Loading...
HomeMy WebLinkAbout170043003_CG-West-Lawn_L000_Cover SheetCO V E R S H E E T L000 PROJECT LOCATION SCALE: N.T.S. These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Landscape Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Landscape Architect. Sheet No: R e v i s i o n D a t e D e s c r i p t i o n Sh e e t T i t l e : Date: Project No: Drawn by: Checked by: 24-1829 KM/SS FP 03/21/2025 58 2 5 L a w t o n L o o p E . D r . | I n d i a n a p o l i s , I N 4 6 2 1 6 31 7 - 4 8 5 - 6 9 0 0 | w w w . c o n t e x t - d e s i g n . c o m CO N S T R U C T I O N D O C U M E N T S Ca r m e l G a t e w a y W e s t L a w n 60 0 E 9 6 t h S t r e e t , I n d i a n a p o l i s , I N 4 6 2 4 0 PE R M I T SE T Know what's below. before you dig.Call R RPO Property Management, LLC and Parkwood Crossing 550 E 96th Street Carmel, IN 46280 PLANS PREPARED FOR: PLANS PREPARED BY: CONSTRUCTION DOCUMENTS FOR WEST LAWN CARMEL GATEWAY AT PARKWOOD CROSSING CARMEL, IN 46280 UTILITY STATEMENT The underground utilities shown have been located from field survey information and existing drawings. The surveyor makes no guarantees that the underground utilities comprise all such utilities in the area, either in-service or abandoned. The surveyor further does not warrant that the underground utilities shown are in the exact location indicated although the surveyor does certify that they are located as accurately as possible from information available. The surveyor has not physically located the underground utilities. SHEET INDEX Description Sheet # TITLE SHEET L000 CIVIL SERIES TOPO BOUNDARY SURVEY V0.0 TOPO BOUNDARY SURVEY V0.1 TOPO BOUNDARY SURVEY V0.2 TOPO BOUNDARY SURVEY V0.3 GENERAL SPECIFICATIONS C1.0 GENERAL NOTES C1.1 EXISTING CONDITIONS AND DEMO PLAN C2.0 SITE PLAN C3.0 EROSION CONTROL PLAN C4.0 EROSION CONTROL DETAILS C4.1 SWPPP C4.2 OVERALL GRADING AND DRAINAGE PLAN C5.0 GRADING AND DRAINAGE PLAN C5.1 AMPHITHEATRE GRADING PLAN C5.2 UTILITY PLAN C6.0 STORM PROFILES C6.1 STORM PROFILES C6.2 CONSTRUCTION DETAILS C7.0 CONSTRUCTION DETAILS C7.1 LANDSCAPE SERIES REFERENCE PLAN L100 MATERIALS AND NOTES PLAN L101 MATERIALS AND NOTES PLAN L102 LAYOUT PLAN L201 LAYOUT PLAN L202 PLANTING PLAN L401 PLANTING PLAN L402 PLANTING SCHEDULE AND DETAILS L410 IRRIGATION INTENT PLAN L420 IRRIGATION INTENT PLAN L421 SITE DETAILS L600 SITE DETAILS L601 SITE DETAILS L602 VICINITY MAP SCALE: N.T.S. 5825 Lawton Loop E. Dr. | Indianapolis, IN 46216 317-485-6900 | www.context-design.com UTILITY AND AGENCY CONTACT LIST PLANNING AND ZONING: City of Carmel Rachel Keesling (317) 571-2417 URBAN FORESTRY: City of Carmel Daren Mindham (317) 571-2444 ENGINEERING DEPARTMENT: City of Carmel Alex Jordan (317) 571-2441 WATER: Citizens Energy Group Chris Kehl (317) 263-6418 SEWER: Citizens Energy Group Chris Kehl (317) 263-6418 ELECTRICITY: AES Indiana Dan Davenport (317) 261-5497 PROJECT LOCATION PROJECT LOCATION 1.It is the Contractors responsibility to review and coordinate the work of all Sub-contractors, Trades and Suppliers with the requirements of the contract before commencing construction, and to assure that all parties are aware of all requirements, regardless of where the requirements occur in the contract documents, which might affect the work of that party. 2.Existing conditions shown are from available record drawings and or visual field surveys. The Contractor shall verify actual existing conditions at the site prior to beginning Work. The Contractor shall notify the Landscape Architect of any discrepancies. 3.The Contractor shall obtain all required permits and similar releases required for the construction and occupancy of the project. The contractor shall furnish copies of all such items to the Owner and Landscape Architect within 10 days of receipt of such items. If permits are issued subject to certain conditions or revisions to the work or if permits are delayed for any reason, the Contractor shall notify the owner and Landscape Architect. 4.The Contractor shall take precautions to maintain and protect new work as well as existing systems and elements which are to remain. Any damage to such systems and elements shall be immediately repaired in a manner acceptable to the landscape architect. If satisfactory repairs cannot be made, the contractor shall replace systems and elements with "like new" quality acceptable to the landscape architect. All repairs and replacement cost shall be the financial responsibility of the Contractor. 5.The Contractor is responsible to comply with applicable laws, codes, regulations and ordinances of the place (city, county, district and state) where the project is located - although such requirements may not be reflected by these contract documents. 250 East 96th Street, Suite 580 | Indianapolis, IN 46240 317-218-9560 | www.kimley-horn.com