Loading...
HomeMy WebLinkAboutConstruction CostsEngineer's Opinion of Probable Construction Cost Name:Carmel Gateway West Lawn Date:3/21/2025 Client:Context Design Prepared By:BAS Item Description Unit Quantity Unit Price Cost 1 Temporary Seed SF 62,660 0.10$6,266.00$ 2 Construction Entrance LS 1 5,000.00$5,000.00$ 3 Stockpile Silt Fence LF 305 1.10$335.50$ 4 Filter Sock LF 845 3.00$2,535.00$ 5 Erosion Control Blanket SY 602 2.00$1,204.00$ 6 Temporary Concrete Washout EA 1 1,000.00$1,000.00$ 7 Inlet Protection EA 17 150.00$2,550.00$ Total Estimated Cost 18,890.50$