Loading...
HomeMy WebLinkAboutSE1.0LAMPS NO TYPE SFA LSI LIGHTING SYSTEMS CT2H-FT-400-MHR-F-MT-BLK 2 400w BRACKET 208 2'-0" HIGH CONCRETE BASE. POLE: 4SQBO-S11G-20-D180-BLK-4BC MH MOUNTED SEE NOTE #1, #2, #3, #4, #5, #6 SFB LSI LIGHTING SYSTEMS CT2H-3-400-MHR-F-MT-BLK 2 400w BRACKET 208 2'-0" HIGH CONCRETE BASE. POLE: 4SQBO-S11G-20-D180-BLK-4BC MH MOUNTED SEE NOTE #1, #2, #3, #4, #5, #6 SFC LSI LIGHTING SYSTEMS CT2H-5-400-MHR-F-MT-BLK 2 400w BRACKET 208 2'-0" HIGH CONCRETE BASE. POLE: 4SQBO-S11G-20-D180-BLK-4BC MH MOUNTED SEE NOTE #1, #2, #3, #4, #5, #6 SITE LIGHTING FIXTURE SCHEDULE NOTES: 1. VERIFY COLOR SELECTION WITH THE ARCHITECT. 2. ALL POLE MOUNTED SITE LIGHTING FIXTURES SHALL HAVE A HAND HOLE WITH FUSES. 3. PROVIDE A WEATHER PROOF, GFI RECEPTACLES +18" AFF WHERE SHOWN IN THE DRAWINGS. 4. PROVIDE ELECTRONIC BALLAST WITH UNIVERSAL VOLTAGE. 5. COORDINATE AND VERIFY ALL SITE LIGHTING FIXTURES SPECIFICATIONS, MOUNTING HEIGHT AND POLE SPECIFICATIONS WITH THE ARCHITECT PRIOR TO ROUGH-IN. 6. VERIFY SITE LIGHITNG FIXTURES/POLE BASE LOCATIONS PRIOR TO ROUGH-IN. REMARKS SITE LIGHTING FIXTURE SCHEDULE TAG MANUFACTURER CATALOG NUMBER MOUNTING VOLT