Loading...
HomeMy WebLinkAboutConverginet Technologies, LLC/IT/$206,987.47/Genetee Servers ASACzTfshfzHsfdivlijobu:;23bn-Gfc39-3136 Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 3/20/2025 NOT PRESENT 3/20/2025 3/20/2025 3/20/2025 9750 E 150th St, Noblesville,Indiana 46060 Mobile 574-265-1964 dave.ruiz@convergint.com January 31, 2025 Quotation:DR15704257P City of Carmel 10701 N College Ave Suite A Carmel, Indiana 46280 Attention: Morgan Rinehart Reference: Genetec Streamvault 4040EX Series, Omnicast Licensing Contract Vehicle: Sourcewell #030421-CTL you for providing Convergint with the opportunity to present this proposal addressing your electronic security needs. We are confident that this proven solution isboth comprehensive and customized to meet your needs today, and in the future. isbackedby a foundational commitment to our core value of service, and we have been recognized as the #1 Systems Integrator by SDM Magazine.This recognition reflects the strongrelationshipsConvergint has with providing exceptional service toour customers. Our guidingOur dedicated and certified team of professionalsstrivesto uphold our customer-focused, service-based missionto make a daily difference for our customers. After achieving a successful on-time and on-budget project installation, Convergint will provide you with the service, including our 24/7customer portal iCare, designed to track service work orders, project progress, and provide you with detailed metric reporting for continuous improvement. The following security proposal is specifically designed to meet your needs. As your single point of contact, please feel free to contact me with any additional questions you may have. Thank you again for trusting Convergint as your partner. Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 ScopeofWork Contract Vehicle: Sourcewell #030421-CTL. All items are covered under contract vehicle pricing. Convergint Technologies to provide thematerials listed below, including pro-rated Omnicast licenses. This is a box sale; no labor is included. Materials ExtendedLineQtyPartDescriptionUnitPricePrice 1Contract Vehicle: Sourcewell #030421-CTL GSC-Om-1Enterprise camera connection, mandatory230.00$220.59$6,617.70E-1CGenetec Advantage Streamvault 4040EX Series -2U28-Bay Appliance 480TB Raw RAID 62xXeon GoldSV- 5416S 64GB RAM 2x480GB M.2SSD 24x 20TB4040EX- 33.003.5Enterprise HDDs 2x 1GbE RJ45 2x $60,176.47$180,529.41R28-480T- 10/25GbE SFP28 2x1400W PSU Windows20-416 Server Standard 5YR NBD KYHD Warranty - Genetec Security Center ADV-Genetec Advantage for1OmnicastEnterprise430.00$106.75$3,202.50CAM-E-5YCamera 5years StreamvaultConfigure with Security CenterSV-CFG- 51.005.12.x (latest minor). Applies toall Streamvault$0.00$0.00GSC5.12 appliances. 190,349.61EquipmentTotal 0.00TotalLabor 0.00OtherCosts 16,637.86Freight/Warranty 0.00Taxifapplicable 206,987.47TotalProjectPrice Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 Clarifications andExclusion 1.All work proposed herein, shall be performed during normal business hours Monday through Friday 8:00 am -5:00 pm. 2.Low voltage wiring shall be installed via open air code approved methods. 3.Provision or installation of conduit, wire, boxes, fittings or other electrical installation materials unless specifically listed under Inclusions or Bill of Materials. 4.Permits or associated fees are not included. 5.Customer to provide static IP addresses and network connections at panel locations. 6.Customer to provide a secured staging & storage area for project related materials. 7.Pricing assumes that electronic Auto CAD files are available from customer for our use in creating submittal drawings. 8.Fifty percent (50%)of the proposed sell price shall be payable to Convergint for project mobilization. Mobilization shall be invoiced and due upon customer acceptance of this proposal. 9.Proposal does not include sales tax unless otherwise noted. 10.Anything in the Contract Documents notwithstanding, in no event shall either Contractor or Subcontractor be liable for special, indirect, incidental or consequential damages, including commercial loss, loss of use, or lost profits, even ifeither party has been advised of the possibility ofsuch damages. 11.Convergint reserves the right to negotiate mutually acceptable contract terms and conditions with customer by making mutually agreeable changes to the formal contract included in the Bid Documents. 