Loading...
HomeMy WebLinkAboutC1.0 CoverOLD 146TH STREET OL D 1 4 6 T H S T R E E T PR I V A T E A L L E Y SO R G H U M H I L L L A N E ( P R I V A T E ) COCO LANE (PUBLIC) AUTUMN GOLD WAY (PRIVATE)AUTUMN GOLD WAY (PRIVATE) BA K E R V I L L A G E D R I V E ( P U B L I C ) DE W B E R R Y D R I V E ( P U B L I C ) BA K E R V I L L A G E CA R M E L , I N CO V E R C1.0 COVER REVISIONS BAKER VILLAGE CARMEL, IN PRIMARY PLAT UTILITY CONTACT INFORMATION: LOCATION MAP SOILS MAP SOILS LEGEND SITE MAP SHEET LIST TABLE Sheet Title Sheet Description C1.0 COVER C1.2 SITE IMPROVEMENTS PLAN AREA LOCATION MAP: STATE OF INDIANA PROJECT LOCATION: CITY OF CARMEL HAMILTON COUNTY SURVEYOR: STORM WATER ADMIN.: CABLE: WATER: ELECTRIC:SANITARY: DEPARTMENT: GAS:TELEPHONE: CIVIL ENGINEER: HWC ENGINEERING 135 N. PENNSYLVANIA ST., SUITE 2800 INDIANAPOLIS, IN 46204 317-347-3663 keichhorn@hwcengineering.com CARMEL ENGINEERINGCARMEL ENGINEERING DEPT. LENNAR HOMES OF INDIANA, LLC 11555 N. MERIDIAN ST., SUITE 400 CARMEL, IN 46032 (317)659-3200 STUART HUCKELBERRY stuart.huckelberry@lennar.com ZONE DISTRICT: UR/URBAN RESIDENTIAL DOCKET NO. PROJECTED START DATE: JUNE 2025 INDIANAPOLIS - TERRE HAUTE MUNCIE - LAFAYETTE - NEW ALBANY www.hwcengineering.com LANDSCAPE PLANL1.0 C1.1 PRIMARY PLAT LANDSCAPE SCHEDULE & NOTESL1.1 LANDSCAPE DETAILSL1.2-L1.3 TOTAL SITE DISTURBANCE= 15.8 AC NOT FOR CONSTRUCTION PRELIMINARY DEVELOPER/OWNER: C1.3 OPEN SPACE PLAN LOTS 1-15 ARE AREA A LOTS 16-47 ARE AREA B