HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2025-00039 SP - Ambleside Lots 3801-3804 Replat
Workflow Started: 3/3/2025 11:02:11 AM
Report Generated: 04/29/2025 03:49 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Vectren Energy
Chad Miller
3/20/25 3:11 PM
Comment
No comments on replat.
Info Only
2 1 Planning & Zoning
Christina Jesse
4/10/25 3:40 PM
Library Comment
Please provide copies of your correspondence with the TAC members and
their correspondence with you.
Responded by: Kyle Eichhorn - 4/11/25 6:18 AM
All correspondence has been on ProjectDox.
Resolved
3 1 Planning & Zoning
Christina Jesse
4/10/25 3:40 PM
Library Comment
Please work with Caleb Warner in the City Engineering Dept. to get on a BPW
(Board of Public Works) meeting agenda, which has a filing deadline. His
number is 571-2441, and his email address is cwarner@carmel.in.gov
Responded by: Kyle Eichhorn - 4/11/25 6:18 AM
Plat emailed to Caleb with a request to be placed on the
BPW agenda.
Info Only
4 1 Planning & Zoning
Christina Jesse
4/10/25 3:40 PM
Library Comment
Staff has been advised that we cannot present a Secondary Plat to the
Director for signature from this point forward until Ms. Terry Krueskamp
(tkrueskamp@carmel.in.gov) in Information Systems has received an e-mail
with an electronic file attached (MicroStation .dgn is preferred, or AutoCad
.dwg of the subdivision) and it (the e-mail) has been copied to myself
(cjesse@carmel.in.gov), OR please upload a .dgn or .dwg file of the proposed
plat.
Responded by: Kyle Eichhorn - 4/11/25 6:18 AM
Autocad sent.
Resolved
5 1 Planning & Zoning
Christina Jesse
4/10/25 3:40 PM
Library Comment
Please submit a revised Secondary Plat after making above-mentioned
changes. Once these changes have been made and comments addressed,
please produce a Mylar copy (with the surveyors and land owners signatures)
for signature by this Department. 1 digital copy of the plat must be provided
with the Mylar copy, prior to recording, and then 1 paper copy and 1
electronic copy of the scanned, recorded plat must be submitted following
recording of the document. Our approval of the secondary plat (signature)
will be forthcoming upon revision of the plans according to the items listed
above.
Responded by: Kyle Eichhorn - 4/11/25 6:19 AM
Revised plat uploaded. Mylars are being routed for
owner signature. Copies will be provided after
recording.
Resolved
6 1 Planning & Zoning
Christina Jesse
4/10/25 3:40 PM
Library Comment
Lastly, please submit a .pdf or .jpg file of the scanned, recorded plat.
Responded by: Kyle Eichhorn - 4/11/25 6:19 AM
Noted.
Info Only
7 1 Planning & Zoning
Christina Jesse
4/10/25 3:40 PM
Library Comment
Please note that the $436.25 filing fee is still due.
Responded by: Kyle Eichhorn - 4/11/25 6:19 AM
I have let the client know this is due.
Info Only
REVIEW COMMENTS
Created in ProjectDox version 9.4.9.4
Plan Review - Review Comments Report
Project Name: PZ-2025-00039 SP - Ambleside Lots 3801-3804 Replat
Workflow Started: 3/3/2025 11:02:11 AM
Report Generated: 04/29/2025 03:49 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
8 1 Planning & Zoning
Christina Jesse
4/10/25 3:49 PM
Changemark
Vicinity Map
Please provide an outline of Ambleside on the map with streets present.
Ambleside Replat 2 page 1.pdf Responded by: Kyle Eichhorn - 4/11/25 6:19 AM
Vicinity map revised with Ambleside streets now shown.
Resolved
9 1 Planning & Zoning
Christina Jesse
4/10/25 3:49 PM
Changemark
Docket number
Please remove docket PZ-2023-00151 SP and replace with "Docket No.
PZ-2025-00039 SP"
Ambleside Replat 2 page 1.pdf Responded by: Kyle Eichhorn - 4/11/25 6:19 AM
Docket revised.
Resolved
10 1 Planning & Zoning
Christina Jesse
4/10/25 3:53 PM
Changemark
Docket number
Please remove docket PZ-2023-00151 SP and replace with "Docket No.
PZ-2025-00039 SP"
Ambleside Replat 2 Page 2.pdf Responded by: Kyle Eichhorn - 4/11/25 6:19 AM
Docket Revised.
Resolved
Created in ProjectDox version 9.4.9.4