12.Customer acknowledges that supply-chain and shipping difficulties may result in unavoidable delays in deliveries of materials despite timely placement of orders and efforts by Convergint and its suppliers to avoid such delays. Customer agrees to provide Convergint with reasonable extensions of time to the extent of any such delays and Convergint agrees to make reasonable efforts to avoid or minimize such delays. Customer further acknowledges that the above-referenced supply-chain and shipping difficulties proposal pricing on products covered by this quote or any resulting agreement and that such increases may occur between the time this quote is provided, or any resulting contract is executed and the time when Convergint actually purchases the products covered by this quote or a resulting agreement. Customer agrees that it above the proposal pricing upon which the quote or agreement was based, by change order or otherwise, and Convergint agrees that itshall make commercially reasonable efforts tominimize any such increase. REVIEW IMPORTANT PRODUCT SAFETY ANDSERVICEINFORMATION PRIOR TOUSINGACONVERGINT-INSTALLED SOLUTION: convergint.com/terms. Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 Performance Items ItemsIncluded Freight (prepaid)Material (listed in the BOM) One-Year Warranty on Parts ItemsExcluded 120 VAC Power and Fused Disconnect Switch120 VAC Power Receptacles Additional Lighting Requirements for CamerasApplicable Taxes Attend General Contractor Project MeetingsAttend Owner Project Meetings Authority having Jurisdiction permit drawing Cable requires customer CAD) Ceiling Tiles and Ceiling Grid RepairsConnection to Building Fire Alarm Panel Correction of Wiring Faults Caused by OthersDoor wiring typical connections Electrical Installation PermitElectrified Door Locking Hardware Engineering and DrawingsEquipment rack layout drawing FA Permit and Plan Review FeesFire Stopping (Excludes Existing Penetrations) Fire WatchFloor Coverings for Lifts Floor plan with device placement and numbering Horizontal Core Drilling requires customer CAD) Installation of Bridle RingsInstallation of CCTV Cameras Installation of Conduit, Boxes and FittingsInstallation of Control Equipment Enclosures Installation of Control PanelsInstallation of Intercom Systems Installation ofIntrusion PanelsInstallation of Low Voltage Wire Installation of Network Cabling to Card ReadersInstallation of Network Cabling to IP Cameras Installation of Network Cabling to IP IntercomsInstallation of Specialty Backboxes Installation of Terminal CabinetsInstallation of Video Recorders (DVR/NVR) Installation of Wire and CableInstallation of Wire Hangars LiftsLoading Software on Customer Provided Computer Low Voltage PermitsMounting/Termination of Proposed Devices On-Site Lockable Storage FacilityOne-Year Warranty on Labor Operations & Maintenance ManualsOwner to Provide DHCP Lease Reservations for Network Connected Devices Owner to Provide Static IP AddressesOwner Training Panel Wall Elevation drawing (may require Panel wiring with point to point connections customer CAD) Patch and PaintPayment & Performance Bonds Project ManagementRecord Documentation (As-Built) Riser drawing with home run wiringServers by Convergint Servers by OthersSpecialty Backboxes Submittal DrawingsSystem Engineering System isDesign-BuildSystem Meets Plans/Drawings System ProgrammingTerminal Cabinets Termination of Control Equipment EnclosuresTesting of all Proposed Devices Vertical Core DrillingWire Workstations by ConvergintWorkstations by Others Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 TotalProjectInvestment:$ 206,987.47 Thank you for considering Convergintfor your Security needs. Ifyou have any questions or would like additional information, please don'thesitate tocontact me immediately. If you would like to proceed with the scope of work as outlined in this proposal, please sign below and return to my attention. Sincerely, Dave Ruiz Convergint Dave Ruiz By signing below, Iaccept this proposal and agree tothe Terms and Conditions contained herein Morgan RinehartJanuary 31, 2025 Customer Name (Printed)Date Authorized SignatureTitle Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 ConvergintTechnologies Install Terms & Conditions Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 ConvergintTechnologies Install Terms & Conditions Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46 Docusign Envelope ID: F67E0198-C959-468F-93CF-F34D6840DF46