Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Construction Costs
Engineer's Opinion of Probable Construction Cost Name:Carmel Gateway West Lawn Date:3/21/2025 Client:Context Design Prepared By:BAS Item Description Unit Quantity Unit Price Cost 1 Temporary Seed SF 62,660 0.10$6,266.00$ 2 Construction Entrance LS 1 5,000.00$5,000.00$ 3 Stockpile Silt Fence LF 305 1.10$335.50$ 4 Filter Sock LF 845 3.00$2,535.00$ 5 Erosion Control Blanket SY 602 2.00$1,204.00$ 6 Temporary Concrete Washout EA 1 1,000.00$1,000.00$ 7 Inlet Protection EA 17 150.00$2,550.00$ Total Estimated Cost 18,890.50$