-ENG-06 Haverstick Rd. MU Path CHANGE ORDER #5 Final balancing Change Order to account for overruns and underruns of pay item quantities during construction. Contract Price prior to this Change Order $904,925.49 Contract Price will be increase by this Change Order $7,837.06 New Contract Price including this Change Order $912,762.55 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $885,000.00 N/A N/A CO 01 $8,930.85 $893,930.85 1.01% CO 02 $5,112.94 $899,043.79 1.59% CO 03 $3,943.00 $902,986.79 2.03% CO 04 $1,938.70 $904,925.49 2.25% CO 05 $7,837.06 $912,762.55 3.14% By Sergey Grechukhin at 4:23 pm, Mar 12, 2025 Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 Project No.:20-ENG-06 Description:Haverstick Rd. MU Path Type:Force Account Summary:Final Balancing Change Order Change Order Description: Awarded Project Amount:$885,000.00 Authorized Project Amount:$904,925.49 Change Order Amount:$7,837.06 Revised Project Amount:$912,762.55 Item No.Unit Unit Price Quantity 2 EACH 843.70$ (2.00) 10 SYS 53.70$ (12.00) 11 EACH 1,180.90$ (1.00) 17 LFT 37.90$ (6.00) 20 DOL 1.00$ (5,425.00) 24 CYS 83.85$ 22.43 25 SYS 3.05$ (567.00) 26 TON 53.45$ (135.63) 27 SYS 29.90$ 266.00 28 TON 231.00$ (1.00) 29 TON 264.00$ 42.50 30 TON 1.10$ (1.00) 31 LFT 242.00$ (21.00) 32 TON 165.00$ 10.00 34 SYS 165.00$ 54.09 35 SYS 550.00$ 3.23 37 LFT 49.50$ 18.18 38 SYS 115.50$ 10.06 39 SYS 137.50$ (2.77) 40 EACH 588.10$ (11.00) 42 MG 137.50$ (26.00) 44 SYS 5.50$ 338.00 45 CYS 191.40$ (5.50) 46 LFT 303.25$ 11.00 53 LFT 7.95$ (2.00) 58 LFT 759.00$ 8.00 71 EACH 4,950.00$ 2.00 72 LFT 22.00$ (85.70) 73 LFT 22.00$ 108.00 77 EACH 2,040.50$ (3.00) 78 EACH 2,738.20$ (3.00) ($1,885.40) $2,376.00 ($6,121.50) ($8,214.60) PAVEMENT, REMOVE ($644.40) ($1,052.70) $3,335.75 ($15.90) $6,072.00 $9,900.00 $1,161.93 ($380.87) ($6,469.10) ($3,575.00) $1,859.00 ($5,082.00) $1,650.00 $8,924.85 $1,776.50 $899.91 ($7,249.42) $7,953.40 ($231.00) $11,220.00 ($1.10) ($1,180.90) ($227.40) ($5,425.00) $1,880.76 ($1,729.35) LIGHT STANDARD, RELOCATE HMA WEDGE AND LEVEL, TYPE B ASPHALT FOR TACK COAT FENCE RELOCATE HMA FOR SIDEWALK CURB RAMP, CONCRETE DETECTABLE WARNING SURFACES CURB AND GUTTER, CONCRETE PCCP FOR APPROACHES, 6 IN. PCCP FOR APPROACHES, 9 IN. MAILBOX ASSEMBLY, RESET, SINGLE WATER SODDING, NURSERY CONCRETE, CLASS A VIDEO INSPECTION FOR PIPE TRENCH DRAIN HEADWALL, REMOVE PIPE, REMOVE STORMWATER MANAGEMENT BUDGET MILLING, ASPHALT, 1 1/2 IN QC/QA-HMA, 2, 64, SURFACE, 9.5mm COMPACTED AGGREGATE NO. 53 GEOGRID, TYPE IB STRUCTURE BACKFILL, TYPE 2 Final Balancing CO to account for overruns and underruns during construction. Description Amount INSPECTION HOLE, DEEPER THAN 3 FT ($1,687.40) DateContractor $7,837.06 PIPE, TYPE 2, CIRCULAR, 8 IN. SANITARY SEWER LATERAL PIPE ADJUSTMENT (UNDISTRIBUTED) ADJUST VALVE TO GRADE & REPLACE VALVE BOX (UNDISTRIBUTED) TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN. TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK LINE, WHITE, 24 IN. Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 AR-1 Version 2024-09-23 CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 5 DATE: 02/27/2025 PROJECT NAME:20-ENG-06 Haverstick Rd. MUT Path CITY REQ. NO.: CITY PO NO.: 110089 CITY PO DATE: _ I. You are directed to make the following changes in this Contract: Force Account Work (Time and Materials) for sod repair. SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: ________ W.D.C. No.: _______ Other:__Change_Order_05_____________________________________________________ The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $__904,625.49____________ Contract Price will be increased/decreased by this Change Order $__7,837.06______________ New Contract Price including this Change Order $__912,762.55____________ Contract Time Prior to this Change Order _N/A__ Days _N/A_ Completion Date Net increased/decreased resulting from this Change Order__N/A Days Current Contract Time including this Change Order__N/A Days _N/A___ Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended The Above Changes Are Accepted: Approved: Clark Dietz, Inc. United Construction Services, LLC ENGINEER CONTRACTOR Laura Campbell, Presiding Officer 8900 Keystone Crossing 347 South Broadway Address Address James Barlow, Member Suite 475 Alan Potasnik, Member Indianapolis, IN 46240 Pendleton, IN 46064 City/State/Zip City/State/Zip Brad Pease, PE, City Engineer By: ____________________ By: ______________________ ATTEST: Phone:_219-775-1427_____ Phone:__765-238-1989____ Jacob Quinn, Clerk Date:__2/27/25_________ Date: _______ Date: _______ 02/28/25 Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 NOT PRESENT 3/20/2025