HomeMy WebLinkAbout170043003_CG-West-Lawn_L000_Cover SheetCO
V
E
R
S
H
E
E
T
L000
PROJECT LOCATION
SCALE: N.T.S.
These Drawings and Specifications, and all copies
thereof are and shall remain the property and
copyright of the Landscape Architect. They shall
be used only with respect to this Project and are
not to be used on any other Project or Work
without prior written permission from the
Landscape Architect.
Sheet No:
R
e
v
i
s
i
o
n
D
a
t
e
D
e
s
c
r
i
p
t
i
o
n
Sh
e
e
t
T
i
t
l
e
:
Date:
Project No:
Drawn by:
Checked by:
24-1829
KM/SS
FP
03/21/2025
58
2
5
L
a
w
t
o
n
L
o
o
p
E
.
D
r
.
|
I
n
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
1
6
31
7
-
4
8
5
-
6
9
0
0
|
w
w
w
.
c
o
n
t
e
x
t
-
d
e
s
i
g
n
.
c
o
m
CO
N
S
T
R
U
C
T
I
O
N
D
O
C
U
M
E
N
T
S
Ca
r
m
e
l
G
a
t
e
w
a
y
W
e
s
t
L
a
w
n
60
0
E
9
6
t
h
S
t
r
e
e
t
,
I
n
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
4
0
PE
R
M
I
T
SE
T
Know what's below.
before you dig.Call
R
RPO Property Management, LLC
and Parkwood Crossing
550 E 96th Street
Carmel, IN 46280
PLANS PREPARED FOR:
PLANS PREPARED BY:
CONSTRUCTION DOCUMENTS
FOR
WEST LAWN
CARMEL GATEWAY AT PARKWOOD CROSSING
CARMEL, IN 46280
UTILITY STATEMENT
The underground utilities shown have been located from field survey information and existing drawings.
The surveyor makes no guarantees that the underground utilities comprise all such utilities in the area,
either in-service or abandoned. The surveyor further does not warrant that the underground utilities
shown are in the exact location indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has not physically located the
underground utilities.
SHEET INDEX
Description Sheet #
TITLE SHEET L000
CIVIL SERIES
TOPO BOUNDARY SURVEY V0.0
TOPO BOUNDARY SURVEY V0.1
TOPO BOUNDARY SURVEY V0.2
TOPO BOUNDARY SURVEY V0.3
GENERAL SPECIFICATIONS C1.0
GENERAL NOTES C1.1
EXISTING CONDITIONS AND DEMO PLAN C2.0
SITE PLAN C3.0
EROSION CONTROL PLAN C4.0
EROSION CONTROL DETAILS C4.1
SWPPP C4.2
OVERALL GRADING AND DRAINAGE PLAN C5.0
GRADING AND DRAINAGE PLAN C5.1
AMPHITHEATRE GRADING PLAN C5.2
UTILITY PLAN C6.0
STORM PROFILES C6.1
STORM PROFILES C6.2
CONSTRUCTION DETAILS C7.0
CONSTRUCTION DETAILS C7.1
LANDSCAPE SERIES
REFERENCE PLAN L100
MATERIALS AND NOTES PLAN L101
MATERIALS AND NOTES PLAN L102
LAYOUT PLAN L201
LAYOUT PLAN L202
PLANTING PLAN L401
PLANTING PLAN L402
PLANTING SCHEDULE AND DETAILS L410
IRRIGATION INTENT PLAN L420
IRRIGATION INTENT PLAN L421
SITE DETAILS L600
SITE DETAILS L601
SITE DETAILS L602
VICINITY MAP
SCALE: N.T.S.
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.com
UTILITY AND AGENCY CONTACT LIST
PLANNING AND ZONING:
City of Carmel
Rachel Keesling (317) 571-2417
URBAN FORESTRY:
City of Carmel
Daren Mindham (317) 571-2444
ENGINEERING DEPARTMENT:
City of Carmel
Alex Jordan (317) 571-2441
WATER:
Citizens Energy Group
Chris Kehl (317) 263-6418
SEWER:
Citizens Energy Group
Chris Kehl (317) 263-6418
ELECTRICITY:
AES Indiana
Dan Davenport (317) 261-5497
PROJECT LOCATION
PROJECT LOCATION
1.It is the Contractors responsibility to review and coordinate the work of all Sub-contractors, Trades and Suppliers with
the requirements of the contract before commencing construction, and to assure that all parties are aware of all
requirements, regardless of where the requirements occur in the contract documents, which might affect the work of
that party.
2.Existing conditions shown are from available record drawings and or visual field surveys. The Contractor shall verify
actual existing conditions at the site prior to beginning Work. The Contractor shall notify the Landscape Architect of
any discrepancies.
3.The Contractor shall obtain all required permits and similar releases required for the construction and occupancy of
the project. The contractor shall furnish copies of all such items to the Owner and Landscape Architect within 10 days
of receipt of such items. If permits are issued subject to certain conditions or revisions to the work or if permits are
delayed for any reason, the Contractor shall notify the owner and Landscape Architect.
4.The Contractor shall take precautions to maintain and protect new work as well as existing systems and elements
which are to remain. Any damage to such systems and elements shall be immediately repaired in a manner
acceptable to the landscape architect. If satisfactory repairs cannot be made, the contractor shall replace systems
and elements with "like new" quality acceptable to the landscape architect. All repairs and replacement cost shall be
the financial responsibility of the Contractor.
5.The Contractor is responsible to comply with applicable laws, codes, regulations and ordinances of the place (city,
county, district and state) where the project is located - although such requirements may not be reflected by these
contract documents.
250 East 96th Street, Suite 580 | Indianapolis, IN 46240
317-218-9560 | www.kimley-horn.com