Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2025-00041 Penn on Pkway Sign Package Update Workflow Started: 2/27/2025 2:44:11 PM Report Generated: 03/25/2025 10:01 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Sign Permits Aliza Shalit 3/6/25 10:55 AM Changemark Sign Packae Please provide updated sign package document. The text must be updated. See Correspondence folder for a copy of materials that were previously emailed for review. Penn Pkwy Facade Sign-Flush Mount.pdf Responded by: Kelly McNulty - 3/10/25 2:02 PM Attached. Resolved 2 1 Sign Permits Aliza Shalit 3/6/25 10:59 AM Comment Please confirm that you are in agreement with the installation method flush mounted signs require. This would be the second time installation method has been changed, from flush mounted to raceway mounted and now back to flush mounted. Individual channel letters require multiple points of contact (drilling) with the building fascia. All those points will have to repaired, in case of sign removal, before any new sign is installed. Responded by: Kelly McNulty - 3/10/25 2:02 PM Agreed. Resolved REVIEW COMMENTS Created in ProjectDox version 9.4.9.4