HomeMy WebLinkAboutHWC Engineering, Inc./ENG/$37,000/ 21-03 Orrchard Park Drainage ASA #1
Hannum Wagle & Cline Engineering, Inc. d/b/a HWC Engineering, Inc
Engineering Department - 2025
Appropriation #2200-43.509.00 Fund 250; P.O. #105869
Contract Not To Exceed $37,000.00
ADDITIONAL SERVICES AMENDMENT TO
AGREEMENT FOR PROFESSIONAL SERVICES
THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES (“Agreement”) entered into by
and between the City of Carmel and Hannum Wagle & Cline Engineering, Inc. d/b/a HWC Engineering, Inc. (the
“Professional”), as City Contract dated December 16, 2021 shall amend the terms of the Agreement by adding the
additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated
herein as Exhibit “A”. The terms and conditions of the Agreement shall not otherwise be affected by this Additional
Services Amendment and shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows:
CITY OF CARMEL, INDIANA Hannum Wagle & Cline Engineering,
d/b/a HWC Engineering, Inc.
By: By:
Zachary Q. Jackson Authorized Signature
Chief Financial Officer/Controller
Date: Printed Name:
Title
FID/TIN:
Date:
Eric M. Smith, PE
Eric M. Smith, PE, Vice President/Director Water Resources
35-1780345
4/3/2025
Apr 9, 2025
March 17, 2025
Jarrod Huff
City of Carmel
One Civic Square
Carmel, IN 46032
Re: Orchard Park Drainage – Design Project 21-SW-03
Amendment #1
Jarrod,
In 2021, the City of Carmel and HWC Engineering engaged in a professional services agreement for
Project 21-SW-03– Professional Services Agreement – Orchard Park Drainage – Design. The contract
agreement was signed at the Board of Public Works and Safety meeting held December 15, 2021.
At that time, Construction Inspection was proposed to be invoiced hourly, not-to-exceed $74,000.
The proposed budget accounted for a 4-month, full time inspection fee.
In August of 2024, the project was bid and awarded to Calumet Civil Contractors, Inc. Since that
time, Calumet Civil Contractors, Inc. has provided a construction schedule indicating a 6-month
construction timeline. In order to allow full time inspection to occur for the longer period of 6-months,
rather than 4-months, it is proposed to amend the current contract by increasing the hourly, not-to-
exceed budget for Construction Inspection to $111,000.
Thank you for the opportunity to continue to provide service to the City of Carmel. Please contact me
if you have any questions or need additional information on the above information. If the proposed
amendemt above is acceptable, please send us a new Services Agreement.
Sincerely,
HWC Engineering
Bryan Grotz, PE, CFM, CPESC
Storm Water Group Lead
12/6/2021
H W C ENGINEERING
TERRE HAUTE, IN 47807 -
105869
601 SOUTH 3RD ST
City of Carmel
ONE CIVIC SQUARE
CARMEL, INDIANA 46032-2584
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997
INDIANA RETAIL TAX EXEMPT
CERTIFICATE NO. 003120155 002 0
FEDERAL EXCISE TAX EXEMPT
35-6000972
PURCHASE ORDER NUMBER
THIS NUMBER MUST APPEAR ON INVOICES, A/P
VOUCHER, DELIVERY MEMO, PACKING SLIPS,
SHIPPING LABELS AND ANY CORRESPONDENCE
PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION
VENDOR SHIP
TO
PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT
EXTENSION
21-03 Orchard Park Drainage - Professional Services -
12/16/2021
City Engineering's Office
1 Civic Square
Carmel, IN 46032-
366795
UNIT PRICEDESCRIPTIONUNIT OF MEASUREQUANTITY
Page 1 of 1
Laurie Slick
61652
2200Department:250Fund:Storm Water
43-509.00Account:
21-03 Orchard Park Drainage - Professional Services1 $212,500.00 $212,500.00Each
ASA 1 - 21-03 Orchard Park Drainage - Additional Inspection
Services
1 $37,000.00 $37,000.00Each
$249,500.00Sub Total
$249,500.00
Send Invoice To:
PLEASE INVOICE IN DUPLICATE
DEPARTMENT ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT
SHIPPING INSTRUCTIONS
*SHIP PREPAID.
*C.O.D. SHIPMENT CANNOT BE ACCEPTED.
*PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO.
*THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
PAYMENT
* A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN
THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
CONTROL NO. 105869
ORDERED BY
TITLE
City Engineering's Office
1 Civic Square
Laurie Slick
Carmel, IN 46032-
Bradley Pease Zac Jackson
Director CFO
H W C Enginieering 21-03 Orchard Park
Drainage ASA 1
Final Audit Report 2025-04-09
Created:2025-04-08
By:Amanda Bennett (abennett@carmel.in.gov)
Status:Signed
Transaction ID:CBJCHBCAABAA_fNxev4Mirh9hcM8gTL5X-zj2Z1Ca9N5
"H W C Enginieering 21-03 Orchard Park Drainage ASA 1" Histo
ry
Document created by Amanda Bennett (abennett@carmel.in.gov)
2025-04-08 - 6:42:17 PM GMT
Document emailed to Zachary Jackson (zjackson@carmel.in.gov) for signature
2025-04-08 - 6:43:03 PM GMT
Email viewed by Zachary Jackson (zjackson@carmel.in.gov)
2025-04-09 - 3:03:58 PM GMT
Document e-signed by Zachary Jackson (zjackson@carmel.in.gov)
Signature Date: 2025-04-09 - 3:04:23 PM GMT - Time Source: server
Agreement completed.
2025-04-09 - 3:04:23 PM GMT