Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2025-00025 ADLS Amend - BuffaLouie's Smart Pergola Workflow Started: 2/3/2025 4:54:10 PM Report Generated: 04/30/2025 10:48 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Building & Code Services Mike Sheeks 2/17/25 9:22 AM Comment Please note that plans for the cooler addition will also need to be submitted to the City of Carmel and the state. Thank you! Info Only 2 1 Building & Code Services Mike Sheeks 2/17/25 9:23 AM Comment Please also note that a permit will still need to be obtained from the City of Carmel prior to construction as well as a state release. Thank you! Info Only 3 1 Fire Carmel Fire 2/19/25 7:57 AM Comment Occupant Load and requirements of Section 903.2.1.2 of the Indiana Fire Code shall be complied with. Info Only 4 1 Vectren Energy Chad Miller 2/19/25 3:20 PM Comment The existing gas meter cannot be inside the pergola when it is in closed position due to the risk of gas releasing from the regulator into an enclosed space creating a safety hazard. Responded by: Ross Atteberry - 4/15/25 2:41 PM Existing gas meter will be relocated to be outside of the pergola as shown in the renderings and noted in the site plan. The plan has been approved by Centerpoint, through Jay Boser and Jeremy Ransford and Centerpoint already has a building permit for the gas relocation. Project is being coordinated with Austin at Miller Pipeline as well. ---------------------------------------------------------- Responded by: Ross Atteberry - 3/26/25 4:56 PM Existing gas meter will be relocated to be outside the new pergola structure in coordination with Vectren Centerpoint. Resolved 5 1 Planning & Zoning Christina Jesse 2/20/25 12:07 PM Comment Please verify that no signage will be present on the pergola or located on the vinyl panels. Responded by: Ross Atteberry - 3/26/25 3:55 PM It is confirmed that no signage will be present on the pergola. Resolved 6 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Transom Window Material Please label the material used for the transom windows. Buffa Louie's Beam Layout 6 (trim and windows added).jpg Responded by: Ross Atteberry - 3/26/25 3:55 PM Drawings have been updated to show the material (aluminum and glass) used for the transom windows. Resolved REVIEW COMMENTS Created in ProjectDox version 9.4.9.4 Plan Review - Review Comments Report Project Name: PZ-2025-00025 ADLS Amend - BuffaLouie's Smart Pergola Workflow Started: 2/3/2025 4:54:10 PM Report Generated: 04/30/2025 10:48 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 7 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark East Elevation Please provide East Elevation for review. Buffa Louie's Beam Layout 6 (trim and windows added).jpg Responded by: Ross Atteberry - 3/26/25 3:55 PM East elevation has been added on new drawing. Resolved 8 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Door Material Please label the materials used for the door and the transom window above. Buffa Louie's Beam Layout 6 (trim and windows added).jpg Responded by: Ross Atteberry - 3/26/25 4:04 PM Door material (aluminum) is now specified in the drawings. Resolved 9 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Planters Please add planters to the site plan with setback distances from the west property line. Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 4/15/25 2:38 PM The business will provide planter boxes to form a wall between the patio and sidewalk as shown in the renderings and site plan. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 4/9/25 12:48 PM Benches do not provide enough of a barrier of division between the sidewalk and the pergola space. Please revise the plans to show the originally planned planters or extend the fencing to provide a true barrier. ---------------------------------------------------------- Responded by: Ross Atteberry - 3/26/25 4:06 PM The restaurant would like to repurpose their existing polywood benches for that barrier space rather than using/purchasing new planters. drawings and renderings have been updated to reflect this. Resolved Created in ProjectDox version 9.4.9.4 Plan Review - Review Comments Report Project Name: PZ-2025-00025 ADLS Amend - BuffaLouie's Smart Pergola Workflow Started: 2/3/2025 4:54:10 PM Report Generated: 04/30/2025 10:48 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 10 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Parking Locations Please identify parking spaces on the site plan and label dimensions if this portion of the site is to be utilized as parking. Please identify if this is for private or public use. Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 4/15/25 2:39 PM Cars have been removed from the rendering to avoid confusion. The area was approved without site parking and no on site parking is planned or requested for this proposal. Area to remain as-is. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 4/9/25 12:49 PM Renderings show cars parked up against the south side of the fence. If parking is to occur here, spaces need to be shown on the site plan, wheel stops added, and at least five feet of space between the wheel stops and the fence provided for pedestrian access. If no vehicles will be parked here, remove the vehicles from the renderings and confirm once again here. ---------------------------------------------------------- Responded by: Ross Atteberry - 3/26/25 4:09 PM The area was originally approved without any on site parking. No on-site parking is planned for this proposal and none is requested. Area to remain as-is. Resolved 11 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Gates Please identify the area(s) where the remaining fencing will include a gate Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 3/26/25 4:09 PM Survey has been updated to show the remaining gate in the fenced area. Resolved 12 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Fencing Inconsistency Rendering show the fencing ending at the pergola. The site plan shows the fencing continuing along the east of the pergola. Please adjust site plan or rendering to reflect the accurate design. Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 3/26/25 4:10 PM Site plan and renderings have been adjusted to consistently reflect benches being used in those areas. Resolved Created in ProjectDox version 9.4.9.4 Plan Review - Review Comments Report Project Name: PZ-2025-00025 ADLS Amend - BuffaLouie's Smart Pergola Workflow Started: 2/3/2025 4:54:10 PM Report Generated: 04/30/2025 10:48 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 13 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Transformer Location Add the location of the transformer on site and provide screening details Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 4/15/25 2:40 PM The electrical transformer will be painted white to match the wall as shown in the rendering and the site plan. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 4/9/25 12:13 PM Screening is required for this transformer unit. Please provide details on how this will be screened. ---------------------------------------------------------- Responded by: Ross Atteberry - 3/26/25 4:11 PM Transformer site has been shown on the updated survey. No additional screening is planned for that space. The area is planned to remain in as-is condition. Resolved 14 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Dumpster Enclosure Gates Have gates been installed yet? These were still missing from the site as of October. Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Reviewer Response: Christina Jesse - 4/9/25 12:13 PM Gates installed on dumpster. ---------------------------------------------------------- Responded by: Ross Atteberry - 3/26/25 4:12 PM Gates have been installed, though one gate is in the area that will be removed as part of the pergola construction, along with the fencing it is attached to. The updated plans accurately reflect this. Resolved 15 1 Planning & Zoning Christina Jesse 2/20/25 12:24 PM Changemark Doorways Identify doors and direction of opening on the site plan for the pergola and building. Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 3/26/25 4:52 PM Doors and direction of opening are shown on the site plan and drawings. Resolved 16 1 Engineering John Thomas 2/24/25 12:47 PM Changemark Existing Underground Storm Line The City has a north/south Storm Sewer line mapped in the area where the pergola is proposed. Please have line included on survey for property and any associated easements. If a drainage easement exists. Project will need to obtain a "consent to encroach" from the City. Buffa Louie's Plot Plan.pdf Responded by: Ross Atteberry - 3/26/25 3:53 PM The survey has been updated to show the storm drain pipe and the distance from the closest post to the pipe (2.7') Resolved Created in ProjectDox version 9.4.9.4 Plan Review - Review Comments Report Project Name: PZ-2025-00025 ADLS Amend - BuffaLouie's Smart Pergola Workflow Started: 2/3/2025 4:54:10 PM Report Generated: 04/30/2025 10:48 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Engineering John Thomas 2/24/25 12:50 PM Changemark Pergola Post or Foundation locations Please show the location of any posts or foundations for the Pergola. Want to see where they will be located in relation to the existing storm line under the pavement and building. Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 3/26/25 3:54 PM The survey has been updated to show the pergola columns and the distance from the closest column to the storm drain pipe (2.7') Resolved 18 1 Engineering John Thomas 2/24/25 12:57 PM Comment A map was uploaded to the Drainage Document Folder showing the approximate location of the storm sewer line. Info Only 19 1 Sign Permits Aliza Shalit 2/25/25 12:18 PM Comment A reminder that signs are not allowed on accessory structures. The exit sign is ok. Info Only 20 2 Engineering John Thomas 4/14/25 3:45 PM Changemark JT Item 1 The horizontal separation between the edge of pipe and the edge of the concrete footing may be in conflict. Is there any way to create more separation between the two? Edge of pipe is 18" off the center of pipe and edge of post footing is 13.5" from the center of post, which means the 2.7 feet shown between the centers would cause an overlap of .5 inches. Buffa Louie's Site Plan with pergola freezer and dumpster marked.jpg Responded by: Ross Atteberry - 4/21/25 11:15 AM The southern posts have been relocated to provide greater separation to the underground storm pipe. Resolved 21 3 Engineering John Thomas 4/23/25 3:18 PM Comment It appears the existing parking lot currently drains east to west. The Pergola may create a blockage and water may stage against it until it can break around the southeast corner of the pergola. This may create standing water along the east side of pergola and rear of building. Consider a drainage solution to this issue when installing the pergola if water is not intended to flow under pergola and through dining area. Info Only Created in ProjectDox version 9.4.9.4